1.0 EXECUTIVE SUMMARY
M/s.Ramdev Chemical Industries (Unit II) is located at plot no 3440, 3443, J-3439, 3441/A,
GIDC Estate Ankleshwar, Dist- Bharuch, Gujarat. The unit is having valid CCA Amendment
order no. AWH - 73496, valid till 31/10/2016 (CCA renewal application is applied by the unit),
for the manufacturing of Organic Phthalocyanine Pigment & Inorganic Salt from Gujarat
Pollution Control Board.
Now unit wants to increase production capacity of the unit, hence unit is going to apply for the
EC on plot no:-3440, 3443, J-3439, 3441/A, J-3438, 3307/A, 3307/B. A detail of existing
product is mentioned in below Table No.1.
TABLE: 1
LIST OF EXISTING & PROPOSED PRODUCTS
Sr.
No. Products Existing
Quantity as
per CCA-
AWH 73496
(MT/Month)
Quantity as
per EC
J-
11011/993/2
008-IA II
(I)*
(MT/Month)
Additional
Quantity
(MT/
Month)
Total
Quantity
after
proposed
Expansion
(MT/Month)
1. CPC Blue Crude 45 360 655 700
2. Pigment Alpha Blue
(Blue 15.0 & 15.1)
7.5 160 97.5 105
3. Activated CPC Blue
(Only grinding process)
100 300 830 930
4. Pthalocyanine Beta
Blue (Pigment Blue
15.3 & 15.4)
300 630 330 630
5. Pthalocyanine Beta
Blue (Pigment Blue
15.3 & 15.4) (only
grinding process)
200 -- 0 200
6. Recovered Inorganic
products (Ammonium
Sulphate 100% base)
OR
Recovered Inorganic
products (Ammonium
Sulphate Solution )
60
315
305 665
3500
725
3815
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
2
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
7. Calcium Carbonate 45 -- 315 360
8. Copper salt -- -- 5.5 5.5
9. Ammonium Carbonate
Solution (100%)
OR
Ammonium Carbonate
Solution
40
270
-40
-270
0
0
Total 797.5 2858 3655.5
*This EC is converted into CTE. (CTE No:-81416)
AS PER CTE No: 81416 TABLE: 2
LIST OF PRODUCTS AS PER CTE
Sr.
No. Products Existing
Quantity as
per CCA-
AWH 73496
(MT/Month)
Quantity as
per granted
CTE:-81416
1. CPC Blue Crude 45 360
2. Pigment Alpha Blue
(Blue 15.0 & 15.1)
7.5 00
3. Activated CPC Blue
(Only grinding process)
100 930
4. Pthalocyanine Beta Blue
(Pigment Blue 15.3 &
15.4)
(Solvent base, water base)
300 00
5. Pthalocyanine Beta Blue
(Pigment Blue 15.3 &
15.4) (only grinding
process)
200 200
6. Recovered Inorganic
products (Ammonium
Sulphate 100% base)
OR
Recovered Inorganic
products (Ammonium
Sulphate Solution )
60
315
305
7. Calcium Carbonate 45 45
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
3
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
8. Ammonium Carbonate
Solution (100%)
OR
Ammonium Carbonate
Solution
40
270
0
Total 797.5 1840
*This CTE is not converted into CCA. Now to meet market demand, unit has decided to increase production capacity. List of existing
product and proposed product is mentioned in Table No:-1.
COST OF PROJECT
The expansion will be carried out at existing plot in GIDC Estate, Ankleshwar Gujarat. The total
cost of the unit after proposed expansion is Rs. 948.48 lacs.
FUEL AND ELECTRICITY CONSUMPTION
As per consent, unit is using 8000 NM3/Day of Natural Gas, 400 Lit/Day LDO, 6 TPD of coal or
10 TPD briquettes. After proposed expansion natural gas, LDO/Diesel quantity will be 10000
NM3/Day and 2000 Lit/day respectively. There will be no change in the quantity of coal and
briquettes.
The unit have electricity from DaxinGujarat Vij Company Limited (DGVCL). The existing
electricity consumption is 1900 KVAand electricity consumption due to proposed expansion will
be 2100 KVA. Total electricity requirement after proposed expansion will be 4000 KVA.
WATER CONSUMPTION
As per existing scenario, unit is using 136.39 KL/Day water from which fresh water
consumption is 90.67 KL/Day and recycled water consumption is 45.72 KL/Day. After proposed
expansion total water consumption will be 485 KL/Day from which GIDC fresh water
consumption will be 130.4 KL/Day and recycled water will be 354.6 KL/Day.
WASTEWATER GENERATION
*Existing industrial waste water discharge permission of the unit is 42 KL/Day which will be
continued after proposed expansion .Due to the proposed expansion additional effluent
generation will be 250 KL/Day from which 9 MTD sludge and 3.4 MTD MEE salt will be
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
4
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
generated. Unit will dispose it at available TSDF site. So due to the proposed expansion
additional waste water generation will be 237.6** KLD which will be reused by the unit after
treatment.
**237.6 KLD WATER BIFURCATION:-1) 96.6 KLD MEE Condensate
2) 141.0 KLD RO permeate***
***Unit is having booked permission of discharge into NCTL is 183 KLD. Unit will send this
RO (additional 141 KLD) permeate into NCTL when NCTL will start to take our additional
effluent as per booked quantity.
FLUE GAS EMISSION
Existing flue gas emission machineries are 2-Boilers, 2-Thermic fluid heater and one D.G.Set.
Unit will install 2-Thermic fluid heater and 1-D.G.Set after expansion.
PROCESS GAS EMISSION
Process gas machineries are Spin flash dryer and reactor.
HAZARDOUS WASTE MANAGEMENT
Hazardous waste generation from the unit is ETP sludge, discarded bag/liners, Used/Spent oil
and MEE salt.
2. INTRODUCTION
2.1 THE PROJECT
M/s. Ramdev Chemical Industries (Unit II) has valid CCA-AWH-73496 for manufacturing of
Organic Phthalocyanine Pigment & Inorganic Salt.
Unit falls in category 5 f-(B) hence unit requires to take prior permission from MoEF.
2.2 PROJECT PROPONENT
M/s. Ramdev Chemical Industries(Unit-II) is involving in the manufacturing of Organic
Phthalocyanine Pigment & Inorganic Salt.
The promoters have well experienced in this field. Now to meet the market demand promoters
want to increase the production capacity of the unit. The plant boasts of contemporary
infrastructure facilities with advanced machinery and automated processes. They are conscious
of environment protection measures and from the conception stage itself necessary care has been
taken.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
5
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
The unit believes in sustainable development and equally concern about environment
preservation and pollution control. The unit has already provided adequate Environment
Management System to meet desired norms of effluent discharge as per the statutory recruitment
and also propose to expand its continuous endeavor for the pollution prevention and betterment
of environment.
A vision, a mission and a will to succeed are the basic ingredients in the foundation of the
company. A team of well-qualified engineers and financial experts supports the company. Main
promoters as well as staff of the company have very good industrial as well as business
experience.
QUALITY POLICY
The company’s commitment is to manufacturing of Organic Phthalocyanine Pigment &
Inorganic Salt. The company has in house testing facility with modern testing equipments to
ascertain the quality of raw materials as well as finished products. Continued emphasis towards
process and technology up gradation is being done effectively to enrich the product quality. R &
D with initiative & innovative ideas had resulted into excellent performance in respect of quality
products.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
6
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
7
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
ENVIRONMENTAL POLICY
The unit is committed to execute all operations, products and services by environmental
protection activities to the extent possible.
As a means of achieving these, the unit pledge to company with the legal & other requirements
to their core and focus on continually improving products, systems & operations.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
8
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
TABLE: 3
CONTACT DEAILS OF PARTNERS
Sr.
No.
Name of the Partner Address Contact No.
1. Mr. Sureshkumar
Mavjibhai Bhingaradia
507/3, Aavkar Society, G.I.D.C.,
New Colony, Ankleshwar- 393
002.
02646- 252828
2. Mrs.Manju S.
Bhingaradia
507/3, Aavkar Society, G.I.D.C.,
New Colony, Ankleshwar- 393
002.
02646- 252828
3. Mrs. Viruben M.
Bhingaradia
507/3, Aavkar Society, G.I.D.C.,
New Colony, Ankleshwar- 393
002.
02646- 252828
4. Mr. Mavjibhai M.
Bhingaradia
507/3, Aavkar Society, G.I.D.C.,
New Colony, Ankleshwar- 393
002.
02646- 252828
The directors of the company have good experience in handling the production management,
financial management.
2.3 NATURE OF PROJECT
The unit is Organic Phthalocyanine Pigment & Inorganic Salt manufacturing unit. The project is
covered under the category of 5(f) in schedule of EIA Notification-2006. This project falls under
category ‘B’.
2.4 MARKET FEASIBILITY
Proposed expansion shall bring in additional quantity for export /domestic market.
3.0 PROJECT DESCRIPTION
3.1 TYPE OF PROJECT
The proposed expansion project is for manufacturing of Organic Phthalocyanine Pigment &
Inorganic Salt.
3.2 PROJECT LOCATION
The proposed project site is located at plot no:-3440, 3443, J-3439, 3441/A, J-3438, 3307/A,
3307/B. GIDC Estate, Ankleshwar-393002, Gujarat. The approximate geographical positioning
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
9
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
of the project site is at Latitude: 21°37’33.106"N, Longitude: 73002’03.25’’E. The location of the
project site can be identified from the location map shown in Figure no.1&2.
The salient features of the project site are presented in below Table-No.4.
TABLE: 4
SALIENT FEATURES OF THE PROJECT SITE
Particulars Details Distance from Site
Villages Ankleshwar 3 KM
Approx.Geographical
positioning
Latitude:
Longitude:
21°37’33.106"N
73002’03.25’’E
Nearest City Ankleshwar
Bharuch
3 KM
15 KM
Nearest Railway line/
Railway station
Ankleshwar 3 KM
Domestic Airport Vadodara 94 KM
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
10
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
FIGURE -1
LOCATION OF THE PROJECT SITE
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
11
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
Ankleshwar
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
12
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
13
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
FIGURE: 2
AERIAL VIEW OF THE 5 KM RADIAL PERIPHERY FROM THE PROJECT SITE
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
14
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
3.3 SITE SELECTION
The project proponent did not consider any other alternative site for proposed project.
3.4 NEIGHBORING INDUSTRIES
The industry is located in an area, which is already industrialized. The industries in the vicinity
of the proposed project are given in the table-5 below:
TABLE: 5
NEARBY INDUSTRIES IN THE VICINITY
Sr. No. Industries Name
1 M/s.Samrat Pharmachem Limited
2 M/s.Neel Pigments
3. M/s. Rallis India Limited
4. M/s. United Phosphorous Limited
3.5 SIZE OF PROJECT
The unit has proposed for the expansion of manufacturing of Organic Phthalocyanine Pigment &
Inorganic Salt. Environment protection and safety systems have also been considered in planning
the cost projection. The unit has proposed to modify effluent treatment plant which will be
maintained as per requirements. The break-up of the proposed project cost is given in below
Table No. 6.
As per EIA notification 2006, the proposed project falls under category 5(f)-B.
TABLE: 6
CAPITAL COST PROJECTION
Sr.
No.
Purpose
(Rs. In Lacs)
1. Land 18.92 lacs
2. Building 179.82 lacs
3. Plant and Machinery 456.5 lacs
4.
Environment Protection & Safety 293.24 lacs
Total 948.48
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
15
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
3.6 PROCESS TECHNOLOGY
Unit is involving in the manufacturing of Organic Phthalocyanine Pigment & Inorganic Salt.
These are characterized for their physicochemical properties. Process details like Process
description, chemical reactions and mass balance for each product is attached as Aannexure-6 of
FORM-I.
3.7 RAW MATERIAL
Unit is involving in the manufacturing of Organic Phthalocyanine Pigment & Inorganic Salt.
and purchasing required raw material from local/Indian market. Detail of Raw material
consumption is attached as Annexure-5 of FORM-I.
3.8 RESOURCE REQUIREMENTS
3.8.1 LAND
The total plot area of the unit is 16249 Sqmeter. Unit has allotted 1938 Sqmeter for green belt
development.
3.8.2 FUEL
For production activity, fuel requirement and Power consumption is as per below table 8 and
table 9.
TABLE: 8
FUEL CONSUMPTION
SR.
NO
FUEL QUANTITY
(As per current CCA-
AWH-73496)
QUANTITY
(As per proposed
expansion)
TOTAL
1. Natural Gas 8000 NM3/Day 2000NM3/Day 10000 NM3/Day
2. LDO/Diesel 400 Lit/Day 1600Lit/Day 2000 Lit/Day
3. Coal/Briquette Coal=6 TPD OR
Briquette=10 TPD
--- Coal=6 TPD OR
Briquette=10
TPD
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
16
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
TABLE: 9
POWER CONSUMPTION
3.8.3 WATER
3.8.3.1 WATER CONSUMPTION
Existing water and Proposed water consumption is incorporated in Table No:-10
TABLE: 10
WATER CONSUMPTION
Sr.
No
Particulars Existing Water
Consumption
KL/Day
(As per CCA-
73496 AWH )
Proposed Water Consumption
KL/Day
(As per proposed expansion)
Total
Water Consumption
KL/Day
Fresh Recycle Fresh Recycle Total Fresh Recycle Total
1. Domestic 2.5 --- 2.5 0 2.5 5 0 5
2. Gardening /
Other use
0.5 --- 1.5 0 1.5 2 0 2
INDUSTRIAL WATER CONSUMPTION
3. Process 55.87 45.72 9.53 308.88 318.41 65.4 354.6* 420
4. Boiler 12 --- 10 0 10 22 0 22
5. Cooling 16.8 --- 13.2 0 13.2 30 0 30
6. Equip. &
Floor
Washing
2 --- 2 0 2 4 0 4
7. Softener
back wash
1 --- 1 0 1 2 0 2
Total
(Industrial)
87.67 45.72 35.73 308.88 344.61 123.4 354.6 478
TOTAL
(Domestic +
Industrial
+Gardening)
136.39
(Fresh
water=90.67+
Recycle
water=45.72)
348.61
(Fresh water=39.73 + Recycled
Water=308.88)
485
(Fresh water=130.4 +
Recycled water=354.6)
SR.
NO
POWER QUANTITY
(As per current CCA-
AWH-73496)
QUANTITY
(As per proposed
expansion)
TOTAL
QUANTITY
1. Electricity 1900 KVA 2100 KVA 4000 KVA
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
17
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
• *Breakup of KL/Day : 354.6 KL/Day
• Recycle from MEE/RO : 237.6 KL/Day
• Internal Recycle (during the mfg of ammonium sulfate) : 117.0 KL/Day
3.8.4 WASTEWATER MANAGEMENT
The category-wise bifurcation of the wastewater generation is given in Table 11.
TABLE: 11
WASTE WATER GENERATION
Sr.
No.
Particulars Existing Waste Water
Generation KL/Day (As
per CCA AWH -73496)
Proposed Waste
water
Generation
KL/Day
Total Waste
Water
Generation
after expansion
KL/Day
1. Domestic 1 1 2
2. Industrial
Process & Process
washing
34 246 280
Boiler 2.5 0 2.5
Cooling 1.5 0 1.5
Equip. & Floor
Washing
2 2 4
Softener back wash 1 1 2
Total Industrial 41 249 290
TOTAL (Domestic +
Industrial)
42 250 292*
*Existing industrial waste water discharge permission of the unit is 42 KL/Day which will be
continued after proposed expansion .Due to the proposed expansion additional effluent
generation will be 250 KL/Day from which 9 MTD sludge and 3.4 MTD MEE salt will be
generated. Unit will dispose it at available TSDF site. So due to the proposed expansion
additional waste water generation will be 237.6** KLD which will be reused by the unit after
treatment.
**237.6 KLD WATER BIFURCATION:-1) 96.6 KLD MEE Condensate
2) 141.0 KLD RO permeate***
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
18
M/s. JYOTI OM CHEMICAL RESEARCH CENTRE PVT.LTD.
***Unit is having booked permission of discharge into NCTL is 183 KLD. Unit will send this
RO (additional 141 KLD) permeate into NCTL when NCTL will start to take our additional
effluent as per booked quantity.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 25
WATER BALANCE DIA-GRAM
TOTAL WATER REQUIREMENT (130.4 KL/DAY GIDC FRESH WATER+237.6 FROM RO&MEE+117 INTERANAL
RECYCLE
TOTAL PROCESS WATER (420 KLD)
(65.4 FRESH+237.6 FROM RO&MEE+
117 INTERNAL RECYCLE
WASHING
(04 KLD)
COOLING
TOWER
(30KLD)
GARDENING
(02 KLD)
BOILER
(22KLD
FRESH
Makeup)
Effluent generation
from CPC
(105 KLD)
PRIMARY TREATMENT (187 KLD)
LOSS
(19.5
KLD)
BLOW DOWN
(2.5KL/DAY) BLOW DOWN
(1.5KL/DAY)
LOSS
(28.5 KL/Day)
WASHING
(04KL/DAY)
Primary Treatment
(105 KLD)
MEE Salt
(3.4 MT/Day)
DOMESTI
C
(05 KLD)
Sludge (4 MTD)
SOFT EN
WATER
(02 KLD)
(02 KL/DAY)
(02 KL/Day)
TREATED EFFLUENT TO FETP THROGH GIDC UNDER GROUND
DRAINAGE
(42 KL/DAY)
LOSS
(3 KL/Day)
MEE
(100 KLD)
Sludge to
TSDF
(5 MTD)
MEE
permeate
(96.6 KLD)
Effluent generation
from Alpha and
Beta
(175 KLD)
2-STAGE RO
(183 KLD)
RO rejected to ETP
42 KLD
RO permeate
141 KLD
Internal
recycle*
(117 KL/DAY)
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 26
3.8.4.1 WASTEWATER CHARACTERISTICS
Existing & proposed effluent characteristic before treatment and after treatment in ETP is
covered in Annexure-7 of FORM I.
3.8.4.2 WASTEWATER TREATMENT & DISPOSAL
A detail of existing & proposed effluent treatment plant (ETP) is covered in Annexure-7 of
FORM I.
3.9 MITIGATION MEASURES & EMP
Based on overall manufacturing & operation activities, the mitigation measures have been
proposed by the company for the control of the anticipated pollution load.
3.9.1 GASEOUS EMISSIONS & CONTROL
3.9.1.1 FLUE GAS EMISSION
Existing flue gas emission and proposed flue gas emission is mentioned in Table No: 12.
TABLE: 12
FLUE GAS EMISSION
Sr.
No.
Stack Attached
To
Stack
Height
(m)
Fuel Consumption APCM
Type
of
Emission
Permissible
Limit
AS PER CCA No:-AWH-73496
1.Boiler
(IBR)(4TPH) 11 Natural gas ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
2.
Thermic Fluid
Heater
(2 Nos)
(10 Lac Kcal/Hr)
11
(for each) Natural gas ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
3. D.G.Set (For
emergency use
only)(125 KVA)
9 Diesel ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
4.
Boiler (IBR)
(6 TPH)
21 Coal/Briquette
Multi cyclone
separator,
Bag filter and
Water scrubber
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
AS PER PROPOSED EXPANSION
5.
D.G.Set (For
emergency use
only) (600 KVA)
09 Diesel ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
6. 11
for each Natural gas ---- PM 150mg/NM3
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 27
Thermic Fluid
Heater
(2 Nos)
(10 Lac Kcal/Hr)
SO2
NOx
100 PPM
50 PPM
AFTER PROPOSED EXPANSION
Sr.
No.
Stack
Attached
To
Stack
Height
(m)
Fuel
Consumption APCM
Type
of
Emission
Permissible
Limit
1. Boiler
(IBR)(4TPH) 11 Natural gas ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
2.
Thermic
Fluid Heater
(2 Nos)
(10 Lac
Kcal/Hr)
11
(for
each)
Natural gas ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
3.
D.G.Set (For
emergency
use
only)(125
KVA)
9 Diesel ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
4.
Boiler (IBR)
(6 TPH)
21 Coal/Briquette
Multi
cyclone
separator,
Bag filter
and
Water
scrubber
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
5.
D.G.Set (For
emergency
use only)
(600 KVA)
09 Diesel ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
6.
Thermic
Fluid Heater
(2 Nos)
(10 Lac
Kcal/Hr)
11
for
each
Natural gas ----
PM
SO2
NOx
150mg/NM3
100 PPM
50 PPM
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 28
3.9.1.2 PROCESS EMISSIONS
Existing process gas emission and proposed flue gas emission is mentioned in Table No: 13.
TABLE:-13
PROCESS GAS EMISSION
As per Existing CCA No.: AWH-73496
Sr.
No.
APCM attached to Stack
Height
APCM Pollutant Remarks
1 Spin Flash Dryer
(2 Nos) (2 stack)
11 for each Bag Filter for
each
PM 150 mg/NM3
2. Stack attached with
Reactors
(1 common stack)
16 Water
scrubber
NH3 175 mg/NM3
For Proposed Expansion
3 Stack attached with
Reactors
(1 common stack)
16 Water
scrubber
NH3 175 mg/NM3
4. Spin Flash Dryer
(2 Nos) (2 stack)
11 for each Bag Filter for
each
PM 150 mg/NM3
PROCESS GAS EMISSION AFTER PROPOSED
EXPANSION Sr.
No.
APCM attached to Stack
Height
APCM Pollutant Remarks
1 Spin Flash Dryer
(2 Nos) (2 stack)
11 for each Bag Filter for
each
PM 150 mg/NM3
2. Stack attached with
Reactor (1 common
stack)
16 Water
scrubber
NH3 175 mg/NM3
3 Stack attached with
Reactor (1 common
stack)
16 Water
scrubber
NH3 175 mg/NM3
4. Spin Flash Dryer 11 for each Bag Filter for PM 150 mg/NM3
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 29
(2 Nos) (2 stack) each
3.9.2 HAZARDOUS WASTE MANAGEMENT
The following types of hazardous wastes are being generated during the operational activities.
All the wastes are being stored separately in a designated storage area. The details of hazardous
waste are below given Table 14.
TABLE 14
DETAILS OF HAZARDOUS WASTE
Sr.
No.
Waste Category Quantity/
Year
(As per CCA-
AWH-73496
Existing)
Quantity/
Year
(As per
Proposed
Expansion)
Total Facility
1. ETP
Sludge
35.3 720 MT/Year 2500
MT/Year
3220
MT/Year
Collection, storage,
transportation,
disposal at TSDF-
BEIL
2. Discarded
Bags/Liners,
Discarded
Container
5.1 24,000
Nos/Year
10000
Nos/Year
34000
Nos/Year Collection, storage,
and
decontamination
3. Used/
Spent Oil
33.1 0.06 KL/Year 0.02
KL/Year
0.08
KL/Year
Collection, storage,
transportation,
disposal by selling
to register
re-refiner or
lubrication of
nut/bolt.
4. MEE Salt 35.3 1224 MT/Year -- 1224
MT/Year
Collection, storage,
transportation,
Disposal by sell or
by send to TSDF
site.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 30
3.9.3 NOISE CONTROL & ODOUR
The major noise generating installation is the D.G. Set. Unit has installed it in a closed room and
provided acoustic enclosure around it. Unit has also provided ear plugs to the operating person of
Boiler room.
Unit is following below steps to Noise control and Odour.
• Raw-material feeding is being carried out by pumps.
• All reactions are being taken in closed reactor system.
• Roof top ventilation is installed in the entire plant area.
• Regular monitoring of piping and fittings is carried out to prevent the leakages.
3.9.4 STORAGE, HANDLING AND TRANSPORT OF HAZARDOUS CHEMICALS
The storage and mode of transport of chemicals are being done as per detailed MSDS and
chemical hazards guide (NIOSH) for the hazardous chemicals.
Few chemical to be used in the proposed activities are listed as ‘Hazardous Chemicals’ as per the
Schedule-1 of the MSIHC Rules, as amended in 2000.
3.9.5 HEALTH AND SAFETY MEASURES
Few chemical to be used in the proposed activities are listed as ‘Hazardous Chemicals’ as per the
Schedule-1 of the MSIHC Rules, as amended in 2000.
Physical hazards may manifest as fires, explosions, excessive temperatures, or the release of
large volumes of gas or toxic or flammable gases or vapors. According to Schedule 2 & 3 of
MSIHC Rules,
Moreover transport activity is being done through drums, so there is a manual loading and
unloading and no unloading through pipe at the site. Hence, the risk of static charge generation
during transfer of such chemicals is not significant.
3.9.6 MAN POWER
The manpower required for the project as well as during the construction/ commissioning
activities will be employed from the local area.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 31
TABLE NO:-15
MAN POWER REQUIREMENT
Sr.
no.
Headings Existing
work force
Proposed work
force
Total after
expansion
1. Technical Managerial
level & Administrative
Manager level
07 02 09
2. Technical skilled staff 20 05 25
3. Unskilled staff 35 15 50
4. Others – security,
gardener, etc
10 05 15
Total 72 27 99
4.0 SITE ANALYSIS
4.1 CONNECTIVITY
Ankleshwar is known for Pigment and Pharmaceutical Industry. Ankleshwar is connected
by Indian National Highway 8 (Mumbai to New Delhi) and by the Western Railway Division
of Indian Railways. The railway division runs the broad gauge train services to Rajpipla. The
133-year-old Golden Bridge connects Ankleshwar to Bharuch across the Narmada on the station
front while a new bridge connects the highway, the other bridge on the highway is now ready to
use.
Ankleshwar railway station is centrally located at the intersection of NH8 & Station Road.
Ankleshwar City Bus stand is located on Station Road (i.e. located in the City, the western
section).Development projects of Ankleshwar Airport & City Bus are in last stage.
4.2 LAND USE AND LAND OWNERSHIP
The proposed project site is located at plot no:-3440, 3443, J-3439, 3441/A, J-3438, 3307/A,
3307/B.GIDC Estate, Ankleshwar and Dist: Bharuch. The total plot area of the unit is 16249 sq
meter in which 1938 sq meter is total green belt area.
4.3 EXISTING LAND USE
The proposed project site is located at plot no:-3440, 3443, J-3439, 3441/A, J-3438, 3307/A,
3307/B.GIDC Estate, Ankleshwar and Dist: Bharuch.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 32
4.4 EXISTING INFRASTRUCTURE
The plant is located in a well-developed industrial zone, which has all essential facilities such as
internal roads, arrangement for supply of water and power to industries, effluent disposal
facilities, gas etc.
The proposed project is relatively small in size and will be employing some skilled and unskilled
people. First preference will be given to local people, so there will be no change in population
pattern due to the proposed project.
4.5 SOIL CLASSIFICATION
The soil of the district can be classified as light, medium and heavy according to depth, texture
and location. There is sandy loam to loamy in texture, brownish black in color.
4.6 CLIMATE DATA
Based on the meteorological data, wind rose have been prepared for the summer season period
between the Oct-2016 to Dec-2016. The wind rose diagram prepared from same data is shown
at Figure 3, Figure 3.1.
TABLE: 16
METEOROLOGICAL DATA
Month -- Temp. (°C) Relative
Humidity (%)
Wind Speed
km/hr
October-16 Min. 23 28 0
Max. 35 94 13
Average 29 61 6.5
November-16 Min. 20 24 0
Max. 34 51 10
Average 27 37.5 5
December-16 Min. 17 23 0
Max. 32 52 11
Average 24.5 37.5 5.5
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 33
FIGURE: 3
WIND ROSE DIAGRAM FOR PERIOD OF OCTOBER-2016 TO DECEMBER-2016
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 34
FIGURE: 3.1
WIND CLASS FREQUENCY DISRTIBUTION
Observation: It observed that wind is blowing mainly towards the SW direction from NE.
Average wind speed was 2.38 m/s.
4.7 SOCIAL INFRASTRUCTURE
As of 2011 India census, Ankleshwar had a population of 140,839. Males constitute 53% of the
population and females 47%. 13% of the population is under 6 years of age.
5.0 PLANNING BRIEF
5.1 PLANNING CONCEPT:
Ankleshwar is largely an industrial area dominated by large scale industries, especially chemical
Plants. Government agencies provide many basic facilities like uninterrupted water supply,
power and road network.
5.2 POPULATION PROJECTION.
As of 2011 India census, Ankleshwar had a population of 140,839. Males constitute 53% of the
population and females 47%. 13% of the population is under 6 years of age.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 35
5.3 LAND USE PLANNING
The names of prominent industries are shown in table no: 17
TABLE: 17
NAME OF SOME PROMINENT INDUSTRIES
Sr. No. Name of industry
1 M/s.Samrat Pharmachem Limited
2 M/s.Neel Pigments
3 M/s. Rallis India Limited
4 M/s. United Phosphorous Limited
6.0 PROPOSED INFRASTRUCTURE
6.1 PROCESSING AREA
The process area is covered plant area, raw material storage area, hazardous waste storage area,
workshop and utilities.
6.2 NON PROCESSING AREA
The non process area is covered Admin Building, toilet blocks, change room and security cabin.
6.3 GREEN BELT AREA
The proposed project site is located at plot no:-3440, 3443, J-3439, 3441/A, J-3438, 3307/A,
3307/B.GIDC Estate, Ankleshwar and Dist: Bharuch. The total plot area of the unit is 16249 sq
meter in which 1938 sq meter is total green belt area.
6.4 SOCIAL INFRASTRUCTURE
The availability of basic amenities is covered as under:
• Training & Education: All the employees are being trained and educated periodically about
the hazardous nature of chemicals used in the process. Also, training for fire fighting, work
permits system, first aid, safe handling of hazardous chemicals and integrating safety, in all
activities.
• Medical facility: Pre-employment medical checkup at the time of employment. In order to
safe guard the health of the employees, all the employees undergo periodic health checkup.
• Drinking water: Unit has provided Aqua Guard/R.O at different places to provide purified
water for drinking purpose.
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 36
• Transportation: The unit is providing basic transportation facility to workers.
• Telegraph & Post: Unit has all the facilities like telephone, fax and internet for the
employees.
6.5 CONNECTIVITY
This industrial estate is well connected to Ahmadabad/Mumbai/Vadodara through the
Ankleshwar. Rail services and Road services are available in Ankleshwar.
6.6 DRINKING WATER MANAGEMENT
Average daily water consumption of unit is 5 KL/day for domestic purpose. GIDC water is a
source of domestic water.
6.7 INDUSTRIAL WASTE MANAGEMENT
The hazardous waste management and disposal is shown in table 14.
6.8 SOLID WASTE MANAGEMENT
The Solid waste management and disposal is shown in table 14.
6.9 SOURCE OF POWER
DGVCL is a main source of Power.
7.0 REHABILITATION AND RESETTLEMENT(R &R) PLAN
The proposed project is located in GIDC Estate, Ankleshwar. There will be no any human
settlement affected by proposed project. So, there is no requirement of any R & R Plan.
8.0 PROJECT SCHEDULE & COST ESTIMATES
8.1 PROJECT IMPLEMENTATION SCHEDULE
The details of project Implementation Schedule is given in below table.
TABLE: 18
PROJECT IMPLEMENTATION SCHEDULE
Project implementation schedule after getting NOC from GPCB
Sr. No. Activity Required Period
1. Civil work Immediately after getting NOC
2. Procurement of machinery 1 month after getting NOC
3. Eraction & installation of
machinery
Immediately after competition of activity no.2
4. Trial of machinery &
equipment
Within 1 months after competition of activity
no.3
5. Commercial activity 1 months after competition of activity no.4
M/s. RAMDEV CHEMICAL INDUSTRIES (UNIT-II)
M/s. JYOTI OM CHEMICAL RESEARCH CENTER PVT.LTD. 37
8.2 ESTIMATED PROJECT COST
The details of Capital cost projection are given in table no. 6.
9.0 ANALYSIS OF PROPOSAL
First preference will be given to local people for employment and Company will also try to
provide indirect employment opportunities by availing local contract services during
transportation and operational phase.
The company intents to donate 0.5 % of the profit to agencies like NGOs or social welfare