Page 1: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

1

M.S. ATTIRES LIMITEDLtd

A.Rahman Plaza, Shashongaon, Fatullah, Narayanganj(23.623569N, 90.476848E)

1st March 2015

Page 2: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

2

ObservationsBuilding 2

Page 3: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

3Observations Building 2

High stress levels in some columns

Page 4: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

4 Observations Building 2

Outline calculations indicate that a number of columns are very highly stressed under their current loading condition, particularly under toilet areas. Columns in other areas are highly stressed.

1

2

3

4

Page 5: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

5Observations Building 2

High shear stress levels in flat slabs at columns

Page 6: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

6 Observations Building 2

Outline calculations indicate that the slab is highly stressed under current loading conditions at some locations, particularly under toilet areas.

Page 7: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

7

Discrepancies between drawingsand site observations

Observations Building 2

Page 8: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

8Observations Building 2

Additional grid of columns observed on site (shown with red rectangle) not shown in the drawings

Dimensions of the columns given in schedule differ from site observations (shown with red circle)

Page 9: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

9

ObservationsBuilding 1

Page 10: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

10Observations Building 1

High stress levels in some columns

Page 11: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

11 Observations Building 1

Outline calculations indicate that a number of columns are very stressed under their current loading conditions.

1

2

3

4

Page 12: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

12

Discrepancies between drawingsand site observations

Observations Building 1

Page 13: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

13Observations Building 1

Dimensions of the columns given in schedule differ from site observations (shown with red ellipse)

Columns shown in the drawings differ from those observed on site

1

2

3

4

Additional column adjacent to staircase not shown in drawings

Page 14: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

14

Apparently non-engineered roof structure

Observations Building 1

Page 15: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

15Observations Building 1

Roof structure over staircase appears non-engineered

Page 16: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

16

Priority Actions

Page 17: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

17

Problems ObservedBuilding 2ITEM 1: High stress levels in some columnsITEM 2: High shear stress levels in flat slabs at columnsITEM 3: Discrepancies between drawings and site observations

Building 1ITEM 1: High stress levels in some columnsITEM 2: Discrepancies between site observations and information on drawingsITEM 3: Apparently non-engineered roof structure

Page 18: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

18

Item No. Observation Recommended Action Plan Recommended Timeline

1Building 2

High stress levels in some columns

Quantity of rebars in columns to be confirmed by exposing locally.

Immediate - Now

2Building 2

High stress levels in some columns

Engineer to review design, loads and column stresses in all columns.

Immediate - Now

3Building 2

High stress levels in some columns

Verify insitu concrete strength by taking an minimum of 4 No. 100mm diameter cores from columns . Verify grade of steel reinforcement used.

Immediate - Now

4Building 2

High stress levels in some columns

A Detail Engineering Assessment to be commenced on Building 1, see attached Scope.

Immediate - Now

5Building 2

High stress levels in some columns

Detail Engineering Assessment to be completed on Building 2.

6-weeks

6Building 2

High stress levels in some columns

Verify insitu concrete strength by taking an minimum of 4 No. 100mm diameter cores from columns . Verify grade of steel reinforcement used.

6-weeks

7Building 2

High stress levels in some columns

Continue to implement load plan 6-months

Page 19: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

19

Item No. Observation Recommended Action Plan Recommended Timeline

8Building 2

High shear stress levels in flat slabs at columns

Engineer to review design, loads and flat slab shear stresses at all slab/column junctions.

Immediate - Now

9Building 2

High shear stress levels in flat slabs at columns

Verify insitu concrete strength by taking an minimum of 4 No. 100mm diameter cores from slabs .

Immediate - Now

10Building 2

High shear stress levels in flat slabs at columns

Verify grade and quantity of steel reinforcement used in slabs at the beam/column junctions.

Immediate - Now

11Building 2

High shear stress levels in flat slabs at columns

A Detail Engineering Assessment to be commenced on Building 1, see attached Scope.

Immediate - Now

12Building 2

High shear stress levels in flat slabs at columns

Detail Engineering Assessment to be completed on Building 2.

6-weeks

13Building 2

High shear stress levels in flat slabs at columns

Produce and actively manage a loading plan for all floor plates within the factory giving consideration to floor capacity and column capacity.

6-weeks

14Building 2

High shear stress levels in flat slabs at columns

Continue to implement load plan 6-months

Page 20: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

20

This Schedule develops a minimum level of information, Analysis and testing expected as part of a Detail Engineering Assessment.The Building(s) have been visually assessed and it is deemed necessary that a detailed engineering assessment be carried out by a competent Engineering Team employed by the factory Owner. This Request should be read in conjunction with the BUET developed Tripartite Guideline document for Assessment of Structural Integrity of Existing RMG Factory Buildings in Bangladesh (Tripartite Document), the latest version of this document should be referenced. T his document also gives guidance on required competency of Engineering Team.

We expect that the following will be carried out:1. Development of Full Engineering As-Built Drawings showing Structure, loading, elements, dimensions , levels, foundations and framing on Plan,

Section and Elevational drawings .2. The Engineering team are to carry out supporting calculations with a model based design check to assess the safety and serviceability of the building

against loading as set out in BNBC-2006, Lower rate provisions can be applied in accordance with the Tripartite Guidelines following international engineering practice, justification for these lower rate provisions must be made.

3. A geotechnical Report describing ground conditions and commenting on foundation systems used/proposed.4. A report on Engineering tests carried out to justify material strengths and reinforcement content in all key elements studied.5. Detailed load plans shall be prepared for each level showing current and potential future loading with all key equipment items shown with associated

loads.6. The Engineering team will prepare an assessment report that covers the following:

• As-Built drawings including• Plans at each level calling up and dimensioning all structural components • Cross sectional drawings showing structural beams, slabs, floor to floor heights, roof build-ups and Basic design information of the

structure• Highlight any variation between As-built compared to the designed structure• Results of testing for strength and materials• Results of geotechnical assessment and testing/investigation• Details of loading, inputs and results of computer modelling• Commentary on adequacy/inadequacy of elements of the structure• Schedule of any required retrofitting required for safety or performance of Structure

Any proposals for Retrofitting to follow guidance developed in the Tripartite Document

Detail Engineering Assessment

Page 21: M.S. ATTIRES LIMITED - bangladeshaccord.orgbangladeshaccord.org/wp-content/uploads/M.S.Attires-Ltd... · Outline calculations indicate that the slab is highly stressed under ... High

21

Item No. Observation Recommended Action Plan Recommended Timeline

15Building 2: Discrepancies

between drawings and site observations

As part of the DEA (see Item 1 and 2 above) the Factory Engineer to prepare as built structural drawings.

6-weeks

16Building 2: Discrepancies

between drawings and site observations

The Factory Engineer to prepare Loading Plan drawings which incorporate the maximum allowable loading which can be applied to each floor area inclusive of live loading due to personnel, taking into account the capacity of the slab, beams and columns.

6-weeks

17Building 2: Discrepancies

between drawings and site observations

Implement the loading plan based on the engineering study 6-months

18Building 1

High stress levels in some columns

Engineer to review design, loads and column stresses in all columns.

6-weeks

19Building 1

High stress levels in some columns

Verify insitu concrete strength by taking an minimum of 4 No. 100mm diameter cores from columns . Verify grade and quantity of steel reinforcement used.

6-weeks

20Building 1

High stress levels in some columns

Produce and actively manage a loading plan for all floor plates within the factory giving consideration to floor capacity and column capacity.

6-weeks

21Building 1

High stress levels in some columns

Continue to implement load plan 6-months

22Building 1: Discrepancies

between site observations and information on drawings

Factory Engineer to prepare a set of as built drawings to reflect the actual column locations, dimensions and reinforcement.

6-months

23Building 1: Apparently non-engineered roof structure

Building engineer to check the capacity of the roof structure above stairs and make any necessary alterations.

6-months