multifamily residential development lot 7 – stone …

77
MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE BRIDGE CROSSING Drainage Report Prepared for: EG Home LLC 41 Fieldstone Lane Beacon Falls, CT 06403 141.15070.00006 May 19, 2021

Upload: others

Post on 21-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE BRIDGE CROSSING

Drainage Report

Prepared for: EG Home LLC

41 Fieldstone Lane Beacon Falls, CT 06403

141.15070.00006

May 19, 2021

Page 2: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

EG Home LLC 2 May 19, 2021 Drainage Report – Multifamily Residential Development Lot 7 – Stone Bridge Crossing

Drainage Report Multifamily Residential Development

Lot 7 – Stone Bridge Crossing Dickerman Road

Cheshire, Connecticut May 19, 2021

141.15070.00006 This Drainage Report has been prepared in support of a proposed multifamily residential development to be constructed off Dickerman Road in the town of Cheshire, Connecticut. One entrance to the site from Dickerman Road will be constructed with a second access point for emergency access. The interior roadways will terminate in cul-de-sacs and there will be a center roundabout connecting the roads. The residential units will consist of a mix of townhouse-style and duplex units.

Figure 1 – Existing Parcel

Page 3: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

EG Home LLC 3 May 19, 2021 Drainage Report – Multifamily Residential Development Lot 7 – Stone Bridge Crossing

Table 1 – Stormwater Data Parcel Size Total 26.8 acres

Existing Impervious Area (Development Area) 0.0 acres

Proposed Impervious Area (Development Area) 8.82 acres

Proposed Land Use Open space, sidewalks, bituminous roadway, and building

Design Storm for Stormwater Management First-flush runoff retention (CTDEEP WQV)

Water Quality Measures 2-foot-sump catch basins, hydrodynamic separator, riprap energy dissipator, sediment forebay, and retention storage

Design Storm for Storm Drainage 10-year storm

Federal Emergency Management Agency Special Flood Hazard Areas

Special Flood Hazard Area (Zone AE), Area of Minimal Flood Hazard (Zone X)

STORMWATER MANAGEMENT APPROACH The stormwater management system for this site has been designed utilizing Best Management Practices (BMPs) to provide water quality management. The design goal is to provide adequate storage for the calculated water quality volume (WQV) in accordance with the Connecticut Department of Energy & Environmental Protection (CTDEEP) requirements, while providing appropriate measures to encourage the infiltration of stormwater and to provide the removal of total suspended solids and other potential stormwater pollutants prior to discharge to the adjacent water resources. Existing drainage patterns will be maintained to the maximum extent practicable, and a new stormwater treatment train proposes catch basins with 2-foot sumps (4-foot sumps, where identified), a hydrodynamic separator, riprap energy dissipators, sediment forebays, and WQV within the five water quality basins. The ultimate discharge from the water quality basins will be directed toward the wetlands to the south and east of the property. The computer program entitled Hydraflow Storm Sewers Extension for AutoCAD® Civil 3D® 2019, by Autodesk, Inc., Version 2018.3, was used for designing the proposed storm drainage collection system. Storm drainage computations performed include pipe capacity, hydraulic grade line, and gutter flow calculations. The contributing watershed to each individual catch basin inlet was delineated to determine the drainage area and land coverage. These values were used to determine the stormwater runoff to each inlet using the Rational Method. The rainfall intensities for the site were obtained from the National Oceanic and Atmospheric Administration (NOAA) Atlas 14, Volume 10, Precipitation Frequency Data Server (PFDS). The proposed storm drainage system is designed to provide adequate capacity to convey the 10-year storm event. The outlet pipes from the water quality basins were adequately sized to convey the 100-year discharge from the basins. The project lies within the Tenmile River watershed, identified as Regional Basin 5202 on CTDEEP's Atlas of Public Water Supply Sources and Drainage Basins. The Tenmile River has a watershed of 20.3 square miles at its confluence with the Quinnipiac River approximately 0.7 miles downstream of this site. This site is located entirely in the 20.3-square-mile Tenmile River watershed, which is part of the larger Quinnipiac River basin. The Stone Bridge Crossing Development lies in the lower third of the Tenmile River

Page 4: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

EG Home LLC 4 May 19, 2021 Drainage Report – Multifamily Residential Development Lot 7 – Stone Bridge Crossing

watershed and the total project area represents less than 1% of the watershed. For reasons identified in prior stormwater management reports for the property, which have been reviewed and approved by the town of Cheshire, it has been confirmed that stormwater detention on site is not required for the project. The design of this development has followed that guidance, with no peak-flow attenuation proposed. The proposed stormwater management system will utilize best management design principles to safely convey stormwater runoff from the site while providing stormwater quality measures prior to discharge to the Tenmile River and associated wetlands. The goal of the storm drainage system design is to remove a high percentage of total suspended solids and other potential stormwater pollutants while promoting infiltration for groundwater recharge. The stormwater approach for the site is focused on water quality management per state and local requirement along with the appropriate conveyance of the 100-year design flows to the Tenmile River. WATER QUALITY MANAGEMENT Stormwater runoff from the proposed development will be collected by a subsurface pipe and catch basin drainage system. The proposed drainage system will include catch basins with 2-foot sumps (4-foot sumps, where identified) to trap sediment and debris. Hydrodynamic separators, such as CDS® or Cascade® devices manufactured by Contech Engineered Solutions or an approved equal product, will be installed in the proposed storm drainage system prior to discharging stormwater runoff into the proposed downstream water quality basins. These units will further remove suspended solids before discharging downgradient, which will in turn remove other pollutants that tend to attach to the suspended solids and effectively remove other debris and floatables that may be present in stormwater runoff. The hydrodynamic separators have been designed to meet criteria recommended by the CTDEEP 2004 Stormwater Quality Manual. The devices were designed based on the determined Water Quality Flow (WQF), which is the peak-flow rate associated with the WQV, and sized based on the manufacturer's specifications. Sediment forebays are proposed around the proposed drainage pipes that daylight into the water quality basins, which will improve water quality by trapping floatables and filtering coarse sediment and other pollutants. The forebays will be constructed using riprap berm and spillway. The proposed riprap splash pads will dissipate the potential erosive velocity of stormwater entering the water quality basins as well as trap sediment. The sediment forebays will contain the deposited sediment within a small area of the basin and will allow for maintenance accessibility. Each water quality basin will provide retention volume along its bottom, thus creating a water quality feature within it. This serves several purposes, including stormwater renovation and first-flush retention. The vegetation will provide pollutant removal by filtering stormwater runoff and utilizing excess nutrients that may be present in the stormwater. The CTDEEP 2004 Stormwater Quality Manual (Chapter 7) recommends methods for sizing stormwater treatment measures with WQV computations. The WQV addresses the initial stormwater runoff, also commonly referred to as the "first-flush" runoff. The WQV provides adequate volume to store the runoff associated with the first 1 inch of rainfall, which tends to contain the highest concentration of potential pollutants. Supporting calculations have been included in the Appendix of this report.

Page 5: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

EG Home LLC 5 May 19, 2021Drainage Report – Multifamily Residential Development Lot 7 – Stone Bridge Crossing

CONCLUSION

The focus of the water quality measures was to remove suspended solids and other potential pollutants as well as protect against excessive erosion during and after construction. The stormwater management design meets the recommendations set forth in the CTDEEP Stormwater Quality Manual following the approach outlined above. The proposed development will introduce a new stormwater treatment train consisting of several water quality measures such as catch basins with 2-foot sumps, hydrodynamic separators, riprap energy dissipators, sediment forebays, and WQV within the proposed water quality basins.

The hydrodynamic separators will pretreat stormwater runoff generated from the proposed impervious surfaces prior to it entering the receiving water quality basins. CDS® or Cascade® units, manufactured by Contech Engineered Solutions, were selected and sized based on the contributing WQF, which is the peak-flow rate associated with the WQV. Furthermore, the CTDEEP WQV has been provided within the water quality basins.

All supporting documentation and stormwater-related computations are attached to this report along with Hydraflow Storm Sewers model results for the proposed storm drainage system. Illustrative watershed maps for the proposed conditions are also attached to this report.

Attachments

Attachment A – Natural Resources Conservation Service Hydrologic Soil Group MapAttachment B – Federal Emergency Management Agency Flood Insurance Rate Map Attachment C – Storm Drainage Computations Attachment D – Water Quality Computations Attachment E – Watershed Maps

15070.00006.m1921.rpt.docx

Page 6: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

APPENDIX A

NATURAL RESOURCES CONSERVATION SERVICE HYDROLOGIC SOIL GROUP MAP Drainage Report

Multifamily Residential Development

Lot 7 – Stone Bridge Crossing

Dickerman Road

Cheshire, Connecticut

May 19, 2021

Page 7: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Hydrologic Soil Group—State of Connecticut

Natural ResourcesConservation Service

Web Soil SurveyNational Cooperative Soil Survey

5/7/2021Page 1 of 4

4602

900

4603

000

4603

100

4603

200

4603

300

4603

400

4602

900

4603

000

4603

100

4603

200

4603

300

4603

400

674900 675000 675100 675200 675300 675400 675500 675600 675700 675800

674900 675000 675100 675200 675300 675400 675500 675600 675700 675800

41° 33' 49'' N72

° 5

4' 1

0'' W

41° 33' 49'' N

72° 5

3' 2

7'' W

41° 33' 28'' N

72° 5

4' 1

0'' W

41° 33' 28'' N

72° 5

3' 2

7'' W

N

Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS840 200 400 800 1200

Feet0 50 100 200 300

MetersMap Scale: 1:4,550 if printed on A landscape (11" x 8.5") sheet.

Soil Map may not be valid at this scale.

Page 8: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

MAP LEGEND MAP INFORMATION

Area of Interest (AOI)Area of Interest (AOI)

SoilsSoil Rating Polygons

A

A/D

B

B/D

C

C/D

D

Not rated or not available

Soil Rating LinesA

A/D

B

B/D

C

C/D

D

Not rated or not available

Soil Rating PointsA

A/D

B

B/D

C

C/D

D

Not rated or not available

Water FeaturesStreams and Canals

TransportationRails

Interstate Highways

US Routes

Major Roads

Local Roads

BackgroundAerial Photography

The soil surveys that comprise your AOI were mapped at 1:12,000.

Warning: Soil Map may not be valid at this scale.

Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.

Please rely on the bar scale on each map sheet for map measurements.

Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857)

Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: State of ConnecticutSurvey Area Data: Version 20, Jun 9, 2020

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Date(s) aerial images were photographed: Aug 30, 2019—Nov 9, 2019

The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

Hydrologic Soil Group—State of Connecticut

Natural ResourcesConservation Service

Web Soil SurveyNational Cooperative Soil Survey

5/7/2021Page 2 of 4

Page 9: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Hydrologic Soil Group

Map unit symbol Map unit name Rating Acres in AOI Percent of AOI

12 Raypol silt loam C/D 0.6 0.5%

15 Scarboro muck, 0 to 3 percent slopes

A/D 8.7 8.2%

28A Elmridge fine sandy loam, 0 to 3 percent slopes

C 1.9 1.8%

30A Branford silt loam, 0 to 3 percent slopes

B 32.2 30.0%

33B Hartford sandy loam, 3 to 8 percent slopes

A 2.5 2.4%

35B Penwood loamy sand, 3 to 8 percent slopes

A 7.9 7.4%

37C Manchester gravelly sandy loam, 3 to 15 percent slopes

A 1.2 1.1%

37E Manchester gravelly sandy loam, 15 to 45 percent slopes

A 6.6 6.2%

305 Udorthents-Pits complex, gravelly

C 35.4 33.1%

306 Udorthents-Urban land complex

B 10.0 9.3%

Totals for Area of Interest 107.1 100.0%

Hydrologic Soil Group—State of Connecticut

Natural ResourcesConservation Service

Web Soil SurveyNational Cooperative Soil Survey

5/7/2021Page 3 of 4

Page 10: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Description

Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.

The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:

Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.

Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission.

Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.

Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.

If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.

Rating Options

Aggregation Method: Dominant Condition

Component Percent Cutoff: None Specified

Tie-break Rule: Higher

Hydrologic Soil Group—State of Connecticut

Natural ResourcesConservation Service

Web Soil SurveyNational Cooperative Soil Survey

5/7/2021Page 4 of 4

Page 11: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

ATTACHMENT B FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP

Drainage Report

Multifamily Residential Development

Lot 7 – Stone Bridge Crossing

Dickerman Road

Cheshire, Connecticut

May 19, 2021

Page 12: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

National Flood Hazard Layer FIRMette

0 500 1,000 1,500 2,000250Feet

Ü

SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT

SPECIAL FLOODHAZARD AREAS

Without Base Flood Elevation (BFE)Zone A, V, A99

With BFE or DepthZone AE, AO, AH, VE, AR

Regulatory Floodway

0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mileZone X

Future Conditions 1% AnnualChance Flood HazardZone X

Area with Reduced Flood Risk due toLevee. See Notes.Zone X

Area with Flood Risk due to LeveeZone D

NO SCREENArea of Minimal Flood HazardZone X

Area of Undetermined Flood HazardZone D

Channel, Culvert, or Storm Sewer

Levee, Dike, or Floodwall

Cross Sections with 1% Annual Chance17.5 Water Surface Elevation

Coastal Transect

Coastal Transect BaselineProfile BaselineHydrographic Feature

Base Flood Elevation Line (BFE)

Effective LOMRs

Limit of StudyJurisdiction Boundary

Digital Data Available

No Digital Data Available

Unmapped

This map complies with FEMA's standards for the use ofdigital flood maps if it is not void as described below.The basemap shown complies with FEMA's basemapaccuracy standards

The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 5/7/2021 at 10:46 AM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time.

This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes.

Legend

OTHER AREAS OFFLOOD HAZARD

OTHER AREAS

GENERALSTRUCTURES

OTHERFEATURES

MAP PANELS

8

B20.2

The pin displayed on the map is an approximatepoint selected by the user and does not representan authoritative property location.

1:6,000

72°54'17"W 41°33'53"N

72°53'40"W 41°33'26"N

Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020

Page 13: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

ATTACHMENT C STORM DRAINAGE COMPUTATIONS

Drainage Report

Multifamily Residential Development

Lot 7 – Stone Bridge Crossing

Dickerman Road

Cheshire, Connecticut

May 19, 2021

Page 14: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Project: By: MCB Date: 5/5/21

Location: Checked: VEH Date: 5/11/21

Impervious Area

C=0.90 (sf)

Grassed Area C=0.3 (sf)

Wooded Area C=0.2

(sf)

Total Area (sf)

Total Area (ac)

Weighted C

Tc to Inlet (min)

16,356 18,140 0 34,496 0.79 0.58 5.0

432 13,025 0 13,457 0.31 0.32 5.0

3,564 1,947 0 5,511 0.13 0.69 5.0

4,250 6,341 0 10,591 0.24 0.54 5.0

1,504 2,600 0 4,104 0.09 0.52 5.0

17,709 8,439 0 26,148 0.60 0.71 5.0

16,748 20,056 0 36,804 0.84 0.57 5.0

4,069 2,186 0 6,255 0.14 0.69 5.0

3,537 1,216 0 4,753 0.11 0.75 5.0

555 212 0 767 0.02 0.73 5.0

4,161 4,988 0 9,149 0.21 0.57 5.0

5,850 2,007 0 7,857 0.18 0.75 5.0

11,371 5,478 0 16,849 0.39 0.70 5.0

12,061 10,047 0 22,108 0.51 0.63 5.0

11,023 6,489 0 17,512 0.40 0.68 5.0

0 110 0 110 0.003 0.30 5.0

6,805 3,293 0 10,098 0.23 0.70 5.0

8,429 3,632 0 12,061 0.28 0.72 5.0

9,692 2,017 0 11,709 0.27 0.80 5.0

4,153 7,173 0 11,326 0.26 0.52 5.0

2,491 3,142 0 5,633 0.13 0.57 5.0

4,539 2,590 0 7,129 0.16 0.68 5.0

4,474 1,839 0 6,313 0.14 0.73 5.0

4,661 2,622 0 7,283 0.17 0.68 5.0

4,023 2,077 0 6,100 0.14 0.70 5.0CCB 38

DBLCCB 30

Rational Method Individual Basin Calculations

Cheshire, CT

Basin Name

CCB 3

CCB 18

Multifamily Residential Development

CCB 39

System 100

DBLCCB 14

AD 4CCB 5CCB 6AD 8

System 300

CCB 17.1CCB 17

System 200

DBLCCB 13

AD 21

DBLCCB 29

DBLCCB 23DBLCCB 24

AD 28System 400

CCB 19CCB 20

System 500CCB 33CCB 34CCB 35CCB 36CCB 37

Page 15: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Project: By: MCB Date: 5/5/21Location: Checked: VEH Date: 5/11/21

10 YR STORM

BLDG TO AD 4

BLDG TO CCB 5

BLDG TO CCB 6

BLDG TO MH 7

BLDG TO CCB 14

BLDG TO MH 16

BLDG TO CCB 17

C 0.90 0.90 0.90 0.90 0.90 0.90 0.90I 7.50 7.50 7.50 7.50 7.50 7.50 7.50A 0.08 0.07 0.08 0.16 0.48 0.35 0.16Q 0.54 0.47 0.54 1.08 3.24 2.36 1.08

BLDG TO CLCB 19

BLDG TO CCB 20

BLDG TO CCB 23

BLDG TO CCB 24

BLDG TO CCB 30

BLDG TO CCB 33

BLDG TO CCB 34

C 0.90 0.90 0.90 0.90 0.90 0.90 0.90I 7.50 7.50 7.50 7.50 7.50 7.50 7.50A 0.08 0.09 0.24 0.15 0.35 0.27 0.08Q 0.54 0.61 1.62 1.01 2.36 1.82 0.54

BLDG TO CCB 36

BLDG TO CCB 37

BLDG TO CCB 38

BLDG TO CCB 39

BLDG TO CCB 5

BLDG TO CCB 6

BLDG TO MH 7

C 0.90 0.90 0.90 0.90 0.90 0.90 0.90I 7.50 7.50 7.50 7.50 11.50 11.50 11.50A 0.08 0.15 0.28 0.11 0.07 0.08 0.16Q 0.54 1.01 1.89 0.74 0.72 0.83 1.66

100 YR STORM

WS 1 - 100 WS 2 - 100 WS 3 - 100 WS 4 - 100 WS 5 - 100 WS 3 - 10 WS 4 - 10

C 0.54 0.71 0.55 0.63 0.72 0.55 0.63I 11.50 11.50 11.50 11.50 11.50 7.50 7.50A 3.26 3.65 3.41 2.51 3.00 3.41 2.51Q 20.24 29.80 21.57 18.18 24.84 14.07 11.86

BLDG TO CCB 17

BLDG TO CCB 19

BLDG TO CCB 20

BLDG TO CCB 23

BLDG TO CCB 24

BLDG TO AD 4

BLDG TO CCB 5

C 3.00 0.90 0.90 0.90 0.90 0.90 0.90I 11.50 11.50 11.50 11.50 11.50 11.50 11.50A 0.16 0.08 0.09 0.24 0.15 0.08 0.07Q 5.52 0.83 0.93 2.48 1.55 0.83 0.72

BLDG TO CCB 6

BLDG TO MH 7

BLDG TO MH 11 - E

BLDG TO MH 11 - W

BLDG TO MH 27 - E

BLDG TO MH 27 - W

C 0.90 0.90 0.90 0.90 0.90 0.90I 11.50 11.50 7.50 7.50 7.50 7.50A 0.08 0.16 0.09 0.22 0.31 0.17Q 0.83 1.66 0.61 1.49 2.09 1.15

Rational Method Roof Drain System Calculations

Multifamily Residential DevelopmentCheshire, CT

Total Roof Runoff to Proposed Storm Drainage System (In Hydraflow Model)

Page 16: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

5/5/2021 Precipitation Frequency Data Server

https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=41.5612&lon=-72.8996&data=intensity&units=english&series=pds 1/4

NOAA Atlas 14, Volume 10, Version 3 Location name: Cheshire, Connecticut, USA*

Latitude: 41.5612°, Longitude: -72.8996° Elevation: 151.79 ft**

* source: ESRI Maps ** source: USGS

POINT PRECIPITATION FREQUENCY ESTIMATES

Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite

NOAA, National Weather Service, Silver Spring, Maryland

PF_tabular | PF_graphical | Maps_&_aerials

PF tabularPDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1

DurationAverage recurrence interval (years)

1 2 5 10 25 50 100 200 500 1000

5-min 4.10(3.20‑5.20)

4.96(3.86‑6.28)

6.35(4.93‑8.06)

7.50(5.80‑9.59)

9.08(6.79‑12.2)

10.3(7.52‑14.1)

11.5(8.20‑16.5)

12.9(8.71‑19.0)

14.9(9.65‑22.7)

16.5(10.4‑25.7)

10-min 2.91(2.27‑3.68)

3.51(2.74‑4.44)

4.49(3.49‑5.71)

5.31(4.10‑6.79)

6.44(4.81‑8.63)

7.29(5.33‑10.0)

8.17(5.80‑11.7)

9.16(6.17‑13.4)

10.5(6.84‑16.1)

11.7(7.39‑18.2)

15-min 2.28(1.78‑2.88)

2.76(2.15‑3.48)

3.53(2.74‑4.48)

4.17(3.22‑5.32)

5.05(3.77‑6.77)

5.71(4.18‑7.84)

6.41(4.55‑9.14)

7.18(4.84‑10.5)

8.27(5.36‑12.6)

9.16(5.80‑14.3)

30-min 1.57(1.22‑1.98)

1.88(1.47‑2.38)

2.40(1.87‑3.05)

2.83(2.19‑3.62)

3.43(2.56‑4.60)

3.87(2.84‑5.32)

4.34(3.09‑6.20)

4.86(3.28‑7.13)

5.61(3.64‑8.55)

6.22(3.93‑9.69)

60-min 0.996(0.778‑1.26)

1.20(0.932‑1.51)

1.52(1.18‑1.93)

1.79(1.39‑2.29)

2.17(1.62‑2.90)

2.45(1.79‑3.36)

2.74(1.95‑3.92)

3.07(2.07‑4.50)

3.54(2.30‑5.40)

3.93(2.49‑6.12)

2-hr 0.654(0.514‑0.821)

0.780(0.612‑0.982)

0.988(0.772‑1.25)

1.16(0.901‑1.47)

1.40(1.05‑1.86)

1.57(1.16‑2.15)

1.76(1.26‑2.50)

1.97(1.33‑2.87)

2.27(1.48‑3.44)

2.52(1.60‑3.90)

3-hr 0.506(0.399‑0.633)

0.604(0.476‑0.756)

0.764(0.599‑0.960)

0.897(0.699‑1.14)

1.08(0.815‑1.43)

1.22(0.899‑1.66)

1.36(0.977‑1.93)

1.53(1.03‑2.22)

1.76(1.15‑2.66)

1.96(1.25‑3.03)

6-hr 0.322(0.255‑0.400)

0.387(0.306‑0.481)

0.492(0.389‑0.615)

0.580(0.455‑0.729)

0.701(0.532‑0.926)

0.791(0.589‑1.07)

0.887(0.641‑1.25)

0.998(0.679‑1.44)

1.16(0.761‑1.75)

1.30(0.830‑2.00)

12-hr 0.197(0.158‑0.244)

0.240(0.191‑0.297)

0.310(0.246‑0.384)

0.368(0.290‑0.459)

0.447(0.342‑0.589)

0.506(0.379‑0.684)

0.570(0.416‑0.806)

0.647(0.441‑0.929)

0.762(0.500‑1.14)

0.861(0.551‑1.31)

24-hr 0.116(0.093‑0.143)

0.144(0.115‑0.177)

0.189(0.151‑0.233)

0.226(0.180‑0.281)

0.278(0.214‑0.365)

0.316(0.239‑0.426)

0.357(0.263‑0.506)

0.409(0.280‑0.585)

0.491(0.322‑0.729)

0.561(0.360‑0.852)

2-day 0.066(0.053‑0.080)

0.082(0.067‑0.101)

0.110(0.089‑0.135)

0.133(0.106‑0.164)

0.165(0.128‑0.216)

0.188(0.143‑0.253)

0.214(0.159‑0.303)

0.247(0.170‑0.352)

0.301(0.199‑0.445)

0.349(0.225‑0.527)

3-day 0.047(0.038‑0.058)

0.060(0.049‑0.073)

0.080(0.065‑0.098)

0.097(0.078‑0.119)

0.120(0.094‑0.157)

0.137(0.105‑0.185)

0.156(0.117‑0.222)

0.181(0.125‑0.257)

0.222(0.147‑0.327)

0.258(0.166‑0.388)

4-day 0.038(0.031‑0.046)

0.048(0.039‑0.058)

0.064(0.052‑0.078)

0.078(0.063‑0.095)

0.096(0.075‑0.126)

0.110(0.084‑0.147)

0.125(0.094‑0.177)

0.145(0.100‑0.205)

0.177(0.117‑0.261)

0.206(0.133‑0.309)

7-day 0.026(0.021‑0.031)

0.032(0.026‑0.039)

0.043(0.035‑0.052)

0.051(0.041‑0.062)

0.063(0.049‑0.082)

0.072(0.055‑0.095)

0.081(0.061‑0.114)

0.094(0.065‑0.132)

0.114(0.075‑0.166)

0.131(0.085‑0.196)

10-day 0.021(0.017‑0.025)

0.026(0.021‑0.031)

0.033(0.027‑0.040)

0.040(0.032‑0.048)

0.049(0.038‑0.062)

0.055(0.042‑0.073)

0.062(0.046‑0.086)

0.071(0.049‑0.099)

0.085(0.056‑0.123)

0.097(0.063‑0.144)

20-day 0.015(0.013‑0.018)

0.018(0.015‑0.021)

0.022(0.018‑0.026)

0.025(0.020‑0.030)

0.030(0.023‑0.038)

0.033(0.026‑0.043)

0.037(0.027‑0.050)

0.041(0.029‑0.057)

0.047(0.032‑0.068)

0.053(0.034‑0.078)

30-day 0.013(0.011‑0.015)

0.014(0.012‑0.017)

0.017(0.014‑0.020)

0.019(0.016‑0.023)

0.023(0.018‑0.028)

0.025(0.019‑0.032)

0.027(0.020‑0.037)

0.030(0.021‑0.042)

0.034(0.023‑0.049)

0.037(0.024‑0.054)

45-day 0.011(0.009‑0.012)

0.012(0.010‑0.014)

0.014(0.011‑0.016)

0.015(0.013‑0.018)

0.017(0.014‑0.022)

0.019(0.015‑0.024)

0.021(0.015‑0.027)

0.022(0.016‑0.031)

0.025(0.017‑0.035)

0.026(0.017‑0.039)

60-day 0.009(0.008‑0.011)

0.010(0.008‑0.012)

0.012(0.010‑0.014)

0.013(0.011‑0.015)

0.015(0.012‑0.018)

0.016(0.012‑0.020)

0.017(0.013‑0.022)

0.018(0.013‑0.025)

0.020(0.013‑0.028)

0.021(0.014‑0.031)

1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for agiven duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are notchecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.Please refer to NOAA Atlas 14 document for more information.

Back to Top

PF graphical

Page 17: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

5/5/2021 Precipitation Frequency Data Server

https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=41.5612&lon=-72.8996&data=intensity&units=english&series=pds 3/4

Large scale terrain

Large scale map

Large scale aerial

+–

3km

2mi

+–

100km

60mi

+–

100km

60mi

Page 18: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 19: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Outlet Protection Calculations

Project: Multifamily Residential Development By: MCB Date: 5/10/2021Location: Dickerman Road, Cheshire, CT Checked: VEH Date: 5/11/2021Outlet I.D. FES 1

*Based on Connecticut DOT Drainage Manual, Section 11.13

Description:FES 1

Design Criteria (100-yr Storm Event):Q (cfs) = 34.46 Rp (ft)= 2

D (in) = 24 Sp (ft) = 2

V (fps) = 11.14 Tw (ft)= 1.91

Q= Flow rate at discharge point in cubic feet per second (cfs)D= Outlet pipe diameter (in)V= Flow velocity at discharge point (ft/s)Rp= Maximum inside pipe rise (ft)

Sp= inside diametere for circular sections of maximum inside pipe span for non-circular sections (ft)

Tw= Tailwater depth (ft)

Based on Table 11.13.1, A Preformed Scour Hole is used One Half Pipe Rise Depression (Type I)

Rip Rap Stone Size:

D50 Computed (ft) Rip Rap Specification D50 Stone Size Required

0.289 Modified 5 inches

Preformed Scour Hole Dimensions:F = 0.5(Rp) = 1 ft

C = 3.0(Sp)+6.0(F) = 12ft

B = 2.0(Sp)+6.0(F) = 10ft

d (Depth of Stone ) = 12 inches

Page 20: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Outlet Protection Calculations

Project: Multifamily Residential Development By: MCB Date: 5/10/2021Location: Dickerman Road, Cheshire, CT Checked: VEH Date: 5/11/2021Outlet I.D. FES 10

*Based on Connecticut DOT Drainage Manual, Section 11.13

Description:FES 10

Design Criteria (10-yr Storm Event):Q (cfs) = 11.6 Rp (ft)= 1.25

D (in) = 15 Sp (ft) = 1.25

V (fps) = 9.54 Tw (ft)= 1.21

Q= Flow rate at discharge point in cubic feet per second (cfs)D= Outlet pipe diameter (in)V= Flow velocity at discharge point (ft/s)Rp= Maximum inside pipe rise (ft)

Sp= inside diametere for circular sections of maximum inside pipe span for non-circular sections (ft)

Tw= Tailwater depth (ft)

Based on Table 11.13.1, A Preformed Scour Hole is used One Half Pipe Rise Depression (Type I)

Rip Rap Stone Size:

D50 Computed (ft) Rip Rap Specification D50 Stone Size Required

0.200 Modified 5 inches

Preformed Scour Hole Dimensions:F = 0.5(Rp) = 0.625 ft

C = 3.0(Sp)+6.0(F) = 7.5ft

B = 2.0(Sp)+6.0(F) = 6.25ft

d (Depth of Stone ) = 12 inches

Page 21: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Outlet Protection Calculations

Project: Multifamily Residential Development By: MCB Date: 5/10/2021Location: Dickerman Road, Cheshire, CT Checked: VEH Date: 5/11/2021Outlet I.D. FES 15

*Based on Connecticut DOT Drainage Manual, Section 11.13

Description:FES 15

Design Criteria (100-yr Storm Event):Q (cfs) = 41.5 Rp (ft)= 2.5

D (in) = 30 Sp (ft) = 2.5

V (fps) = 10.1 Tw (ft)= 1.8

Q= Flow rate at discharge point in cubic feet per second (cfs)D= Outlet pipe diameter (in)V= Flow velocity at discharge point (ft/s)Rp= Maximum inside pipe rise (ft)

Sp= inside diametere for circular sections of maximum inside pipe span for non-circular sections (ft)

Tw= Tailwater depth (ft)

Based on Table 11.13.1, A Preformed Scour Hole is used One Half Pipe Rise Depression (Type I)

Rip Rap Stone Size:

D50 Computed (ft) Rip Rap Specification D50 Stone Size Required

0.293 Modified 5 inches

Preformed Scour Hole Dimensions:F = 0.5(Rp) = 1.25 ft

C = 3.0(Sp)+6.0(F) = 15ft

B = 2.0(Sp)+6.0(F) = 12.5ft

d (Depth of Stone ) = 12 inches

Page 22: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Outlet Protection Calculations

Project: Multifamily Residential Development By: MCB Date: 5/10/2021Location: Dickerman Road, Cheshire, CT Checked: VEH Date: 5/11/2021Outlet I.D. FES 26

*Based on Connecticut DOT Drainage Manual, Section 11.13

Description:FES 26

Design Criteria (10-yr Storm Event):Q (cfs) = 8.52 Rp (ft)= 1.25

D (in) = 15 Sp (ft) = 1.25

V (fps) = 7.94 Tw (ft)= 0.94

Q= Flow rate at discharge point in cubic feet per second (cfs)D= Outlet pipe diameter (in)V= Flow velocity at discharge point (ft/s)Rp= Maximum inside pipe rise (ft)

Sp= inside diametere for circular sections of maximum inside pipe span for non-circular sections (ft)

Tw= Tailwater depth (ft)

Based on Table 11.13.1, A Preformed Scour Hole is used One Half Pipe Rise Depression (Type I)

Rip Rap Stone Size:

D50 Computed (ft) Rip Rap Specification D50 Stone Size Required

0.171 Modified 5 inches

Preformed Scour Hole Dimensions:F = 0.5(Rp) = 0.625 ft

C = 3.0(Sp)+6.0(F) = 7.5ft

B = 2.0(Sp)+6.0(F) = 6.25ft

d (Depth of Stone ) = 12 inches

Page 23: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Outlet Protection Calculations

Project: Multifamily Residential Development By: MCB Date: 5/10/2021Location: Dickerman Road, Cheshire, CT Checked: VEH Date: 5/11/2021Outlet I.D. FES 31

*Based on Connecticut DOT Drainage Manual, Section 11.13

Description:FES 31

Design Criteria (10-yr Storm Event):Q (cfs) = 11.97 Rp (ft)= 1.25

D (in) = 15 Sp (ft) = 1.25

V (fps) = 13.38 Tw (ft)= 0.7

Q= Flow rate at discharge point in cubic feet per second (cfs)D= Outlet pipe diameter (in)V= Flow velocity at discharge point (ft/s)Rp= Maximum inside pipe rise (ft)

Sp= inside diametere for circular sections of maximum inside pipe span for non-circular sections (ft)

Tw= Tailwater depth (ft)

Based on Table 11.13.1, A Preformed Scour Hole is used One Half Pipe Rise Depression (Type I)

Rip Rap Stone Size:

D50 Computed (ft) Rip Rap Specification D50 Stone Size Required

0.361 Modified 5 inches

Preformed Scour Hole Dimensions:F = 0.5(Rp) = 0.625 ft

C = 3.0(Sp)+6.0(F) = 7.5ft

B = 2.0(Sp)+6.0(F) = 6.25ft

d (Depth of Stone ) = 12 inches

Page 24: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 25: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 26: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 27: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 28: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 29: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 30: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 31: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 32: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 33: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 34: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 35: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 36: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 37: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 38: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 39: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 40: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 41: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 42: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 43: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 44: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 45: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 46: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 47: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 48: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 49: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 50: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 51: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 52: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 53: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 54: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 55: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 56: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 57: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

3130 Verona Avenue • Buford, GA 30518

(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490

© Nyloplast Inlet Capacity Charts June 2012

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10

Cap

acit

y (c

fs)

Head (ft)

Nyloplast 24" Dome Grate Inlet Capacity Chart

Page 58: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

3130 Verona Avenue • Buford, GA 30518

(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490

© Nyloplast Inlet Capacity Charts June 2012

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10

Cap

acit

y (c

fs)

Head (ft)

Nyloplast 30" Dome Grate Inlet Capacity Chart

Page 59: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Weir ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, May 10 2021

<Name>

Trapezoidal WeirCrest = BroadBottom Length (ft) = 75.00Total Depth (ft) = 1.00Side Slope (z:1) = 3.00

CalculationsWeir Coeff. Cw = 2.60Compute by: Q vs DepthNo. Increments = 50

HighlightedDepth (ft) = 0.36Q (cfs) = 42.61Area (sqft) = 27.39Velocity (ft/s) = 1.56Top Width (ft) = 77.16

0 10 20 30 40 50 60 70 80 90 100 110

Depth (ft) Depth (ft)<Name>

-0.50 -0.50

0.00 0.00

0.50 0.50

1.00 1.00

1.50 1.50

2.00 2.00

Length (ft)Weir W.S.

mberardi
Text Box
Q100 = 40.81 cfs
mberardi
Text Box
WQ Basin 1
Page 60: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Weir ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, May 10 2021

<Name>

Trapezoidal WeirCrest = BroadBottom Length (ft) = 45.00Total Depth (ft) = 1.50Side Slope (z:1) = 3.00

CalculationsWeir Coeff. Cw = 2.60Compute by: Q vs DepthNo. Increments = 30

HighlightedDepth (ft) = 0.55Q (cfs) = 49.12Area (sqft) = 25.66Velocity (ft/s) = 1.91Top Width (ft) = 48.30

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

Depth (ft) Depth (ft)<Name>

-0.50 -0.50

0.00 0.00

0.50 0.50

1.00 1.00

1.50 1.50

2.00 2.00

Length (ft)Weir W.S.

mberardi
Text Box
WQ Basin 2
mberardi
Text Box
Q100 = 47.98 cfs
Page 61: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Weir ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, May 10 2021

<Name>

Trapezoidal WeirCrest = BroadBottom Length (ft) = 120.00Total Depth (ft) = 1.00Side Slope (z:1) = 3.00

CalculationsWeir Coeff. Cw = 2.60Compute by: Q vs DepthNo. Increments = 37

HighlightedDepth (ft) = 0.19Q (cfs) = 25.77Area (sqft) = 22.81Velocity (ft/s) = 1.13Top Width (ft) = 121.14

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Depth (ft) Depth (ft)<Name>

-0.50 -0.50

0.00 0.00

0.50 0.50

1.00 1.00

1.50 1.50

2.00 2.00

Length (ft)Weir W.S.

mberardi
Text Box
WQ Basin 5
mberardi
Text Box
Q100 = 24.84 cfs
Page 62: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

N/F

RIVERCREST HOMEOWNERS

ASSOCIATION, INC OF

SOUTHINGTON

N/F

339 CLARK, LLC

18

71

69

70

41

73

90

91

92

93

88

87

89

68

64

83

61

62

60

59

67

6363

IPIN

IPIN

N 765408.7368

E 958583.3685

IP (TOWNLINE)

T

R

A

I

L

72

65

66

86

84

58

57

85

R

I

V

E

R

C

R

E

S

T

D

R

I

V

E

B

R

O

O

K

V

I

E

W

P

L

A

C

E

50'

INLAND

WETLAND

UPLAND

REVIEW

LINE

Type "C" Catch Basin

TG =153.91

INV =147.79 E&W

18" RCP FES

INV=149.61

18" RCP

150

1

6

0

1

6

0

1

6

0

1

6

0

1

8

0

1

7

0

160

1

5

0

1

4

0

1

4

0

1

5

0

1

5

0

1

4

0

1

3

0

1

3

0

1

4

0

1

5

0

1

5

0

1

4

0

130

1

3

0

140

150

1

4

0

50'

INLAND

WETLAND

UPLAND

REVIEW

LINE

1

5

0

1

6

0

1

4

2

1

4

4

1

4

6

1

4

8

1

5

2

1

5

4

1

5

4

1

5

4

1

5

6

1

5

6

1

5

6

1

5

8

1

5

8

1

5

8

1

5

8

1

5

8

1

6

2

1

6

4

1

5

0

1

4

2

1

4

2

1

4

4

1

4

4

1

4

4

1

4

6

1

4

6

1

4

6

1

4

8

1

5

2

1

5

4

1

5

6

139.0

138.5

135.0

136.5

145.0

144.5

144.5

147.0

143.5

143.5

1

5

0

1

6

0

1

7

0

1

5

2

1

5

4

1

5

6

1

5

8

1

6

2

1

6

4

1

6

6

1

6

8

1

7

2

174

1

5

0

1

6

0

1

4

8

1

5

2

1

5

4

1

5

6

1

5

8

161.0

158.5

155.2

153.5

152.6

152.5

153.6

154.7

158.5

154.0

152.2

153.3

155.7

157.8

157.7

157.5

157.5

156.3

156.2

156.5

156.5

157.4

158.7

158.5

158.4

157.5

155.3

154.1

152.1

148.7

144.3

142.7

142.3

141.9

141.3

140.8

156.9

156.0

155.1

155.3

155.5

155.1

153.1

154.7

151.3

144.3

144.2

146.3

142.2

141.4

141.5

141.3

141.9

142.0

143.4

144.6

145.4

146.3

146.9

146.9

146.6

145.7

144.8

144.4

143.2

142.5

142.1

142.0

140.5

GF=159.0

GF=154.5

GF=152.7

GF=153.8

GF=156.2

GF=158.2

GF=158.0

GF=156.8

GF=157.0

GF=158.3

GF=158.0

GF=156.7

GF=157.0

GF=157.9

GF=160.5

GF=

159.5

GF=

161.5

SHEET NAME

DATE

CB

PROJECT NO.

DESIGNED

MCB

SCALE

DRAWN

MCBCHECKED

FAB

MAY 17, 2021

15070.00006

1"=60'

DR

AIN

AG

E A

REA

MA

P - S

TOR

M D

RA

INA

GE

SYST

EM

CH

ESH

IRE,

CO

NN

ECTI

CU

T

MU

LTIF

AM

ILY

RES

IDEN

TIA

L D

EVEL

OPM

ENT

LOT

7 - S

TON

E B

RID

GE

CR

OSS

ING

I-691

AN

D D

ICK

ERM

AN

RO

AD

SHEET NO.1 OF 1

DES

CR

IPTI

ON

BY

DA

TE

0' 30' 60'

0 1/2" 1"

Copyright SLR International Corporation - 2021

S

W

N

E

99

R

EA

LT

Y D

RIV

E

CH

ES

HIR

E, C

T 0

64

10

20

3.2

71

.1

77

3

SLR

CO

NS

ULT

IN

G.C

OM

Page 63: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

ATTACHMENT D WATER QUALITY COMPUTATIONS

Drainage Report

Multifamily Residential Development

Lot 7 – Stone Bridge Crossing

Dickerman Road

Cheshire, Connecticut

May 19, 2021

Page 64: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

STORMWATER QUALITY CALCULATIONSWater Quality Volume (WQV)

Basin Total Impervious Percent Volumetric WQV Total Volume Total Volume

ID Area (ac.) Area (ac.) Impervious Runoff Coeff., R (ac‐ft) Required (ac‐ft) Provided1. (ac‐ft)

1 3.26 1.41 43% 0.44 0.119 0.119 0.1892 3.65 2.50 68% 0.67 0.203 0.203 0.2573 3.41 1.43 42% 0.43 0.121 0.121 0.1214 2.51 1.40 56% 0.55 0.115 0.115 0.1295 3.00 2.08 69% 0.67 0.169 0.169 0.279

Where: WQV = Water Quality Volume in acre‐feetA = Contributing Area in acresR = 0.05 + 0.009 ( I )I = Site Imperviousness as percent

WQV =(1.0 inches) x A x R

12

Multifamily Residential DevelopmentLot 7 - Stone Bridge CrossingCheshire, CTLot 7 - WQV_01.xls Page 1 of 1 May 17, 2021

Page 65: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

STORMWATER QUALITY CALCULATIONSWater Quality Volume (WQV)

WQ Basin 1 (Overflow Elevation = 135.0)

Elevation Surface Area Volume Volume Cumulative Volume(ft) (ft2) (ft3) (ac-ft) (ac-ft)

133.0 3,074 0.0 0.000 0.000134.0 4,092 3,583.0 0.082 0.082135.0 5,225 4,658.5 0.107 0.189

WQ Basin 2 (Overflow Elevation = 136.5)

Elevation Surface Area Volume Volume Cumulative Volume(ft) (ft2) (ft3) (ac-ft) (ac-ft)

133.0 2,731 0.0 0.000 0.000134.0 3,370 3,050.5 0.070 0.070135.0 4,065 3,717.5 0.085 0.155136.0 4,817 4,441.0 0.102 0.257

WQ Basin 3 (Overflow Elevation = 145.5)

Elevation Surface Area Volume Volume Cumulative Volume(ft) (ft2) (ft3) (ac-ft) (ac-ft)

143.5 908 0.0 0.000 0.000144.0 1,331 559.8 0.013 0.013144.5 2,294 906.3 0.021 0.034145.0 3,605 1,474.8 0.034 0.068145.5 5,717 2,330.5 0.054 0.121

WQ Basin 4 (Overflow Elevation = 145.5)

Elevation Surface Area Volume Volume Cumulative Volume(ft) (ft2) (ft3) (ac-ft) (ac-ft)

144.0 1,448 0.0 0.000 0.000145.0 2,577 2,012.5 0.046 0.046145.5 3,310 3,616.1 0.083 0.129

WQ Basin 5 (Overflow Elevation = 128.0)

Elevation Surface Area Volume Volume Cumulative Volume(ft) (ft2) (ft3) (ac-ft) (ac-ft)

126.0 4,897 0.0 0.000 0.000127.0 6,072 5,484.5 0.126 0.126128.0 7,305 6,688.5 0.154 0.279

Multifamily Residential DevelopmentLot 7 - Stone Bridge CrossingCheshire, CTLot 7 - WQV_01.xls Page 1 of 1 May 17, 2021

Page 66: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Project 15070.00006

Made By: MCB Date: 5/6/2021 Chkd by: Date:

CDS Unit - MH 2

Contributing Basins

Imperv. Area

(acres)Total Area

(acres)Total 0.99 1.96

Table 4.1: WQV = (P)(Rv)(A)/12 = 0.082 acre-feet

Where:I = % of Impervious Cover = 51%Rv = volumetric runoff coeff. 0.05 + 0.009(I) = 0.505

P = design precipitation (1.0" for water quality storm) = 1 inchA = site area (acres) = 1.96 acres = 0.0031 miles2

Q = runoff depth (in watershed inches) = [WQV(acrefeet)]*[12(inches/foot)]/drainage area (acres) Q = 0.505

CN = 1000 / [10+ 5P + 10Q -10(Q2 + 1.25QP)0.5] = 94Where:Q = runoff depth (in watershed inches)

tc = 0.1 hours

Type III Rainfall Distribution:From Table 4-1, Ia = 0.128 Ia/P = 0.128

From Exhibit 4-III, qu = 625 csm/in.

WQF = (qu)(A)(Q) = 0.97 cfs CDS 2015-4-C Flow = 1.40 cfs -> OK

(TR-55)

(TR-55)

SLR Consulting

COMPUTATION SHEET - WATER QUALITY FLOW (WQF)Subject: Multifamily Residential Development

Lot 7 - Stone Bridge Crossing

WATER QUALITY FLOW Page 1 of 1

Page 67: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

2004 Connecticut Stormwater Quality ManualB-2 B-2

2. Compute the time of concentration (tc) based on the methods described in Chapter 3 of TR-55. A minimum value of 0.167 hours (10 minutes) should be used. For sheet flow, the flow path shouldnot be longer than 300 feet.

3. Using the computed CN, tc, and drainage area (A) in acres, compute the peak discharge for thewater quality storm (i.e., the water quality flow [WQF]), based on the procedures described inChapter 4 of TR-55.

❍ Read initial abstraction (Ia) from Table 4-1 in Chapter 4 of TR-55 (reproduced below); compute Ia /P

Table 4-1 Ia values for runoff curve numbers

Curve Ianumber (in)

40 . . . . . . . . . . . . . . . . . . . 3.00041 . . . . . . . . . . . . . . . . . . . 2.87842 . . . . . . . . . . . . . . . . . . . 2.76243 . . . . . . . . . . . . . . . . . . . 2.65144 . . . . . . . . . . . . . . . . . . . 2.54545 . . . . . . . . . . . . . . . . . . . 2.44446 . . . . . . . . . . . . . . . . . . . 2.34847 . . . . . . . . . . . . . . . . . . . 2.25548 . . . . . . . . . . . . . . . . . . . 2.16749 . . . . . . . . . . . . . . . . . . . 2.08250 . . . . . . . . . . . . . . . . . . . 2.00051 . . . . . . . . . . . . . . . . . . . 1.92252 . . . . . . . . . . . . . . . . . . . 1.84653 . . . . . . . . . . . . . . . . . . . 1.77454 . . . . . . . . . . . . . . . . . . . 1.704

Curve Ianumber (in)

55 . . . . . . . . . . . . . . . . . . . 1.63656 . . . . . . . . . . . . . . . . . . . 1.57157 . . . . . . . . . . . . . . . . . . . 1.50958 . . . . . . . . . . . . . . . . . . . 1.44859 . . . . . . . . . . . . . . . . . . . 1.39060 . . . . . . . . . . . . . . . . . . . 1.33361 . . . . . . . . . . . . . . . . . . . 1.27962 . . . . . . . . . . . . . . . . . . . 1.22663 . . . . . . . . . . . . . . . . . . . 1.17564 . . . . . . . . . . . . . . . . . . . 1.12565 . . . . . . . . . . . . . . . . . . . 1.07766 . . . . . . . . . . . . . . . . . . . 1.03067 . . . . . . . . . . . . . . . . . . . 0.98568 . . . . . . . . . . . . . . . . . . . 0.94169 . . . . . . . . . . . . . . . . . . . 0.899

Curve Ianumber (in)

70 . . . . . . . . . . . . . . . . . . . 0.85771 . . . . . . . . . . . . . . . . . . . 0.81772 . . . . . . . . . . . . . . . . . . . 0.77873 . . . . . . . . . . . . . . . . . . . 0.74074 . . . . . . . . . . . . . . . . . . . 0.70375 . . . . . . . . . . . . . . . . . . . 0.66776 . . . . . . . . . . . . . . . . . . . 0.63277 . . . . . . . . . . . . . . . . . . . 0.59778 . . . . . . . . . . . . . . . . . . . 0.56479 . . . . . . . . . . . . . . . . . . . 0.53280 . . . . . . . . . . . . . . . . . . . 0.50081 . . . . . . . . . . . . . . . . . . . 0.46982 . . . . . . . . . . . . . . . . . . . 0.43983 . . . . . . . . . . . . . . . . . . . 0.41084 . . . . . . . . . . . . . . . . . . . 0.381

Curve Ianumber (in)

85 . . . . . . . . . . . . . . . . . . . 0.35386 . . . . . . . . . . . . . . . . . . . 0.32687 . . . . . . . . . . . . . . . . . . . 0.29988 . . . . . . . . . . . . . . . . . . . 0.27389 . . . . . . . . . . . . . . . . . . . 0.24790 . . . . . . . . . . . . . . . . . . . 0.22291 . . . . . . . . . . . . . . . . . . . 0.19892 . . . . . . . . . . . . . . . . . . . 0.17493 . . . . . . . . . . . . . . . . . . . 0.15194 . . . . . . . . . . . . . . . . . . . 0.12895 . . . . . . . . . . . . . . . . . . . 0.10596 . . . . . . . . . . . . . . . . . . . 0.08397 . . . . . . . . . . . . . . . . . . . 0.06298 . . . . . . . . . . . . . . . . . . . 0.041

Exhibit 4-111 Unit peak discharge (qu) for NRCS (SCS) type III rainfall distribution

❍ Read the unit peak discharge (qu) from Exhibit 4-III in Chapter 4 of TR-55 (reproduced below)for appropriate tc

Uni

t pe

ak d

isch

arge

(q u

),(c

sm/in

)

Time of concentration (Tc), (hours)

mberardi
Rectangle
mberardi
Polygonal Line
mberardi
Text Box
625
mberardi
Text Box
MH 2
Page 68: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 69: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Project 15070.00006

Made By: MCB Date: 5/6/2021 Chkd by: Date:

CDS Unit - MH 16

Contributing Basins

Imperv. Area

(acres)Total Area

(acres)Total 2.95 3.70

Table 4.1: WQV = (P)(Rv)(A)/12 = 0.237 acre-feet

Where:I = % of Impervious Cover = 80%Rv = volumetric runoff coeff. 0.05 + 0.009(I) = 0.768

P = design precipitation (1.0" for water quality storm) = 1 inchA = site area (acres) = 3.7 acres = 0.0058 miles2

Q = runoff depth (in watershed inches) = [WQV(acrefeet)]*[12(inches/foot)]/drainage area (acres) Q = 0.768

CN = 1000 / [10+ 5P + 10Q -10(Q2 + 1.25QP)0.5] = 98Where:Q = runoff depth (in watershed inches)

tc = 0.1 hours

Type III Rainfall Distribution:From Table 4-1, Ia = 0.041 Ia/P = 0.041

From Exhibit 4-III, qu = 700 csm/in.

WQF = (qu)(A)(Q) = 3.11 cfs CDS 2025-5-C Flow = 3.20 cfs -> OK

(TR-55)

(TR-55)

SLR Consulting

COMPUTATION SHEET - WATER QUALITY FLOW (WQF)Subject: Multifamily Residential Development

Lot 7 - Stone Bridge Crossing

WATER QUALITY FLOW Page 1 of 1

Page 70: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

2004 Connecticut Stormwater Quality ManualB-2 B-2

2. Compute the time of concentration (tc) based on the methods described in Chapter 3 of TR-55. A minimum value of 0.167 hours (10 minutes) should be used. For sheet flow, the flow path shouldnot be longer than 300 feet.

3. Using the computed CN, tc, and drainage area (A) in acres, compute the peak discharge for thewater quality storm (i.e., the water quality flow [WQF]), based on the procedures described inChapter 4 of TR-55.

❍ Read initial abstraction (Ia) from Table 4-1 in Chapter 4 of TR-55 (reproduced below); compute Ia /P

Table 4-1 Ia values for runoff curve numbers

Curve Ianumber (in)

40 . . . . . . . . . . . . . . . . . . . 3.00041 . . . . . . . . . . . . . . . . . . . 2.87842 . . . . . . . . . . . . . . . . . . . 2.76243 . . . . . . . . . . . . . . . . . . . 2.65144 . . . . . . . . . . . . . . . . . . . 2.54545 . . . . . . . . . . . . . . . . . . . 2.44446 . . . . . . . . . . . . . . . . . . . 2.34847 . . . . . . . . . . . . . . . . . . . 2.25548 . . . . . . . . . . . . . . . . . . . 2.16749 . . . . . . . . . . . . . . . . . . . 2.08250 . . . . . . . . . . . . . . . . . . . 2.00051 . . . . . . . . . . . . . . . . . . . 1.92252 . . . . . . . . . . . . . . . . . . . 1.84653 . . . . . . . . . . . . . . . . . . . 1.77454 . . . . . . . . . . . . . . . . . . . 1.704

Curve Ianumber (in)

55 . . . . . . . . . . . . . . . . . . . 1.63656 . . . . . . . . . . . . . . . . . . . 1.57157 . . . . . . . . . . . . . . . . . . . 1.50958 . . . . . . . . . . . . . . . . . . . 1.44859 . . . . . . . . . . . . . . . . . . . 1.39060 . . . . . . . . . . . . . . . . . . . 1.33361 . . . . . . . . . . . . . . . . . . . 1.27962 . . . . . . . . . . . . . . . . . . . 1.22663 . . . . . . . . . . . . . . . . . . . 1.17564 . . . . . . . . . . . . . . . . . . . 1.12565 . . . . . . . . . . . . . . . . . . . 1.07766 . . . . . . . . . . . . . . . . . . . 1.03067 . . . . . . . . . . . . . . . . . . . 0.98568 . . . . . . . . . . . . . . . . . . . 0.94169 . . . . . . . . . . . . . . . . . . . 0.899

Curve Ianumber (in)

70 . . . . . . . . . . . . . . . . . . . 0.85771 . . . . . . . . . . . . . . . . . . . 0.81772 . . . . . . . . . . . . . . . . . . . 0.77873 . . . . . . . . . . . . . . . . . . . 0.74074 . . . . . . . . . . . . . . . . . . . 0.70375 . . . . . . . . . . . . . . . . . . . 0.66776 . . . . . . . . . . . . . . . . . . . 0.63277 . . . . . . . . . . . . . . . . . . . 0.59778 . . . . . . . . . . . . . . . . . . . 0.56479 . . . . . . . . . . . . . . . . . . . 0.53280 . . . . . . . . . . . . . . . . . . . 0.50081 . . . . . . . . . . . . . . . . . . . 0.46982 . . . . . . . . . . . . . . . . . . . 0.43983 . . . . . . . . . . . . . . . . . . . 0.41084 . . . . . . . . . . . . . . . . . . . 0.381

Curve Ianumber (in)

85 . . . . . . . . . . . . . . . . . . . 0.35386 . . . . . . . . . . . . . . . . . . . 0.32687 . . . . . . . . . . . . . . . . . . . 0.29988 . . . . . . . . . . . . . . . . . . . 0.27389 . . . . . . . . . . . . . . . . . . . 0.24790 . . . . . . . . . . . . . . . . . . . 0.22291 . . . . . . . . . . . . . . . . . . . 0.19892 . . . . . . . . . . . . . . . . . . . 0.17493 . . . . . . . . . . . . . . . . . . . 0.15194 . . . . . . . . . . . . . . . . . . . 0.12895 . . . . . . . . . . . . . . . . . . . 0.10596 . . . . . . . . . . . . . . . . . . . 0.08397 . . . . . . . . . . . . . . . . . . . 0.06298 . . . . . . . . . . . . . . . . . . . 0.041

Exhibit 4-111 Unit peak discharge (qu) for NRCS (SCS) type III rainfall distribution

❍ Read the unit peak discharge (qu) from Exhibit 4-III in Chapter 4 of TR-55 (reproduced below)for appropriate tc

Uni

t pe

ak d

isch

arge

(q u

),(c

sm/in

)

Time of concentration (Tc), (hours)

mberardi
Rectangle
mberardi
Polygonal Line
mberardi
Text Box
700
mberardi
Text Box
MH 16
Page 71: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …
Page 72: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Project 15070.00006

Made By: MCB Date: 5/6/2021 Chkd by: Date:

CDS Unit - MH 32

Contributing Basins

Imperv. Area

(acres)Total Area

(acres)Total 1.75 2.24

Table 4.1: WQV = (P)(Rv)(A)/12 = 0.141 acre-feet

Where:I = % of Impervious Cover = 78%Rv = volumetric runoff coeff. 0.05 + 0.009(I) = 0.753

P = design precipitation (1.0" for water quality storm) = 1 inchA = site area (acres) = 2.24 acres = 0.0035 miles2

Q = runoff depth (in watershed inches) = [WQV(acrefeet)]*[12(inches/foot)]/drainage area (acres) Q = 0.753

CN = 1000 / [10+ 5P + 10Q -10(Q2 + 1.25QP)0.5] = 98Where:Q = runoff depth (in watershed inches)

tc = 0.1 hours

Type III Rainfall Distribution:From Table 4-1, Ia = 0.041 Ia/P = 0.041

From Exhibit 4-III, qu = 700 csm/in.

WQF = (qu)(A)(Q) = 1.85 cfs Cascade CS-4 Flow = 2.0 cfs -> OK

(TR-55)

(TR-55)

SLR Consulting

COMPUTATION SHEET - WATER QUALITY FLOW (WQF)Subject: Multifamily Residential Development

Lot 7 - Stone Bridge Crossing

WATER QUALITY FLOW Page 1 of 1

Page 73: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

2004 Connecticut Stormwater Quality ManualB-2 B-2

2. Compute the time of concentration (tc) based on the methods described in Chapter 3 of TR-55. A minimum value of 0.167 hours (10 minutes) should be used. For sheet flow, the flow path shouldnot be longer than 300 feet.

3. Using the computed CN, tc, and drainage area (A) in acres, compute the peak discharge for thewater quality storm (i.e., the water quality flow [WQF]), based on the procedures described inChapter 4 of TR-55.

❍ Read initial abstraction (Ia) from Table 4-1 in Chapter 4 of TR-55 (reproduced below); compute Ia /P

Table 4-1 Ia values for runoff curve numbers

Curve Ianumber (in)

40 . . . . . . . . . . . . . . . . . . . 3.00041 . . . . . . . . . . . . . . . . . . . 2.87842 . . . . . . . . . . . . . . . . . . . 2.76243 . . . . . . . . . . . . . . . . . . . 2.65144 . . . . . . . . . . . . . . . . . . . 2.54545 . . . . . . . . . . . . . . . . . . . 2.44446 . . . . . . . . . . . . . . . . . . . 2.34847 . . . . . . . . . . . . . . . . . . . 2.25548 . . . . . . . . . . . . . . . . . . . 2.16749 . . . . . . . . . . . . . . . . . . . 2.08250 . . . . . . . . . . . . . . . . . . . 2.00051 . . . . . . . . . . . . . . . . . . . 1.92252 . . . . . . . . . . . . . . . . . . . 1.84653 . . . . . . . . . . . . . . . . . . . 1.77454 . . . . . . . . . . . . . . . . . . . 1.704

Curve Ianumber (in)

55 . . . . . . . . . . . . . . . . . . . 1.63656 . . . . . . . . . . . . . . . . . . . 1.57157 . . . . . . . . . . . . . . . . . . . 1.50958 . . . . . . . . . . . . . . . . . . . 1.44859 . . . . . . . . . . . . . . . . . . . 1.39060 . . . . . . . . . . . . . . . . . . . 1.33361 . . . . . . . . . . . . . . . . . . . 1.27962 . . . . . . . . . . . . . . . . . . . 1.22663 . . . . . . . . . . . . . . . . . . . 1.17564 . . . . . . . . . . . . . . . . . . . 1.12565 . . . . . . . . . . . . . . . . . . . 1.07766 . . . . . . . . . . . . . . . . . . . 1.03067 . . . . . . . . . . . . . . . . . . . 0.98568 . . . . . . . . . . . . . . . . . . . 0.94169 . . . . . . . . . . . . . . . . . . . 0.899

Curve Ianumber (in)

70 . . . . . . . . . . . . . . . . . . . 0.85771 . . . . . . . . . . . . . . . . . . . 0.81772 . . . . . . . . . . . . . . . . . . . 0.77873 . . . . . . . . . . . . . . . . . . . 0.74074 . . . . . . . . . . . . . . . . . . . 0.70375 . . . . . . . . . . . . . . . . . . . 0.66776 . . . . . . . . . . . . . . . . . . . 0.63277 . . . . . . . . . . . . . . . . . . . 0.59778 . . . . . . . . . . . . . . . . . . . 0.56479 . . . . . . . . . . . . . . . . . . . 0.53280 . . . . . . . . . . . . . . . . . . . 0.50081 . . . . . . . . . . . . . . . . . . . 0.46982 . . . . . . . . . . . . . . . . . . . 0.43983 . . . . . . . . . . . . . . . . . . . 0.41084 . . . . . . . . . . . . . . . . . . . 0.381

Curve Ianumber (in)

85 . . . . . . . . . . . . . . . . . . . 0.35386 . . . . . . . . . . . . . . . . . . . 0.32687 . . . . . . . . . . . . . . . . . . . 0.29988 . . . . . . . . . . . . . . . . . . . 0.27389 . . . . . . . . . . . . . . . . . . . 0.24790 . . . . . . . . . . . . . . . . . . . 0.22291 . . . . . . . . . . . . . . . . . . . 0.19892 . . . . . . . . . . . . . . . . . . . 0.17493 . . . . . . . . . . . . . . . . . . . 0.15194 . . . . . . . . . . . . . . . . . . . 0.12895 . . . . . . . . . . . . . . . . . . . 0.10596 . . . . . . . . . . . . . . . . . . . 0.08397 . . . . . . . . . . . . . . . . . . . 0.06298 . . . . . . . . . . . . . . . . . . . 0.041

Exhibit 4-111 Unit peak discharge (qu) for NRCS (SCS) type III rainfall distribution

❍ Read the unit peak discharge (qu) from Exhibit 4-III in Chapter 4 of TR-55 (reproduced below)for appropriate tc

Uni

t pe

ak d

isch

arge

(q u

),(c

sm/in

)

Time of concentration (Tc), (hours)

mberardi
Rectangle
mberardi
Polygonal Line
mberardi
Text Box
700
mberardi
Text Box
MH 32
Page 74: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

(4'-0

" [12

19])

SOLIDS STORAGE SUMP

INLET PIPE(MULTIPLE INLET PIPES

MAY BE ACCOMMODATED)OUTLET PIPE

VA

RIE

S

BB

2'-3

" [68

6]

PLAN VIEW B-B

NOT TO SCALE

ELEVATION A-A

NOT TO SCALE

FIBERGLASS INTERNALCOMPONENTS

FLOW

CONTRACTOR TO GROUTTO FINISHED GRADE

GRADERINGS/RISERS

A

A

48" [1219] I.D. MANHOLESTRUCTURE

TOP SLAB ACCESS(SEE FRAME AND COVERDETAIL)FLOW

TOP OF CENTER CHAMBER(EXTENSIONS AVAILABLE

AS REQUIRED)

INLET PIPE(S)LOCATION MAY

VARY WITHIN 260°

PERMANENTPOOL ELEVATION

FRAME AND COVER

(DIAMETER VARIES)NOT TO SCALE

www.ContechES.com

®

800-338-1122 513-645-7000 513-645-7993 FAX

9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069

CS-4 CASCADE SEPARATOR

STANDARD DETAIL

I:\C

OM

MO

N\C

AD

\TR

EA

TME

NT\

21 C

AS

CA

DE

\40

STA

ND

AR

D D

RA

WIN

GS

\DW

G\C

S-4

-DTL

.DW

G 1

/22/

2019

9:3

4 A

M

www.contechES.com

CASCADE SEPARATOR DESIGN NOTES

THE STANDARD CS-4 CONFIGURATION IS SHOWN. ALTERNATE CONFIGURATIONS ARE AVAILABLE AND ARE LISTED BELOW. SOME CONFIGURATIONSMAY BE COMBINED TO SUIT SITE REQUIREMENTS.

CONFIGURATION DESCRIPTION

GRATED INLET ONLY (NO INLET PIPE)

GRATED INLET WITH INLET PIPE OR PIPES

CURB INLET ONLY (NO INLET PIPE)

CURB INLET WITH INLET PIPE OR PIPES

GENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR SITE SPECIFIC DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED

SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN

THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT.4. CASCADE SEPARATOR STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2' [610], AND GROUNDWATER

ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION.CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITH THE CONTECH LOGO.

5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C478 AND AASHTO LOAD FACTOR DESIGNMETHOD.

6. ALTERNATE UNITS ARE SHOWN IN MILLIMETERS [mm ].

INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE

SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CASCADE SEPARATOR

MANHOLE STRUCTURE.C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET PIPE(S). MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE

CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS

SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.

SITE SPECIFIC

DATA REQUIREMENTS

STRUCTURE IDWATER QUALITY FLOW RATE (cfs [L/s])PEAK FLOW RATE (cfs [L/s])RETURN PERIOD OF PEAK FLOW (yrs)RIM ELEVATION

PIPE DATA: INVERT MATERIAL DIAMETERINLET PIPE 1INLET PIPE 2OUTLET PIPE

NOTES / SPECIAL REQUIREMENTS:

Page 75: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

Get social with us:

800-338-1122 | www.ContechES.com

NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS A WARRANTY. APPLICATIONS SUGGESTED HEREIN ARE DESCRIBED ONLY TO HELP READERS MAKE THEIR OWN EVALUATIONS AND DECISIONS, AND ARE NEITHER GUARANTEES NOR WARRANTIES OF SUITABILITY FOR ANY APPLICATION. CONTECH MAKES NO WARRANTY WHATSOEVER, EXPRESS OR IMPLIED, RELATED TO THE APPLICATIONS, MATERIALS, COATINGS, OR PRODUCTS DISCUSSED HEREIN. ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY CONTECH. SEE CONTECH’S CONDITIONS OF SALE (AVAILABLE AT WWW.CONTECHES.COM/COS) FOR MORE INFORMATION.

© 2019 Contech Engineered Solutions LLC, a QUIKRETE Company All Rights Reserved. Printed in the USA.)

Revision 10/19

ENGINEERED SOLUTIONS

STORMWATER SOLUTIONS

PIPE SOLUTIONS

STRUCTURES SOLUTIONS

CASCADE

ModelTreatment Rate

(cfs)Sediment Capacity1

(CF)

CS-4 2.00 19

CS-5 3.50 29

CS-6 5.60 42

CS-8 12.00 75

CS-10 18.00 118

CDS

ModelTreatment Rate²

(cfs)Sediment Capacity1

(CF)

1515-3 1.00 14

2015-4 1.40 25

2015-5 1.40 39

2015-6 1.40 57

2020-5 2.20 39

2020-6 2.20 57

2025-5 3.20 39

2025-6 3.20 57

3020-6 3.90 57

3025-6 5.00 57

3030-6 5.70 57

3035-6 6.50 57

4030-8 7.50 151

4040-8 9.50 151

VORTECHS

ModelTreatment Rate

(cfs)Sediment Capacity3

(CF)

1000 1.60 16

2000 2.80 32

3000 4.50 49

4000 6.00 65

5000 8.50 86

7000 11.00 108

9000 14.00 130

11000 17.5 151

16000 25 192

STORMCEPTOR STC

ModelTreatment Rate

(cfs)Sediment Capacity1

(CF)

STC 450i 0.40 46

STC 900 0.89 89

STC 2400 1.58 205

STC 4800 2.47 543

STC 7200 3.56 839

STC 11000 4.94 1086

STC 16000 7.12 1677

1 Additional sediment storage capacity available – Check with your local representative for information.2 Treatment Capacity is based on laboratory testing using OK-110 (average D50 particle size of approximately 100 microns) and a 2400 micron screen.3 Maintenance recommended when sediment depth has accumulated to within 12-18 inches of the dry weather water surface elevation.

Product Flow Rates

mberardi
Rectangle
mberardi
Rectangle
mberardi
Rectangle
Page 76: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

ATTACHMENT E WATERSHED MAPS

Drainage Report

Multifamily Residential Development

Lot 7 – Stone Bridge Crossing

Dickerman Road

Cheshire, Connecticut

May 19, 2021

Page 77: MULTIFAMILY RESIDENTIAL DEVELOPMENT LOT 7 – STONE …

N/F

RIVERCREST HOMEOWNERS

ASSOCIATION, INC OF

SOUTHINGTON

N/F

339 CLARK, LLC

N/F

STATE OF

CONNECTICUT

APPROX. SLOPE RIGHTS

IN FAVOR OF THE

TOWN OF CHESHIRE

VOL. 1085/PG. 268 C.L.R.

20' DRAINAGE EASEMENT

IN FAVOR OF THE

TOWN OF CHESHIRE

VOL. 1085/PG. 268 C.L.R.

T

O

W

N

O

F

S

O

U

T

H

I

N

G

T

O

N

T

O

W

N

O

F

C

H

E

S

H

I

R

E

20

21

19

18

71

69

70

41

73

90

91

92

93

88

87

89

68

64

83

61

62

60

59

67

6363

IPIN

IPIN

N 764320.1437

E 958378.3254

P

E

R

R

E

F

M

A

P

3

P

R

I

G

H

T

O

F

W

A

Y

O

F

D

I

C

K

E

R

M

A

N

R

O

A

D

I

S

5

0

'

I

N

T

H

I

S

A

R

E

A

5

0

'

NO

ESTABLISH

ED

STREETLIN

E IN

TH

IS AREA

N/F

MAUREEN D. &

ROBERT

DEBISHOP

STREETLIN

E ASSU

MED

AT 25'

OFF CEN

TERLIN

E O

F RO

AD

IN

TH

IS AREA

D

I

C

K

E

R

M

A

N

R

O

A

D

N 765408.7368

E 958583.3685

IP (TOWNLINE)

T

R

A

I

L

20' SANITARY & WATER

EASEMENT IN FAVOR OF

TRI-STAR DEVELOPMENT, LLC

(VOL. 1201 PG. 520 SLR.)

72

65

66

86

84

58

57

85

AREA OF APPARENT

ENCROACHMENT

(LAWN)

AREA OF APPARENT

ENCROACHMENT

(LAWN)

AREA OF APPARENT

ENCROACHMENT

(GARDENS)

R

I

V

E

R

C

R

E

S

T

D

R

I

V

E

B

R

O

O

K

V

I

E

W

P

L

A

C

E

50'

INLAND

WETLAND

UPLAND

REVIEW

LINE

Type "C" Catch Basin

TG =153.91

INV =147.79 E&W

18" RCP FES

INV=149.61

18" RCP

18"RCP

Type "C" Catch Basin

=153.64

=147.10 W&E

18" RCP FES

INV=150.78

150

1

6

0

1

6

0

1

6

0

1

6

0

1

7

0

1

8

0

1

7

0

160

1

5

0

1

4

0

1

4

0

1

5

0

1

5

0

1

4

0

1

3

0

1

3

0

1

4

0

1

7

0

1

6

0

1

5

0

180

1

6

0

160

150

1

4

0

1

3

0

1

4

0

1

3

0

1

5

0

1

3

0

1

3

0

1

5

0

1

4

0

130

130

140

150

1

4

0

50'

INLAND

WETLAND

UPLAND

REVIEW

LINE

1

5

0

1

6

0

1

4

2

1

4

4

1

4

6

1

4

8

1

5

2

1

5

4

1

5

4

1

5

4

1

5

6

1

5

6

1

5

6

1

5

8

1

5

8

1

5

8

1

5

8

1

5

8

1

6

2

1

6

4

1

5

0

1

4

2

1

4

2

1

4

4

1

4

4

1

4

4

1

4

6

1

4

6

1

4

6

1

4

8

1

5

2

1

5

4

1

5

6

139.0

138.5

135.0

136.5

145.0

144.5

144.5

147.0

143.5

143.5

1

5

0

1

6

0

1

7

0

1

5

2

1

5

4

1

5

6

1

5

8

1

6

2

1

6

4

1

6

6

1

6

8

1

7

2

174

1

5

0

1

6

0

1

4

8

1

5

2

1

5

4

1

5

6

1

5

8

161.0

158.5

155.2

153.5

152.6

152.5

153.6

154.7

158.5

154.0

152.2

153.3

155.7

157.8

157.7

157.5

157.5

156.3

156.2

156.5

156.5

157.4

158.7

158.5

158.4

157.5

155.3

154.1

152.1

148.7

144.3

142.7

142.3

141.9

141.3

140.8

156.9

156.0

155.1

155.3

155.5

155.1

153.1

154.7

151.3

144.3

144.2

146.3

142.2

141.4

141.5

141.3

141.9

142.0

143.4

144.6

145.4

146.3

146.9

146.9

146.6

145.7

144.8

144.4

143.2

142.5

142.1

142.0

140.5

GF=159.0

GF=154.5

GF=152.7

GF=153.8

GF=156.2

GF=158.2

GF=158.0

GF=156.8

GF=157.0

GF=158.3

GF=158.0

GF=156.7

GF=157.0

GF=157.9

GF=160.5

GF=

159.5

GF=

161.5

SHEET NAME

DATE

PRWS

PROJECT NO.

DESIGNED

MCB

SCALE

DRAWN

MCBCHECKED

FAB

MAY 17, 2021

15070.00006

1"=70'

WA

TER

SHED

MA

P - P

RO

POSE

D C

ON

DIT

ION

S

CH

ESH

IRE,

CO

NN

ECTI

CU

T

MU

LTIF

AM

ILY

RES

IDEN

TIA

L D

EVEL

OPM

ENT

LOT

7 - S

TON

E B

RID

GE

CR

OSS

ING

I-691

AN

D D

ICK

ERM

AN

RO

AD

SHEET NO.1 OF 1

DES

CR

IPTI

ON

BY

DA

TE

0' 35' 70'

0 1/2" 1"

Copyright SLR International Corporation - 2021

S

W

N

E

99

R

EA

LT

Y D

RIV

E

CH

ES

HIR

E, C

T 0

64

10

20

3.2

71

.1

77

3

SLR

CO

NS

ULT

IN

G.C

OM