  • AFRICAN DEVELOPMENT BANK

    AFRICAN DEVELOPENT FUND

    MULTINATIONAL ZAMBIA AND ZIMBABWE KARIBA DAM

    REHABILITATION PROJECT

    COUNTRY: REGIONAL (ZAMBIA AND ZIMBABWE)

    PROJECT APPRAISAL REPORT

    ONEC

    December 2014

  • TABLE OF CONTENTS

    Currency Equivalents i Fiscal Year ...i

    Weights and Measures. i

    acronyms And Abbreviations..ii

    Financial Information......................................................................................................iii

    Project Summary.iv

    PROJECT IMPLEMENTATION SCHEDULE ........................................................................................... viii

    1. STRATEGIC THRUST AND RATIONALE ............................................................................... 2

    1.1 Project Linkages with Country Strategy and Objectives ........................................................ 2

    1.2 Rationale for Bank Group Involvement ................................................................................. 2

    1.3 Aid Coordination .................................................................................................................... 3

    2. PROJECT DESCRIPTION............................................................................................................ 4

    2.1 Project Objectives ................................................................................................................... 4

    2.2 Technical Solutions Adopted and Alternatives Considered ................................................... 4

    2.3 Project Type............................................................................................................................ 5

    2.4 Project Cost and Financing Arrangements ............................................................................. 6

    2.5 Project Target Area and Population ...................................................................................... 10

    2.6 Participatory process for project identification, design ........................................................ 10

    2.7 Bank Group Experience and Lessons Reflected in Project Design ...................................... 10

    2.8 Key performance indicators.................................................................................................. 11

    3. PROJECT FEASIBILITY ........................................................................................................... 11

    3.1 Financial and Economic Performance .................................................................................. 11

    3.2 Environmental and Social Impact......................................................................................... 13

    4. IMPLEMENTATION .................................................................................................................. 16

    4.1 Implementation Arrangements ............................................................................................. 16

    4.2 Monitoring and Evaluation ................................................................................................... 19

    4.3 Governance ........................................................................................................................... 19

    4.4 Sustainability ....................................................................................................................... 20

    4.5 Risk Management ................................................................................................................. 20

    4.6 Knowledge Building ............................................................................................................. 21

    5. LEGAL INSTRUMENTS AND AUTHORITY ......................................................................... 21

    5.1 Legal instrument ................................................................................................................... 21

    5.2 Compliance with the Bank Group policy ............................................................................. 23

    6. RECOMMENDATIONS ............................................................................................................. 24

    Appendix I: Zimbabwe Macro-Economic Indicators

    Appendix II: Zambia Macro-Economic Indicators

    Appendix III: Zambia Comparative Socio-Economic Indicators

    Appendix IV: Zimbabwe Comparative Socio-Economic Indicator

    Appendix V: Map Of Project Area

    Appendix VI: Project Management Organogram

    Appendix VII: Afdb Portfolio Zimbabwe

    Appendix VIII: Disbursements By Financiers & Instrument

    Appendix IX: Options for Funding Zimbabwe

    Appendix X: Status of AfDB Portfolio Zambia

    Appendix XI: Procurement Arrangements

  • i

    CURRENCY EQUIVALENTS

    AUGUST 2014

    1 UA = 1.5474 US$

    1 UA = 6.5 ZMK

    FISCAL YEAR 1 JULY 30 JUNE

    WEIGHTS AND MEASURES

    1 metric tonne = 2204 pounds (lbs)

    1 kilogramme (kg) = 2.200 lbs

    1 metre (m) = 3.28 feet (ft)

    1 millimetre (mm) = 0.03937 inch ()

    1 kilometre (km) = 0.62 mile

    1 hectare (ha) = 2.471 acres

    m Metre KOE kilogram of oil equivalent

    cm centimetre = 0.01 metre kV kilovolt = 1,000 volts

    mm millimetre = 0.001 metre KVa kilovolt ampere (1,000 Va)

    km kilometre = 1,000 metres KW kilowatt = 1,000 Watts

    m square meter GW gigawatt (1,000,000 kW or 1,000 MW)

    cm square centimetre MW megawatt (1,000,000 W or 1,000 kW

    km square kilometre = 1,000,000 m KWh kilowatt hour (1,000 Wh)

    ha hectare = 10,000 m MWh megawatt hour (1,000 KWh)

    t (t) metric tonne (1,000 kg) GWh gigawatt hour (1,000,000 KWh)

  • ii

    ACRONYMS AND ABBREVIATIONS

    ADF African Development Fund

    AfDB African Development Bank Group

    CSP Country Strategy Paper

    DFIs Development Finance Institutions

    EDF European Development Fund

    EU European Union

    EPC Engineering, Procurement and Construction

    EPP Emergency Preparedness Plan

    ESAP Environmental and Social Assessment Procedures

    ESIA Environmental and Social Impact Assessment

    ESMP Environmental and Social Management Plan

    GDP Gross Domestic Product

    GRZ Government of the Republic of Zambia

    GoZ Government of the Republic Of Zimbabwe

    ICB International Competitive Bidding

    IDA International Development Association

    ICEP Improved Community Emergency Preparedness

    KDRP Kariba Dam Rehabilitation Project

    MEM Ministry of Energy and Mines

    MEPD Ministry of Energy and Power Development

    PBA Performance Based Allocation

    PMU Project Management Unit

    POC Project Oversight Committee

    PSC Project Steering Committee

    RMC Resource Mobilization Committee

    SADC Southern African Development Community

    SAPP Southern Africa Power Pool

    TSF Transition Support Facility

    TS&SC Technical Service and Supervision Consultant

    UA Unit of Account

    US$ United States Dollars

    WB World Bank

    ZESCO Zambia Electricity Supply Company

    ZPC Zimbabwe Power Company

    ZMFO Zambia Field Office

    ZWFO Zimbabwe Field Office

    ZRA Zambezi River Authority

    ZVDF Zambezi Valley Development Fund

  • iii

    FINANCIAL INFORMATION

    CLIENTS INFORMATION

    Countries Zambia and Zimbabwe

    Recipient Republic of Zambia and the Republic of Zimbabwe

    Implementing Agency Ministry of Energy and Mines Zambia; and Ministry of Energy and

    Power Development Zimbabwe

    Executing Agency Zambezi River Authority (ZRA)

    FINANCING PLAN

    Amount (UA million) Instrument

    Sources Zambia Zimbabwe Total Zambia Zimbabwe

    African Development Fund

    Performance-Based Allocation (PBA)

    Regional Operations (RO) envelop

    25.20

    10.34

    14.86

    15.51

    0.00

    15.51

    40.71

    10.34

    30.37

    Loan

    Grant

    Transition Support Facility Pillar I 0.00 7.75 7.75 N/A Grant

    IDA 48.47 0.00 48.47 Loan N/A

    European Development Fund 64.63 0.00 64.62 Grant N/A

    Sweden 16.16 0.00 16.16 Grant N/A

    Zambezi River Authority 6.21 6.21 12.43 Counterpart

    financing

    Counterpart

    financing

    Total 160.67 29.47 190.15

    ADFS KEY FINANCING INFORMATION FOR ZAMBIA LOAN

    Interest type N/A

    Interest rate spread N/A

    Commitment fee 0.5%

    Service Charge 0.75%

    Interest Rate 1.00%

    Tenor 30 years

    Grace period 5 years

    KEY FINANCIAL AND ECONOMIC OUTCOMES

    PROJECT

    FIRR FNPV @ 1% (US$

    million)

    EIRR ENPV@ 10% (US$

    billion)

    2.8% 70.25 27.3% 1.317

    TIME FRAME MAIN MILESTONES Concept note approval August 2014

    Project Appraisal Report September 2014

    Board approval December 2014

    Loan and Grant signing January 2015

    Launching May- June 2015

    Effectiveness April 2015

    Project Completion Report December 2025

    Last disbursement June 2026

  • iv

    PROJECT SUMMARY

    Project Overview

    The project involves the rehabilitation of the Kariba Dam infrastructure by reshaping the plunge pool

    and rehabilitating the spillway. The Plunge Pool will be reshaped in order to dissipate energy from the

    spilled water thereby reducing the energy on impact and hence bedrock erosion which could undermine

    the dam foundations, leading to dam failure. The project will rehabilitate the spillway gates t