multi-level linear referencing system (mllrs) cost - benefit
TRANSCRIPT
MULTI-LEVEL LINEAR REFERENCING SYSTEM (MLLRS) COST/BENEFIT
VALUE ANALYSIS STUDY
Requested by:
American Association of State Highway and Transportation Officials (AASHTO)
Standing Committee on Highways
Prepared by:
Renee L. Hoekstra, CVS RH & Associates, Inc.
Glendale, Arizona
May 2011 The information contained in this report was prepared as part of NCHRP Project 20-07, Task 302,
National Cooperative Highway Research Program, Transportation Research Board.
SPECIAL NOTE: This report IS NOT an official publication of the National Cooperative Highway Research Program, Transportation Research Board, National Research Council, or The
National Academies.
Acknowledgements This study was requested by the American Association of State Highway and Transportation Officials (AASHTO), and conducted as part of National Cooperative Highway Research Program (NCHRP) Project 08-36. The NCHRP is supported by annual voluntary contributions from the state Departments of Transportation. Project 08-36 is intended to fund quick response studies on behalf of the AASHTO Standing Committee on Planning. The report was prepared by Renee L. Hoekstra, CVS, President of RH & Associates, Inc. The work was guided by a task group chaired by Peggi Knight (Iowa DOT) which included Jonathan J. DuChateau (Wisconsin DOT); John Farley (North Carolina DOT), Oscar E. Jarquin (California DOT); Matt Koukol (Ramsey County GIS); Paul E. Krugler (Texas A&M University); Greg Slater (Maryland SHA); Reginald Souleyrette (Iowa State University); Robert "Bob" Pollack (FHWA) and Keith Platte (AASHTO). The project was managed by Nanda Srinivasan, NCHRP Senior Program Officer. The Value Analysis Study, which provided the information for this report, required the use of the SAVE International Value Analysis 6-Step Job Plan and was administered by Renee L. Hoekstra, a Certified Value Specialist. The VA Study Team providing the information in this document included the following members; Jerome “Joe” Breyer, Works Consulting, LLC, Gilbert, Arizona, is identified as a technical expert and also represented the Arizona Department of Transportation, Multimodal Planning Division; Jun Wu, North Carolina Department of Transportation, IT-GIS Division; Michael Ney Sheffer, Maryland State Highway Administration; Thomas Martin, Minnesota Department of Transportation; Peggi Knight, Iowa Department of Transportation; Eric Abrams, Iowa Department of Transportation; Michael Clement, Iowa Department of Transportation; Karen Carroll, Iowa Department of Transportation; Ryan Wyllie, Iowa Department of Transportation; Oscar Jarquin, Caltrans IT Department; Reg Souleyrette, Iowa State University; Bruce Aquila, Intergraph; and Gary Waters, ESRI. Disclaimer The opinions and conclusions expressed or implied are those of the team that performed the research and are not necessarily those of the Transportation Research Board or its sponsors. The information contained in this document was taken directly from the submission of the author(s). This document is not a report of the Transportation Research Board or of the National Research Council.
MULTI-LEVEL LINEAR REFERENCING SYSTEM (MLLRS) COST/BENEFIT
VALUE ANALYSIS STUDY
Requested by:
American Association of State Highway and Transportation Officials (AASHTO)
Standing Committee on Highways
Authors: Renee L. Hoekstra, CVS, RH & Associates, Inc., Glendale, Arizona Jerome P. Breyer, Works Consulting LLC,
Gilbert, Arizona
TABLE OF CONTENTS Abstract ......................................................................................................... 1 Chapter 1 – Executive Summary .................................................................. 2 Chapter 2 – Introduction and Methodology ................................................. 8 Chapter 3 – Measures of MLLRS Success ................................................. 10 Chapter 4 – Defining the Use and Function of a MLLRS ......................... 17 Chapter 5 – Costs, Savings and Improvement Statistics ............................ 25 Chapter 6 – Implementation of MLLRS ..................................................... 32 Chapter 7 – Glossary of Terms ................................................................... 34 Chapter 8 - References ................................................................................ 35
ABSTRACT This report documents the outcome of the Value Analysis (VA) Study which was conducted at the Iowa Department of Transportation in Ames Iowa on April 6-8, 2011. The purpose of the VA Study was to identify the costs and benefits of implementing and maintaining a statewide Multi-Level Linear Referencing System (MLLRS). The VA Study followed the SAVE International 6-step job plan which helped to identify the various aspects of a statewide MLLRS including; System Needs, Constraints, Performance Attributes, Qualitative and Quantitative Benefits, Defined Users/Business Units, System Functions, Alignment with the 10 Functional Requirements of Report 20-27, Costs for Developing and Maintaining a Baseline MLLRS and Implementation Considerations. The findings of the study represent a 5-year breakeven point for the baseline and the optional functional elements with potential overall cost/benefit savings of $12.6 million for a state with 25,000 miles of road network.
Mu
Chapt
Introdu
Many tecReferencto the devespeciallystate by pinvestmeLevel Linthis reporterm “opbaseline
Definiti
Efficient dependaboperationelectroniessentiall “The NCgrowing by the trareferencirepresentnetworkslinear dat While thestudy reladifferentirepresentaddress pcross-rela NCHRP
Research
The reseaSAVE In
ulti-Level Linea
ter 1 - Ex
uction
chnical reporcing System velopment oy if there areproviding creent as well asnear Referenrt represents
ptional functiMLLRS.
ion of Mu
planning, deble and electns, and needc managemely the multi-
CHRP 20-27(awareness o
ansportation ng methods,tations. Datas, and cartogtum.”
e above defiates specificiates a MLLtations and nperhaps the mate informat
P 20-07 V
h Approach
arch for this nternational 6
ar Referencing Nation
xecutive S
rts have been(LRS) withi
of a LRS ande no data to edible quants sample cosncing Systems the minimuional elemen
lti-Level L
esign, constrtronically bas. These meent systems t-dimensional
(2) linear refof the need to
community, multiple caa integration
graphic repre
inition uses tcally to the liLRS from a Lnetwork reprmost significion from dif
alue Analy
h and Study
paper was c6-Step Job P
System Cost/Bnal Cooperativ
Summary
n completedin a state trand the commitsupport the ctitative and qsts and requim (MLLRS).um requiremnts” refers to
Linear Ref
ruction, andased methodsethods must to optimize ol LRS (MDL
ferencing syo integrate in (1). The 20
artographic rn is supporteesentations b
the “multipleinear referenLRS. This doresentations cant existingfferent data s
ysis for M
Objectives
completed duPlan. The Jo
Benefit Value Ae Highway Res
y
d about develnsportation atment requircosts or expequalitative brements for . The use of
ments for a fuo supplemen
ferencing
maintenancs of positionbe logically overall operaLRS) defined
stem data mncreasing am-27(2) data m
representatioed through trby associatin
e” adjective ncing methodoes not dimiin MLLRS –
g deterrent instores.
MLLRS
uring a 3-dayob Plan inclu
Analysis Study -search Progra
loping and inagency. Thered by an ageected benefienefits obtaiimplementin
f the word “bully functionintal elements
System (M
ce operationsning and loca
linked with ational efficd in the NCH
model was demounts of linmodel includ
ons, and multransformationg with a cen
with three sds, or LRMsinish the imp– but insteadn efficient da
y Value Anauded the follo
- NCHRP Projm, Transporta
ntegrating a e magnitude ency can be its. This repined from a ng and mainbaseline sysing MLLRSs that will im
MLLRS)
s require accating specific other organiency. The MHRP Report
veloped in rnearly referedes multipletiple networ
ons among mntral object r
separate chars, as the key portance of cd allows the ata sharing –
alysis (VA) Sowing Phase
ject 20-07, Tastion Research
Linear of costs relaoverwhelmiort will helpstate’s
ntaining a Mutem” throug
S. The use ofmprove the
curate, c facilities,
nizational MLLRS is 460 as follo
response to aenced data use linear rk
methods, eferred to as
racteristics, taspect that
cartographicstudy team t
– the inability
Study using es: Informati
sk 302, Board
ated ing, p the
ulti-ghout f the
ows:
a sed
s a
this
c to y to
the ion,
Mu
Functionperforme
A VA Stubenefits, research informaticonsensu
• Proviminim
• Provi• Ident
funct• Unde
MLL• Ident• Provi• Provi
maint
Basic A
It is neceassumptimiles of rcommon LRS is n
Why It
1) Dth
2) Imwex
3) Imm
4) Imw
5) Tre
ulti-Level Linea
n Analysis, Ced. A compl
udy approacconstraints, to be conducion in real ti
us in a very s
iding a definmum requireiding a defintifying all cotional featureerstanding alLRS tifying the cuiding the potiding implemtaining a ML
Assumptio
essary to firston. This assroad and somlinear datumot included.
is Import
Data and infohe same linemprovement
which are oftxternal requemprove anal
more consistemprove com
with other agThe ability toeadily access
ar Referencing Nation
Creativity, Evlete descripti
ch was used timpacts and
cted in a teamme. The VAshort time. T
nition for whements versunition of Mulosts associatees in the systll benefits –
urrent and potential impacmentation coLLRS
n
t identify thasumption is tme type of am”. This is i
tant to Im
ormation are ar datum, ts are made ren required tests and manysis leading ency in the d
mmunication ency partner
o improve cused and disse
System Cost/Bnal Cooperativ
valuation, anion of the pr
to bring toged the implemm approach A approach The objectiv
hat is requireus supplemenlti-Level in ted with bothtem including qu
otential usescts of not imonsiderations
at this study that “each stn existing Limportant as
plement M
more readil
related to quto meet a standates, to more dat
decision-makwithin the ars and stakehustomer servieminated in
Benefit Value Ae Highway Res
nd Developmrocess can be
ether severalmentation of
allowing forenabled the
ves included:
ed in a baselintal or suppothe context o
h a baseline M
uantitative an
s of a MLLRmplementings for both the
and the findtate implemeRS – includi
s the costs an
ML into LR
y available f
uality, timelinate’s internal
ta-driven decking processgency acrosholders by shice by allowa more time
Analysis Study -search Progra
ment; the 6th
e found in C
l state DOTsa MLLRS. r integrationteam to disc
ine MLLRS,orting functiof a LRS MLLRS and
nd qualitativ
RS a MLLRS e initial syste
dings are preenting a ML
ding multiplend efforts ide
RS
from differen
ness, and thel mission an
cision suppos within the as departmenharing inform
wing informaely manner,
- NCHRP Projm, Transporta
phase, PreseChapter 2.
s to discuss tThis also all
n of data andcuss approac
, which meanions
d any potenti
ve – with imp
em developm
edicated on aLLRS alreadye LRMs that entified to es
nt sources w
e efficiency nd/or needs a
ort which wilagency over nts and greatemation,
ation and dat
ject 20-07, Tastion Research
entation, wa
the merits, lowed this
d the sharingches and reac
ns, what are
al additive
plementing a
ment as well
a basic y has 25,000do not share
stablish an in
which referen
in many repas well as
ll also lead ttime, er involvem
ta to be more
sk 302, Board
as not
of ch
e the
a
l as
0 e a nitial
nce
ports
o
ent
e
Mu
6) Ate
7) Ew
8) L
Althoughboth quanidentifiedrating an
Quanti
impacts tbenefits a
The overfollows:
Base
• $• $• $
OptioincreConn
M
• • •
ulti-Level Linea
Able to integrechnology,
Establish stanwide, and Lower the life
h many of thntitative andd by the studd ranking, w
tative Ben
to maintenanare provided
rall annual qu
line System
10,000 per F20,000 per F2,000 per FT
onal Functiase the funct
nectivity.
Manage Cha
$10,000 F$20,000 p$2,000 pe
ar Referencing Nation
rate with leg
ndards to inc
fe cycle cost
he items stated qualitative dy team. Thewithin Chapte
nefits
nce. A compd within Cha
uantitative s
m
FTE for a redFTE for a redTE for a redu
onal Elemetionality of t
ange
FTE for a redper FTE for aer FTE for a
System Cost/Bnal Cooperativ
gacy systems
crease LRS c
impacts of s
ed above repbenefits to iese benefits er 3.
The quantisaving timare definedhours assowill be an operationaunits wereand they wfor litigatio
plete definitiapter 3.
avings for th
duction in stduction in opuction in sta
nts – Thesethe baseline
duction in sta reduction ireduction in
Benefit Value Ae Highway Res
s and ultimat
consistency t
system owne
present benefimplementinare identifie
itative benefme and costs
d as a reductociated with improved st
al unit improe used for thiwere defined on, reduced ion and the s
he benefits a
taff hours perational hoff hours for
are describesystem inclu
taff hours in operationan staff hours
Analysis Study -search Progra
tely eliminat
throughout t
ership.
fits of a MLLng a MLLRSed in detail, i
fits identifiedfor the agention in staff hother departtewardship oovements. Sis study to sh
d as safety imimpacts to t
savings asso
as described
ours other depart
ed as additiouding Manag
al hours for other De
- NCHRP Projm, Transporta
te dependen
the agency a
LRS, the teaS. Other benincluding th
d for a MLLncy. Time anhours, operatments. Addof data and bample businhow improve
mprovementsthe project, aciated with e
above can b
tments
onal elementsging Change
epartments
ject 20-07, Tastion Research
cies on obso
and industry-
am also idennefits were ale definition,
LRS are relatnd cost savinational hoursditionally, thbusiness/ ness/operatioement savins, reduced riand reduced each of these
be summariz
s which wille and Model
sk 302, Board
olete
-
ntified lso ,
ted to ngs s, and
here
onal gs sk
e
ed as
l ling
Mu
M• • •
Bprunthdbureth
• • •
Qualita
Qualitativhowever identified
• E• F• Q• In• D
A full de
Implem
Cost to I
The basicalready eassociateThe costshardwareintegrate
ulti-Level Linea
Model Conne$10,000 F$20,000 p$2,000 pe
Business/Operovides a difnits as a reprhe business/oetermine theusiness/opereduced impahe agency fo
Baseline -Manage CModel Co
ative Bene
ve benefits aof equal imp
d the followi
Ease of use anlexibility an
Quality of datnternal and e
Data-driven d
scription of
mentation
Implement a
c assumptionexists” withined costs is ins shown are e. Additionad agency an
ar Referencing Nation
ectivity FTE for a redper FTE for aer FTE for a
erational Unfferent level resentation ooperational ue overall savrational unitsacts to projecor the baselin
- $1,168,000Change - $1,onnectivity -
fits
are much moportance to ting qualitativ
nd accessibind integrationta external colladecision mak
each of thes
Considera
a MLLRS
n made by thn the agencycluded in Chexclusive of
ally, in orderd consultant
System Cost/Bnal Cooperativ
duction in sta reduction ireduction in
nit Improvemof savings.
of potential sunits. The anings as a pers; safety impcts, and redune and the op
0 208,000 $1,220,000
ore difficult tthe DOT. Tve benefits:
ility n
aboration king
se benefits ca
ations
his team, as ey wanting to hapter 5 andf what is alrer to develop t rate as well
Benefit Value Ae Highway Res
taff hours in operationan staff hours
ments – Eac This team isavings and nnual savingrcentage of tprovements, uced maintenptional funct
to measure, he study tea
an be found
expressed onimplement a
d includes boeady availabthe overall cl as a singula
Analysis Study -search Progra
al hours for other de
ch of the benidentified sevestablished gs calculatiothe identifiedreduced lev
nance, the estional eleme
am
in Chapter 3
n the previoua MLLRS. A
oth capital anble within thecosts, labor rar civil servi
- NCHRP Projm, Transporta
epartments
nefits identifiveral businea sample bu
on used the sd budget. U
vel of risk forstimated annnts can be su
3.
us page, is “A complete nd annual mae agency, incrates are reprice rate.
ject 20-07, Tastion Research
ied above ss/operation
udget for eacsample budg
Using the four litigation,
nual savings ummarized a
“that a LRS listing of thaintenance ccluding resented by
sk 302, Board
nal h of et to
ur
for as:
e costs.
an
Mu
The baseroad netwsome LR
There areMLLRS.required
• • •
Mainte
Maintenafor the ba
Maintenaimpact on
A breakeof a compas needed
Benefit
The studycycle cosperiod wcycle/cossavings cbut with the additiof 3%.
The over
ulti-Level Linea
eline costs arwork, includ
RM already.
e additional These addito establish
ManagingModelingLRM Dev
enance Cos
ance annual aseline syste
ance costs fon the overall
even timeframplete systemd, has been l
t Cost Ana
y team realizst savings ovas used to shst benefit savcan be very bthe adoptionional elemen
rall cost-to-
• Baseli• Optio
ar Referencing Nation
re also baseddes a spatial r
The baselin
functional eitional total cthe MLLRS
g Change - $g Connectivitvelopment -
sts
costs includem, consider
or the optionl annual bud
me that can m. The schedulet with a sel
alysis to Im
zed other bever the life ohow the estimvings, these beneficial ton of a MLLRnts. The sav
benefit (C/B
ine - $2,437,nal Function
System Cost/Bnal Cooperativ
d on 25,000 mrepresentatio
ne developme
lements thatcosts, includ
S is as follow
$31,650 ty - $793,40$40,000 eac
ding labor, haring the 25,0
nal functionadget.
be expected ule for implelected consu
mplement
nefits to havf the systemmated cost bnumbers can the DOT. T
RS, a savingsvings was cal
B) savings is
,874 nal Elements
Benefit Value Ae Highway Res
miles of centon, hardwareent cost is ap
t can be addeding labor anws:
00 ch
ardware and 00 miles of c
al elements a
is approximementation i
ultant.
and Main
ving an agenm. However, benefit. If a n be multipliThere is on-gs can be calclculated ove
s as shown:
s - $10,120,4
Analysis Study -search Progra
terline per ste, software, approximately
ed to the basnd as needed
d software, wcenterline as
are very mino
mately five (5is estimated
ntain a ML
ncy-wide MLin this instaDOT wanteied out to thegoing mainteculated for ber a 5-year pe
428
- NCHRP Projm, Transporta
tate, a good and assumesy $2 million
seline to addd, software an
will vary, butssumption, a
or and will h
5) years afteat (2) years
LLRS
LLRS. This ance, a 5-yead to underste life of the enance that w
both the baseeriod with an
ject 20-07, Tastion Research
existing prims the agency n.
d value to thend hardware
t on an averaare $251,700
have very litt
r the installaafter a contr
includes a liar breakevenand the full system, the will be requi
eline system n escalation
sk 302, Board
mary uses
e e,
age 0.
tle
ation ract,
ife n life total ired, and rate
Mu
When exfunctionageneratedparticipananalyzedcondition
Critical
Critical iMLLRS consider to addresconsidera
ulti-Level Linea
xpressed as aal elements yd from empints. These a
d separately fns.
l Impleme
mplementatineed to be ctaking the n
ss each of theations can be
ar Referencing Nation
a C/B ratio, tyield an aggrrical values
aggregate C/for their own
entation C
ion considerconsidered bynext steps inte consideratie found in C
System Cost/Bnal Cooperativ
the baseline regate 21.4:1generated by
/B ratios are n costs versu
Considerat
rations as wey each DOTto developinions to ensur
Chapter 6.
Benefit Value Ae Highway Res
effort yields1 ratio of beny several of bound to be
us benefits us
tions
ell as the potT. This is a c
g a MLLRSre success o
Analysis Study -search Progra
s a C/B ratio nefits to costhe participa
e different wsing their in
tential impaccritical step f. The agencf a MLLRS.
- NCHRP Projm, Transporta
of 1.8:1 whst. These figating states a
when each padividual ope
cts to not imfor the agenccy should be. A complet
ject 20-07, Tastion Research
hile the optiogures were as workshop
articular stateerating
mplementing cy as they fully prepar
te listing of t
sk 302, Board
onal
p e is
a
red these
Mu
Chapt
Problem
Efficient operationbased meoperationlinked wisystems tRecognizinitiated based fundata moddevelopinguidelinetransportpublished Some stadegrees. state of thto the AATIG for minformatilocation r Developmof resourlinear refto aid in very substhey are c Researc
The reseaconducteDepartm(IADOT)AdministadditionaprogramsTranspor
ulti-Level Linea
ter 2 – In
m Stateme
planning, dens require acethods of posns, and needith other orgto optimize ozing these obwith the objnctional requdel for multimng an improves to implemtation organid via NCHR
ates have impAn examplehe art technoASHTO Tecmarketing asion for otherreferencing
ment of a linrce commitmferencing systhe decisionstantial, but considering
ch / Value
arch for this ed using teament of Trans), North Cartration (MSHal team mems for LRS anrtation Resea
ar Referencing Nation
troductio
ent
esign, constrccurate, depesitioning ands. These me
ganizational overall operabjectives, NCectives of: (uirements fomodal transpved LRS dat
ment an improizations. The
RP Report 46
plemented Me is the linearology in locahnology Impssistance andr State DOTssystem.
near referencments. The mstem require
n-making proa more definmaking this
e Analysis
report was cm members fportation (A
rolina DepartHA), and Mi
mbers includend MLLRS sarch and Edu
System Cost/Bnal Cooperativ
on and M
ruction and mendable and d locating spethods must electronic mational efficiCHRP Proje1) establishi
or a multi-dimportation systa model, anoved LRS dae results of th60.
Multi-Level Lr referencingation referenplementationd a TIG leads which are c
cing system cmagnitude of es a credible ocess. Anecdnitive estimainvestment.
Study Ap
conducted ufrom state tra
ADOT), Caltrtment of Trainnesota Deped two membsystems. Facucation (CTR
Benefit Value Ae Highway Res
Methodol
maintenanceelectronicall
pecific facilitbe logically
management iency. ct 20-27 wa
ing consensumensional Lstems, (2) nd (3) develoata model inhat research
Linear Referg system devncing systemn Group (TIG
d states team currently, or
can require sf resource co
and quantitadotal information of bene.
pproach
sing a value ansportationrans (CT), Io
ansportation partment of bers from inculty at IowaRE) rounded
Analysis Study -search Progra
logy
e ly ties,
as us-
LRS
oping n
are
rencing Systveloped by I
ms. Iowa DOTG). This techwas formed
r in the near
several millimmitment foative determ
mation suggeefits is critica
analysis stun agencies inowa Departm(NCDOT), Transportati
ndustry reprea State Univd out the team
- NCHRP Projm, Transporta
tems (MLLRowa DOT thT nominatedhnology was
d to provide hfuture, deve
ion dollars afor a state to
mination of costs that the ral to inform
udy approachncluding the ment of TranMaryland Stion (MNDOesenting prodversity’s Cenm.
ject 20-07, Tastion Research
RS) to variouhat representd this technos selected byhelpful
eloping a new
and several yimplement aosts and benrate of returnstate DOTs
h and was Arizona
nsportation tate HighwaT). Three ducts and nter for
sk 302, Board
us ts ology y the
w
years a
nefits n is as
ay
Mu
Value anstudy. Tnecessaryas the Sothe next pvarious c SAVE I
Step This and to• VA
• Def
• Per
• Def
• A l
• Def
Step The fsucceto be
Step The sPhaseother
Step A trathe futhe de
Step The daboveimple
Step It wa
ulti-Level Linea
nalysis studieo help the rey backgroun
ociety for Ampage. The sp
chapters of th
Internatio
1 - Informaphase of theo establish th
A study goals
fined the nee
rformance at
fined how a
ist of VA stu
fined the con
2 - Functionfunction anaessful, fully fstudied and
3 - Creativistudy team me. The teamr benefits as
4 - Evaluatditional evalunction analyevelopment
5 - Developdevelopmente. This incluementation i
6 – Presents not necess
ar Referencing Nation
es use team meader better und for this repmerican Valupecific outcohe report.
onal Value
ation Phase e process allohe followings and objecti
eds of a MLL
ttributes wer
MLLRS is u
udy assumpt
nstraints/cha
n Analysis Plysis activityfunctioning
d the importa
ity Phase members disc
m identified thwell as the c
ion Phase luation phasysis and creaphase.
pment Phaset phase incluuded identifympacts.
tation Phaseary to comp
System Cost/Bnal Cooperativ
members thaunderstand wport, a descrue Engineersomes of each
e Analysis
owed the teag study elemives
LRS
re developed
used within s
tions
allenges to im
Phase y is a recognMLLRS. Th
ance and criti
cussed the vhe benefits ocost impacts
e was not neativity phase
e uded further ying, definin
e lete the pres
Benefit Value Ae Highway Res
at have expewhat occurreription of thes) 6-Step Jobh of the step
(VA) Job
am membersments:
d and defined
state agencie
mplementing
nized VA techis ensured tical element
various elemeof a MLLRS
to implemen
eeded for thies provided a
defining andng and quant
sentation pha
Analysis Study -search Progra
erience and eed during thie SAVE Inteb Plan used dps in the job p
Plan
to discuss th
d to outline a
es
g a MLLRS
chnique to idthat the studts of a functi
ents as identS including qnt a MLLRS
is study. Thadditional in
d then refinintifying the u
ase for this s
- NCHRP Projm, Transporta
expertise in tis study and ernational (foduring this splan can be
he overall pr
a successful
dentify the fudy team undeioning system
tified in the qualitative, qS.
e elements information to
ng the objecuses, benefits
study.
ject 20-07, Tastion Research
the topic undobtain the
ormerly knostudy is listedfound in the
roblem state
MLLRS
unctions of aerstood whatm.
function anaquantitative a
dentified duo aid the team
ctives as stats, costs and
sk 302, Board
der
wn d on
e
ement
a t was
alysis and
uring m in
ed
Mu
Chapt
Introdu
As the stureasons ounderstanbenefits t
Needs f
1) Are
2) Imwex
3) Imm
4) Imw
5) Tre
6) Ate
7) Ew
8) L
How M
A succeswhen endperformabest appr
Perform
The follocomplain
ulti-Level Linea
ter 3 – M
uction
udy began, ior needs for nding of neeto be obtaine
for Implem
A Data and ineferences themprovement
which are oftxternal requemprove anal
more consistemprove com
with other agThe ability toeadily access
Able to integrechnology,
Establish stanwide, and Lower the life
Must a MLL
ssful MLLRSdeavoring toance attributeroach for the
mance Attrib
owing attribunts and to ga
ar Referencing Nation
Measures o
it was imporimplementin
ed, the defineed by implem
menting a
nformation ae same lineats are made ren required tests and manysis leading ency in the d
mmunication ency partner
o improve cused and disserate with leg
ndards to inc
fe cycle cost
LRS Perfo
S requires mo develop a ses, each withe agency.
butes
utes will garnin high-leve
System Cost/Bnal Cooperativ
of MLLR
rtant for the sng a MLLRSed performanmenting a M
MLLRS i
are more readar datum, related to quto meet a standates, to more dat
decision-makwithin the ars and stakehustomer servieminated in
gacy systems
crease LRS c
impacts of s
orm
many things. successful syh a definition
ner user acceel champions
Benefit Value Ae Highway Res
RS Succe
study team tS within a stance measure
MLLRS.
in Your A
dily availabl
uality, timelinate’s internal
ta-driven decking processgency acrosholders by shice by allowa more time
s and ultimat
consistency t
system owne
This is one ystem. The fn that should
eptance of Ms to maintain
Analysis Study -search Progra
ess
to have a shaate agency. es for a succe
Agency
le from diffe
ness, and thel mission an
cision suppos within the as departmenharing inform
wing informaely manner,tely eliminat
throughout t
ership.
of the imporfollowing lisd be conside
MLLRS by hn organizatio
- NCHRP Projm, Transporta
ared understSeveral elem
essful system
erent sources
e efficiency nd/or needs a
ort which wilagency over nts and greatemation,
ation and dat
te dependen
the agency a
rtant issues tst representsered when de
helping to redonal support.
ject 20-07, Tastion Research
anding of thments includm, and the
s which
in many repas well as
ll also lead ttime, er involvem
ta to be more
cies on obso
and industry-
to understan the necessa
eciding on th
duce custom.
sk 302, Board
he de an
ports
o
ent
e
olete
-
nd ary he
mer
Mu
1) U
msh
2) R3) T
re4) D
oun
5) Qun
6) Ew
7) Imo
8) Esyexex
Expecte
When imidentifiedexpectedapplied. Assumpt While deseveral aelements 1) There
and i2) Basel
businrefleconce inclu
ulti-Level Linea
User transpamanual resouhares the sam
ResponsiveneTime Savingseconciliation
Data Governf data and prnderstanding
Quality Datanderlying lin
Ease of Mainwhen the linemproved Buf system hits
Ease of Integystems, accoxtensibility txtensible to
ed Outcom
mplementing d as Quantita
d, especially
tions for De
eveloping bossumptions . They inclu
e are two hos $150.00 peline – this or
ness/operatioct that COTSthose LRMsde the “integ
ar Referencing Nation
rency - Locaurces neededme linear datess – A reasos – Improvemn, analysis, dance – Elimromotes datag of data thro – To ensurenear datum ntenance – Rear datum is usiness/Opers and the numgration – Levommodating to support otother local,
mes or Ben
an MLLRS ative, Qualitif the perfor
eveloping Be
oth the quantand definitioude:
urly rates, oner hour, the sriginally repronal units usiS GIS softwas are able to gration of da
System Cost/Bnal Cooperativ
ation data w; other themtum onable amouments to rep
data entry, anminates or miabase usageough use of e accuracy, c
Reduction inupdated
rational Unimber of busivel of effort propagation
ther modes lregional and
nefits from
in the agenctative, and Ormance attrib
enefits
titative and qons of the ba
ne is a blendsecond is a cresented a siing differentare can easilreference th
ata” as the en
Benefit Value Ae Highway Res
will automaticmatic informa
unt of elapseporting requind usage inimizes the versus the umetadata
consistency a
n time (hours
it Use – an ininess/operatiand time re
n of linear dalike pedestriad federal age
m a MLLR
cy there are mOther. The fobutes, as iden
qualitative beaseline eleme
ded rate of cocivil service imple visualt LRMs. Thly overlay (ohe linear datund goal of a
Analysis Study -search Progra
cally populaation is autom
ed processingirements bas
duplication use of spread
and stable re
s) used to ma
ncrease in usional units uquired to intatum changean, bicycle,
encies
RS
many benefiollowing listntified above
enefits, it waent versus tw
onsultant corate of $50.0
lization of dahe definition or integrate) um. Therefobaseline sys
- NCHRP Projm, Transporta
ate with minimatically acc
g time baseded on needs
of data, ensudsheets, and p
eferential int
anage chang
se is definedusing the systegrate with e, data validarail, and bus
its to be attats the benefite, are establi
as importantwo optional
osts and civil00 per hour.ata from varultimately edata from di
ore, baselinestem.
ject 20-07, Tastion Research
imal additioncessed when
d on the requand cycles,
ures consisteprovides an
tegrity to the
ge propagatio
d as the numbstem existing
ation, and s, as well as
ined. Thesets that shoulished and
t to identify functional
l service cos ious
expanded to ifferent LRM
e objectives
sk 302, Board
nal n it
uest data
ency
e
on
ber
be
e are ld be
ts
Ms
Mu
3) Mana
out othe M
4) ModetruckfunctRepo
5) Scoribasel
6) The ccompexpos
Quanti
1) Q co
a.
b
c.
d
ulti-Level Linea
age Change –n the linear
MLLRS. el Connectiv
ks, transit, etctional elemenort 460 to be ing of additioline and the ocomplexity oplexity, but used to the co
tative Ben
Quantitative bosts includin. A reductio
efficienciintegratinthat datum
. A reductioefficienciwithin thetear, mate
. A reductioby increasare involv
. Business/elements below: i. Safety
safetymeasu
ii. Reducto supothers
iii. Reducallow agencmanne
ar Referencing Nation
– this optiondatum – and
vity – multipc.) which intnt essentiallyan additionaonal optionaoptional elemof the additiousers that doomplexity to
nefits
benefits are ng: on in GIS stes for maint
ng multiple lim, and analyon in operaties in the daye organizatioerial uses, etcon in adminising efficienved in mainta/operational and not spec
y improvemey related infoures. ce the level opport the ages. ce impacts da reduction y to identifyer.
System Cost/Bnal Cooperativ
nal functionad the cascadi
ple routable nterconnect toy enables theal working fual functional ments. onal optiona not need acmaintain ea
defined by s
aff hours byaining a lineinear referen
yzing the valiional staff hoy-to-day opeon, and/or rec.) istrative hou
ncies of the baining, integunit improvecifically with
ents by increormation for
of risk due toency’s positio
during constrin change or
y impacts, i.e
Benefit Value Ae Highway Res
al element peing and prop
networks – ino represent re "multiple n
functionality elements is
al functional ccess to the oase of use.
saving time a
y increasing ear datum, ncing methodidity of LRSours by incr
erations by pducing over
urs provided business/opegrating and aements are ih the baselin
easing efficieboth active
o litigation bon, i.e. envir
ruction by imrders duringe. utilities, ri
Analysis Study -search Progra
ertains to syspagating of c
ncluding difrealistic travenetwork repr delivered inbased on a c
elements maoptional func
and
ds to S data. reasing roviding add
rall operation
by other deperational unitanalyzing buidentified wine. Savings
encies throuand reactive
by improvingronmental, to
mproving accg constructioight of way,
- NCHRP Projm, Transporta
stem-to-systchanges to th
ffering modeel movemenresentations"n the NCHRcumulative b
ay increase octional elem
ditional valunal costs (i.e
partments wts which use
usiness data. ith the optionin staff hour
ugh the idente safety impr
g access to tort liability,
cess to data wn. This wouetc., in a mo
ject 20-07, Tastion Research
tem edits carhe events usi
es (bicycles, nts. This opti" in NCHRPP data modebenefit of the
overall ents will not
uable servicee. fuel, wear
within the agee the MLLRS
nal functionars are describ
ification of rovement
the data needsafety, and
which woulduld allow theore timely
sk 302, Board
rried ing
ional P el. e
t be
es and
ency S or
al bed
ded
d e
Mu
e.
f.
2) TelotthGhpdHanin
3) TfuMsarepbuth
4) Top
Table 1 –
ReducedReducedReduced
ulti-Level Linea
iv. Reducnecess
v. Reducimprocomm
. An improautomate efficient u
In order tobudgets w
Table 1 reprelements for tther departmhat is employ
GIS branch wours. Since otential staffatum mainte
However, thend spatial innitiatives wit
Table 2 repreunctional ele
MLLRS. Theafety improveduced mainercentage ofudget shownhe possible c
Table 3 is a sperational un
– QuantitatiBenefits
d Staff Hourd Operationad Hours for
ar Referencing Nation
cing impactssary to reduccing impactsove planningmunication woved steward
the synchronuse of staff ho determine
were establish
esents the quthe MLLRS
ments. The nyed working
which would DOTs will t
f turnover, thenance and re typical MLnformation sethin the depa
esents the quements for the representatvements, redntenance costf the transpon below in Tcost and savi
ample reprenits.
ive Annual Bs
rs al Hours other
System Cost/Bnal Cooperativ
s to maintenace operations to overall p and design
with the publidship of datanization of b
hours. the annual shed for the i
uantitative befor reduced
numbers in thg on the syste
account for typically prohere might nrelated tasks LLRS staff wervices to theartment – ad
uantitative anhe improvemtive business
duced level ots. The numrtation depar
Table 2 is basings.)
sentation of
Benefits/SavBase
$10,000$20,000
$2,000
Benefit Value Ae Highway Res
ance departmnal activity coproject costs by creating ic. by providin
business data
savings for thidentified bu
enefits for thd staff hours, he table are em. As an ea $25,000 s
ovide cross-tnever be less– regardless
would be capae organizatio
dding further
nnual benefitments to busis/operationa
of risk for litimbers represe
rtment’s ovesed on a sam
f savings for
vings for Baseline
0 per FTE0 per FTE0 per FTE
Analysis Study -search Progra
ments by imposts. by improvinless impacts
ng the agencya using MLL
he business/usiness/opera
he baseline a operationalrepresented
example, Iowsavings per ytrained reduns than two stas of the lengtable of also on allowing r value that m
ts for the basiness/operatial units used igation, reduent an overalerall budget
mple budget a
Caltrans in t
seline MLLRManage Ch
$10,000 pe$20,000 pe
$2,000 pe
- NCHRP Projm, Transporta
proving acce
ng access to s and improv
y with the abLRS leading
/operational ational units
and the optiol hours and has a benefit
wa DOT has year in the rendancy to acaff dedicatedth of centerlproviding mthem to wor
may also be
seline and thional units wduring this s
uced impactsll cost savinfor that busiand used onl
their various
RS hange
Cer FTE $1er FTE $2er FTE $
ject 20-07, Tastion Research
ess to data th
data that wived
bility to g to a more
units, sampl.
onal functionhours used by
savings per 2.5 FTE’s in
eduction of sccommodated to MLLRSline mileage.
more general rk on other quantified.
he optional working withstudy includs to a projectgs based on iness unit. (Tly to represe
s business/
Model Connectivity10,000 per F20,000 per F$2,000 per F
sk 302, Board
hat is
ill
le
nal y FTE
n the staff e S . GIS
h the de t and a
The ent
y FTEFTEFTE
Mu
Table 2 –Savings
Safety I
ReducedLitigatio
Reduced(i.e. Con
Reduced
Table 3 –Improvem
BSafety ImReducedCostsReducedReducedCostsTOTAL
Qualita Qualitativbenefits. following
1) Ecobdcu
ulti-Level Linea
– Quantitati
Benefit
Improvemen
d Level of Ron
d Impacts tonstruction)
d Maintenan
– Sample Caments/Savin
Benefitsmprovementsd Litigation
d Project Cosd Maintenance
ative Bene
ve benefits a Implementi
g qualitative
Ease of use/aompletion ofeing able to ifferent themustomers.
ar Referencing Nation
ive Annual B
s
nts
Risk for
o Projects
nce Costs
altrans Annungs
Bud$117
$800sts $6,400e
$1,800$9,117
fits
are difficult ting a MLLR
e benefits:
accessibility f more timelaccess more
mes of data, t
System Cost/Bnal Cooperativ
Benefits for
SampBudg
$20,00
$50,00
$300,00
$50,00
ual Benefits
dget7,000,000
0,000,0000,000,000
0,000,0007,000,000
to quantify bRS should als
– This occuly and consise informationthereby impr
Benefit Value Ae Highway Res
Sample Bus
ple get
B
00,000
00,000
$00,000
$00,000
s for Busines
Baseline$81
$14,400$5,120
$1,260$20,861
but are as imso provide th
urs through thstent reportsn and interreroving servi
Analysis Study -search Progra
siness/Opera
Baseline
.07%
$14,0001.8%
$900,000.08%
$240,000.07%
$14,000
ss/Operation
Mana,900
0,000 $0,000
0,000,900 $
mportant to uhe
he s by elate ice to
- NCHRP Projm, Transporta
ational Unit
Manage Change
.09%
$18,0001.8%
$900,000.08%
$240,000.10%
$50,000
nal Unit Cos
age Change$105,300
$14,400,000$5,120,000
$1,800,000$21,425,300
understand as
ject 20-07, Tastion Research
t Improveme
ModeConnecti
%
0
.1
$20%
0
1
$900%
0
.0
$240%
0
.1
$50
st
Model Connectiv
$117,
$14,400$5,120,
$1,800,$21,437
s the quantit
sk 302, Board
ents/
el ivity10%
,000.8%
,00008%
,00010%
,000
vity,000
,000,000
,000,000
tative
Mu
2) F
inliin
3) Qfub
4) Inpb
5) Dreth
In the evdevelopequalitativMLLRS follows:
3 = High
Table 4 –Benefits Ease of UFlexibilitQuality oInternal/EData Driv
Other O
1) Ta.
b2) M
bryM
ulti-Level Linea
Flexibility/Inncluding locainear datum. nformation r
Quality of daurther data carriers to shanternal/exteolitical jurisenefit of the
Data-driven desponsive tohrough the u
aluation phaed to aid in thve benefits w– and then a
h Improveme
– Qualitative
Use/Accessibty/Integratioof Data External Colven Decision
Opportuni
The continual. It will be
MLLRS a. Easier to v
MLLRS is imreakdown ofou build it, t
MLLRS if it i
ar Referencing Nation
ntegration – al, state and This will a
resources. ata – Provideollection, daaring data an
ernal collabodictions, pri public. decision sup factual info
use of the ML
ase and the dhe evaluation
was then rankadding the su
ent 2 =
e Benefit Ra
bility n
llaboration n-making
ities/Bene
l advances inless expensi
actually is imvisualize dat
mplemented wf departmentthey will comis available a
System Cost/Bnal Cooperativ
The ability tfederal agenllow the coo
es for accuraata driven dend informatioration – Anvate organiz
pport – Ensuormation basLLRS.
development n of the variked based onubsequent op
= Moderate I
atings for BaB
fits
n technologyive to adopt mplemented.ta with eachwith an entetal silos inteme”. Other band they und
Benefit Value Ae Highway Res
to share datancies based oordination of
ate, consistenecision suppoon.
n increase in zations and i
ures that decied on all ava
phase of thiious qualitatin an improveptional funct
Improvemen
aseline and Baseline
2 3 1 1 1
y make this ait now – tho
h newer generprise architrnal to manybusiness/opederstand the
Analysis Study -search Progra
a and informon common f inter-agenc
nt and comport, and the e
n collaboratiointernal orga
isions are mailable data,
is study, objive benefits ement gainetional eleme
nt 1
Optional FuMan
a better timeough the ben
eration of GItecture and thy agencies. erational unibenefits to b
- NCHRP Projm, Transporta
mation througmethods of
cy investmen
lete data setelimination
on and coopeanizational u
made in a manby inter-rela
ective criterof the MLLR
ed for addingnts. The ran
1 = Low Imp
unctional Elnage
3 3 3 2 3
e to adopt annefits will be
IS software. thereby facilThere is a feits will be atbe obtained
ject 20-07, Tastion Research
ghout the DOrelating to a
nts in data an
s to support of institution
eration amonunits for the
nner more ating the dat
ia were RS. Each of
g the baselinenkings are as
provement
lements Model
3 3 3 3 3
n MLLRS. delayed unt
itates the eeling that “ittracted to ththrough its
sk 302, Board
OT, a nd
nal
ng
ta
f the e s
til
if he
Mu
ad
3) ItGth
4) Win
A samplIowa DO
“The LRSThe LRS be operaincludes as possibof the LRThe LRS completeintegratio “The LRSintegratiopracticescomparainvestmen(GIMS), DOT doeDOT’s ddisjointe
ulti-Level Linea
doption and t is now mor
Google Earthhe purpose o
With today’s nto the field
e of typical OT (IADOT
S approach implementating while otend user app
ble. Many cuRS implemen
approach alely redesign on solutions
S approach on needs ides and industrble to what onts that will and technolo
es not implemdata integratd and duplic
ar Referencing Nation
use. re possible toh and cloud-bof pilot proje
mobile advaoperations.
benefits to T) report:
at IADOT wtion strategyther componplication dev
urrent and futation plan wlso allows thexisting syst (e.g., enterp
defined for Ientified abovry-accepted other state Dalso benefitogy and relament the LR
tion needs. Hcative, with
System Cost/Bnal Cooperativ
o exploit extbased web seects. ances, there
be gained b
will provide by breaks the nents are notvelopment p
uture informawill also benhe DOT busitems. This is prise resourc
Iowa DOT isve. It is basedapproaches
DOTs are invt the GIS proated trainingRS, the DOTHowever, thecertain requ
Benefit Value Ae Highway Res
ternal resourervices) prio
is an increas
by implemen
benefits evenLRS down i
t yet implemrojects, thusation systemnefit from appiness areas tquite differe
ce planning
s a very goodd on sound ito the problvesting to imogram, Geogg to be used oT will still expe effort will uirements no
Analysis Study -search Progra
rces to help bor to making
sed opportun
nting a MLL
n while the Linto componeented. The is allowing be
ms developmepplying the Lto find benefent from oth(ERP) and d
d approach information lem. The cosmplement thegraphic Inforon other bus
xpend the momost likely ot being met
- NCHRP Projm, Transporta
build a case full capital
nity for integ
LRS is take
LRS is being ents, so somimplementatenefits to be ent projects LRS as part ofits without hher enterprisdata wareho
to meet the Dsystems devest of the LRSeir LRS. The rmation Mansiness appliconey and effcontinue as t.”
ject 20-07, Tastion Research
for MLLRScommitmen
grating MLL
en from the
implementeme of the LRStion plan realized as
that are not of their soluthaving to e system
ousing efforts
DOT data elopment S is very price includ
nagement Sycations. If thffort to meet
it does toda
sk 302, Board
(i.e. nts for
LRS
d. S can
soon part
tion.
s).”
des ystem he
the ay:
Mu
Chapt
Ten coreworkshopSupportinlist of the Functionmulti-dimobjects a
Functioncomprehrelates thtransform
Functiondimensiotemporal
FunctionA comprtopologictransport
Functionmodel mtemporal
Functionmodel malong a tr
FunctionLRS datathe netwo
Functiondimensiodata at th
ulti-Level Linea
ter 4 – De
functional rp. These corng each funce ten functio
nal Requiremensional LRnd events in
nal Requireensive, mult
he database rmations amon
nal Requireonal LRS datl referencing
nal Requireehensive, mcal representtation object
nal Requireust support tl resolutions.
nal Requireust support traversal in a
nal Requirea model musork event his
nal Requireonal LRS dathe object lev
ar Referencing Nation
efining th
requirementsre functionalctional requinal requirem
ments I: SpRS data mod
n three dimen
ments II: Tti-dimensionrepresentationg temporal
ments III: Tta model mu
g methods wi
ments IV: Multi-dimensitations at bots.
ments V: Rthe display a.
ments VI: Dthe navigatio
a transportati
ments VII: st support regstory.
ments VIIIta model muel and suppo
System Cost/Bnal Cooperativ
he Use an
s were synthl requiremenirement is a sments from s
patiotempordel must supnsions and ti
Temporal Renal LRS dataon to the real
referencing
Transformaust support trithout loss o
Multiple Caional LRS dath the same
Resolution –and analysis
Dynamics –on of objectsion network.
Historical Dgeneration o
: Accuracy ust support asort propagati
Benefit Value Ae Highway Res
nd Funct
hesized from nts form the eset of functioection 1.6 of
ral Referencpport the locaime relative
eferencing Sa model mustl world and m methods.
ation of Datransformatiof spatiotemp
artographic/ata model mlevel and va
A compreheof objects an
A comprehes in near real
Databases –of object and
and Error Pssociation ofion of those
Analysis Study -search Progra
tions of a
m the results oessence of thonal specificf NCHRP R
cing Methodation, place, to the roadw
System/Temt accommodmust provide
a Sets – A con among linporal accurac
/Spatial Topmust support marying levels
ensive, multnd events at
ensive, multl time and co
– A comprehd network sta
Propagationf error measerrors throu
- NCHRP Projm, Transporta
a MLLRS
of the NCHRhe MDLRS dcations. The
Report 460:
ds – A comp and position
way.
mporal Datudate a tempore the domain
comprehensinear, non-lincy, precision
pological Remultiple car of generaliz
i-dimensiont multiple sp
ti-dimensionontingent on
hensive, multates over tim
n – A comprures with sp
ugh analytica
ject 20-07, Tastion Research
S
RP 20-27(3) data model. following is
prehensive, n processes
um – A ral datum thn for
ive, multi-near, and n, and resolu
epresentatiortographic anzation of
nal LRS data atial and
nal LRS datan various crit
ti-dimensionme and maint
rehensive, mpatiotemporaal processes.
sk 302, Board
s a
for
hat
ution.
ons – nd
a teria,
nal tain
multi-al
Mu
FunctionLRS data
Functiondimensiosupport tevents oc
MLLR
A VA Stufunctionafully funcanalysis ipresented
Also, theto regard– the listi
ThereforMLLRS required are listedverb/nouanalysis irepetitiousingular Lcolumns
Table 1 –MinimizeOptimizeModel RStore DaEnsure BIntegratManage CIdentify LReduce IIntegratTranslat
ulti-Level Linea
nal Requirea model mus
nal Requireonal LRS datthe latency occurring at a
S Functio
udy is predical requiremectioning MLin a VA Studd in Report 4
e discussion d “multiple Ling of ten fu
e, the study under the coin the baseli
d in essentialun descriptionis completedus or overlapLRS) are lisfrom left to
– Function Ae Redundance Efficiencie
Reality atum Better Decisie Data Change Locations Impacts e Systems te Positions
ar Referencing Nation
ments IX: Ost store and e
ments X: Tta model mu
of events (i.e particular lo
n Analysis
cated on the ents from ReLLRS under dy is not dire460.
during the SLRMs” as theunctional req
team identifonstraints of ine system ally two wordn ensures cod as a brainstpping. The oted below inright).
Analysis cy
es
ons
System Cost/Bnal Cooperativ
Object-Leveexpress objec
emporal Toust support te. the differenocation).
s
discussion oport 460 wethis VA Stuectly associa
Step 1 Informe prime diffe
quirements fr
fied all of thef our VA studnd what fun
ds, shown as omplete undetorming effooverall functn the order th
Enhance CMaintainLeverage Improve ASupport TSupport BOperationEnable ViSave MonAssociateSave Tim
Benefit Value Ae Highway Res
el Metadatact-level meta
opology/Latemporal relance in time b
of functions,re also considy. It is impated with the
mation Phaseerentiating farom Report 4
e functions tdy. The team
nctions were an active ve
erstanding oort. Note thations for a fuhat they were
Cartographyn Datum
InvestmentsAccuracy Temporality
Business/ nal Units isualization ney e Attributes
me
Analysis Study -search Progra
a – A compreadata to guid
tency – A coationships ambetween sche
, as describeidered as theportant to die list of func
e of the VA Sfactor betwee460 could no
that were reqm then identoptional fun
erb and a mef the functioat some of thully functione generated
y
s
y
- NCHRP Projm, Transporta
ehensive, mude general d
omprehensivmong objectseduled even
ed in Chaptere basis for imfferentiate th
ctional requir
Study constren MLLRS aot be regarde
quired for a ftified what functional elemeasurable nouons of the syhe identifiedning MLLRSby the study
Improve REnsure CoDefine RoEstablish Stabilize LSupport MModel ConEnhance LSupport DUseable A
ject 20-07, Tastion Research
ulti-dimensidata use.
ve, multi-s and events
nts and actual
r 2. The mplementinghat function rements
rained the teand singulared in its enti
fully functiofunctions arements. Functun. A simplstem. Funct
d functions arS (compared y team (down
Relationshipsonsistency outes
FrameworkLocation Multi-modesnnectivity LRS
Design API
sk 302, Board
onal
and l
g a
eam r LRS irety.
oning e tions le tion re
d to n
s
k
s
Mu
The studyMLLRS received
Team medescriptioFunction
The MLLanchor po
linear refthe abilit
The MLLchanged.compromretired, o
ulti-Level Linea
y team used (minimum ra score of 5
embers wereons were the
ns (shown in
LRS must stooints constit
ferencing mey to add LRM
LRS must st The correct
mised when ror obliterated
ar Referencing Nation
a scoring prrequired) to evotes or mo
e then assignen consolida bold):
ore a linear tuting a mutu
locationto correlUltimatereplacedMLLRSbe relateamong th
The MLwith regbusinessversionstemporaending delementstime-bas
In NCHRethods. An eMs as they a
abilize locattness and theroutes (or sed.
System Cost/Bnal Cooperativ
rocess and idestablish a u
ore are listed
ned to define ated into the
datum. Thually exclusis. The MLLlate data fromely, the MLLd with contemS directly. Aed to the datuhe multiple
LLRS must agards to chans applications of NCHRP ality – therebdate-time vals of the netwsed events th
RP 20-27(3)established are determin
tion of objece accuracy ogments there
Benefit Value Ae Highway Res
dentified theuseable systed in bold in T
each of the following na
he datum is thive and totalLRS must inm systems thLRS can intemporary syst
As long as locum – disparapotential lev
lso include fnges in the trns. Evolving
20-27 elevaby enhancinlues that spe
work (hence hat are mana
) the networkframework
ned to be nec
cts and evenf spatial locaeof) are rena
Analysis Study -search Progra
e baseline fuem. The twoTable 1 abov
11 baseline arrative whic
he completelly exhaustivtegrate datahat use differegrate systetems that arecation or spaate systems cvels of the sy
functionalityransportationg business apated the needng the linear ecify the opedatum). Thi
aged in the bu
k is tied to thk provided bycessary.
nts when a tration of objeamed, renum
- NCHRP Projm, Transporta
unctions neco-word functve.
functions. Tch describes
e set of anchove ordered sea by providirent referenc
ems as legace designed toatial referenccan translatystem.
y to maintain network anpplications sd for MLLRSdatum with
erational statis can be trausiness appl
he linear daty MLLRS sh
ransportationects and even
mbered, reali
ject 20-07, Tastion Research
cessary for ations that
Those s the Baselin
or sections aet of linear ing a mechancing methody systems aro use the cing methodte positions
in the datumnd evolving ince earlier S to supporbeginning a
tus of the anslated to thlications.
tum through hould allow
n system is nts must notgned, extend
sk 302, Board
ne
and
nism ds. re
ds can
m
t and
he
for
t be ded,
Mu
By virtuemultiple
Finally, tdelivers twill typicwhereas clients th
In considbaseline
Functionand modiand even
Functionable to gepositionselement.
Functiondatum to
Functionbetween
Functionguide gen
The otheVI-dynambe accomGIS funcAPIs can
Two optinot scoreestablish
ulti-Level Linea
e of multiplee modes (rail
the MLLRS the full MLLcally be utilia smaller foo
hat attach to
deration of thapplication p
nal Requireify traversal
nts have begi
nal Requireenerate a dats and distanc
nal Requiretransform b
nal Requireactive traver
nal Requireneral data us
r five functiomics, VIII-ac
mmodated byctionality if tn be structure
ional functioe into the bas
some costs/
ar Referencing Nation
e LRMs, the l, transit, ped
needs to havLRS maintenized to manaotprint of theor utilize the
he Functionaprogrammin
ments I: Sps (i.e. routesinning and en
ments II: Ttum which r
ces over the h
ments III: Tbusiness data
ments VII: rsal dates an
ments IX: Ose.
onal requiremccuracy and y the same apthe model ined to provide
onal elementseline functio/benefits for
System Cost/Bnal Cooperativ
MLLRS wildestrians, bik
ve a useablenance abilitieage all 10 of e API can bee MLLRS.
al Requiremeng interface s
patiotempors) and the evnding time d
Temporal Reelates the elehistory of ea
Transformaasets between
Historical Dnd event date
Object-Leve
ments (IV-merror propag
pplication prncorporates the functionali
s where idenons categorytypical addi
Benefit Value Ae Highway Res
ll naturally eke paths, and
e applicationes to the GISthe NCHRP
e exposed to
ents I througshall therefo
ral Referencvents that occdurations.
eferencing Sectronic linkach and each
ation of Datn disparate b
Databases –es to display
el Metadata
multiple cartogation, X-temrogramminghe framewority to specifi
ntified from y. The purpoitions above
Analysis Study -search Progra
enhance LRd airports in
n programmS/LRS updatP 20-27(3) fuo the busines
gh X of Repoore address:
cing Methodcur along tra
System/Temk-node topolh transport lin
a Sets – mubusiness syst
– must utilizenetwork sta
a – must acce
ographic repmporal topo
g interface (Ark provisionic uses.
the remaininose of analythe baseline
- NCHRP Projm, Transporta
RS as it proviaddition to
ming interfate team. Thiunctional reqss/operationa
ort 460 show
ds – must beaversals – an
mporal Datulogy to the renk, with tim
st be able totems.
e the time coates and even
ess object le
presentationsology/latencyAPI), or evenns of NCHRP
ng set of funyzing these fue functions.
ject 20-07, Tastion Research
ides supporroads).
ace (API) whis full interfaquirements al units or w
wn above, th
e able to creand these rout
um – must beeal world
me being an
o utilize the
omponent nts over histo
evel metadata
s, V-resolutiy) can ultiman by the baseP 20-27 (3).
nctions that dunctions was
sk 302, Board
rt for
hich ace
eb
he
ate tes
e
ory.
a to
on, ately e
did s to
Mu
The optio
1) Lthth
2) Manin
3) Mp
Use of M
There areinformaticommunmethod tMLLRS encompaagency.
Table 2 –BusinessLRS Ma
Asset M
Sign/Sig Mainten Pavemen Structure Inter-age
Safety M HighwaySystem (
ulti-Level Linea
onal function
LRM Develohan is part ofhat was not a
Manage Chand the synchntegrate into
Model Connossibilities a
MLLRS
e many diffeion from theication, reduo method trais being use
assing list. H
– Business/Os/Operationa
aintenance
anagement
gnal Inventory
ance Manage
nt Manageme
es/Bridge Ma
ency Planning
Management S
y Performanc(HPMS)
ar Referencing Nation
nal elements
opment is def the baselinas highly conange is definhronization o the MLLRSectivity is d
and other con
erent uses fore available dauced liabilityanslation thrd in many ag
However, it p
Operational al Unit
y
ement
ent System
anagement Sy
g and Data Sh
System
e Monitoring
System Cost/Bnal Cooperativ
s include:
efined as thee plan – extensidered durned as data frof business dS. defined as ennnectivity is
r a MLLRSata to facilita
y and reducerough a commgencies throrovides info
Unit and UsUse CreameasCollefashiCapt
ProvmainCollepave
ystem Collebridg
haring Collebetwthe sCollerelat
g Collethe H
Benefit Value Ae Highway Res
e opportunityending the Mring the baserom one busdata, cascadi
nabling a roussues like un
which will iate better ded duplicatiomon linear dughout the U
ormation in s
Use or Benefior Benefit
ation, maintensures ection, creatioion ture, managem
vide resource ntenance activection, creatio
ement conditioection, creatioge, overpass aection, planni
ween local govstate DOT ection, managed informatioection and ma
HPMS regulat
Analysis Study -search Progra
y to integrateMLLRS to a eline developsiness systeming the chang
utable networnconnected g
improve an iecision-makin of efforts.
datum. The United Statesupport of ad
fit within the
nance of the L
on, maintenan
ment, analysi
allocation, wvities and repon, reporting,on data on, reporting,and other struing and sharinvernments, re
gement and aon aintenance oftory reports
- NCHRP Projm, Transporta
e perhaps evmore obscu
pment. m to another ges to the ne
rk that is awgrade separat
integrated leing, improve A MLLRSfollowing iss. This is no
dopting a ML
e Unit
LRS geometry
nce of asset d
s of sign and
work schedulinorting of wor, maintenance
, maintenanceucture informang of transpo
egional planni
analysis of acc
f HPMS data
ject 20-07, Tastion Research
ven more dature LRM typ
business sysetwork to
ware of turnintions.
evel of ed highlights
s a list of howot an all-LLRS within
y, routes,
data in a digita
signal assets
ng for rk performede and analysis
e and analysisation rtation projecing agencies a
cident and saf
and provision
sk 302, Board
ta e
stem
ng
w a
n an
al
s of
s of
cts and
fety
n of
Mu
BusinessExecutiv
511
Traffic M
EnvironmComplia RoadwayProgramEquipmeMaterialRoadwayFinance ReportinEvaluatiLegislatiIntersect
Legal
Outdoor
Examp
Iowa De
The statereports toover the pGIS/LRS
ulti-Level Linea
s/Operationave Dashboard
Management C
mental Impacance
y Photo Log m Managemenent Manageml Managemeny Inventory Department
ng on Routing/Pive tions
Advertising
le Usages
partment o
e of Iowa useo the Federalpast 18 mon
S based datab
ar Referencing Nation
al Unit d
Center
ct Review/NE
nt ment
t
Planning
f Transport
es MLLRS tl Highway A
nths to changbase with a m
System Cost/Bnal Cooperativ
Use Easilvisuadata and rColletravecondoptioTraffsituaSigncontr
EPA PerfodeterwetlaLandRepoGPSGPSSuppSuppSuppUsedProvUsefpoinProvissueTrac
tation – HPM
o submit HigAdministratioge to the newmore normal
Benefit Value Ae Highway Res
or Benefit ly accessed analization of Kto support dereports for prection and maelers; potentiaditions, constrons, etc. ffic or transpoational awarennal control, trarol, dispatch, orm environmrmine NEPA ands, endanged based photoort and track o-AVL, tracki tracking of m
ports HPMS rports reportinports all otherd to coordinatvides reports aful for traffic ts
vides multi-leves/cases cking location
MS 2010+
ghway Perfoon (FHWA)
w HPMS 201lized structu
Analysis Study -search Progra
nd easily usedKey Performanecision makinresentation puaintenance ofally includes wruction, conge
ortation operatness and contaffic flow conetc.
mental impactcompliance. ered species,
ographs of theon funding thing equipmenmaterial locatreporting, but
ng duties for sr types of requte statewide eand data to mand planning
vel, accessibl
ns for signage
ormance Mo. All states
10+ submittaure rather tha
- NCHRP Projm, Transporta
d presentationnce Indicator
ng. Uses charurposes f data to commweather-relatestion, alterna
tions center thtrol of transpontrol, variable
t studies for p Looking at farchaeologic
e system hat has been pnt locations tions/storage lt also tracks otate and federuired or requeevacuation mo
meet requests g to store turni
le data to supp
e and billboard
onitoring Syswere faced wal format whan the old se
ject 20-07, Tastion Research
n and rs and associarts, graphs, m
municate to ted road ative travel
hat provides ortation device message sig
project work tfactors such acal sites, etc.
provided
locations other data ral agencies ested reportinodels
ing movemen
port tort liabi
ds
stem (HPMSwith a challehich is a gmented sys
sk 302, Board
ated maps
ces. n
to as
ng
nt
ility
S) enge
stem.
Mu
The HPMall busine
Iowa neeall to mildo transfeverythin Local datprobablyby refereBeing abpast IADto combiprocess tbetter rat
Arizona
The Arizdisparatedone for accomplieven in th
For examone that mLRMs fodata stew
All businenabled. that have“LRS Gepending f
For this pthan the lGeocodedifferent organizat
ulti-Level Linea
MS 2010+ daess data even
eded to be able point LRMformations, ing to mile po
ta authoritiey use more ofence post offble to combinDOT could sp
ne pavemeno eliminate tther than wo
Departmen
zona Departmely referencecrash data aishes MLLRhe same bus
mple, a trafficmakes the m
or each end oward’s need a
ness tables u This allows
e been validaeocoding”. Ofuture realig
purpose, the last build da is advised (business dat
tion to be qu
ar Referencing Nation
ata model usn on local ro
ble to locate M with consit is easy to coint for HPM
s usually wif an intersecfset, GPS locne data frompend weeks o
nt data with ithe user persrrying about
nt of Transp
ment of Traned data to a canalysis and tRS by allowin
iness table.
c crash, HPMmost sense toof the same eand understa
sing the MLs the entire eated against tOnce an evengnments.
last validatiate of the rou(resulting in tasets. Geo
uickly valida
System Cost/Bnal Cooperativ
ses a mile pooads.
all data usedistent routes.collect the daMS submittal
ll not use mition offset o
cation and mm different sy
or months trnventory datspective andt its location
portation – C
nsportation (Acommon linethen to meetng data stew
MS event or o the data proevent makinganding.
LLRS adopt aenterprise to the linear dant is LRS-ge
ion date is stute that it is man update to
oprocessing rated – in who
Benefit Value Ae Highway Res
oint type line
d for HPMS . If there is ata in the datl.
ile points or or GPS locatimile point. ystems on therying to matcta, as an exa
d the users/ann.
Crashes, th
ADOT) has ear datum fort HPMS requ
wards to utiliz
other event ovider. Lineg the descrip
a compliant use any acc
atum. In Arieocoded, its
tored on eachmeasured upo the last valroutines enabole, or as ind
Analysis Study -search Progra
ear referencin
on their roaa good LRSta’s native lo
reference poion with a ro
e fly is the kch mile poinample. An Lnalyst can fo
en HPMS
been using Mr business puuirements. Aze any of the
can use anyear events caption of each
schema in oessible businizona, this varoute and m
h event recopon. Otherwlidation date ble businessdividual rout
- NCHRP Projm, Transporta
ng method (
ad network a System withocation meth
osts to locateoute. State d
key in savingnts to referenLRS system aocus on maki
MLLRS to purposes. IniArizona’s Me multiple su
y LRM of chan even utilih event custo
order to beconess table haalidation pro
measure are r
rd and is expwise a precau
value) befors tables acrostes are built/
ject 20-07, Tastion Research
(LRM) to loc
and convert th the abilityhod and conv
e data. Theydata is collec
g time. In thnce post locaallows this ing the data
process itially this w
MLLRS upported LR
oice – usualize different omizable to t
ome MLLRSaving recordocess is calleelatively sta
pected to be utionary LRSre overlayinss the /rebuilt.
sk 302, Board
cate
them y to vert
y will cted
he ations
itself
was
RMs -
ly
the
S-ds ed able –
later S ng
Mu
The availcapabilityThe MLLvalidate –validity oto make t
ulti-Level Linea
lability of upy to quickly LRS increase– positional of the other athe overall d
ar Referencing Nation
p-to-date LRassemble re
es efficiencyaspects of anaspects of thdatasets more
System Cost/Bnal Cooperativ
RS-geocodedeports from dy by minimizn event. The
he event (i.e. e reliable an
Benefit Value Ae Highway Res
d business tabdifferent datazing the effoe saved timethe actual sh
nd accurate fo
Analysis Study -search Progra
ables provideasets into su
ort necessarye-effort can bhoulder wid
for better dec
- NCHRP Projm, Transporta
es analysts wubmittals likey to keep tracbe used to im
dth, year of ccision-makin
ject 20-07, Tastion Research
with the e the HPMSck of – and mprove the construction,ng support.
sk 302, Board
.
, etc.)
Mu
Chapt
It is impodiscussedMLLRS Along wiimplemenimprovemimplemen4. The cbenefit/celements
There areimplicati
• Tinwsoin
• Fsecoau
• Tagm
• E
ex
• 2avimstcem
ulti-Level Linea
ter 5 – Co
ortant to undd in Chapter to help in thith the actuanting the MLments and cont the baseliosts for mainost savings a and mainten
e several assions.
The costs shoncluding har
would be reduoftware expenitiative.
or labor rateervice rates, overed by agutonomous,
The MLLRS gency staff d
management
Either nothingxpertise and
5,000 miles verage state mplement Mtate highwayenterline mil
maintenance
ar Referencing Nation
osts, Savi
derstand the b3, when imp
he decision-mal costs assocLLRS, thereost savings thine system anntenance areand improvenance of the
sumptions th
own are exclurdware. For uced if existenses might
es, both costsof $150.00 p
gency staff aa $50.00 rat
will be implduring impleby the consu
g exists or thd learning co
of centerlinehas over thr
MLLRS for ony agency. Aleage to helplabor costs f
System Cost/Bnal Cooperativ
ings and
benefits, as plementing amaking proceciated with e are also hat can be rend the two oe also providements are ale system.
hat have been
usive of whaexample, da
ting LRMs aalready be e
s and savingper hour wa
after implemte for civil se
lemented froementation isultant during
he current systs to make i
e per state wree times thisnly the fracts costs are dp determine for Applicati
Benefit Value Ae Highway Res
Improve
a ess.
ealized. Theoptional funcded. The costlso provided
n made to he
at is already ata migrationare already inencumbered
gs, an integras used. How
mentation haservice was u
om scratch bs gauged at tg implement
ystem will noit work is to
was used as ths mileage in tion of the pudetermined fothe total cosion Managem
Analysis Study -search Progra
ement St
e following ictional elemet savings, in
d for the base
elp understan
available wn costs (i.e. dn place. Fixby the enter
ated rate of bwever, wheres succeeded used.
by specialiststhe equivaleation.
ot integrate,o high.
he baseline fn total, some ublic networ
for the agencst. As an exament are pre
- NCHRP Projm, Transporta
atistics
information ents, as desc
ncluding someline, option
nd both the c
within the statdevelopmented hardware
rprise prior to
both consultae annual maiand the agen
s, the contribent cost of pr
or the existi
for costs. Thstate DOTs
rk that is macy, judiciousample, the anesented in Ta
ject 20-07, Tastion Research
lists the coscribed in Cha
me life cycle nal functiona
cost and savi
te agency, t of LRMs) e and COTS o a MLLRS
ant and civilintenance is ncy is
bution of theroject
ing manpow
hough the may choose
aintained by tly factor thennual able 3 below
sk 302, Board
ts to apter
al
ing
l
e
wer
e to the
e
w is
Mu
$bisgrT
• Tce
• Aac
• Abyunro
• Tdsc
• S
Table 1 -Cost CatHardwarCore SysAnnual M
Total Ba
Table 2 –La
ApplicatiData DevTraining System IProject MAnalysis LRM DeTOTAL
ulti-Level Linea
75,000, but etween the Ds dependent urowth/chang
Transportatio
There alreadyenterline).
All importantccess local r
A spatial repry GPS roadwnder the annoads in a 25,
The existing boes have somchema whichome staging
- Baseline Sytegories e
stem SoftwarMaintenance
aseline Syste
– Baseline Dabor Cost Cion Managemvelopment &
ntegration Management
& Coordinaevelopment
ar Referencing Nation
are likely noDOT and theupon the ove
ge in the areaon, they are m
y exists a goo
t open-to-pubroad informaresentation iway traces tonual mainten,000 mile of business sysme type of sph can be leve
g work will b
System Costs
re (COTS) e of COTS
em
DevelopmentCategory ment
& Input
, Business ation
System Cost/Bnal Cooperativ
ot factored toe applicationerall centerlias covered bmaintaining
od primary r
blic roads aration throughs available so confirm th
nance cost prf road state. stem targetedpatial descrieraged). be required w
t Costs ParamState 25k miState 5 businState
3 LRM
Benefit Value Ae Highway Res
o total milean provider. Hine mileage
by the MLLR100,000 mil
road network
re included ah agreementssuch as recene above two
rovides an an
d for integratiptive compo
within a busi
meter Cons$2
iles $1$
ness $2$5
Ms $$1,3
Analysis Study -search Progra
age – dependHowever, linand is also i
RS. For the les of roadw
k (+/– 3 met
and the states, digitizationt aerial imao issues. Thennual figure
tion is usingonent already
iness system
sultant S242,400
76,400$26,400288,000517,200
$93,600344,000
- NCHRP Projm, Transporta
ding upon thenear datum minfluenced byIowa Depart
way at a cost
ter accuracy
e agency is abon, or purchaagery perhape “Purchase for confirm
g some LRMy incumbent
m for integrat
Staff Costs $77,48$56,38
$8,439$92,057
$165,319
$29,919$429,600
ject 20-07, Tastion Research
e relationshimaintenancey the rate oftment of of $300,000
from true
ble to easilyase. s supplemenData” line it
ming the exten
M method (i.et in the datab
tion to occur
Total $42
$190Includ
Ta$232
Combi1 $3195 $2329 $347 $3809 $682
9 $1230 $1,773
sk 302, Board
ip cost
f
0.
y
nted tem nt of
e. it base
r.
Cost2,5000,000ded in able 42,500
ned 9,8812,7854,8390,0572,519
3,5193,600
Mu
Table 3 – Cost CatLabor – ALabor – TLabor – SBusiness(Actual idependenbusiness/smaller oexperienccost to alshown.) Labor – S
HardwarSoftwarePurchaseTOTAL
Table 4 -
CLabor – ALabor – DLabor – TLabor – S
Table 5 - Cost CatLabor – ALabor – TLabor – SSoftware
ulti-Level Linea
– Annual M
tegories Application Training System Integ System) Incntegration cnt on the size/operational organizationsce a potentialmost 1/10th
System Over
e e e Data
- Optional F
Cost CategoApplication Data DeveloTraining System Over
- Maintenan
tegories Application Training System Overe
ar Referencing Nation
Maintenance
Managemen
gration (Per cludes Repoosts are e of the unit. Much s will al reduction of the cost
rsight
Functional E
ories Managemen
opment/Input
rsight
nce Costs – O
Managemen
rsight
System Cost/Bnal Cooperativ
Costs – Bas
FTEnt
rts
in
Budgetdepreci
Annual
Element CosLRM D
nt t $
Optional FuL
Devent
Benefit Value Ae Highway Res
seline
E’s Ho
R.750.9 $
0.50.5 $
0.10.1 $
t 20% of baseliiation and COT
lly updated aer
sts evelopment
0$40,000/each
00
unctional EleLRM elopment
00
$6,000$5,000
Analysis Study -search Progra
ourly Rate T
$50.00$150.00
$50.00$150.00
$50.00$150.00ine costs for haTS software ma
rial imagery
t Manage
0h $12,000
ements Manage
0000
- NCHRP Projm, Transporta
Total Hours 1500
120
1600400
1600400
ardware aintenance fees
e Change
$12,000 000/system
0 $5,250
e Change
$1,800 $600
0 0
ject 20-07, Tastion Research
Total C0 $750 $16
0 0
$40$30
0 0
$8$6
s $8
$38$30
$251
ModelConnectiv
$275$206
$6$5
ModelConnectiv
sk 302, Board
Cost 5,0006,200
0,0000,000
8,0006,0008,5008,0000,0001,700
l vity 5,0006,5506,0005,250
l vity
0$600
00
Mu
Cost Be
Total cosunderstanbaseline Optional analyses Note thatto underslead to su
When exwhile thefigures wthrough teach partindividua
From a VB/C ratioversus 21topics of aggregateMLLRS organizatdisparateframewo
Thereformultiple the enterpexponent
Table 6 a
ulti-Level Linea
enefit Ana
st/benefit is ind the total iMLLRS. (SFunctional were done wt the annual stand that theubstantial ov
xpressed as ae optional fuwere generatethe workshopticular state ial operating
Value Analysos in VA stud1.4:1 optionaf VA studies.ed conditionis a cost-bention comes f
e data to the rk, yields sig
e, it is impormethods of prise - as wetial benefits
and 7 are loc
ar Referencing Nation
alysis
important toimpacts of thSee Table 6 –Elements ca
with an estimbenefits are ese savings cverall system
a cost-to-bennctional elemed from empp participantis analyzed sconditions.
sis perspectidies. Withinal functional. The numbe
ns of the stateneficial endefrom further same linear gnificant sav
rtant to havelinear refereell as handle for relatively
cated on the
System Cost/Bnal Cooperativ
o evaluate to he system. A– Life Cycle
an be found imated breake
significant ocan be contin
m savings for
nefit ratio (C/ments yield pirical valuests. These agseparately fo
ive, it is not n this study, l elements, isers - though es that couldeavor by itseexploitationdatum. Eac
vings reward
e a single linencing. Expa
other functiy incrementa
next two pa
Benefit Value Ae Highway Res
aid in the imA cost/benefe Cost - Basein Table 7 –even time of over the 5-yenued througr the agency.
/B), the basean aggregates generated bggregate C/Bor their own
outside of exthe disparitys within reassubject to th
d provide datelf. Once bun of the singlh added func
ds with very
near datum inanding that sional objectial additional
ages.
Analysis Study -search Progra
mportant decfit analysis weline). TheCost Benefi
f 5 years andear period. I
ghout the actu.
eline effort ye 21.4:1 ratioby several o
B ratios are bbenefits ver
xpectations ty between 1.sonable expehe limitationta - still refle
uilt, the MLLle frameworkctionality bulittle added
n a framewosame framewives of NCHl cost.
- NCHRP Projm, Transporta
cision-makinwas performee cost/benefifit Analysis –d an escalatioIt is importaual life of th
yields a C/B o of benefitsf the particip
bound to be drsus costs us
to yield sign.8:1 for baseectation comns of the partect that build
LRS real valuk for assimiluilt onto the capital costs
rk that accomwork to exte
HRP 20-27(3)
ject 20-07, Tastion Research
ng process toed on the it analysis fo– Optional. on rate of 3%ant for the aghe system an
ratio of 1.8:s to cost. Thpating statesdifferent whing their
nificantly higeline elemen
mpared to othticular ding the baseue to the lating previobaseline s.
mmodates thnd further ac) - will prov
sk 302, Board
o
or the The
%. gency d can
1 hese s hen
gher nts her
eline
ously
he cross ide
Mu
Table 6 –
TITL
Life Cycl
A.
B.
F.
ulti-Level Linea
– Cost/Benef
LE:
le Period
INITIAL
Service LiOriginal
Service LiAlternativ
SUBSEQU
1. Labor
2. Softwa
C. SUBSEQU
1. Staff H
2. Operati
3. Busine
4. Other D
TOTAL P
ar Referencing Nation
fit Analysis
CosMLLR
5 Ye
COST
ife-
ife-ve
UENT ANNUA
are
UENT ANNUA
Hours
ional Hours
ss/Operational U
Departmental Ho
P
PRESENT VAL
System Cost/Bnal Cooperativ
Baseline M
st Benefit ARS Baseline C
ears
AL MAINTENA
AL BENEFITS/
Unit Improvemen
ours
T
PRESENT V
PRESENT VAL
LUE BENEFIT
Benefit Value Ae Highway Res
MLLRS
Analysis Cost/Benefit
Real Discount
Years
Years
ANCE COSTS
SAVINGS
nts
T
Total Subseque
VALUE OF SUB
PRESENT
LUE OF SESEQ
(A+D+E)
Analysis Study -search Progra
nt Rate
INIT
Total Subsequen
ent Annual Ben
Present Val
BSEQUENT AN
T VALUE OF T
QUENT ANNU
TOTAL C
COST BE
- NCHRP Projm, Transporta
3.00%
TIAL COST:
nt Annual Cost
nefits/Savings:
lue Factor (P/A
NNUAL COSTS
TOTAL COSTS
UAL BENEFITS
COST BENEFIT
ENEFIT RATIO
ject 20-07, Tastion Research
$2,0
$1
$
($
($1
($1,16
($
ts: $2
($1,19
A):
S: $1,0
S: $3,0
S: ($5,45
($2,43
T: $2,4
O:
sk 302, Board
006,100
75,200
$46,500
$7,500)
15,000)
68,000)
$1,500)
221,700
92,000)
4.580
015,386
021,486
59,360)
37,874)
437,874
1.8:1
Mu
Table 7 –
ulti-Level Linea
– Cost/Benef
ar Referencing Nation
fit Analysis
System Cost/Bnal Cooperativ
Optional Fu
Benefit Value Ae Highway Res
unctional El
Analysis Study -search Progra
Elements
- NCHRP Projm, Transporta
ject 20-07, Tastion Research
sk 302, Board
Mu
SCHEDU
To impleafter awa
ulti-Level Linea
ULE
ement a MLLard of the con
ar Referencing Nation
LRS it is reantract to a co
System Cost/Bnal Cooperativ
asonable to eonsultant an
Benefit Value Ae Highway Res
expect that apd then full u
Analysis Study -search Progra
pproximatelyuse of the ML
- NCHRP Projm, Transporta
y 2 years forLLRS.
ject 20-07, Tastion Research
r completion
sk 302, Board
n
Mu
Chapt
Agenciesupgradedrequirem
Key Im
1) O
2) Ean
3) Idp
4) E5) E6) S7) D8) S9) D
ulti-Level Linea
ter 6 – Im
s often face nd systems. P
ments should
mplementa
Organizationaa. The o
suppoi.
ii.
b. High lc. This md. Devel
i.
ii.
iii. Establish modnd/or compldentify functerformance
Establish a mEstablish a tra
ecure resourDetermine the
et and manaDevelop an o
ar Referencing Nation
mplement
numerous chPrior to maki
be identified
tion Requ
al Support rganization m
ort the MLLRAn enterprAs busineslegacy datconformin
level (i.e. upmust fit withlop a busines
Include saimplementDevelop abeing doneComplete
del specificaete the worktional requirattributes
maintenance paining plan arces – manpoe schedule p
age internal eutreach plan
System Cost/Bnal Cooperativ
tation of
hallenges reling a final ded and action
uirements
must have eRS includingrise informatss/operationta can be adang MLLRS cpper managehin agency’sss case
avings expectation
a lessons leare in a timelya risk analys
ations and a k with existinrements need
plan and appand approachower, fundin
progress timeexpectationsn internally w
Benefit Value Ae Highway Res
a MLLR
lated to implecision on implans put in
stablished pg; tion technolal units begi
apted until lecomponentsement) cham
mission or t
ted once imp
rned plan any manner andsis and mitigscope of wong staff ded within y
proach, capith ng, staffing, eline and mos with staff and
Analysis Study -search Progra
RS
lementation mplementingnto place to e
olicies and p
ogy infrastruin or continuegacy system
mpion to leadthe mission m
plemented a
d milestonesd on schedulgation plan ork to be used
our agency t
talizing on le
contingencyonitor it
d manageme
- NCHRP Projm, Transporta
of new systeg a MLLRS,ensure succe
procedures in
ucture ue to developms are replac
d the effort must be chan
and even dur
s to ensure ale
d to obtain o
to meet the b
essons learne
y for staff tur
ent
ject 20-07, Tastion Research
ems or even the followin
ess.
n place that
p informatioced with
nged
ing
activities are
outside servi
baseline
ed
rnover, etc.
sk 302, Board
ng
on,
ices
Mu
Impact
It is also implemen
1) C2) In3) C4) C
m5) L
ab6) A7) D
ar
The impaIowa rep
“anmre
ulti-Level Linea
ts of Not Im
important fonting a MLL
Continued “sinability to ad
Continued poContinued resmore timely iLack of transpble to provid
A need to incDelays to prore changing
act of not imort presented
…If the DOnd effort to m
most likely coequirements
ar Referencing Nation
mplement
or the agencyLRS. The on
ilos and stovdequately anolitical pressusponsivenesinformation parency andde the necesscrease resouroject scheduland increasi
mplementing d at the end
T does not immeet the DOontinue as it not being m
System Cost/Bnal Cooperativ
ting MLLR
y to understanes identifie
vepipes” of dnd factually dure to be mos issues to mincreases
d potential pusary data rces to meet les will contiing
MLLRS is pof Chapter 3
mplement thOT’s data int
does today:met.”
Benefit Value Ae Highway Res
RS
and some of d by the stud
data internal defend budgore responsivmeeting requ
ublic percept
increasing dinue or incre
probably bes3:
he LRS, the Dtegration nee disjointed a
Analysis Study -search Progra
f the pitfalls dy team are
l to the agencget requests fve and provi
uests as they
tion issues b
demands, whease because
st qualified b
DOT will steds. Howeveand duplicati
- NCHRP Projm, Transporta
and concernas follows:
cy for allocationide more accwill increase
because the a
hich are not ae requiremen
by the anecd
till expend ther, the effort ive, with cer
ject 20-07, Tastion Research
ns with not
n curate data e as the need
agency is no
available nts and dema
dote from the
he money will
rtain
sk 302, Board
d for
t
ands
e
Mu
Chapt
AASHTO
API .......
COTS ...
DOT .....
ERP ......
FTE ......
GIS .......
GIMS....
GPS ......
GPS-AV
HPMS ...
LRM .....
LRS ......
MDLRS
MLLRS
NCHRP
NEPA ...
PM ........
SAVE In
TASAS .
TIG .......
VA ........
ulti-Level Linea
ter 7 – Gl
O ................
...................
...................
...................
...................
...................
...................
...................
...................
VL ................
...................
...................
...................
...................
...................
...................
...................
...................
nternational .
...................
...................
...................
ar Referencing Nation
lossary o
............ ame
...................
...................
...................
...................
...................
...................
...................
...................
.................. g
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
System Cost/Bnal Cooperativ
f Terms
erican associ
....................
....................
....................
....................
....................
....................
....................
....................
geographic p
....................
....................
....................
....................
....................
............... na
....................
....................
............. (for
.............. traf
....................
....................
Benefit Value Ae Highway Res
ation of state
................. ap
....................
....................
....................
....................
....................
. geographic
....................
position syste
......... highwa
....................
....................
.. multi-dime
.............. mul
ational coope
...... national
....................
rmerly) Soci
ffic accident
.................. t
....................
Analysis Study -search Progra
e highway tr
pplication pr
.............. com
........ departm
........ enterpr
....................
.... geographi
c managemen
.......... geogr
em for autom
ay pavement
............ linea
............. line
ensional line
lti-level line
erative highw
environmen
....................
iety of Amer
t surveillanc
technology i
....................
- NCHRP Projm, Transporta
ransportation
rogramming
mmercial off
ment of trans
rise resource
.... full time
ic informatio
nt informatio
raphic positio
matic vehicl
t manageme
ar referencin
ear referencin
ear referencin
ear referencin
way research
ntal protectio
....................
rican Value E
ce and analys
implementat
............ valu
ject 20-07, Tastion Research
n officials
g interface
f-the-shelf
sportation
e planning
employee
on system
on system
on system
e location
ent system
ng method
ng system
ng system
ng system
h program
on agency
. post mile
Engineers
sis system
tion group
ue analysis
sk 302, Board
Mu
Chapt
………..NLocation ……….SA
ulti-Level Linea
ter 8 – Re
NCHRP Repon Referencing
AVE Interna
ar Referencing Nation
eferences
ort 460, Guig Systems
ational Body
System Cost/Bnal Cooperativ
s
idelines for t
y of Knowled
Benefit Value Ae Highway Res
the Impleme
dge
Analysis Study -search Progra
entation of M
- NCHRP Projm, Transporta
Multimodal T
ject 20-07, Tastion Research
Transportatio
sk 302, Board
on