multi-level linear referencing system (mllrs) cost - benefit

39
MULTI-LEVEL LINEAR REFERENCING SYSTEM (MLLRS) COST/BENEFIT VALUE ANALYSIS STUDY Requested by: American Association of State Highway and Transportation Officials (AASHTO) Standing Committee on Highways Prepared by: Renee L. Hoekstra, CVS RH & Associates, Inc. Glendale, Arizona May 2011 The information contained in this report was prepared as part of NCHRP Project 20-07, Task 302, National Cooperative Highway Research Program, Transportation Research Board. SPECIAL NOTE : This report IS NOT an official publication of the National Cooperative Highway Research Program, Transportation Research Board, National Research Council, or The National Academies.

Upload: tranphuc

Post on 16-Jan-2017

342 views

Category:

Documents


3 download

TRANSCRIPT

MULTI-LEVEL LINEAR REFERENCING SYSTEM (MLLRS) COST/BENEFIT

VALUE ANALYSIS STUDY

Requested by:

American Association of State Highway and Transportation Officials (AASHTO)

Standing Committee on Highways

Prepared by:

Renee L. Hoekstra, CVS RH & Associates, Inc.

Glendale, Arizona

May 2011 The information contained in this report was prepared as part of NCHRP Project 20-07, Task 302,

National Cooperative Highway Research Program, Transportation Research Board.

SPECIAL NOTE: This report IS NOT an official publication of the National Cooperative Highway Research Program, Transportation Research Board, National Research Council, or The

National Academies.

Acknowledgements This study was requested by the American Association of State Highway and Transportation Officials (AASHTO), and conducted as part of National Cooperative Highway Research Program (NCHRP) Project 08-36. The NCHRP is supported by annual voluntary contributions from the state Departments of Transportation. Project 08-36 is intended to fund quick response studies on behalf of the AASHTO Standing Committee on Planning. The report was prepared by Renee L. Hoekstra, CVS, President of RH & Associates, Inc. The work was guided by a task group chaired by Peggi Knight (Iowa DOT) which included Jonathan J. DuChateau (Wisconsin DOT); John Farley (North Carolina DOT), Oscar E. Jarquin (California DOT); Matt Koukol (Ramsey County GIS); Paul E. Krugler (Texas A&M University); Greg Slater (Maryland SHA); Reginald Souleyrette (Iowa State University); Robert "Bob" Pollack (FHWA) and Keith Platte (AASHTO). The project was managed by Nanda Srinivasan, NCHRP Senior Program Officer. The Value Analysis Study, which provided the information for this report, required the use of the SAVE International Value Analysis 6-Step Job Plan and was administered by Renee L. Hoekstra, a Certified Value Specialist. The VA Study Team providing the information in this document included the following members; Jerome “Joe” Breyer, Works Consulting, LLC, Gilbert, Arizona, is identified as a technical expert and also represented the Arizona Department of Transportation, Multimodal Planning Division; Jun Wu, North Carolina Department of Transportation, IT-GIS Division; Michael Ney Sheffer, Maryland State Highway Administration; Thomas Martin, Minnesota Department of Transportation; Peggi Knight, Iowa Department of Transportation; Eric Abrams, Iowa Department of Transportation; Michael Clement, Iowa Department of Transportation; Karen Carroll, Iowa Department of Transportation; Ryan Wyllie, Iowa Department of Transportation; Oscar Jarquin, Caltrans IT Department; Reg Souleyrette, Iowa State University; Bruce Aquila, Intergraph; and Gary Waters, ESRI. Disclaimer The opinions and conclusions expressed or implied are those of the team that performed the research and are not necessarily those of the Transportation Research Board or its sponsors. The information contained in this document was taken directly from the submission of the author(s). This document is not a report of the Transportation Research Board or of the National Research Council.

MULTI-LEVEL LINEAR REFERENCING SYSTEM (MLLRS) COST/BENEFIT

VALUE ANALYSIS STUDY

Requested by:

American Association of State Highway and Transportation Officials (AASHTO)

Standing Committee on Highways

Authors: Renee L. Hoekstra, CVS, RH & Associates, Inc., Glendale, Arizona Jerome P. Breyer, Works Consulting LLC,

Gilbert, Arizona

TABLE OF CONTENTS Abstract ......................................................................................................... 1 Chapter 1 – Executive Summary .................................................................. 2 Chapter 2 – Introduction and Methodology ................................................. 8 Chapter 3 – Measures of MLLRS Success ................................................. 10 Chapter 4 – Defining the Use and Function of a MLLRS ......................... 17 Chapter 5 – Costs, Savings and Improvement Statistics ............................ 25 Chapter 6 – Implementation of MLLRS ..................................................... 32 Chapter 7 – Glossary of Terms ................................................................... 34 Chapter 8 - References ................................................................................ 35

ABSTRACT This report documents the outcome of the Value Analysis (VA) Study which was conducted at the Iowa Department of Transportation in Ames Iowa on April 6-8, 2011. The purpose of the VA Study was to identify the costs and benefits of implementing and maintaining a statewide Multi-Level Linear Referencing System (MLLRS). The VA Study followed the SAVE International 6-step job plan which helped to identify the various aspects of a statewide MLLRS including; System Needs, Constraints, Performance Attributes, Qualitative and Quantitative Benefits, Defined Users/Business Units, System Functions, Alignment with the 10 Functional Requirements of Report 20-27, Costs for Developing and Maintaining a Baseline MLLRS and Implementation Considerations. The findings of the study represent a 5-year breakeven point for the baseline and the optional functional elements with potential overall cost/benefit savings of $12.6 million for a state with 25,000 miles of road network.

 

Mu

Chapt

Introdu

Many tecReferencto the devespeciallystate by pinvestmeLevel Linthis reporterm “opbaseline

Definiti

Efficient dependaboperationelectroniessentiall “The NCgrowing by the trareferencirepresentnetworkslinear dat While thestudy reladifferentirepresentaddress pcross-rela NCHRP

Research

The reseaSAVE In

ulti-Level Linea

ter 1 - Ex

uction

chnical reporcing System velopment oy if there areproviding creent as well asnear Referenrt represents

ptional functiMLLRS.

ion of Mu

planning, deble and electns, and needc managemely the multi-

CHRP 20-27(awareness o

ansportation ng methods,tations. Datas, and cartogtum.”

e above defiates specificiates a MLLtations and nperhaps the mate informat

P 20-07 V

h Approach

arch for this nternational 6

ar Referencing Nation

xecutive S

rts have been(LRS) withi

of a LRS ande no data to edible quants sample cosncing Systems the minimuional elemen

lti-Level L

esign, constrtronically bas. These meent systems t-dimensional

(2) linear refof the need to

community, multiple caa integration

graphic repre

inition uses tcally to the liLRS from a Lnetwork reprmost significion from dif

alue Analy

h and Study

paper was c6-Step Job P

System Cost/Bnal Cooperativ

Summary

n completedin a state trand the commitsupport the ctitative and qsts and requim (MLLRS).um requiremnts” refers to

Linear Ref

ruction, andased methodsethods must to optimize ol LRS (MDL

ferencing syo integrate in (1). The 20

artographic rn is supporteesentations b

the “multipleinear referenLRS. This doresentations cant existingfferent data s

ysis for M

Objectives

completed duPlan. The Jo

Benefit Value Ae Highway Res

y

d about develnsportation atment requircosts or expequalitative brements for . The use of

ments for a fuo supplemen

ferencing

maintenancs of positionbe logically overall operaLRS) defined

stem data mncreasing am-27(2) data m

representatioed through trby associatin

e” adjective ncing methodoes not dimiin MLLRS –

g deterrent instores.

MLLRS

uring a 3-dayob Plan inclu

Analysis Study -search Progra

loping and inagency. Thered by an ageected benefienefits obtaiimplementin

f the word “bully functionintal elements

System (M

ce operationsning and loca

linked with ational efficd in the NCH

model was demounts of linmodel includ

ons, and multransformationg with a cen

with three sds, or LRMsinish the imp– but insteadn efficient da

y Value Anauded the follo

- NCHRP Projm, Transporta

ntegrating a e magnitude ency can be its. This repined from a ng and mainbaseline sysing MLLRSs that will im

MLLRS)

s require accating specific other organiency. The MHRP Report

veloped in rnearly referedes multipletiple networ

ons among mntral object r

separate chars, as the key portance of cd allows the ata sharing –

alysis (VA) Sowing Phase

ject 20-07, Tastion Research

Linear of costs relaoverwhelmiort will helpstate’s

ntaining a Mutem” throug

S. The use ofmprove the

curate, c facilities,

nizational MLLRS is 460 as follo

response to aenced data use linear rk

methods, eferred to as

racteristics, taspect that

cartographicstudy team t

– the inability

Study using es: Informati

sk 302, Board

 

ated ing, p the

ulti-ghout f the

ows:

a sed

s a

this

c to y to

the ion,

 

Mu

Functionperforme

A VA Stubenefits, research informaticonsensu

• Proviminim

• Provi• Ident

funct• Unde

MLL• Ident• Provi• Provi

maint

Basic A

It is neceassumptimiles of rcommon LRS is n

Why It

1) Dth

2) Imwex

3) Imm

4) Imw

5) Tre

ulti-Level Linea

n Analysis, Ced. A compl

udy approacconstraints, to be conducion in real ti

us in a very s

iding a definmum requireiding a defintifying all cotional featureerstanding alLRS tifying the cuiding the potiding implemtaining a ML

Assumptio

essary to firston. This assroad and somlinear datumot included.

is Import

Data and infohe same linemprovement

which are oftxternal requemprove anal

more consistemprove com

with other agThe ability toeadily access

ar Referencing Nation

Creativity, Evlete descripti

ch was used timpacts and

cted in a teamme. The VAshort time. T

nition for whements versunition of Mulosts associatees in the systll benefits –

urrent and potential impacmentation coLLRS

n

t identify thasumption is tme type of am”. This is i

tant to Im

ormation are ar datum, ts are made ren required tests and manysis leading ency in the d

mmunication ency partner

o improve cused and disse

System Cost/Bnal Cooperativ

valuation, anion of the pr

to bring toged the implemm approach A approach The objectiv

hat is requireus supplemenlti-Level in ted with bothtem including qu

otential usescts of not imonsiderations

at this study that “each stn existing Limportant as

plement M

more readil

related to quto meet a standates, to more dat

decision-makwithin the ars and stakehustomer servieminated in

Benefit Value Ae Highway Res

nd Developmrocess can be

ether severalmentation of

allowing forenabled the

ves included:

ed in a baselintal or suppothe context o

h a baseline M

uantitative an

s of a MLLRmplementings for both the

and the findtate implemeRS – includi

s the costs an

ML into LR

y available f

uality, timelinate’s internal

ta-driven decking processgency acrosholders by shice by allowa more time

Analysis Study -search Progra

ment; the 6th

e found in C

l state DOTsa MLLRS. r integrationteam to disc

ine MLLRS,orting functiof a LRS MLLRS and

nd qualitativ

RS a MLLRS e initial syste

dings are preenting a ML

ding multiplend efforts ide

RS

from differen

ness, and thel mission an

cision suppos within the as departmenharing inform

wing informaely manner,

- NCHRP Projm, Transporta

phase, PreseChapter 2.

s to discuss tThis also all

n of data andcuss approac

, which meanions

d any potenti

ve – with imp

em developm

edicated on aLLRS alreadye LRMs that entified to es

nt sources w

e efficiency nd/or needs a

ort which wilagency over nts and greatemation,

ation and dat

ject 20-07, Tastion Research

entation, wa

the merits, lowed this

d the sharingches and reac

ns, what are

al additive

plementing a

ment as well

a basic y has 25,000do not share

stablish an in

which referen

in many repas well as

ll also lead ttime, er involvem

ta to be more

sk 302, Board

 as not

of ch

e the

a

l as

0 e a nitial

nce

ports

o

ent

e

 

Mu

6) Ate

7) Ew

8) L

Althoughboth quanidentifiedrating an

Quanti

impacts tbenefits a

The overfollows:

Base

• $• $• $

OptioincreConn

M

• • •

ulti-Level Linea

Able to integrechnology,

Establish stanwide, and Lower the life

h many of thntitative andd by the studd ranking, w

tative Ben

to maintenanare provided

rall annual qu

line System

10,000 per F20,000 per F2,000 per FT

onal Functiase the funct

nectivity.

Manage Cha

$10,000 F$20,000 p$2,000 pe

ar Referencing Nation

rate with leg

ndards to inc

fe cycle cost

he items stated qualitative dy team. Thewithin Chapte

nefits

nce. A compd within Cha

uantitative s

m

FTE for a redFTE for a redTE for a redu

onal Elemetionality of t

ange

FTE for a redper FTE for aer FTE for a

System Cost/Bnal Cooperativ

gacy systems

crease LRS c

impacts of s

ed above repbenefits to iese benefits er 3.

The quantisaving timare definedhours assowill be an operationaunits wereand they wfor litigatio

plete definitiapter 3.

avings for th

duction in stduction in opuction in sta

nts – Thesethe baseline

duction in sta reduction ireduction in

Benefit Value Ae Highway Res

s and ultimat

consistency t

system owne

present benefimplementinare identifie

itative benefme and costs

d as a reductociated with improved st

al unit improe used for thiwere defined on, reduced ion and the s

he benefits a

taff hours perational hoff hours for

are describesystem inclu

taff hours in operationan staff hours

Analysis Study -search Progra

tely eliminat

throughout t

ership.

fits of a MLLng a MLLRSed in detail, i

fits identifiedfor the agention in staff hother departtewardship oovements. Sis study to sh

d as safety imimpacts to t

savings asso

as described

ours other depart

ed as additiouding Manag

al hours for other De

- NCHRP Projm, Transporta

te dependen

the agency a

LRS, the teaS. Other benincluding th

d for a MLLncy. Time anhours, operatments. Addof data and bample businhow improve

mprovementsthe project, aciated with e

above can b

tments

onal elementsging Change

epartments

ject 20-07, Tastion Research

cies on obso

and industry-

am also idennefits were ale definition,

LRS are relatnd cost savinational hoursditionally, thbusiness/ ness/operatioement savins, reduced riand reduced each of these

be summariz

s which wille and Model

sk 302, Board

 olete

-

ntified lso ,

ted to ngs s, and

here

onal gs sk

e

ed as

l ling

 

Mu

M• • •

Bprunthdbureth

• • •

Qualita

Qualitativhowever identified

• E• F• Q• In• D

A full de

Implem

Cost to I

The basicalready eassociateThe costshardwareintegrate

ulti-Level Linea

Model Conne$10,000 F$20,000 p$2,000 pe

Business/Operovides a difnits as a reprhe business/oetermine theusiness/opereduced impahe agency fo

Baseline -Manage CModel Co

ative Bene

ve benefits aof equal imp

d the followi

Ease of use anlexibility an

Quality of datnternal and e

Data-driven d

scription of

mentation

Implement a

c assumptionexists” withined costs is ins shown are e. Additionad agency an

ar Referencing Nation

ectivity FTE for a redper FTE for aer FTE for a

erational Unfferent level resentation ooperational ue overall savrational unitsacts to projecor the baselin

- $1,168,000Change - $1,onnectivity -

fits

are much moportance to ting qualitativ

nd accessibind integrationta external colladecision mak

each of thes

Considera

a MLLRS

n made by thn the agencycluded in Chexclusive of

ally, in orderd consultant

System Cost/Bnal Cooperativ

duction in sta reduction ireduction in

nit Improvemof savings.

of potential sunits. The anings as a pers; safety impcts, and redune and the op

0 208,000 $1,220,000

ore difficult tthe DOT. Tve benefits:

ility n

aboration king

se benefits ca

ations

his team, as ey wanting to hapter 5 andf what is alrer to develop t rate as well

Benefit Value Ae Highway Res

taff hours in operationan staff hours

ments – Eac This team isavings and nnual savingrcentage of tprovements, uced maintenptional funct

to measure, he study tea

an be found

expressed onimplement a

d includes boeady availabthe overall cl as a singula

Analysis Study -search Progra

al hours for other de

ch of the benidentified sevestablished gs calculatiothe identifiedreduced lev

nance, the estional eleme

am

in Chapter 3

n the previoua MLLRS. A

oth capital anble within thecosts, labor rar civil servi

- NCHRP Projm, Transporta

epartments

nefits identifiveral businea sample bu

on used the sd budget. U

vel of risk forstimated annnts can be su

3.

us page, is “A complete nd annual mae agency, incrates are reprice rate.

ject 20-07, Tastion Research

ied above ss/operation

udget for eacsample budg

Using the four litigation,

nual savings ummarized a

“that a LRS listing of thaintenance ccluding resented by

sk 302, Board

 

nal h of et to

ur

for as:

e costs.

an

 

Mu

The baseroad netwsome LR

There areMLLRS.required

• • •

Mainte

Maintenafor the ba

Maintenaimpact on

A breakeof a compas needed

Benefit

The studycycle cosperiod wcycle/cossavings cbut with the additiof 3%.

The over

ulti-Level Linea

eline costs arwork, includ

RM already.

e additional These addito establish

ManagingModelingLRM Dev

enance Cos

ance annual aseline syste

ance costs fon the overall

even timeframplete systemd, has been l

t Cost Ana

y team realizst savings ovas used to shst benefit savcan be very bthe adoptionional elemen

rall cost-to-

• Baseli• Optio

ar Referencing Nation

re also baseddes a spatial r

The baselin

functional eitional total cthe MLLRS

g Change - $g Connectivitvelopment -

sts

costs includem, consider

or the optionl annual bud

me that can m. The schedulet with a sel

alysis to Im

zed other bever the life ohow the estimvings, these beneficial ton of a MLLRnts. The sav

benefit (C/B

ine - $2,437,nal Function

System Cost/Bnal Cooperativ

d on 25,000 mrepresentatio

ne developme

lements thatcosts, includ

S is as follow

$31,650 ty - $793,40$40,000 eac

ding labor, haring the 25,0

nal functionadget.

be expected ule for implelected consu

mplement

nefits to havf the systemmated cost bnumbers can the DOT. T

RS, a savingsvings was cal

B) savings is

,874 nal Elements

Benefit Value Ae Highway Res

miles of centon, hardwareent cost is ap

t can be addeding labor anws:

00 ch

ardware and 00 miles of c

al elements a

is approximementation i

ultant.

and Main

ving an agenm. However, benefit. If a n be multipliThere is on-gs can be calclculated ove

s as shown:

s - $10,120,4

Analysis Study -search Progra

terline per ste, software, approximately

ed to the basnd as needed

d software, wcenterline as

are very mino

mately five (5is estimated

ntain a ML

ncy-wide MLin this instaDOT wanteied out to thegoing mainteculated for ber a 5-year pe

428

- NCHRP Projm, Transporta

tate, a good and assumesy $2 million

seline to addd, software an

will vary, butssumption, a

or and will h

5) years afteat (2) years

LLRS

LLRS. This ance, a 5-yead to underste life of the enance that w

both the baseeriod with an

ject 20-07, Tastion Research

existing prims the agency n.

d value to thend hardware

t on an averaare $251,700

have very litt

r the installaafter a contr

includes a liar breakevenand the full system, the will be requi

eline system n escalation

sk 302, Board

 mary uses

e e,

age 0.

tle

ation ract,

ife n life total ired, and rate

 

Mu

When exfunctionageneratedparticipananalyzedcondition

Critical

Critical iMLLRS consider to addresconsidera

ulti-Level Linea

xpressed as aal elements yd from empints. These a

d separately fns.

l Impleme

mplementatineed to be ctaking the n

ss each of theations can be

ar Referencing Nation

a C/B ratio, tyield an aggrrical values

aggregate C/for their own

entation C

ion considerconsidered bynext steps inte consideratie found in C

System Cost/Bnal Cooperativ

the baseline regate 21.4:1generated by

/B ratios are n costs versu

Considerat

rations as wey each DOTto developinions to ensur

Chapter 6.

Benefit Value Ae Highway Res

effort yields1 ratio of beny several of bound to be

us benefits us

tions

ell as the potT. This is a c

g a MLLRSre success o

Analysis Study -search Progra

s a C/B ratio nefits to costhe participa

e different wsing their in

tential impaccritical step f. The agencf a MLLRS.

- NCHRP Projm, Transporta

of 1.8:1 whst. These figating states a

when each padividual ope

cts to not imfor the agenccy should be. A complet

ject 20-07, Tastion Research

hile the optiogures were as workshop

articular stateerating

mplementing cy as they fully prepar

te listing of t

sk 302, Board

 onal

p e is

a

red these

Mu

 

Chapt

Problem

Efficient operationbased meoperationlinked wisystems tRecognizinitiated based fundata moddevelopinguidelinetransportpublished Some stadegrees. state of thto the AATIG for minformatilocation r Developmof resourlinear refto aid in very substhey are c Researc

The reseaconducteDepartm(IADOT)AdministadditionaprogramsTranspor

ulti-Level Linea

ter 2 – In

m Stateme

planning, dens require acethods of posns, and needith other orgto optimize ozing these obwith the objnctional requdel for multimng an improves to implemtation organid via NCHR

ates have impAn examplehe art technoASHTO Tecmarketing asion for otherreferencing

ment of a linrce commitmferencing systhe decisionstantial, but considering

ch / Value

arch for this ed using teament of Trans), North Cartration (MSHal team mems for LRS anrtation Resea

ar Referencing Nation

 

troductio

ent

esign, constrccurate, depesitioning ands. These me

ganizational overall operabjectives, NCectives of: (uirements fomodal transpved LRS dat

ment an improizations. The

RP Report 46

plemented Me is the linearology in locahnology Impssistance andr State DOTssystem.

near referencments. The mstem require

n-making proa more definmaking this

e Analysis

report was cm members fportation (A

rolina DepartHA), and Mi

mbers includend MLLRS sarch and Edu

System Cost/Bnal Cooperativ

on and M

ruction and mendable and d locating spethods must electronic mational efficiCHRP Proje1) establishi

or a multi-dimportation systa model, anoved LRS dae results of th60.

Multi-Level Lr referencingation referenplementationd a TIG leads which are c

cing system cmagnitude of es a credible ocess. Anecdnitive estimainvestment.

Study Ap

conducted ufrom state tra

ADOT), Caltrtment of Trainnesota Deped two membsystems. Facucation (CTR

Benefit Value Ae Highway Res

Methodol

maintenanceelectronicall

pecific facilitbe logically

management iency. ct 20-27 wa

ing consensumensional Lstems, (2) nd (3) develoata model inhat research

Linear Referg system devncing systemn Group (TIG

d states team currently, or

can require sf resource co

and quantitadotal information of bene.

pproach

sing a value ansportationrans (CT), Io

ansportation partment of bers from inculty at IowaRE) rounded

Analysis Study -search Progra

logy

e ly ties,

as us-

LRS

oping n

are

rencing Systveloped by I

ms. Iowa DOTG). This techwas formed

r in the near

several millimmitment foative determ

mation suggeefits is critica

analysis stun agencies inowa Departm(NCDOT), Transportati

ndustry reprea State Univd out the team

- NCHRP Projm, Transporta

tems (MLLRowa DOT thT nominatedhnology was

d to provide hfuture, deve

ion dollars afor a state to

mination of costs that the ral to inform

udy approachncluding the ment of TranMaryland Stion (MNDOesenting prodversity’s Cenm.

ject 20-07, Tastion Research

RS) to variouhat representd this technos selected byhelpful

eloping a new

and several yimplement aosts and benrate of returnstate DOTs

h and was Arizona

nsportation tate HighwaT). Three ducts and nter for

sk 302, Board

us ts ology y the

w

years a

nefits n is as

ay

Mu

  Value anstudy. Tnecessaryas the Sothe next pvarious c SAVE I

Step This and to• VA

• Def

• Per

• Def

• A l

• Def

Step The fsucceto be

Step The sPhaseother

Step A trathe futhe de

Step The daboveimple

Step It wa

ulti-Level Linea

nalysis studieo help the rey backgroun

ociety for Ampage. The sp

chapters of th

Internatio

1 - Informaphase of theo establish th

A study goals

fined the nee

rformance at

fined how a

ist of VA stu

fined the con

2 - Functionfunction anaessful, fully fstudied and

3 - Creativistudy team me. The teamr benefits as

4 - Evaluatditional evalunction analyevelopment

5 - Developdevelopmente. This incluementation i

6 – Presents not necess

ar Referencing Nation

 

es use team meader better und for this repmerican Valupecific outcohe report.

onal Value

ation Phase e process allohe followings and objecti

eds of a MLL

ttributes wer

MLLRS is u

udy assumpt

nstraints/cha

n Analysis Plysis activityfunctioning

d the importa

ity Phase members disc

m identified thwell as the c

ion Phase luation phasysis and creaphase.

pment Phaset phase incluuded identifympacts.

tation Phaseary to comp

System Cost/Bnal Cooperativ

members thaunderstand wport, a descrue Engineersomes of each

e Analysis

owed the teag study elemives

LRS

re developed

used within s

tions

allenges to im

Phase y is a recognMLLRS. Th

ance and criti

cussed the vhe benefits ocost impacts

e was not neativity phase

e uded further ying, definin

e lete the pres

Benefit Value Ae Highway Res

at have expewhat occurreription of thes) 6-Step Jobh of the step

(VA) Job

am membersments:

d and defined

state agencie

mplementing

nized VA techis ensured tical element

various elemeof a MLLRS

to implemen

eeded for thies provided a

defining andng and quant

sentation pha

Analysis Study -search Progra

erience and eed during thie SAVE Inteb Plan used dps in the job p

Plan

to discuss th

d to outline a

es

g a MLLRS

chnique to idthat the studts of a functi

ents as identS including qnt a MLLRS

is study. Thadditional in

d then refinintifying the u

ase for this s

- NCHRP Projm, Transporta

expertise in tis study and ernational (foduring this splan can be

he overall pr

a successful

dentify the fudy team undeioning system

tified in the qualitative, qS.

e elements information to

ng the objecuses, benefits

study.

ject 20-07, Tastion Research

the topic undobtain the

ormerly knostudy is listedfound in the

roblem state

MLLRS

unctions of aerstood whatm.

function anaquantitative a

dentified duo aid the team

ctives as stats, costs and

sk 302, Board

der

wn d on

e

ement

a t was

alysis and

uring m in

ed

Mu

 

Chapt

Introdu

As the stureasons ounderstanbenefits t

Needs f

1) Are

2) Imwex

3) Imm

4) Imw

5) Tre

6) Ate

7) Ew

8) L

How M

A succeswhen endperformabest appr

Perform

The follocomplain

ulti-Level Linea

ter 3 – M

uction

udy began, ior needs for nding of neeto be obtaine

for Implem

A Data and ineferences themprovement

which are oftxternal requemprove anal

more consistemprove com

with other agThe ability toeadily access

Able to integrechnology,

Establish stanwide, and Lower the life

Must a MLL

ssful MLLRSdeavoring toance attributeroach for the

mance Attrib

owing attribunts and to ga

ar Referencing Nation

 

Measures o

it was imporimplementin

ed, the defineed by implem

menting a

nformation ae same lineats are made ren required tests and manysis leading ency in the d

mmunication ency partner

o improve cused and disserate with leg

ndards to inc

fe cycle cost

LRS Perfo

S requires mo develop a ses, each withe agency.

butes

utes will garnin high-leve

System Cost/Bnal Cooperativ

of MLLR

rtant for the sng a MLLRSed performanmenting a M

MLLRS i

are more readar datum, related to quto meet a standates, to more dat

decision-makwithin the ars and stakehustomer servieminated in

gacy systems

crease LRS c

impacts of s

orm

many things. successful syh a definition

ner user acceel champions

Benefit Value Ae Highway Res

 

RS Succe

study team tS within a stance measure

MLLRS.

in Your A

dily availabl

uality, timelinate’s internal

ta-driven decking processgency acrosholders by shice by allowa more time

s and ultimat

consistency t

system owne

This is one ystem. The fn that should

eptance of Ms to maintain

Analysis Study -search Progra

ess

to have a shaate agency. es for a succe

Agency

le from diffe

ness, and thel mission an

cision suppos within the as departmenharing inform

wing informaely manner,tely eliminat

throughout t

ership.

of the imporfollowing lisd be conside

MLLRS by hn organizatio

- NCHRP Projm, Transporta

ared understSeveral elem

essful system

erent sources

e efficiency nd/or needs a

ort which wilagency over nts and greatemation,

ation and dat

te dependen

the agency a

rtant issues tst representsered when de

helping to redonal support.

ject 20-07, Tastion Research

anding of thments includm, and the

s which

in many repas well as

ll also lead ttime, er involvem

ta to be more

cies on obso

and industry-

to understan the necessa

eciding on th

duce custom.

sk 302, Board

he de an

ports

o

ent

e

olete

-

nd ary he

mer

Mu

 1) U

msh

2) R3) T

re4) D

oun

5) Qun

6) Ew

7) Imo

8) Esyexex

Expecte

When imidentifiedexpectedapplied. Assumpt While deseveral aelements 1) There

and i2) Basel

businrefleconce inclu

ulti-Level Linea

User transpamanual resouhares the sam

ResponsiveneTime Savingseconciliation

Data Governf data and prnderstanding

Quality Datanderlying lin

Ease of Mainwhen the linemproved Buf system hits

Ease of Integystems, accoxtensibility txtensible to

ed Outcom

mplementing d as Quantita

d, especially

tions for De

eveloping bossumptions . They inclu

e are two hos $150.00 peline – this or

ness/operatioct that COTSthose LRMsde the “integ

ar Referencing Nation

 

rency - Locaurces neededme linear datess – A reasos – Improvemn, analysis, dance – Elimromotes datag of data thro – To ensurenear datum ntenance – Rear datum is usiness/Opers and the numgration – Levommodating to support otother local,

mes or Ben

an MLLRS ative, Qualitif the perfor

eveloping Be

oth the quantand definitioude:

urly rates, oner hour, the sriginally repronal units usiS GIS softwas are able to gration of da

System Cost/Bnal Cooperativ

ation data w; other themtum onable amouments to rep

data entry, anminates or miabase usageough use of e accuracy, c

Reduction inupdated

rational Unimber of busivel of effort propagation

ther modes lregional and

nefits from

in the agenctative, and Ormance attrib

enefits

titative and qons of the ba

ne is a blendsecond is a cresented a siing differentare can easilreference th

ata” as the en

Benefit Value Ae Highway Res

 

will automaticmatic informa

unt of elapseporting requind usage inimizes the versus the umetadata

consistency a

n time (hours

it Use – an ininess/operatiand time re

n of linear dalike pedestriad federal age

m a MLLR

cy there are mOther. The fobutes, as iden

qualitative beaseline eleme

ded rate of cocivil service imple visualt LRMs. Thly overlay (ohe linear datund goal of a

Analysis Study -search Progra

cally populaation is autom

ed processingirements bas

duplication use of spread

and stable re

s) used to ma

ncrease in usional units uquired to intatum changean, bicycle,

encies

RS

many benefiollowing listntified above

enefits, it waent versus tw

onsultant corate of $50.0

lization of dahe definition or integrate) um. Therefobaseline sys

- NCHRP Projm, Transporta

ate with minimatically acc

g time baseded on needs

of data, ensudsheets, and p

eferential int

anage chang

se is definedusing the systegrate with e, data validarail, and bus

its to be attats the benefite, are establi

as importantwo optional

osts and civil00 per hour.ata from varultimately edata from di

ore, baselinestem.

ject 20-07, Tastion Research

imal additioncessed when

d on the requand cycles,

ures consisteprovides an

tegrity to the

ge propagatio

d as the numbstem existing

ation, and s, as well as

ined. Thesets that shoulished and

t to identify functional

l service cos ious

expanded to ifferent LRM

e objectives

sk 302, Board

nal n it

uest data

ency

e

on

ber

be

e are ld be

ts

Ms

Mu

 3) Mana

out othe M

4) ModetruckfunctRepo

5) Scoribasel

6) The ccompexpos

Quanti

1) Q co

a.

b

c.

d

ulti-Level Linea

age Change –n the linear

MLLRS. el Connectiv

ks, transit, etctional elemenort 460 to be ing of additioline and the ocomplexity oplexity, but used to the co

tative Ben

Quantitative bosts includin. A reductio

efficienciintegratinthat datum

. A reductioefficienciwithin thetear, mate

. A reductioby increasare involv

. Business/elements below: i. Safety

safetymeasu

ii. Reducto supothers

iii. Reducallow agencmanne

ar Referencing Nation

 

– this optiondatum – and

vity – multipc.) which intnt essentiallyan additionaonal optionaoptional elemof the additiousers that doomplexity to

nefits

benefits are ng: on in GIS stes for maint

ng multiple lim, and analyon in operaties in the daye organizatioerial uses, etcon in adminising efficienved in mainta/operational and not spec

y improvemey related infoures. ce the level opport the ages. ce impacts da reduction y to identifyer.

System Cost/Bnal Cooperativ

nal functionad the cascadi

ple routable nterconnect toy enables theal working fual functional ments. onal optiona not need acmaintain ea

defined by s

aff hours byaining a lineinear referen

yzing the valiional staff hoy-to-day opeon, and/or rec.) istrative hou

ncies of the baining, integunit improvecifically with

ents by increormation for

of risk due toency’s positio

during constrin change or

y impacts, i.e

Benefit Value Ae Highway Res

 

al element peing and prop

networks – ino represent re "multiple n

functionality elements is

al functional ccess to the oase of use.

saving time a

y increasing ear datum, ncing methodidity of LRSours by incr

erations by pducing over

urs provided business/opegrating and aements are ih the baselin

easing efficieboth active

o litigation bon, i.e. envir

ruction by imrders duringe. utilities, ri

Analysis Study -search Progra

ertains to syspagating of c

ncluding difrealistic travenetwork repr delivered inbased on a c

elements maoptional func

and

ds to S data. reasing roviding add

rall operation

by other deperational unitanalyzing buidentified wine. Savings

encies throuand reactive

by improvingronmental, to

mproving accg constructioight of way,

- NCHRP Projm, Transporta

stem-to-systchanges to th

ffering modeel movemenresentations"n the NCHRcumulative b

ay increase octional elem

ditional valunal costs (i.e

partments wts which use

usiness data. ith the optionin staff hour

ugh the idente safety impr

g access to tort liability,

cess to data wn. This wouetc., in a mo

ject 20-07, Tastion Research

tem edits carhe events usi

es (bicycles, nts. This opti" in NCHRPP data modebenefit of the

overall ents will not

uable servicee. fuel, wear

within the agee the MLLRS

nal functionars are describ

ification of rovement

the data needsafety, and

which woulduld allow theore timely

sk 302, Board

rried ing

ional P el. e

t be

es and

ency S or

al bed

ded

d e

Mu

 

e.

f.

2) TelotthGhpdHanin

3) TfuMsarepbuth

4) Top

Table 1 –

ReducedReducedReduced

ulti-Level Linea

iv. Reducnecess

v. Reducimprocomm

. An improautomate efficient u

In order tobudgets w

Table 1 reprelements for tther departmhat is employ

GIS branch wours. Since otential staffatum mainte

However, thend spatial innitiatives wit

Table 2 repreunctional ele

MLLRS. Theafety improveduced mainercentage ofudget shownhe possible c

Table 3 is a sperational un

– QuantitatiBenefits

d Staff Hourd Operationad Hours for

ar Referencing Nation

 

cing impactssary to reduccing impactsove planningmunication woved steward

the synchronuse of staff ho determine

were establish

esents the quthe MLLRS

ments. The nyed working

which would DOTs will t

f turnover, thenance and re typical MLnformation sethin the depa

esents the quements for the representatvements, redntenance costf the transpon below in Tcost and savi

ample reprenits.

ive Annual Bs

rs al Hours other

System Cost/Bnal Cooperativ

s to maintenace operations to overall p and design

with the publidship of datanization of b

hours. the annual shed for the i

uantitative befor reduced

numbers in thg on the syste

account for typically prohere might nrelated tasks LLRS staff wervices to theartment – ad

uantitative anhe improvemtive business

duced level ots. The numrtation depar

Table 2 is basings.)

sentation of

Benefits/SavBase

$10,000$20,000

$2,000

Benefit Value Ae Highway Res

 

ance departmnal activity coproject costs by creating ic. by providin

business data

savings for thidentified bu

enefits for thd staff hours, he table are em. As an ea $25,000 s

ovide cross-tnever be less– regardless

would be capae organizatio

dding further

nnual benefitments to busis/operationa

of risk for litimbers represe

rtment’s ovesed on a sam

f savings for

vings for Baseline

0 per FTE0 per FTE0 per FTE

Analysis Study -search Progra

ments by imposts. by improvinless impacts

ng the agencya using MLL

he business/usiness/opera

he baseline a operationalrepresented

example, Iowsavings per ytrained reduns than two stas of the lengtable of also on allowing r value that m

ts for the basiness/operatial units used igation, reduent an overalerall budget

mple budget a

Caltrans in t

seline MLLRManage Ch

$10,000 pe$20,000 pe

$2,000 pe

- NCHRP Projm, Transporta

proving acce

ng access to s and improv

y with the abLRS leading

/operational ational units

and the optiol hours and has a benefit

wa DOT has year in the rendancy to acaff dedicatedth of centerlproviding mthem to wor

may also be

seline and thional units wduring this s

uced impactsll cost savinfor that busiand used onl

their various

RS hange

Cer FTE $1er FTE $2er FTE $

ject 20-07, Tastion Research

ess to data th

data that wived

bility to g to a more

units, sampl.

onal functionhours used by

savings per 2.5 FTE’s in

eduction of sccommodated to MLLRSline mileage.

more general rk on other quantified.

he optional working withstudy includs to a projectgs based on iness unit. (Tly to represe

s business/

Model Connectivity10,000 per F20,000 per F$2,000 per F

sk 302, Board

hat is

ill

le

nal y FTE

n the staff e S . GIS

h the de t and a

The ent

y FTEFTEFTE

Mu

 Table 2 –Savings

Safety I

ReducedLitigatio

Reduced(i.e. Con

Reduced

Table 3 –Improvem

BSafety ImReducedCostsReducedReducedCostsTOTAL

Qualita Qualitativbenefits. following

1) Ecobdcu

ulti-Level Linea

– Quantitati

Benefit

Improvemen

d Level of Ron

d Impacts tonstruction)

d Maintenan

– Sample Caments/Savin

Benefitsmprovementsd Litigation

d Project Cosd Maintenance

ative Bene

ve benefits a Implementi

g qualitative

Ease of use/aompletion ofeing able to ifferent themustomers.

ar Referencing Nation

 

ive Annual B

s

nts

Risk for

o Projects

nce Costs

altrans Annungs

Bud$117

$800sts $6,400e

$1,800$9,117

fits

are difficult ting a MLLR

e benefits:

accessibility f more timelaccess more

mes of data, t

System Cost/Bnal Cooperativ

Benefits for

SampBudg

$20,00

$50,00

$300,00

$50,00

ual Benefits

dget7,000,000

0,000,0000,000,000

0,000,0007,000,000

to quantify bRS should als

– This occuly and consise informationthereby impr

Benefit Value Ae Highway Res

 

Sample Bus

ple get

B

00,000

00,000

$00,000

$00,000

s for Busines

Baseline$81

$14,400$5,120

$1,260$20,861

but are as imso provide th

urs through thstent reportsn and interreroving servi

Analysis Study -search Progra

siness/Opera

Baseline

.07%

$14,0001.8%

$900,000.08%

$240,000.07%

$14,000

ss/Operation

Mana,900

0,000 $0,000

0,000,900 $

mportant to uhe

he s by elate ice to

- NCHRP Projm, Transporta

ational Unit

Manage Change

.09%

$18,0001.8%

$900,000.08%

$240,000.10%

$50,000

nal Unit Cos

age Change$105,300

$14,400,000$5,120,000

$1,800,000$21,425,300

understand as

ject 20-07, Tastion Research

t Improveme

ModeConnecti

%

0

.1

$20%

0

1

$900%

0

.0

$240%

0

.1

$50

st

Model Connectiv

$117,

$14,400$5,120,

$1,800,$21,437

s the quantit

sk 302, Board

ents/

el ivity10%

,000.8%

,00008%

,00010%

,000

vity,000

,000,000

,000,000

tative

Mu

 2) F

inliin

3) Qfub

4) Inpb

5) Dreth

In the evdevelopequalitativMLLRS follows:

3 = High

Table 4 –Benefits Ease of UFlexibilitQuality oInternal/EData Driv

Other O

1) Ta.

b2) M

bryM

ulti-Level Linea

Flexibility/Inncluding locainear datum. nformation r

Quality of daurther data carriers to shanternal/exteolitical jurisenefit of the

Data-driven desponsive tohrough the u

aluation phaed to aid in thve benefits w– and then a

h Improveme

– Qualitative

Use/Accessibty/Integratioof Data External Colven Decision

Opportuni

The continual. It will be

MLLRS a. Easier to v

MLLRS is imreakdown ofou build it, t

MLLRS if it i

ar Referencing Nation

 

ntegration – al, state and This will a

resources. ata – Provideollection, daaring data an

ernal collabodictions, pri public. decision sup factual info

use of the ML

ase and the dhe evaluation

was then rankadding the su

ent 2 =

e Benefit Ra

bility n

llaboration n-making

ities/Bene

l advances inless expensi

actually is imvisualize dat

mplemented wf departmentthey will comis available a

System Cost/Bnal Cooperativ

The ability tfederal agenllow the coo

es for accuraata driven dend informatioration – Anvate organiz

pport – Ensuormation basLLRS.

development n of the variked based onubsequent op

= Moderate I

atings for BaB

fits

n technologyive to adopt mplemented.ta with eachwith an entetal silos inteme”. Other band they und

Benefit Value Ae Highway Res

 

to share datancies based oordination of

ate, consistenecision suppoon.

n increase in zations and i

ures that decied on all ava

phase of thiious qualitatin an improveptional funct

Improvemen

aseline and Baseline

2 3 1 1 1

y make this ait now – tho

h newer generprise architrnal to manybusiness/opederstand the

Analysis Study -search Progra

a and informon common f inter-agenc

nt and comport, and the e

n collaboratiointernal orga

isions are mailable data,

is study, objive benefits ement gainetional eleme

nt 1

Optional FuMan

a better timeough the ben

eration of GItecture and thy agencies. erational unibenefits to b

- NCHRP Projm, Transporta

mation througmethods of

cy investmen

lete data setelimination

on and coopeanizational u

made in a manby inter-rela

ective criterof the MLLR

ed for addingnts.  The ran

1 = Low Imp

unctional Elnage

3 3 3 2 3

e to adopt annefits will be

IS software. thereby facilThere is a feits will be atbe obtained

ject 20-07, Tastion Research

ghout the DOrelating to a

nts in data an

s to support of institution

eration amonunits for the

nner more ating the dat

ia were RS. Each of

g the baselinenkings are as

provement

lements Model

3 3 3 3 3

n MLLRS. delayed unt

itates the eeling that “ittracted to ththrough its

sk 302, Board

OT, a nd

nal

ng

ta

f the e s

til

if he

Mu

 ad

3) ItGth

4) Win

A samplIowa DO

“The LRSThe LRS be operaincludes as possibof the LRThe LRS completeintegratio “The LRSintegratiopracticescomparainvestmen(GIMS), DOT doeDOT’s ddisjointe

ulti-Level Linea

doption and t is now mor

Google Earthhe purpose o

With today’s nto the field

e of typical OT (IADOT

S approach implementating while otend user app

ble. Many cuRS implemen

approach alely redesign on solutions

S approach on needs ides and industrble to what onts that will and technolo

es not implemdata integratd and duplic

ar Referencing Nation

 

use. re possible toh and cloud-bof pilot proje

mobile advaoperations.

benefits to T) report:

at IADOT wtion strategyther componplication dev

urrent and futation plan wlso allows thexisting syst (e.g., enterp

defined for Ientified abovry-accepted other state Dalso benefitogy and relament the LR

tion needs. Hcative, with

System Cost/Bnal Cooperativ

o exploit extbased web seects. ances, there

be gained b

will provide by breaks the nents are notvelopment p

uture informawill also benhe DOT busitems. This is prise resourc

Iowa DOT isve. It is basedapproaches

DOTs are invt the GIS proated trainingRS, the DOTHowever, thecertain requ

Benefit Value Ae Highway Res

 

ternal resourervices) prio

is an increas

by implemen

benefits evenLRS down i

t yet implemrojects, thusation systemnefit from appiness areas tquite differe

ce planning

s a very goodd on sound ito the problvesting to imogram, Geogg to be used oT will still expe effort will uirements no

Analysis Study -search Progra

rces to help bor to making

sed opportun

nting a MLL

n while the Linto componeented. The is allowing be

ms developmepplying the Lto find benefent from oth(ERP) and d

d approach information lem. The cosmplement thegraphic Inforon other bus

xpend the momost likely ot being met

- NCHRP Projm, Transporta

build a case full capital

nity for integ

LRS is take

LRS is being ents, so somimplementatenefits to be ent projects LRS as part ofits without hher enterprisdata wareho

to meet the Dsystems devest of the LRSeir LRS. The rmation Mansiness appliconey and effcontinue as t.”

ject 20-07, Tastion Research

for MLLRScommitmen

grating MLL

en from the

implementeme of the LRStion plan realized as

that are not of their soluthaving to e system

ousing efforts

DOT data elopment S is very price includ

nagement Sycations. If thffort to meet

it does toda

sk 302, Board

(i.e. nts for

LRS

d. S can

soon part

tion.

s).”

des ystem he

the ay:

Mu

 

Chapt

Ten coreworkshopSupportinlist of the Functionmulti-dimobjects a

Functioncomprehrelates thtransform

Functiondimensiotemporal

FunctionA comprtopologictransport

Functionmodel mtemporal

Functionmodel malong a tr

FunctionLRS datathe netwo

Functiondimensiodata at th

ulti-Level Linea

ter 4 – De

functional rp. These corng each funce ten functio

nal Requiremensional LRnd events in

nal Requireensive, mult

he database rmations amon

nal Requireonal LRS datl referencing

nal Requireehensive, mcal representtation object

nal Requireust support tl resolutions.

nal Requireust support traversal in a

nal Requirea model musork event his

nal Requireonal LRS dathe object lev

ar Referencing Nation

 

efining th

requirementsre functionalctional requinal requirem

ments I: SpRS data mod

n three dimen

ments II: Tti-dimensionrepresentationg temporal

ments III: Tta model mu

g methods wi

ments IV: Multi-dimensitations at bots.

ments V: Rthe display a.

ments VI: Dthe navigatio

a transportati

ments VII: st support regstory.

ments VIIIta model muel and suppo

System Cost/Bnal Cooperativ

he Use an

s were synthl requiremenirement is a sments from s

patiotempordel must supnsions and ti

Temporal Renal LRS dataon to the real

referencing

Transformaust support trithout loss o

Multiple Caional LRS dath the same

Resolution –and analysis

Dynamics –on of objectsion network.

Historical Dgeneration o

: Accuracy ust support asort propagati

Benefit Value Ae Highway Res

nd Funct

hesized from nts form the eset of functioection 1.6 of

ral Referencpport the locaime relative

eferencing Sa model mustl world and m methods.

ation of Datransformatiof spatiotemp

artographic/ata model mlevel and va

A compreheof objects an

A comprehes in near real

Databases –of object and

and Error Pssociation ofion of those

Analysis Study -search Progra

tions of a

m the results oessence of thonal specificf NCHRP R

cing Methodation, place, to the roadw

System/Temt accommodmust provide

a Sets – A con among linporal accurac

/Spatial Topmust support marying levels

ensive, multnd events at

ensive, multl time and co

– A comprehd network sta

Propagationf error measerrors throu

- NCHRP Projm, Transporta

 

a MLLRS

of the NCHRhe MDLRS dcations. The

Report 460:

ds – A comp and position

way.

mporal Datudate a tempore the domain

comprehensinear, non-lincy, precision

pological Remultiple car of generaliz

i-dimensiont multiple sp

ti-dimensionontingent on

hensive, multates over tim

n – A comprures with sp

ugh analytica

ject 20-07, Tastion Research

S

RP 20-27(3) data model. following is

prehensive, n processes

um – A ral datum thn for

ive, multi-near, and n, and resolu

epresentatiortographic anzation of

nal LRS data atial and

nal LRS datan various crit

ti-dimensionme and maint

rehensive, mpatiotemporaal processes.

sk 302, Board

s a

for

hat

ution.

ons – nd

a teria,

nal tain

multi-al

Mu

 FunctionLRS data

Functiondimensiosupport tevents oc

MLLR

A VA Stufunctionafully funcanalysis ipresented

Also, theto regard– the listi

ThereforMLLRS required are listedverb/nouanalysis irepetitiousingular Lcolumns

Table 1 –MinimizeOptimizeModel RStore DaEnsure BIntegratManage CIdentify LReduce IIntegratTranslat

ulti-Level Linea

nal Requirea model mus

nal Requireonal LRS datthe latency occurring at a

S Functio

udy is predical requiremectioning MLin a VA Studd in Report 4

e discussion d “multiple Ling of ten fu

e, the study under the coin the baseli

d in essentialun descriptionis completedus or overlapLRS) are lisfrom left to

– Function Ae Redundance Efficiencie

Reality atum Better Decisie Data Change Locations Impacts e Systems te Positions

ar Referencing Nation

 

ments IX: Ost store and e

ments X: Tta model mu

of events (i.e particular lo

n Analysis

cated on the ents from ReLLRS under dy is not dire460.

during the SLRMs” as theunctional req

team identifonstraints of ine system ally two wordn ensures cod as a brainstpping. The oted below inright).

Analysis cy

es

ons

System Cost/Bnal Cooperativ

Object-Leveexpress objec

emporal Toust support te. the differenocation).

s

discussion oport 460 wethis VA Stuectly associa

Step 1 Informe prime diffe

quirements fr

fied all of thef our VA studnd what fun

ds, shown as omplete undetorming effooverall functn the order th

Enhance CMaintainLeverage Improve ASupport TSupport BOperationEnable ViSave MonAssociateSave Tim

Benefit Value Ae Highway Res

el Metadatact-level meta

opology/Latemporal relance in time b

of functions,re also considy. It is impated with the

mation Phaseerentiating farom Report 4

e functions tdy. The team

nctions were an active ve

erstanding oort. Note thations for a fuhat they were

Cartographyn Datum

InvestmentsAccuracy Temporality

Business/ nal Units isualization ney e Attributes

me

Analysis Study -search Progra

a – A compreadata to guid

tency – A coationships ambetween sche

, as describeidered as theportant to die list of func

e of the VA Sfactor betwee460 could no

that were reqm then identoptional fun

erb and a mef the functioat some of thully functione generated

y

s

y

- NCHRP Projm, Transporta

 

ehensive, mude general d

omprehensivmong objectseduled even

ed in Chaptere basis for imfferentiate th

ctional requir

Study constren MLLRS aot be regarde

quired for a ftified what functional elemeasurable nouons of the syhe identifiedning MLLRSby the study

Improve REnsure CoDefine RoEstablish Stabilize LSupport MModel ConEnhance LSupport DUseable A

ject 20-07, Tastion Research

ulti-dimensidata use.

ve, multi-s and events

nts and actual

r 2. The mplementinghat function rements

rained the teand singulared in its enti

fully functiofunctions arements. Functun. A simplstem. Funct

d functions arS (compared y team (down

Relationshipsonsistency outes

FrameworkLocation Multi-modesnnectivity LRS

Design API

sk 302, Board

onal

and l

g a

eam r LRS irety.

oning e tions le tion re

d to n

s

k

s

Mu

 The studyMLLRS received

Team medescriptioFunction

The MLLanchor po

linear refthe abilit

The MLLchanged.compromretired, o

ulti-Level Linea

y team used (minimum ra score of 5

embers wereons were the

ns (shown in

LRS must stooints constit

ferencing mey to add LRM

LRS must st The correct

mised when ror obliterated

ar Referencing Nation

 

a scoring prrequired) to evotes or mo

e then assignen consolida bold):

ore a linear tuting a mutu

locationto correlUltimatereplacedMLLRSbe relateamong th

The MLwith regbusinessversionstemporaending delementstime-bas

In NCHRethods. An eMs as they a

abilize locattness and theroutes (or sed.

System Cost/Bnal Cooperativ

rocess and idestablish a u

ore are listed

ned to define ated into the

datum. Thually exclusis. The MLLlate data fromely, the MLLd with contemS directly. Aed to the datuhe multiple

LLRS must agards to chans applications of NCHRP ality – therebdate-time vals of the netwsed events th

RP 20-27(3)established are determin

tion of objece accuracy ogments there

Benefit Value Ae Highway Res

dentified theuseable systed in bold in T

each of the following na

he datum is thive and totalLRS must inm systems thLRS can intemporary syst

As long as locum – disparapotential lev

lso include fnges in the trns. Evolving

20-27 elevaby enhancinlues that spe

work (hence hat are mana

) the networkframework

ned to be nec

cts and evenf spatial locaeof) are rena

Analysis Study -search Progra

e baseline fuem. The twoTable 1 abov

11 baseline arrative whic

he completelly exhaustivtegrate datahat use differegrate systetems that arecation or spaate systems cvels of the sy

functionalityransportationg business apated the needng the linear ecify the opedatum). Thi

aged in the bu

k is tied to thk provided bycessary.

nts when a tration of objeamed, renum

- NCHRP Projm, Transporta

 

unctions neco-word functve.

functions. Tch describes

e set of anchove ordered sea by providirent referenc

ems as legace designed toatial referenccan translatystem.

y to maintain network anpplications sd for MLLRSdatum with

erational statis can be trausiness appl

he linear daty MLLRS sh

ransportationects and even

mbered, reali

ject 20-07, Tastion Research

cessary for ations that

Those s the Baselin

or sections aet of linear ing a mechancing methody systems aro use the cing methodte positions

in the datumnd evolving ince earlier S to supporbeginning a

tus of the anslated to thlications.

tum through hould allow

n system is nts must notgned, extend

sk 302, Board

ne

and

nism ds. re

ds can

m

t and

he

for

t be ded,

Mu

 By virtuemultiple

Finally, tdelivers twill typicwhereas clients th

In considbaseline

Functionand modiand even

Functionable to gepositionselement.

Functiondatum to

Functionbetween

Functionguide gen

The otheVI-dynambe accomGIS funcAPIs can

Two optinot scoreestablish

ulti-Level Linea

e of multiplee modes (rail

the MLLRS the full MLLcally be utilia smaller foo

hat attach to

deration of thapplication p

nal Requireify traversal

nts have begi

nal Requireenerate a dats and distanc

nal Requiretransform b

nal Requireactive traver

nal Requireneral data us

r five functiomics, VIII-ac

mmodated byctionality if tn be structure

ional functioe into the bas

some costs/

ar Referencing Nation

 

e LRMs, the l, transit, ped

needs to havLRS maintenized to manaotprint of theor utilize the

he Functionaprogrammin

ments I: Sps (i.e. routesinning and en

ments II: Ttum which r

ces over the h

ments III: Tbusiness data

ments VII: rsal dates an

ments IX: Ose.

onal requiremccuracy and y the same apthe model ined to provide

onal elementseline functio/benefits for

System Cost/Bnal Cooperativ

MLLRS wildestrians, bik

ve a useablenance abilitieage all 10 of e API can bee MLLRS.

al Requiremeng interface s

patiotempors) and the evnding time d

Temporal Reelates the elehistory of ea

Transformaasets between

Historical Dnd event date

Object-Leve

ments (IV-merror propag

pplication prncorporates the functionali

s where idenons categorytypical addi

Benefit Value Ae Highway Res

ll naturally eke paths, and

e applicationes to the GISthe NCHRP

e exposed to

ents I througshall therefo

ral Referencvents that occdurations.

eferencing Sectronic linkach and each

ation of Datn disparate b

Databases –es to display

el Metadata

multiple cartogation, X-temrogramminghe framewority to specifi

ntified from y. The purpoitions above

Analysis Study -search Progra

enhance LRd airports in

n programmS/LRS updatP 20-27(3) fuo the busines

gh X of Repoore address:

cing Methodcur along tra

System/Temk-node topolh transport lin

a Sets – mubusiness syst

– must utilizenetwork sta

a – must acce

ographic repmporal topo

g interface (Ark provisionic uses.

the remaininose of analythe baseline

- NCHRP Projm, Transporta

 

RS as it proviaddition to

ming interfate team. Thiunctional reqss/operationa

ort 460 show

ds – must beaversals – an

mporal Datulogy to the renk, with tim

st be able totems.

e the time coates and even

ess object le

presentationsology/latencyAPI), or evenns of NCHRP

ng set of funyzing these fue functions.

ject 20-07, Tastion Research

ides supporroads).

ace (API) whis full interfaquirements al units or w

wn above, th

e able to creand these rout

um – must beeal world

me being an

o utilize the

omponent nts over histo

evel metadata

s, V-resolutiy) can ultiman by the baseP 20-27 (3).

nctions that dunctions was

sk 302, Board

rt for

hich ace

eb

he

ate tes

e

ory.

a to

on, ately e

did s to

Mu

 The optio

1) Lthth

2) Manin

3) Mp

Use of M

There areinformaticommunmethod tMLLRS encompaagency.

Table 2 –BusinessLRS Ma

Asset M

Sign/Sig Mainten Pavemen Structure Inter-age

Safety M HighwaySystem (

ulti-Level Linea

onal function

LRM Develohan is part ofhat was not a

Manage Chand the synchntegrate into

Model Connossibilities a

MLLRS

e many diffeion from theication, reduo method trais being use

assing list. H

– Business/Os/Operationa

aintenance

anagement

gnal Inventory

ance Manage

nt Manageme

es/Bridge Ma

ency Planning

Management S

y Performanc(HPMS)

ar Referencing Nation

 

nal elements

opment is def the baselinas highly conange is definhronization o the MLLRSectivity is d

and other con

erent uses fore available dauced liabilityanslation thrd in many ag

However, it p

Operational al Unit

y

ement

ent System

anagement Sy

g and Data Sh

System

e Monitoring

System Cost/Bnal Cooperativ

s include:

efined as thee plan – extensidered durned as data frof business dS. defined as ennnectivity is

r a MLLRSata to facilita

y and reducerough a commgencies throrovides info

Unit and UsUse CreameasCollefashiCapt

ProvmainCollepave

ystem Collebridg

haring Collebetwthe sCollerelat

g Collethe H

Benefit Value Ae Highway Res

e opportunityending the Mring the baserom one busdata, cascadi

nabling a roussues like un

which will iate better ded duplicatiomon linear dughout the U

ormation in s

Use or Benefior Benefit

ation, maintensures ection, creatioion ture, managem

vide resource ntenance activection, creatio

ement conditioection, creatioge, overpass aection, planni

ween local govstate DOT ection, managed informatioection and ma

HPMS regulat

Analysis Study -search Progra

y to integrateMLLRS to a eline developsiness systeming the chang

utable networnconnected g

improve an iecision-makin of efforts.

datum. The United Statesupport of ad

fit within the

nance of the L

on, maintenan

ment, analysi

allocation, wvities and repon, reporting,on data on, reporting,and other struing and sharinvernments, re

gement and aon aintenance oftory reports

- NCHRP Projm, Transporta

 

e perhaps evmore obscu

pment. m to another ges to the ne

rk that is awgrade separat

integrated leing, improve A MLLRSfollowing iss. This is no

dopting a ML

e Unit

LRS geometry

nce of asset d

s of sign and

work schedulinorting of wor, maintenance

, maintenanceucture informang of transpo

egional planni

analysis of acc

f HPMS data

ject 20-07, Tastion Research

ven more dature LRM typ

business sysetwork to

ware of turnintions.

evel of ed highlights

s a list of howot an all-LLRS within

y, routes,

data in a digita

signal assets

ng for rk performede and analysis

e and analysisation rtation projecing agencies a

cident and saf

and provision

sk 302, Board

ta e

stem

ng

w a

n an

al

s of

s of

cts and

fety

n of

Mu

 BusinessExecutiv

511

Traffic M

EnvironmComplia RoadwayProgramEquipmeMaterialRoadwayFinance ReportinEvaluatiLegislatiIntersect

Legal

Outdoor

Examp

Iowa De

The statereports toover the pGIS/LRS

ulti-Level Linea

s/Operationave Dashboard

Management C

mental Impacance

y Photo Log m Managemenent Manageml Managemeny Inventory Department

ng on Routing/Pive tions

Advertising

le Usages

partment o

e of Iowa useo the Federalpast 18 mon

S based datab

ar Referencing Nation

 

al Unit d

Center

ct Review/NE

nt ment

t

Planning

f Transport

es MLLRS tl Highway A

nths to changbase with a m

System Cost/Bnal Cooperativ

Use Easilvisuadata and rColletravecondoptioTraffsituaSigncontr

EPA PerfodeterwetlaLandRepoGPSGPSSuppSuppSuppUsedProvUsefpoinProvissueTrac

tation – HPM

o submit HigAdministratioge to the newmore normal

Benefit Value Ae Highway Res

or Benefit ly accessed analization of Kto support dereports for prection and maelers; potentiaditions, constrons, etc. ffic or transpoational awarennal control, trarol, dispatch, orm environmrmine NEPA ands, endanged based photoort and track o-AVL, tracki tracking of m

ports HPMS rports reportinports all otherd to coordinatvides reports aful for traffic ts

vides multi-leves/cases cking location

MS 2010+

ghway Perfoon (FHWA)

w HPMS 201lized structu

Analysis Study -search Progra

nd easily usedKey Performanecision makinresentation puaintenance ofally includes wruction, conge

ortation operatness and contaffic flow conetc.

mental impactcompliance. ered species,

ographs of theon funding thing equipmenmaterial locatreporting, but

ng duties for sr types of requte statewide eand data to mand planning

vel, accessibl

ns for signage

ormance Mo. All states

10+ submittaure rather tha

- NCHRP Projm, Transporta

 

d presentationnce Indicator

ng. Uses charurposes f data to commweather-relatestion, alterna

tions center thtrol of transpontrol, variable

t studies for p Looking at farchaeologic

e system hat has been pnt locations tions/storage lt also tracks otate and federuired or requeevacuation mo

meet requests g to store turni

le data to supp

e and billboard

onitoring Syswere faced wal format whan the old se

ject 20-07, Tastion Research

n and rs and associarts, graphs, m

municate to ted road ative travel

hat provides ortation device message sig

project work tfactors such acal sites, etc.

provided

locations other data ral agencies ested reportinodels

ing movemen

port tort liabi

ds

stem (HPMSwith a challehich is a gmented sys

sk 302, Board

ated maps

ces. n

to as

ng

nt

ility

S) enge

stem.

Mu

 The HPMall busine

Iowa neeall to mildo transfeverythin Local datprobablyby refereBeing abpast IADto combiprocess tbetter rat

Arizona

The Arizdisparatedone for accomplieven in th

For examone that mLRMs fodata stew

All businenabled. that have“LRS Gepending f

For this pthan the lGeocodedifferent organizat

ulti-Level Linea

MS 2010+ daess data even

eded to be able point LRMformations, ing to mile po

ta authoritiey use more ofence post offble to combinDOT could sp

ne pavemeno eliminate tther than wo

Departmen

zona Departmely referencecrash data aishes MLLRhe same bus

mple, a trafficmakes the m

or each end oward’s need a

ness tables u This allows

e been validaeocoding”. Ofuture realig

purpose, the last build da is advised (business dat

tion to be qu

ar Referencing Nation

 

ata model usn on local ro

ble to locate M with consit is easy to coint for HPM

s usually wif an intersecfset, GPS locne data frompend weeks o

nt data with ithe user persrrying about

nt of Transp

ment of Traned data to a canalysis and tRS by allowin

iness table.

c crash, HPMmost sense toof the same eand understa

sing the MLs the entire eated against tOnce an evengnments.

last validatiate of the rou(resulting in tasets. Geo

uickly valida

System Cost/Bnal Cooperativ

ses a mile pooads.

all data usedistent routes.collect the daMS submittal

ll not use mition offset o

cation and mm different sy

or months trnventory datspective andt its location

portation – C

nsportation (Acommon linethen to meetng data stew

MS event or o the data proevent makinganding.

LLRS adopt aenterprise to the linear dant is LRS-ge

ion date is stute that it is man update to

oprocessing rated – in who

Benefit Value Ae Highway Res

oint type line

d for HPMS . If there is ata in the datl.

ile points or or GPS locatimile point. ystems on therying to matcta, as an exa

d the users/ann.

Crashes, th

ADOT) has ear datum fort HPMS requ

wards to utiliz

other event ovider. Lineg the descrip

a compliant use any acc

atum. In Arieocoded, its

tored on eachmeasured upo the last valroutines enabole, or as ind

Analysis Study -search Progra

ear referencin

on their roaa good LRSta’s native lo

reference poion with a ro

e fly is the kch mile poinample. An Lnalyst can fo

en HPMS

been using Mr business puuirements. Aze any of the

can use anyear events caption of each

schema in oessible businizona, this varoute and m

h event recopon. Otherwlidation date ble businessdividual rout

- NCHRP Projm, Transporta

 

ng method (

ad network a System withocation meth

osts to locateoute. State d

key in savingnts to referenLRS system aocus on maki

MLLRS to purposes. IniArizona’s Me multiple su

y LRM of chan even utilih event custo

order to beconess table haalidation pro

measure are r

rd and is expwise a precau

value) befors tables acrostes are built/

ject 20-07, Tastion Research

(LRM) to loc

and convert th the abilityhod and conv

e data. Theydata is collec

g time. In thnce post locaallows this ing the data

process itially this w

MLLRS upported LR

oice – usualize different omizable to t

ome MLLRSaving recordocess is calleelatively sta

pected to be utionary LRSre overlayinss the /rebuilt.

sk 302, Board

cate

them y to vert

y will cted

he ations

itself

was

RMs -

ly

the

S-ds ed able –

later S ng

Mu

 The availcapabilityThe MLLvalidate –validity oto make t

ulti-Level Linea

lability of upy to quickly LRS increase– positional of the other athe overall d

ar Referencing Nation

 

p-to-date LRassemble re

es efficiencyaspects of anaspects of thdatasets more

System Cost/Bnal Cooperativ

RS-geocodedeports from dy by minimizn event. The

he event (i.e. e reliable an

Benefit Value Ae Highway Res

d business tabdifferent datazing the effoe saved timethe actual sh

nd accurate fo

Analysis Study -search Progra

ables provideasets into su

ort necessarye-effort can bhoulder wid

for better dec

- NCHRP Projm, Transporta

 

es analysts wubmittals likey to keep tracbe used to im

dth, year of ccision-makin

ject 20-07, Tastion Research

with the e the HPMSck of – and mprove the construction,ng support.

sk 302, Board

.

, etc.)

Mu

Chapt

It is impodiscussedMLLRS Along wiimplemenimprovemimplemen4. The cbenefit/celements

There areimplicati

• Tinwsoin

• Fsecoau

• Tagm

• E

ex

• 2avimstcem

ulti-Level Linea

ter 5 – Co

ortant to undd in Chapter to help in thith the actuanting the MLments and cont the baseliosts for mainost savings a and mainten

e several assions.

The costs shoncluding har

would be reduoftware expenitiative.

or labor rateervice rates, overed by agutonomous,

The MLLRS gency staff d

management

Either nothingxpertise and

5,000 miles verage state mplement Mtate highwayenterline mil

maintenance

ar Referencing Nation

 

osts, Savi

derstand the b3, when imp

he decision-mal costs assocLLRS, thereost savings thine system anntenance areand improvenance of the

sumptions th

own are exclurdware. For uced if existenses might

es, both costsof $150.00 p

gency staff aa $50.00 rat

will be implduring impleby the consu

g exists or thd learning co

of centerlinehas over thr

MLLRS for ony agency. Aleage to helplabor costs f

System Cost/Bnal Cooperativ

ings and

benefits, as plementing amaking proceciated with e are also hat can be rend the two oe also providements are ale system.

hat have been

usive of whaexample, da

ting LRMs aalready be e

s and savingper hour wa

after implemte for civil se

lemented froementation isultant during

he current systs to make i

e per state wree times thisnly the fracts costs are dp determine for Applicati

Benefit Value Ae Highway Res

Improve

a ess.

ealized. Theoptional funcded. The costlso provided

n made to he

at is already ata migrationare already inencumbered

gs, an integras used. How

mentation haservice was u

om scratch bs gauged at tg implement

ystem will noit work is to

was used as ths mileage in tion of the pudetermined fothe total cosion Managem

Analysis Study -search Progra

ement St

e following ictional elemet savings, in

d for the base

elp understan

available wn costs (i.e. dn place. Fixby the enter

ated rate of bwever, wheres succeeded used.

by specialiststhe equivaleation.

ot integrate,o high.

he baseline fn total, some ublic networ

for the agencst. As an exament are pre

- NCHRP Projm, Transporta

 

atistics

information ents, as desc

ncluding someline, option

nd both the c

within the statdevelopmented hardware

rprise prior to

both consultae annual maiand the agen

s, the contribent cost of pr

or the existi

for costs. Thstate DOTs

rk that is macy, judiciousample, the anesented in Ta

ject 20-07, Tastion Research

lists the coscribed in Cha

me life cycle nal functiona

cost and savi

te agency, t of LRMs) e and COTS o a MLLRS

ant and civilintenance is ncy is

bution of theroject

ing manpow

hough the may choose

aintained by tly factor thennual able 3 below

sk 302, Board

 

ts to apter

al

ing

l

e

wer

e to the

e

w is

Mu

$bisgrT

• Tce

• Aac

• Abyunro

• Tdsc

• S

Table 1 -Cost CatHardwarCore SysAnnual M

Total Ba

Table 2 –La

ApplicatiData DevTraining System IProject MAnalysis LRM DeTOTAL

ulti-Level Linea

75,000, but etween the Ds dependent urowth/chang

Transportatio

There alreadyenterline).

All importantccess local r

A spatial repry GPS roadwnder the annoads in a 25,

The existing boes have somchema whichome staging

- Baseline Sytegories e

stem SoftwarMaintenance

aseline Syste

– Baseline Dabor Cost Cion Managemvelopment &

ntegration Management

& Coordinaevelopment

ar Referencing Nation

 

are likely noDOT and theupon the ove

ge in the areaon, they are m

y exists a goo

t open-to-pubroad informaresentation iway traces tonual mainten,000 mile of business sysme type of sph can be leve

g work will b

System Costs

re (COTS) e of COTS

em

DevelopmentCategory ment

& Input

, Business ation

System Cost/Bnal Cooperativ

ot factored toe applicationerall centerlias covered bmaintaining

od primary r

blic roads aration throughs available so confirm th

nance cost prf road state. stem targetedpatial descrieraged). be required w

t Costs ParamState 25k miState 5 businState

3 LRM

Benefit Value Ae Highway Res

o total milean provider. Hine mileage

by the MLLR100,000 mil

road network

re included ah agreementssuch as recene above two

rovides an an

d for integratiptive compo

within a busi

meter Cons$2

iles $1$

ness $2$5

Ms $$1,3

Analysis Study -search Progra

age – dependHowever, linand is also i

RS. For the les of roadw

k (+/– 3 met

and the states, digitizationt aerial imao issues. Thennual figure

tion is usingonent already

iness system

sultant S242,400

76,400$26,400288,000517,200

$93,600344,000

- NCHRP Projm, Transporta

 

ding upon thenear datum minfluenced byIowa Depart

way at a cost

ter accuracy

e agency is abon, or purchaagery perhape “Purchase for confirm

g some LRMy incumbent

m for integrat

Staff Costs $77,48$56,38

$8,439$92,057

$165,319

$29,919$429,600

ject 20-07, Tastion Research

e relationshimaintenancey the rate oftment of of $300,000

from true

ble to easilyase. s supplemenData” line it

ming the exten

M method (i.et in the datab

tion to occur

Total $42

$190Includ

Ta$232

Combi1 $3195 $2329 $347 $3809 $682

9 $1230 $1,773

sk 302, Board

 ip cost

f

0.

y

nted tem nt of

e. it base

r.

Cost2,5000,000ded in able 42,500

ned 9,8812,7854,8390,0572,519

3,5193,600

Mu

Table 3 – Cost CatLabor – ALabor – TLabor – SBusiness(Actual idependenbusiness/smaller oexperienccost to alshown.) Labor – S

HardwarSoftwarePurchaseTOTAL

Table 4 -

CLabor – ALabor – DLabor – TLabor – S

Table 5 - Cost CatLabor – ALabor – TLabor – SSoftware

ulti-Level Linea

– Annual M

tegories Application Training System Integ System) Incntegration cnt on the size/operational organizationsce a potentialmost 1/10th

System Over

e e e Data

- Optional F

Cost CategoApplication Data DeveloTraining System Over

- Maintenan

tegories Application Training System Overe

ar Referencing Nation

 

Maintenance

Managemen

gration (Per cludes Repoosts are e of the unit. Much s will al reduction of the cost

rsight

Functional E

ories Managemen

opment/Input

rsight

nce Costs – O

Managemen

rsight

System Cost/Bnal Cooperativ

Costs – Bas

FTEnt

rts

in

Budgetdepreci

Annual

Element CosLRM D

nt t $

Optional FuL

Devent

Benefit Value Ae Highway Res

seline

E’s Ho

R.750.9 $

0.50.5 $

0.10.1 $

t 20% of baseliiation and COT

lly updated aer

sts evelopment

0$40,000/each

00

unctional EleLRM elopment

00

$6,000$5,000

Analysis Study -search Progra

ourly Rate T

$50.00$150.00

$50.00$150.00

$50.00$150.00ine costs for haTS software ma

rial imagery

t Manage

0h $12,000

ements Manage

0000

- NCHRP Projm, Transporta

 

Total Hours 1500

120

1600400

1600400

ardware aintenance fees

e Change

$12,000 000/system

0 $5,250

e Change

$1,800 $600

0 0

ject 20-07, Tastion Research

Total C0 $750 $16

0 0

$40$30

0 0

$8$6

s $8

$38$30

$251

ModelConnectiv

$275$206

$6$5

ModelConnectiv

sk 302, Board

 

Cost 5,0006,200

0,0000,000

8,0006,0008,5008,0000,0001,700

l vity 5,0006,5506,0005,250

l vity

0$600

00

Mu

Cost Be

Total cosunderstanbaseline Optional analyses Note thatto underslead to su

When exwhile thefigures wthrough teach partindividua

From a VB/C ratioversus 21topics of aggregateMLLRS organizatdisparateframewo

Thereformultiple the enterpexponent

Table 6 a

ulti-Level Linea

enefit Ana

st/benefit is ind the total iMLLRS. (SFunctional were done wt the annual stand that theubstantial ov

xpressed as ae optional fuwere generatethe workshopticular state ial operating

Value Analysos in VA stud1.4:1 optionaf VA studies.ed conditionis a cost-bention comes f

e data to the rk, yields sig

e, it is impormethods of prise - as wetial benefits

and 7 are loc

ar Referencing Nation

 

alysis

important toimpacts of thSee Table 6 –Elements ca

with an estimbenefits are ese savings cverall system

a cost-to-bennctional elemed from empp participantis analyzed sconditions.

sis perspectidies. Withinal functional. The numbe

ns of the stateneficial endefrom further same linear gnificant sav

rtant to havelinear refereell as handle for relatively

cated on the

System Cost/Bnal Cooperativ

o evaluate to he system. A– Life Cycle

an be found imated breake

significant ocan be contin

m savings for

nefit ratio (C/ments yield pirical valuests. These agseparately fo

ive, it is not n this study, l elements, isers - though es that couldeavor by itseexploitationdatum. Eac

vings reward

e a single linencing. Expa

other functiy incrementa

next two pa

Benefit Value Ae Highway Res

aid in the imA cost/benefe Cost - Basein Table 7 –even time of over the 5-yenued througr the agency.

/B), the basean aggregates generated bggregate C/Bor their own

outside of exthe disparitys within reassubject to th

d provide datelf. Once bun of the singlh added func

ds with very

near datum inanding that sional objectial additional

ages.

Analysis Study -search Progra

mportant decfit analysis weline). TheCost Benefi

f 5 years andear period. I

ghout the actu.

eline effort ye 21.4:1 ratioby several o

B ratios are bbenefits ver

xpectations ty between 1.sonable expehe limitationta - still refle

uilt, the MLLle frameworkctionality bulittle added

n a framewosame framewives of NCHl cost.

- NCHRP Projm, Transporta

 

cision-makinwas performee cost/benefifit Analysis –d an escalatioIt is importaual life of th

yields a C/B o of benefitsf the particip

bound to be drsus costs us

to yield sign.8:1 for baseectation comns of the partect that build

LRS real valuk for assimiluilt onto the capital costs

rk that accomwork to exte

HRP 20-27(3)

ject 20-07, Tastion Research

ng process toed on the it analysis fo– Optional. on rate of 3%ant for the aghe system an

ratio of 1.8:s to cost. Thpating statesdifferent whing their

nificantly higeline elemen

mpared to othticular ding the baseue to the lating previobaseline s.

mmodates thnd further ac) - will prov

sk 302, Board

 

o

or the The

%. gency d can

1 hese s hen

gher nts her

eline

ously

he cross ide

Mu

Table 6 –

TITL

Life Cycl

A.

B.

F.

 

ulti-Level Linea

– Cost/Benef

LE:

le Period

INITIAL

Service LiOriginal

Service LiAlternativ

SUBSEQU

1. Labor

2. Softwa

C. SUBSEQU

1. Staff H

2. Operati

3. Busine

4. Other D

TOTAL P

ar Referencing Nation

 

fit Analysis

CosMLLR

5 Ye

COST

ife-

ife-ve

UENT ANNUA

are

UENT ANNUA

Hours

ional Hours

ss/Operational U

Departmental Ho

P

PRESENT VAL

 

System Cost/Bnal Cooperativ

Baseline M

st Benefit ARS Baseline C

ears

AL MAINTENA

AL BENEFITS/

Unit Improvemen

ours

T

PRESENT V

PRESENT VAL

LUE BENEFIT

Benefit Value Ae Highway Res

MLLRS

Analysis Cost/Benefit

Real Discount

Years

Years

ANCE COSTS

SAVINGS

nts

T

Total Subseque

VALUE OF SUB

PRESENT

LUE OF SESEQ

(A+D+E)

Analysis Study -search Progra

nt Rate

INIT

Total Subsequen

ent Annual Ben

Present Val

BSEQUENT AN

T VALUE OF T

QUENT ANNU

TOTAL C

COST BE

- NCHRP Projm, Transporta

 

3.00%

TIAL COST:

nt Annual Cost

nefits/Savings:

lue Factor (P/A

NNUAL COSTS

TOTAL COSTS

UAL BENEFITS

COST BENEFIT

ENEFIT RATIO

ject 20-07, Tastion Research

$2,0

$1

$

($

($1

($1,16

($

ts: $2

($1,19

A):

S: $1,0

S: $3,0

S: ($5,45

($2,43

T: $2,4

O:

sk 302, Board

 

006,100

75,200

$46,500

$7,500)

15,000)

68,000)

$1,500)

221,700

92,000)

4.580

015,386

021,486

59,360)

37,874)

437,874

1.8:1

Mu

Table 7 –

 

 

ulti-Level Linea

– Cost/Benef

ar Referencing Nation

 

fit Analysis

System Cost/Bnal Cooperativ

Optional Fu

Benefit Value Ae Highway Res

unctional El

Analysis Study -search Progra

Elements

- NCHRP Projm, Transporta

 

ject 20-07, Tastion Research

sk 302, Board

 

Mu

SCHEDU

To impleafter awa

ulti-Level Linea

ULE

ement a MLLard of the con

ar Referencing Nation

 

LRS it is reantract to a co

System Cost/Bnal Cooperativ

asonable to eonsultant an

Benefit Value Ae Highway Res

expect that apd then full u

Analysis Study -search Progra

pproximatelyuse of the ML

- NCHRP Projm, Transporta

 

y 2 years forLLRS.

ject 20-07, Tastion Research

r completion

sk 302, Board

 

n

Mu

 

Chapt

Agenciesupgradedrequirem

Key Im

1) O

2) Ean

3) Idp

4) E5) E6) S7) D8) S9) D

ulti-Level Linea

ter 6 – Im

s often face nd systems. P

ments should

mplementa

Organizationaa. The o

suppoi.

ii.

b. High lc. This md. Devel

i.

ii.

iii. Establish modnd/or compldentify functerformance

Establish a mEstablish a tra

ecure resourDetermine the

et and manaDevelop an o

ar Referencing Nation

 

mplement

numerous chPrior to maki

be identified

tion Requ

al Support rganization m

ort the MLLRAn enterprAs busineslegacy datconformin

level (i.e. upmust fit withlop a busines

Include saimplementDevelop abeing doneComplete

del specificaete the worktional requirattributes

maintenance paining plan arces – manpoe schedule p

age internal eutreach plan

System Cost/Bnal Cooperativ

tation of

hallenges reling a final ded and action

uirements

must have eRS includingrise informatss/operationta can be adang MLLRS cpper managehin agency’sss case

avings expectation

a lessons leare in a timelya risk analys

ations and a k with existinrements need

plan and appand approachower, fundin

progress timeexpectationsn internally w

Benefit Value Ae Highway Res

a MLLR

lated to implecision on implans put in

stablished pg; tion technolal units begi

apted until lecomponentsement) cham

mission or t

ted once imp

rned plan any manner andsis and mitigscope of wong staff ded within y

proach, capith ng, staffing, eline and mos with staff and

Analysis Study -search Progra

RS

lementation mplementingnto place to e

olicies and p

ogy infrastruin or continuegacy system

mpion to leadthe mission m

plemented a

d milestonesd on schedulgation plan ork to be used

our agency t

talizing on le

contingencyonitor it

d manageme

- NCHRP Projm, Transporta

of new systeg a MLLRS,ensure succe

procedures in

ucture ue to developms are replac

d the effort must be chan

and even dur

s to ensure ale

d to obtain o

to meet the b

essons learne

y for staff tur

ent

ject 20-07, Tastion Research

ems or even the followin

ess.

n place that

p informatioced with

nged

ing

activities are

outside servi

baseline

ed

rnover, etc.

sk 302, Board

ng

on,

ices

Mu

 Impact

It is also implemen

1) C2) In3) C4) C

m5) L

ab6) A7) D

ar

The impaIowa rep

“anmre

ulti-Level Linea

ts of Not Im

important fonting a MLL

Continued “sinability to ad

Continued poContinued resmore timely iLack of transpble to provid

A need to incDelays to prore changing

act of not imort presented

…If the DOnd effort to m

most likely coequirements

ar Referencing Nation

 

mplement

or the agencyLRS. The on

ilos and stovdequately anolitical pressusponsivenesinformation parency andde the necesscrease resouroject scheduland increasi

mplementing d at the end

T does not immeet the DOontinue as it not being m

System Cost/Bnal Cooperativ

ting MLLR

y to understanes identifie

vepipes” of dnd factually dure to be mos issues to mincreases

d potential pusary data rces to meet les will contiing

MLLRS is pof Chapter 3

mplement thOT’s data int

does today:met.”  

Benefit Value Ae Highway Res

RS

and some of d by the stud

data internal defend budgore responsivmeeting requ

ublic percept

increasing dinue or incre

probably bes3:

he LRS, the Dtegration nee disjointed a

Analysis Study -search Progra

f the pitfalls dy team are

l to the agencget requests fve and provi

uests as they

tion issues b

demands, whease because

st qualified b

DOT will steds. Howeveand duplicati

- NCHRP Projm, Transporta

and concernas follows:

cy for allocationide more accwill increase

because the a

hich are not ae requiremen

by the anecd

till expend ther, the effort ive, with cer

ject 20-07, Tastion Research

ns with not

n curate data e as the need

agency is no

available nts and dema

dote from the

he money will

rtain

sk 302, Board

d for

t

ands

e

Mu

 

Chapt

AASHTO

API .......

COTS ...

DOT .....

ERP ......

FTE ......

GIS .......

GIMS....

GPS ......

GPS-AV

HPMS ...

LRM .....

LRS ......

MDLRS

MLLRS

NCHRP

NEPA ...

PM ........

SAVE In

TASAS .

TIG .......

VA ........

ulti-Level Linea

ter 7 – Gl

O ................

...................

...................

...................

...................

...................

...................

...................

...................

VL ................

...................

...................

...................

...................

...................

...................

...................

...................

nternational .

...................

...................

...................

ar Referencing Nation

 

lossary o

............ ame

...................

...................

...................

...................

...................

...................

...................

...................

.................. g

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

System Cost/Bnal Cooperativ

f Terms

erican associ

....................

....................

....................

....................

....................

....................

....................

....................

geographic p

....................

....................

....................

....................

....................

............... na

....................

....................

............. (for

.............. traf

....................

....................

Benefit Value Ae Highway Res

ation of state

................. ap

....................

....................

....................

....................

....................

. geographic

....................

position syste

......... highwa

....................

....................

.. multi-dime

.............. mul

ational coope

...... national

....................

rmerly) Soci

ffic accident

.................. t

....................

Analysis Study -search Progra

e highway tr

pplication pr

.............. com

........ departm

........ enterpr

....................

.... geographi

c managemen

.......... geogr

em for autom

ay pavement

............ linea

............. line

ensional line

lti-level line

erative highw

environmen

....................

iety of Amer

t surveillanc

technology i

....................

- NCHRP Projm, Transporta

 

ransportation

rogramming

mmercial off

ment of trans

rise resource

.... full time

ic informatio

nt informatio

raphic positio

matic vehicl

t manageme

ar referencin

ear referencin

ear referencin

ear referencin

way research

ntal protectio

....................

rican Value E

ce and analys

implementat

............ valu

ject 20-07, Tastion Research

n officials

g interface

f-the-shelf

sportation

e planning

employee

on system

on system

on system

e location

ent system

ng method

ng system

ng system

ng system

h program

on agency

. post mile

Engineers

sis system

tion group

ue analysis

sk 302, Board

Mu

 

Chapt

………..NLocation ……….SA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ulti-Level Linea

ter 8 – Re

NCHRP Repon Referencing

AVE Interna

 

ar Referencing Nation

 

eferences

ort 460, Guig Systems

ational Body

System Cost/Bnal Cooperativ

s

idelines for t

y of Knowled

Benefit Value Ae Highway Res

the Impleme

dge

Analysis Study -search Progra

entation of M

- NCHRP Projm, Transporta

Multimodal T

ject 20-07, Tastion Research

Transportatio

sk 302, Board

on