1 6 Abd El-aziz fahmy basha st. –El-motmyz district, 6 October City ,Giza,Egypt (0020) 1114547087 [email protected] Education 2012: B.Sc. In Civil Engineering (Cairo University) with grade: GOOD Graduation project: Project Management & Planning with grade: Excellent. 2007: Graduated from EL-Nasr Language school with grade: 99.1% Experience -Planning Engineer at Consolidated Contractors International Company (CCC) “March 2015 to Present” -Planning Engineer at DETAC “June 2014 to March 2015” -Civil Engineer at EEG- SABBOUR “September 2012 to June 2014” Projects At Consolidated Contractors International Company (CCC) Position: Planning Engineer -Nile Corniche Project (NCP) Saint Regis Hotel-Cairo, Budget= 2 Billion USD -Owner :Qatari Diar, Project Manager: Turner, Main Contractor: CCC MEP Subcontractor : Drake & Scull International Consultant:ECG, Shaker, ACE The Nile Corniche is a 197,000-square-meter mixed-use development along the Corniche on the east bank of the Nile River in Cairo, Egypt. This luxury property, destined to become the most exclusive address in the city, is organized as two towers above a podium and below-grade service and parking. Tower 1 contains offices at its base, 102 luxury condominiums and a multi-level penthouse. The L-shaped Tower 2, with retail at its base, contains a six-star St. Regis hotel with 283 keys and 93 serviced apartments. The project has 37 floors above grade and four below Responsibilities: 1- Reporting to Control Manager and Project Manager. 2- Creating the Target Baseline Schedule (Resource loaded) 4- Managing S/c`s submitted time programme and pulling them to be in line with the master programme. 5- Preparation of the Weekly and the Monthly Reports. 6- Preparation for Time Extension Claims using TIA. 7- Preparation of Time Impact substantiated analysis for design changes, VOR, RFI. 8- Proper monitoring for the project activities (Procurement, Engineering, Construction, Logistics, QA/QC). 9- Preparation of monthly based Cash Flow for interim payments. 10- Presenting overall master Programme to client. 11-Updating Schedule according to actual progress of works. 12- Producing mitigation plans for activities drifting from the baseline dates.

Upload: muhammad-ibrahim

Post on 13-Aug-2015

103 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Muhammad Ibrahim (CV)

1

6 Abd El-aziz fahmy basha st. –El-motmyz district, 6 October City ,Giza,Egypt (0020) 1114547087

[email protected]

Education

2012: B.Sc. In Civil Engineering (Cairo University) with grade: GOOD

Graduation project: Project Management & Planning with grade: Excellent.

2007: Graduated from EL-Nasr Language school with grade: 99.1%

Experience

-Planning Engineer at Consolidated Contractors International Company (CCC) “March 2015 to Present” -Planning Engineer at DETAC “June 2014 to March 2015”

-Civil Engineer at EEG- SABBOUR “September 2012 to June 2014”

Projects

At Consolidated Contractors International Company (CCC)

Position: Planning Engineer

-Nile Corniche Project (NCP) ”Saint Regis Hotel-Cairo” , Budget= 2 Billion USD

-Owner :Qatari Diar, Project Manager: Turner, Main Contractor: CCC

MEP Subcontractor : Drake & Scull International

Consultant:ECG, Shaker, ACE

The Nile Corniche is a 197,000-square-meter mixed-use development along the Corniche

on the east bank of the Nile River in Cairo, Egypt. This luxury property, destined to

become the most exclusive address in the city, is organized as two towers above a

podium and below-grade service and parking. Tower 1 contains offices at its base, 102

luxury condominiums and a multi-level penthouse. The L-shaped Tower 2, with retail at

its base, contains a six-star St. Regis hotel with 283 keys and 93 serviced apartments.

The project has 37 floors above grade and four below

Responsibilities:

1- Reporting to Control Manager and Project Manager.

2- Creating the Target Baseline Schedule (Resource loaded)

4- Managing S/c`s submitted time programme and pulling them to be in line with the

master programme.

5- Preparation of the Weekly and the Monthly Reports.

6- Preparation for Time Extension Claims using TIA.

7- Preparation of Time Impact substantiated analysis for design changes, VOR, RFI.

8- Proper monitoring for the project activities (Procurement, Engineering, Construction,

Logistics, QA/QC).

9- Preparation of monthly based Cash Flow for interim payments.

10- Presenting overall master Programme to client.

11-Updating Schedule according to actual progress of works.

12- Producing mitigation plans for activities drifting from the baseline dates.

Page 2: Muhammad Ibrahim (CV)

2

At DETAC (June 2014 to March 2015 )

Position: Planning Engineer

1-MIVIDA (Parcel 15 ,PK#37) ,Budget=170,000,000 EGP

Owner :EMAAR, Project Manager: Turner, Contractor: DETAC

Consultant: ABCG, Al-AMAAR

Responsibilities:

-Preparing revised schedules. -Loading schedules with the budgeted cost & resources. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Supervising site labor force and subcontractors. -Monitoring Actual Cost VS Planned Cost. -Analysis of time claims 2-MIVIDA (Parcel 2 ,PK#42) ,Budget=56,000,000 EGP

Owner :EMAAR, Project Manager: Turner, Contractor: DETAC

Consultant: EGEC

Responsibilities:

-Preparing revised schedules. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Supervising site labor force and subcontractors. -Monitoring Actual Cost VS Planned Cost. -Analysis of time claim. 3-(GOLF PORTO EL-SOKHNA ,Budget=110,000,000EGP

Owner :Amer Group, Project Manager: Hill International ,Contractor: DETAC

Consultant: SHAKER, EHAF

Responsibilities:

-Preparing revised schedules. -Updating Schedule according to actual progress of works. -Preparing (Daily, Weekly, Bi-weekly, Monthly& Internal) Reports. -Following up Engineering submittals (Shop Drawings, Material& method statement) -Preparing reasons of delays. -Following up work progress & highlighting the delayed activities. -Attending progress meeting to follow up the status of progress -Monitoring Actual Cost VS Planned Cost.

At EEG (“September 2012” to “June 2014”) 1-Zayed Dunes Complex

Position: (Design,Site) Engineer

Owner: JV between El-rabwa Group & El-Ofok , Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 2- Site Supervision for works 2-Ashgar City Compound

Position: Design Engineer

Owner: IGI ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets

Page 3: Muhammad Ibrahim (CV)

3

3-Hay El-Ashgar Compound

Position: Design Engineer

Owner: IGI ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 4-Residential Building at “Al-Mukkatam”

Position: Site Engineer

Owner: Private ,Consultant: EEG 1-Site Supervision of works and attending meetings with the owner and the contractor 5-Park Ville (6 October City)

Position: Design & QS Engineer

Owner: Link ,Consultant: EEG 1-Design different models using SAP2000, and preparing calculation sheets 2-Quantity surveying for concrete and steel for different models of buildings. 6-ITCC (RIYADH)

Position: Shopdrawing Engineer

Owner: Saudi Public Pensions Agency (PPA) ,Consultant: EEG, Contractor: Azmeel Preparing shopdrawings for different villas with all its details 7-City Walk Shopping Mall (New Cairo)

Position: Shopdrawing Engineer

Owner: Al-Mohandeson Real Estate Development Co. ,Consultant: EEG Modifying Shop-drawings for (Foundations, Columns, Beams& Slabs)

Skills

Excellent at planning programs: Primavera (P6) and Ms Project Excellent at drawing programs: AUTOCAD 2D Excellent at design programs :SAP2000,EXCEL SHEET PROGRAMS

Certificate

Professional Program in Project Management (PRMG) at AUC

PRMG 025 Introduction to Project Management International Standards

PRMG 030 Project Budgeting and Financial Control

PRMG 035 Cost Management for Engineering Projects

Languages

ARABIC: Mother tongue

ENGLISH: Excellent written & spoken

FRENCH: Good written &reading