CWIND.GLOBAL CASE STUDY POWER Mul-purpose Cable Innovator installs power cable between oil plaorms in the Gulf of Mexico Global Marine Group’s mul-purpose vessel, the Cable Innovator, was used to install a subsea power cable between two oil plaorms in the Bay of Campeche, Gulf of Mexico. As part of an upgrade program which was administered by Swecomex SA de CV, an offshore engineering company, the cabling provides vital power connecvity between Nahoch A and Takin A which are owned by Mexico’s naonal oil company, Pemex. Swecomex required a rapid and professional power cable installaon to keep the upgrade project to me and budget. The operaons began in December 2006 and ended in April 2007. Swecomex selected the company, aſter a compeve tender process, based upon a combinaon of its experse in the oil and gas industry and leading edge cable installaon and maintenance technology. TECHNIQUES USED The Cable Innovator placed an 11.5 kilometre connecng power cable between the two plaorms. The cable was buried one metre beneath the sea bed at an ocean depth of up to 40 metres. “Maressing” was also used, a process which uses an electronic heave compensaon control winch in the laying of protecve concrete maresses, over seven different Pemex oil or gas pipelines. These pipelines connect the two oil plaorms back to the mainland. The maresses are laid between the pipe and subsea cable to reduce damage to the exisng pipes and then on top of the cable to protect the cable from erosion. ‘Sandwiching’ the cable provides long term protecon and therefore reduces costs in the future. VESSEL: CABLE INNOVATOR Locaon: Gulf of Mexico Cable Length: 11.5km power cable Services: Installaon, Maressing & PLIB Subsea Equipment: ST200 Series CWind, part of the Global Marine Group, delivers the company’s power cable capabilies. The group has a significant track record in offshore renewables and power, and this is one of many case studies that demonstrates our collaborave experience.

Upload: others

Post on 23-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Multi-purpose Cable Innovator installs power cable between ......the oil and gas industry and leading edge cable installation and maintenance technology. TECHNIQUES USED The Cable

CWIND.GLOBAL

CASE STUDYPOWER

CW00

2 v1

Multi-purpose Cable Innovator installs power cablebetween oil platforms in the Gulf of Mexico

Global Marine Group’s multi-purpose vessel, the Cable Innovator, was used to install a subsea power cable between two oil platforms in the Bay of Campeche, Gulf of Mexico.

As part of an upgrade program which was administered by Swecomex SA de CV, an offshore engineering company, the cabling provides vital power connectivity between Nahoch A and Takin A which are owned by Mexico’s national oil company, Pemex. Swecomex required a rapid and professional power cable installation to keep the upgrade project to time and budget.

The operations began in December 2006 and ended in April 2007. Swecomex selected the company, after a competitive tender process, based upon a combination of its expertise in the oil and gas industry and leading edge cable installation and maintenance technology.

TECHNIQUES USEDThe Cable Innovator placed an 11.5 kilometre connecting power cable between the two platforms. The cable was buried one metre beneath the sea bed at an ocean depth of up to 40 metres.

“Mattressing” was also used, a process which uses an electronic heave compensation control winch in the laying of protective concrete mattresses, over seven different Pemex oil or gas pipelines. These pipelines connect the two oil platforms back to the mainland.

The mattresses are laid between the pipe and subsea cable to reduce damage to the existing pipes and then on top of the cable to protect the cable from erosion. ‘Sandwiching’ the cable provides long term protection and therefore reduces costs in the future.

VESSEL: CABLE INNOVATORLocation: Gulf of MexicoCable Length: 11.5km power cableServices: Installation, Mattressing & PLIBSubsea Equipment: ST200 Series

CWind, part of the Global Marine Group, delivers the company’s power cable capabilities. The group has a significant track record in offshore renewables and power, and this is one of many case studies that demonstrates our collaborative experience.

Page 2: Multi-purpose Cable Innovator installs power cable between ......the oil and gas industry and leading edge cable installation and maintenance technology. TECHNIQUES USED The Cable

For further information on CWind please visit: CWIND.GLOBAL or contact our sales team.

UK: +44 1245 702000 | Asia: +65 65131300

CW03

0 v1

KEY CHALLENGES Locating existing pipelines: Many of the oil and gas pipes had been buried deep into the ocean floor and had now become difficult to locate. Maps and indication plans from Pemex could only offer basic information of where the pipes may lay, so Global Marine used Remotely Operated Vehicles (ROVs), which have sensory devices, to locate exactly where the pipes were.

The work required trained operators who controlled the ROVs from the Cable Innovator, to monitor a camera relayed from the ROV to the vessel, to see what was happening undersea.

RESOURCESShip: Cable Innovator, an advanced offshore engineering ship, is a multi purpose offshore vessel and is capable of handling the wide variety of subsea tasks required by such diverse industries as telecommunications, oil & gas and deep sea scientific research.

Submersibles: Cable Innovator was equipped with the ST200 series of free swimming ROVs which have set the benchmark for modern cable working ROVs. The flexible system can operate in both free swimming and tracked modes.

“Trust was the determining factor when selecting a partner to work with on this project. They have proven experience of delivering high level power cable installation and maintenance services to the oil and gas market and was therefore a natural partner of choice.”

Mr. Armando Rimoldi Renteria Managing Director for Swecomex