muhammad ibrahim (cv)
TRANSCRIPT
1
6 Abd El-aziz fahmy basha st. –El-motmyz district, 6 October City ,Giza,Egypt (0020) 1114547087
Education
2012: B.Sc. In Civil Engineering (Cairo University) with grade: GOOD
Graduation project: Project Management & Planning with grade: Excellent.
2007: Graduated from EL-Nasr Language school with grade: 99.1%
Experience
-Planning Engineer at Consolidated Contractors International Company (CCC) “March 2015 to Present” -Planning Engineer at DETAC “June 2014 to March 2015”
-Civil Engineer at EEG- SABBOUR “September 2012 to June 2014”
Projects
At Consolidated Contractors International Company (CCC)
Position: Planning Engineer
-Nile Corniche Project (NCP) ”Saint Regis Hotel-Cairo” , Budget= 2 Billion USD
-Owner :Qatari Diar, Project Manager: Turner, Main Contractor: CCC
MEP Subcontractor : Drake & Scull International
Consultant:ECG, Shaker, ACE
The Nile Corniche is a 197,000-square-meter mixed-use development along the Corniche
on the east bank of the Nile River in Cairo, Egypt. This luxury property, destined to
become the most exclusive address in the city, is organized as two towers above a
podium and below-grade service and parking. Tower 1 contains offices at its base, 102
luxury condominiums and a multi-level penthouse. The L-shaped Tower 2, with retail at
its base, contains a six-star St. Regis hotel with 283 keys and 93 serviced apartments.
The project has 37 floors above grade and four below
Responsibilities:
1- Reporting to Control Manager and Project Manager.
2- Creating the Target Baseline Schedule (Resource loaded)
4- Managing S/c`s submitted time programme and pulling them to be in line with the
master programme.
5- Preparation of the Weekly and the Monthly Reports.
6- Preparation for Time Extension Claims using TIA.
7- Preparation of Time Impact substantiated analysis for design changes, VOR, RFI.
8- Proper monitoring for the project activities (Procurement, Engineering, Construction,
Logistics, QA/QC).
9- Preparation of monthly based Cash Flow for interim payments.
10- Presenting overall master Programme to client.
11-Updating Schedule according to actual progress of works.
12- Producing mitigation plans for activities drifting from the baseline dates.
2
At DETAC (June 2014 to March 2015 )
Position: Planning Engineer
1-MIVIDA (Parcel 15 ,PK#37) ,Budget=170,000,000 EGP
Owner :EMAAR, Project Manager: Turner, Contractor: DETAC
Consultant: ABCG, Al-AMAAR
Responsibilities:
-Preparing revised schedules. -Loading schedules with the budgeted cost & resources. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Supervising site labor force and subcontractors. -Monitoring Actual Cost VS Planned Cost. -Analysis of time claims 2-MIVIDA (Parcel 2 ,PK#42) ,Budget=56,000,000 EGP
Owner :EMAAR, Project Manager: Turner, Contractor: DETAC
Consultant: EGEC
Responsibilities:
-Preparing revised schedules. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Supervising site labor force and subcontractors. -Monitoring Actual Cost VS Planned Cost. -Analysis of time claim. 3-(GOLF PORTO EL-SOKHNA ,Budget=110,000,000EGP
Owner :Amer Group, Project Manager: Hill International ,Contractor: DETAC
Consultant: SHAKER, EHAF
Responsibilities:
-Preparing revised schedules. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Attending progress meeting to follow up the status of progress -Monitoring Actual Cost VS Planned Cost.
At EEG (“September 2012” to “June 2014”) 1-Zayed Dunes Complex
Position: (Design,Site) Engineer
Owner: JV between El-rabwa Group & El-Ofok , Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 2- Site Supervision for works 2-Ashgar City Compound
Position: Design Engineer
Owner: IGI ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets
3
3-Hay El-Ashgar Compound
Position: Design Engineer
Owner: IGI ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 4-Residential Building at “Al-Mukkatam”
Position: Site Engineer
Owner: Private ,Consultant: EEG 1-Site Supervision of works and attending meetings with the owner and the contractor 5-Park Ville (6 October City)
Position: Design & QS Engineer
Owner: Link ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 2-Quantity surveying for concrete and steel for different models of buildings. 6-ITCC (RIYADH)
Position: Shopdrawing Engineer
Owner: Saudi Public Pensions Agency (PPA) ,Consultant: EEG, Contractor: Azmeel Preparing shopdrawings for different villas with all its details 7-City Walk Shopping Mall (New Cairo)
Position: Shopdrawing Engineer
Owner: Al-Mohandeson Real Estate Development Co. ,Consultant: EEG Modifying Shop-drawings for (Foundations, Columns, Beams& Slabs)
Skills
Excellent at planning programs: Primavera (P6) and Ms Project Excellent at drawing programs: AUTOCAD 2D Excellent at design programs :SAP2000,EXCEL SHEET PROGRAMS
Certificate
Professional Program in Project Management (PRMG) at AUC
PRMG 025 Introduction to Project Management International Standards
PRMG 030 Project Budgeting and Financial Control
PRMG 035 Cost Management for Engineering Projects
Languages
ARABIC: Mother tongue
ENGLISH: Excellent written & spoken
FRENCH: Good written &reading