Multiple Partnering ConsortiumMultiple Partnering Consortium
A Case Study
Greg Holthouse, Fru-Con
Dwayne Wilson, Fluor
A Case Study
Greg Holthouse, Fru-Con
Dwayne Wilson, Fluor
CPI Conference 2001CPI Conference 2001
Multiple Partnering Consortium
Greg Holthouse
Fru-Con
Greg Holthouse
Fru-Con
CPI Conference 2001CPI Conference 2001
Multiple Partnering Consortium
Dwayne Wilson
Fluor
Dwayne Wilson
Fluor
CPI Conference 2001CPI Conference 2001
Introduction
Project- Tissue & Towel Plant
- Cape Girardeau
- Jan. ’98 – March 2000
Client- Procter & Gamble
Contract Value- $350+ million
Project- Tissue & Towel Plant
- Cape Girardeau
- Jan. ’98 – March 2000
Client- Procter & Gamble
Contract Value- $350+ million
Presentation Outline
•Introduction and video
•Use of CII Best Practices
- Partnering
- Team Building
- Constructability
- Zero Accident Techniques
•Conclusion
•Introduction and video
•Use of CII Best Practices
- Partnering
- Team Building
- Constructability
- Zero Accident Techniques
•Conclusion
Project Organization Chart
Fru-Con/Fluor DanielJoint Venture
Fru-Con/Fluor DanielJoint Venture
ValmetValmet
New Site ConsortiumNew Site Consortium
Procter & GambleProcter & Gamble
CII Best Practices
7.2 Partnering
7.1 Team Building
2.1 Constructability
11.1 Zero Accident Techniques
7.2 Partnering
7.1 Team Building
2.1 Constructability
11.1 Zero Accident Techniques
CII Best PracticePartnering
Objective
Partners invest unique strengths to contribute to project success.
Objective
Partners invest unique strengths to contribute to project success.
Actions and Results
• Value engineering, collaborative measures
- Avoided more than $50 million in capital costs.
• Integrated start-up plan
- Gained an additional $20 million in revenues.
- Set new benchmark for start-up.
Actions and Results
• Value engineering, collaborative measures
- Avoided more than $50 million in capital costs.
• Integrated start-up plan
- Gained an additional $20 million in revenues.
- Set new benchmark for start-up.
CII Best PracticePartnering
Objectives
Achieve continuous feedback in all directions and focus on continuous quality improvement.
Objectives
Achieve continuous feedback in all directions and focus on continuous quality improvement.
CII Best PracticePartnering
Actions and Results
• Feedback incentive program:
- Improved cost, safety, quality, and schedules.
- “5G” — owner’s most productive paper machine.
• Blended, spelled out work processes from JV.
- Fewer contractual, procedural disputes.
Actions and Results
• Feedback incentive program:
- Improved cost, safety, quality, and schedules.
- “5G” — owner’s most productive paper machine.
• Blended, spelled out work processes from JV.
- Fewer contractual, procedural disputes.
CII Best PracticePartnering
ObjectiveFocus, align, and motivate
team.
ObjectiveFocus, align, and motivate
team.
CII Best PracticeTeam Building
Actions and Results
• Consultant-led alignment meetings
- Ensured working toward common goals.
• Five milestone celebrations
- Motivated team to accomplish all goals.
• 50/50 joint venture by two contractors
- Ensured common financial objectives.
Actions and Results
• Consultant-led alignment meetings
- Ensured working toward common goals.
• Five milestone celebrations
- Motivated team to accomplish all goals.
• 50/50 joint venture by two contractors
- Ensured common financial objectives.
CII Best PracticeTeam Building
ObjectiveRemove roadblocks to project success.
ObjectiveRemove roadblocks to project success.
CII Best PracticeTeam Building
Actions• Regular meetings at job site and with joint
venture, consortium, and client.
• Internal and joint alignment sessions held at critical times.
Results• Dispute resolution process streamlined.
• Challenges proactively resolved; team remained aligned.
Actions• Regular meetings at job site and with joint
venture, consortium, and client.
• Internal and joint alignment sessions held at critical times.
Results• Dispute resolution process streamlined.
• Challenges proactively resolved; team remained aligned.
CII Best PracticeTeam Building
ObjectiveIntegrate construction input into planning, design, and field operations.
ObjectiveIntegrate construction input into planning, design, and field operations.
CII Best PracticeConstructability
Actions and Results
• Start-up driven, resource-loaded schedule
- Project milestones reached before contract dates.
• Changes in scope and change orders limited
- Project delivered under owner-establishedcost goal.
Actions and Results
• Start-up driven, resource-loaded schedule
- Project milestones reached before contract dates.
• Changes in scope and change orders limited
- Project delivered under owner-establishedcost goal.
CII Best PracticeConstructability
ObjectiveImprove
productivity.
ObjectiveImprove
productivity.
CII Best PracticeConstructability
Actions and Results
• Schedule flexibility
- Enabled early training for plant personnel.
- Some operations started prior to finish.
• Early release from owner for site work
- Enabled completion of project ahead of schedule.
• Utilized lessons learned from similar project
Actions and Results
• Schedule flexibility
- Enabled early training for plant personnel.
- Some operations started prior to finish.
• Early release from owner for site work
- Enabled completion of project ahead of schedule.
• Utilized lessons learned from similar project
CII Best PracticeConstructability
ObjectiveProvide safe environment for all
workers.
ObjectiveProvide safe environment for all
workers.
CII Best PracticeZero Accident Techniques
Actions and Results
• Pre-employment and random substance abuse testing
- Ninety-four percent passed.
• Behaviors observed
- Practically 100 percent commended for safe behavior.
Actions and Results
• Pre-employment and random substance abuse testing
- Ninety-four percent passed.
• Behaviors observed
- Practically 100 percent commended for safe behavior.
CII Best PracticeZero Accident Techniques
ObjectiveInstill zero-accident mentality.
ObjectiveInstill zero-accident mentality.
CII Best PracticeZero Accident Techniques
Actions
• Pre-job training, on-site orientation for 7,200
• Over 2,700 weekly safety meetings
• Trained 455 supervisors
Results
• Zero lost-time accidents
• Over four million safe hours worked
• OSHA recordable rate of 0.42
Actions
• Pre-job training, on-site orientation for 7,200
• Over 2,700 weekly safety meetings
• Trained 455 supervisors
Results
• Zero lost-time accidents
• Over four million safe hours worked
• OSHA recordable rate of 0.42
CII Best PracticeZero Accident Techniques
Conclusion
A commitment to utilizing the CIIBest Practices will aid in establishing a win/win result for owner and contractor.
Partnering
Team Building
Constructability
Zero Accident Techniques
A commitment to utilizing the CIIBest Practices will aid in establishing a win/win result for owner and contractor.
Partnering
Team Building
Constructability
Zero Accident Techniques
Implementation Session Panelists
John Moseley Procter & Gamble
Dwayne Wilson Fluor
Pat Sanders Fluor
Greg Holthouse Fru-Con Construction
Bill Gregerson Fru-Con Construction
John Moseley Procter & Gamble
Dwayne Wilson Fluor
Pat Sanders Fluor
Greg Holthouse Fru-Con Construction
Bill Gregerson Fru-Con Construction