MISSISSIPPI
RIVER BRIDGE ITS IMPROVEMENTS
PERFORMANCE MEASURES
![Page 2: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/2.jpg)
Project Goals
Mississippi River Bridge Incident Management, Freight Movements and Security Project
Tiger 3 Project – Arkansas, Louisiana, Mississippi
• Improves mobility and safety
• Assists multi-model traffic (Highway and River)
• Uses ITS to accomplish these goal
• MSRITS.com
![Page 3: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/3.jpg)
Bridge Locations
![Page 4: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/4.jpg)
Project Goals
• Improve Traveler Information Services
• Improve Incident and Emergency Management
• Manage and Mitigate Congestion
• Improve Efficiency and Safety of Goods
• Provide for Locally Specific Goals/Needs
• Improve Interagency/Inter-Jurisdictional Coordination, Cooperation and Information Sharing
![Page 5: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/5.jpg)
Key Initiatives
• Advanced Transportation Management Systems
• Advanced Traveler Information Systems
• Coordinated Incident Management
• Advanced Emergency Management
• Advanced Construction and Maintenance Systems
![Page 6: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/6.jpg)
Monitoring
• CCTV Cameras
• RDS Devices
• RTRC Devices
• DMS
• RWIS
• HAR
![Page 7: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/7.jpg)
Communications
• Rural ITS Locations
• Leased Lines
• Fiber
• Cellular Networks
![Page 8: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/8.jpg)
Traffic Management
• Monitoring of ITS devices
• Sharing of information
between three States
• Sharing information between
multiple agencies
• Common ATMS system
![Page 9: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/9.jpg)
Performance Measures
Mobility
• Delay
• Speed
• Throughput
• Travel Times
Safety
• Crash Totals
• Crash Rates
• Severity
![Page 10: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/10.jpg)
Performance Measures
Delay based on Crash Reports
• Project Requirements
– Annual Vehicle Crash Rates
– Bridge Collision Crash Rates
– Response Times (Highways/River)
– Delay (per incident)
![Page 11: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/11.jpg)
Delay Calculations
• Delay based on Crash Reports
• MDOT SAMS
Crashes near/on Bridge
• Coast Guard Reports
• Assumptions
Peak Hour Flow (AADT)
Full Lane Closures
Minimum Diversions
![Page 12: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/12.jpg)
Delay Equation
Measured Delay Calculation = Avg. Delay during
Accident Event + Avg. Delay During Congestion
Clearance
FREE FLOW
TRAFFIC
CONGESTION QUEUE
AC
CID
ENT
OC
CU
RS
AC
CID
ENT
CLE
AR
ED
FREE
FLO
W
TRA
FFIC
TIME
![Page 13: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/13.jpg)
Delay Equation
Measured Delay Calculation = Avg. Delay during
Accident Event + Avg. Delay During Congestion
ClearanceNatchez Bridge
MDOT CRASH DATA
Crash # Date Description Severity Index Clearance Time (min)
1 05/17/2013 Run off Road - Right 5 64
2 06/04/2013 Head on 4 40
3 06/22/2013 Run off Road - Left 5 50
4 07/09/2013 Rear end slow or stop 4 69
5 07/20/2013 Rear end slow or stop 5 80
Total Vehicle Delay (Based on MDOT SAMS data)
Crash # Congestion (veh) *1Congestion Length (ft) (2 lanes) *2
Free Flow time (min) *3
Total Clearance Time (min)
1 1242 15520.0 11.76 75.76
2 776 9700.0 7.35 47.35
3 970 12125.0 9.19 59.19
4 1339 16732.5 12.68 81.68
5 1552 19400.0 14.70 94.70DELAY IN VEH-HRAvg Delay During Accident (min)
Avg Delay During Accident (veh-hr)
Avg Queue Delay (veh-hr)
Total Delay (veh-hr)
32.00 662.19 121.75 783.94
20.00 258.67 47.58 306.25
25.00 404.17 74.33 478.49
34.50 769.70 141.51 911.20
40.00 1034.67 190.20 1224.87
![Page 14: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/14.jpg)
Reporting Period
• Quarterly Reports
• Comparison Studies
• 5 Year Reporting Period
![Page 15: MS RIVER BRIDGE SECURITY ITS PROJECT](https://reader033.vdocuments.net/reader033/viewer/2022051213/55a3ab271a28ab7e658b477e/html5/thumbnails/15.jpg)
Reporting Goals
• See Greater Diversion
• Less Congestion
• Lower Delay on Routes
• Fewer Accidents