1-50 Grant Timmins Drive Kingston, Ontario K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028
Submitted To:
The Municipality of Brighton
Public Works and Development Office
67 Sharp Road,
Brighton, Ontario K0K 1H0
August 2018
AG File No: 18523-1
Municipality of Brighton
Final Geotechnical Report
Reconstruction Russell Street, Napier Street and
Monck Street
![Page 2: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/2.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
i
TABLE OF CONTENTS
PAGE NO.
1.0 INTRODUCTION ........................................................................................................ 1
2.0 PRESENT CONDITIONS ........................................................................................... 1
3.0 FIELDWORK / METHODOLOGY ............................................................................... 1
4.0 RESULTS OF THE INVESTIGATION ........................................................................ 2
4.1 Sub-Surface Conditions ....................................................................................... 2
5.0 DISCUSSION AND RECOMMENDATIONS ............................................................... 4
5.2 Groundwater Control/Subsurface Drainage........................................................ 5
5.3 Excavations ........................................................................................................... 5
5.4 Suitability of Material ............................................................................................ 5
5.5 Utility Trenches ..................................................................................................... 5
5.6 Site Inspections .................................................................................................... 6
6.0 CLOSURE .................................................................................................................. 6
FIGURES
Figure No. 1 – 4 - Borehole Location Plan
APPENDICES
Appendix A - Borehole Logs
Appendix B - Grain Size Distribution Results
![Page 3: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/3.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 1
1.0 INTRODUCTION
Ainley Graham & Associates Limited (Ainley Group) was retained by the Municipality of
Brighton, to carry out geotechnical consulting services in support of the detail design for the
proposed reconstruction of Russell Street, Napier Street and Monck Street located in the Town
of Brighton. The proposed works associated with the reconstruction of the Streets is to consist
of a new urban cross section with concrete curb and gutter, sidewalk, and replacement of
underground infrastructure including storm sewer, watermain, and sanitary sewer laterals.
The objectives of the geotechnical assignment were:
To secure soils and groundwater information/data about the proposed reconstruction
limits that could affect the design, including the effects that the soil and groundwater may
have on construction procedures.
To determine the physical properties of the soil within the proposed reconstruction limits.
To prepare a geotechnical report with recommendations pertaining to the design and
construction of the project including sewers, watermain and roadway construction based
on the information obtained during the geotechnical site investigation and laboratory
analysis completed.
2.0 PRESENT CONDITIONS
The subject sites are located in the northwest quadrant of the Town of Brighton. The limits of the
geotechnical investigation areas consist of the following:
Napier Street from Napoleon Street to Monck Street (approximately 400 m)
Russell Street from Ontario Street to Centre Street (approximately 300 m)
Monck Street from Ontario Street to Maplewood Avenue (approximately 200 m)
Within the project limits, Napier, Russell and Monck Streets are two lane low volume streets
with shallow to non-existent ditching. Drainage is considered to be very poor throughout. With
exception to Monck Street, which is predominately commercial entrances, Napier and Russell
have numerous residential entrances on both sides of the street with increased commercial
development at the south end of Napier closest to Monck Street. The roadway conditions are
fair to poor.
3.0 FIELDWORK / METHODOLOGY
The field program consisted of the advancement of ten (10) boreholes (BH1 to BH10) to
investigate sub-surface conditions. BH1 to BH4 were completed on Napier Street, BH5 to BH8
![Page 4: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/4.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 2
on Russell Street and BH9 and BH10 on Monck Street. Prior to commencing the geotechnical
investigation program, Ainley Group contacted local utility companies in order to obtain
clearances for all underground services in the immediate area of the proposed field program.
The borehole program was completed on May 14th, 2018. All drilling was completed under the
constant supervision of a qualified member of Ainley Group’s geotechnical/environmental team.
A Site and Borehole Location Plan is attached to this report as Figure No. 1 - 4.
The boreholes were advanced to a depth 3.0 m below existing ground surface. The boreholes
were advanced by means of a truck-mounted CME-55 drill rig equipped for soil sampling. Solid
stem augers were used to complete the boreholes with grab sampling procedures used to
secure the necessary soil samples to determine the soil engineering properties.
The location and ground surface elevations at each respective borehole location were surveyed
using a Sokkia SRX3 Robotic Total Station with real time sub-centimeter accuracy, and
referenced to the MTM Geodetic Coordinate system.
4.0 RESULTS OF THE INVESTIGATION
4.1 Sub-Surface Conditions
Full details of the subsurface conditions encountered at the borehole locations are presented on
the individual borehole logs included in Appendix A. It is emphasized however, that the soil
types, their sequence, thickness and physical properties may vary between test locations and
samples both vertically and horizontally.
Representative samples of the subsoil materials encountered within the boreholes were
collected and returned to our office for further visual review by an engineer having experience
with soil classification and identification. A total of ten (10) samples were selected and
submitted to SNC Lavalin in Kingston, Ontario for gradation analysis and moisture content
determination. Copies of the Grain Size Distribution results are included in Appendix B.
The typical average pavement structure and subsoil conditions encountered throughout the
project sites generally consisted of the following:
Napier Street (BH1 – BH4)
50 mm Asphalt, over
225 mm Gravel with Sand Fill (200 mm to 250 mm), over
500 mm Sand some Gravel Fill (400 mm to 600 mm), over
1250 mm Gravelly Sand some Silt trace Clay Fill (1000 mm to 1500 mm), over
Silt with Sand and Gravel Till
![Page 5: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/5.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 3
BH1 and BH2 appear to fall within existing utility trenches and differ from the typical soils
encountered in BH3 and BH4. Groundwater infiltration was only encountered at BH1 on Napier
Street at 2.70 m below existing site grades during the borehole investigation.
A total of four samples retrieved from Napier Street were submitted for gradation analysis and
moisture content determination. Results indicate that the Granular ‘A’ fill material is gravel with
sand with 36.0% of the material passing the 4.75 mm sieve and 6.4 % of the material passing
the 75 µm sieve which generally meets a Granular ‘A’ specification in comparison to OPSS
1010. The Moisture Content was found to be 1.8% at the time of the field investigation.
Results indicate that the Granular ‘B’ fill material is sand some gravel with 82.4% of the material
passing the 4.75 mm sieve and 20.7% of the material passing the 75 µm sieve which generally
meets a Granular ‘B’ Type I specification in comparison to OPSS 1010. The Moisture Content
was found to range be 8.1% at the time of the field investigation.
Results indicate that the subbase fill material was found to be gravelly sand, some silt, trace of
clay with a LSFH (Low Susceptibility to Frost Heaving). The Moisture Content was found to be
16.3% at the time of the field investigation.
Russell Street (BH5 – BH8)
40 mm Asphalt (30 mm to 50 mm), over
285 mm Sand and Gravel Fill (270 mm to 300 mm), over
275 mm Sand with varying amounts of Gravel Fill (250 mm to 300 mm), over
1350 mm Silty Sand trace Gravel and Clay Fill (1200 mm to 1500 mm), over
Clay with Silt some Sand Till
BH6 and BH8 appear to fall within existing utility trenches and differ from the typical soils
encountered in BH5 and BH7. Groundwater infiltration was encountered within BH6 and BH8 at
1.80 m below existing site grades during the borehole investigation.
A total of four samples retrieved from Russell Street were submitted for gradation analysis and
moisture content determination. Results indicate that the Granular ‘A’ fill material is gravel and
sand with 56.0% of the material passing the 4.75 mm sieve and 5.0 % of the material passing
the 75 µm sieve which generally meets a Granular ‘A’ specification in comparison to OPSS
1010. The Moisture Content was found to be 2.0% at the time of the field investigation.
Results indicate that the subbase fill material was found to be silty sand, trace of gravel and clay
with a MSFH (Medium Susceptibility to Frost Heaving). The Moisture Content was found to be
18.1% at the time of the field investigation.
The native till material was found to be clay with silt, some sand with a MSFH (Medium
Susceptibility to Frost Heaving). The Moisture Content was found to be 21.7% at the time of the
field investigation.
![Page 6: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/6.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 4
Monck Street (BH9 – BH10)
45 mm Asphalt (40 mm to 50 mm), over
245 mm Gravelly Sand Fill (230 mm to 260 mm), over
625 mm Sand with Gravel trace of Cobbles Fill (600 mm to 650 mm), over
985 mm Clay with Silt some Sand and Gravel Fill (600 mm to 650 mm), over
Silt with Gravel and Sand Till
Groundwater infiltration was only encountered within BH9 at 1.35 m below existing site grades
during the borehole investigation.
A total of two samples retrieved from Monck Street were submitted for gradation analysis and
moisture content determination.
Results indicate that the subbase fill material was found to be Clay with silt, some sand and
gravel with a LSFH (Low Susceptibility to Frost Heaving). The Moisture Content was found to
be 20.9% at the time of the field investigation.
The native till material was found to be silt with gravel and sand with a MSFH (Medium
Susceptibility to Frost Heaving). The Moisture Content was found to be 9.8% at the time of the
field investigation.
5.0 DISCUSSION AND RECOMMENDATIONS
It is our understanding that the scope of work for Napier, Russell and Monck Streets is to
consist of considerable reconstruction efforts including, sewers and watermain replacement and
drainage and intersection improvements throughout. Due to the extent of reconstruction work
anticipated it is recommended that the existing asphalt be removed full depth and the roadways
reinstated with the following pavement structure:
90 mm Hot Mix (40 mm HL3, over 50 mm HL8), over
150 mm Granular ‘A’, over
300 mm Granular ‘B’ Type II or III
It is recommended that the subgrade material be proof rolled prior to placement of the granular
subbase to reveal any loose areas. Any areas exhibiting rutting or appreciable deflection should
be excavated and replaced with suitable fill material compacted to a minimum of 95% SPMDD.
Granular ‘A’ and Granular ‘B’ Type II/III used for base and subbase material shall meet the
requirements of OPSS 1010 and shall be compacted to 100% SPMDD.
Inspection by qualified geotechnical personnel should be carried out during the construction
process to verify the competence of the subgrade material and to verify the compaction
densities of both the subbase and base course materials.
![Page 7: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/7.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 5
5.2 Groundwater Control/Subsurface Drainage
Based on the observations made during the field investigation and our knowledge of the local
geologic conditions, perched groundwater infiltrations may be encountered within excavations,
however it should be noted that groundwater levels will fluctuate seasonally and also during
periods of drought and precipitation.
Development areas within the site should be graded in the early stages of construction to
provide for positive runoff of all surface water. The nature of the silty sand material encountered
makes it prone to strength loss therefore, groundwater and moisture control during construction
and post development is key to the workability and movement of this soil.
The pumping of groundwater may be required during excavation of the shallow overburden.
Normal pumps should suffice but sand filters may be required to prevent clogging of the pumps.
The groundwater level should be controlled at all times and be kept below the excavation level
during the construction period.
5.3 Excavations
All excavations should be carried out in accordance with the provisions in the Occupational
Health and Safety Act. At the time of the field investigations the sub-soil materials encountered
across the project sites may be classified as follows:
The fill and native materials may be classified as Type 3 soil.
Shallow excavations into the soils are considered straightforward and conventional excavation
techniques and equipment appropriate.
5.4 Suitability of Material
The fill and native materials encountered across are considered suitable for reuse as subgrade
material below exterior paved areas or in utility trenches. It is recommended that moisture
contents in the soils be closely monitored when they are to be used as select subgrade fill or as
a founding soil during construction. Wet soils should not be placed as backfill, subgrade fill or
utilized as a founding material under any circumstances.
5.5 Utility Trenches
The construction of proposed utility trenches should consist of removal of the existing
overburden soils to achieve the required grades. Based on the soils information obtained from
the site utility pipes will be installed in fine-grained subsoil trenches. Bedding for the pipes
should consist of 150 mm Granular ‘A’ material. The bedding should be placed in lifts
compatible with the compaction equipment used to achieve 100% SPMDD. Backfill around the
![Page 8: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/8.jpg)
![Page 9: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/9.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Page 7
Limitations of Report
The conclusions and recommendations given in this report are based on information determined
at the borehole locations. Subsurface and groundwater conditions between and beyond the test
holes may differ from those encountered at the test locations, and conditions may become
apparent during construction, which could not be detected or anticipated at the time of the site
investigation. It is recommended practice that the Soils Engineer be retained during
construction to confirm that the subsurface conditions throughout the site do not deviate
materially from those encountered in the boreholes.
The comments made in this report are intended only for the guidance of the designer. The
number of test holes may not be sufficient to determine all factors that may affect construction
methods and costs. The contractors bidding on this project or undertaking the construction
should therefore make their own interpretation of the factual information presented and draw
their own conclusions as to how the subsurface conditions may affect their work.
This report has been prepared for design purposes, for the sole use of The Municipality of
Brighton. Any uses, which a Third Party makes of this report, or any reliance or decisions to be
made based on it, are the responsibilities of said Third Parties. Ainley Group accepts no
responsibility for damages if any, suffered by any Third Party as a result of decisions made or
actions based on this report.
![Page 10: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/10.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Figure No. 1 - 4
Borehole Location Plans
![Page 11: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/11.jpg)
MONCK ST
BC
=
1
+1
02
.2
86
EC
=
1+
124.770
1+
00
0
1+
10
0
HO
C 1
+1
06
.4
71
M
ON
CK
S
T =
HO
T 2
+0
00
.0
00
N
AP
IE
R S
T
R=1300.000
PI 1+
11
3.5
28
BO 9
1+
20
0
1+
21
0
MONCK ST
BO 10
BOREHOLE LOCATION PLAN
STA 1+000 TO STA 1+202
FIGURE
1
RUSSELL STREET, NAPIER
STREET AND MONCK STREET
RECONSTRUCTION
MUNICIPALITY OF BRIGHTON
PLANNERS
CONSULTING
ENGINEERS
FIL
E N
AM
E: V
:\1
85
23
-1
- R
usse
ll, N
ap
ie
r M
on
ck R
eco
nstru
ctio
n - B
rig
hto
n\D
ra
win
gs\_
civil\E
xh
ib
its\1
85
23
-1
B
ore
ho
le
L
oca
tio
n P
la
n.d
wg
P
LO
T D
AT
E: 2
01
8-0
6-0
8 4
:1
5 P
M
0 5 10m
HORIZ: 1:250
SCALES
DRAWING NOT TO BE SCALED
100mm ON ORIGINAL DRAWING
MA
TC
HL
IN
E 1
+1
50
MA
TC
HLIN
E 1+
150
NA
PIE
R S
T
MA
TC
HLIN
E 2
+020
![Page 12: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/12.jpg)
MO
NC
K S
T
BC
= 1
+102.2
86
EC =
1+124.7
70
1+
100
2+
100
HO
C 1
+106.4
71 M
ON
CK
ST
=
HO
T 2
+000.0
00 N
AP
IER
ST
NAPIER ST
R=
1300.000
PI 1
+113.5
28
BO 3
BO 4
PI =
2+
152.371
PI =
2+
185.565
BC
=
2+
239.824
EC
=
2+
279.931
3+100
2+
200
HO
T 3+
103.551 R
US
SE
LL S
T =
HO
T 2+
164.330 N
AP
IE
R S
T
R=1290.000
PI 2+
259.879
NAPIER ST
NAPIER ST
BO 2
BO 1
BOREHOLE LOCATION PLAN
STA 2+000 TO STA 2+280
PLANNERS
CONSULTING
ENGINEERS
FIL
E N
AM
E: V
:\1
85
23
-1
- R
usse
ll, N
ap
ie
r M
on
ck R
eco
nstru
ctio
n - B
rig
hto
n\D
ra
win
gs\_
civil\E
xh
ib
its\1
85
23
-1
B
ore
ho
le
L
oca
tio
n P
la
n.d
wg
P
LO
T D
AT
E: 2
01
8-0
6-0
8 4
:1
5 P
M
MA
TC
HLIN
E 1
+095
MA
TCH
LINE
1+020
MA
TC
HLIN
E 2
+13
0
MA
TC
HL
IN
E 2
+1
30
MA
TC
HLIN
E 2+
280
MATCHLINE 3+145
MATCHLINE 3+185
MO
NC
K S
T
RU
SS
ELL S
T
FIGURE
2
RUSSELL STREET, NAPIER
STREET AND MONCK STREET
RECONSTRUCTION
MUNICIPALITY OF BRIGHTON
0 5 10m
HORIZ: 1:250
SCALES
DRAWING NOT TO BE SCALED
100mm ON ORIGINAL DRAWING
![Page 13: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/13.jpg)
PI = 2+152.371
PI = 2+185.565
PI =
3+
150.282
3+
000
3+
100
HOT 3+103.551 RUSSELL ST =
HOT 2+164.330 NAPIER ST
RUSSELL ST
NA
PIE
R S
T
BO 5
BO 6
PI =
3
+1
50
.2
82
PI =
3
+1
90
.1
41
3+
20
0
3+
30
0
RUSSELL ST
BO 7
BOREHOLE LOCATION PLAN
STA 3+000 TO STA 3+300
PLANNERS
CONSULTING
ENGINEERS
FIL
E N
AM
E: V
:\1
85
23
-1
- R
usse
ll, N
ap
ie
r M
on
ck R
eco
nstru
ctio
n - B
rig
hto
n\D
ra
win
gs\_
civil\E
xh
ib
its\1
85
23
-1
B
ore
ho
le
L
oca
tio
n P
la
n.d
wg
P
LO
T D
AT
E: 2
01
8-0
6-0
8 4
:1
5 P
M
MA
TC
HLIN
E 3+
150
MA
TC
HL
IN
E 3
+3
00
MA
TC
HLIN
E 3
+15
0
MATCHLINE 2+185
MATCHLINE 2+150
NA
PIE
R S
T
FIGURE
3
RUSSELL STREET, NAPIER
STREET AND MONCK STREET
RECONSTRUCTION
MUNICIPALITY OF BRIGHTON
0 5 10m
HORIZ: 1:250
SCALES
DRAWING NOT TO BE SCALED
100mm ON ORIGINAL DRAWING
![Page 14: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/14.jpg)
3+
39
4
3+
30
0
RUSSELL ST
BO 8
LAYOUT
STA 3+300 TO STA 3+394
PLANNERS
CONSULTING
ENGINEERS
FIL
E N
AM
E: V
:\1
85
23
-1
- R
usse
ll, N
ap
ie
r M
on
ck R
eco
nstru
ctio
n - B
rig
hto
n\D
ra
win
gs\_
civil\E
xh
ib
its\1
85
23
-1
B
ore
ho
le
L
oca
tio
n P
la
n.d
wg
P
LO
T D
AT
E: 2
01
8-0
6-0
8 4
:1
5 P
M
MA
TC
HLIN
E 3
+30
0
FIGURE
4
RUSSELL STREET, NAPIER
STREET AND MONCK STREET
RECONSTRUCTION
MUNICIPALITY OF BRIGHTON
0 5 10m
HORIZ: 1:250
SCALES
DRAWING NOT TO BE SCALED
100mm ON ORIGINAL DRAWING
![Page 15: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/15.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Appendix A
Borehole Logs
![Page 16: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/16.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH1
SBL Midlane, Napier St.
95.95
93.25
2.7
0.00
0.60
1.80
2.85
3.00
Ground Surface
Asphalt50 mm
FillGravel with sand, trace of cobbles, compact, brown.
FillGravelly sand, some silt, trace of clay, compact, brown.
FillClay and silt, trace of sand, stiff, brown.
TillSilt with sand and gravel, compact, brown.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was encountered at 2.7 m
JC010
JC011
G
G
![Page 17: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/17.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH2
SBL Midlane, Napier St.
95.00
NA
NA
0.00
0.40
1.80
3.00
Ground Surface
Asphalt50 mm
FillGravel with sand, trace of cobbles, compact, brown.
FillGravelly sand, some silt, trace of clay, compact, brown.
FillClay and silt, trace of sand, stiff, brown.% Passing JC0094.75 mm = 100.075 um = 96.05 um = 59.0 LSFH2 um = 40.0Moisture Content = 37.5%Plasticity Index = 14.5Classification = CL
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was not encountered during the borehole investigation.
JC009 G
![Page 18: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/18.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH3
SBL Midlane, Napier St.
93.57
NA
NA
0.00
0.30
0.90
2.40
3.00
Ground Surface
Asphalt50 mm
FillGravel with sand, compact, brown.% Passing JC0054.75 mm = 36.075 um = 6.4Moisture Content = 1.8%
FillSand some gravel, trace of cobbles, compact, brown.% Passing JC0064.75 mm = 82.475 um = 20.7Moisture Content = 8.1%
FillGravelly sand, some silt, trace of clay, compact, brown.% Passing JC0074.75 mm = 66.075 um = 23.05 um = 9.0 LSFH2 um = 5.0Moisture Content = 16.3%
TillSilt with sand and gravel, compact, brown.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was not encountered during the borehole investigation.
JC005
JC006
JC007
JC008
G
G
G
G
![Page 19: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/19.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH4
SBL Midlane, Napier St.
91.84
90.49
1.35
0.00
0.25
0.60
1.60
3.00
Ground Surface
Asphalt50 mm
FillGravel with sand, compact, brown.
FillSand some gravel, compact, brown.
FillGravelly sand, some silt, trace of clay, compact, dark brown.
TillSilt with sand and gravel, compact, grey.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was encountered at 1.35 m below existing site grades.
![Page 20: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/20.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH5
EBL Midlane, Russell St.
93.00
NA
NA
0.00
0.30
0.60
2.10
3.00
Ground Surface
Asphalt30 mm
FillSand and gravel, compact, brown.
FillSand with gravel, trace of cobbles, compact, brown.
FillSilty sand, trace of gravel and clay, compact, brown.
TillClay with silt, some sand, stiff, grey.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was not encountered during the borehole investigation.
![Page 21: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/21.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH6
EBL Midlane, Russell St.
94.90
93.10
1.8
0.00
0.75
1.80
3.00
Ground Surface
Asphalt70 mm
FillSand and gravel, trace of cobbles, compact, brown.% Passing JC0124.75 mm = 57.075 um = 7.2Moisture Content = 2.6%
FillSilty sand, trace of clay and gravel, compact, brown.
FillClay and silt, trace of sand, stiff, brown.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was encountered at 1.8 m below existing site grades.
JC012 G
![Page 22: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/22.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH7
EBL Midlane, Russell St.
96.23
96.23
NA
0.00
0.35
0.60
1.80
3.00
Ground Surface
Asphalt50 mm
FillSand and gravel, compact, brown.
FillSand, trace of gravel, compact, brown.
FillSilty sand, trace of gravel and clay, compact, brown.% Passing JC0134.75 mm = 99.075 um = 56.05 um = 13.0 MSFH2 um = 8.0Moisture Content = 18.1%
TillClay with silt, some sand, stiff, brown.% Passing JC0144.75 mm = 100.075 um = 84.05 um = 34.0 MSFH2 um = 22.0Moisture Content = 21.7%Plasticity Index = 22.0Classification = CL
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was not encountered during the borehole investigation.
JC013
JC014
G
G
![Page 23: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/23.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH8
EBL Midlane, Russell St.
97.04
95.24
1.8
0.00
0.75
1.80
3.00
Ground Surface
Asphalt50 mm
FillSand and gravel, trace of cobbles, compact, brown.% Passing JC0164.75 mm = 56.075 um = 5.0Moisture Content = 2.0%
FillSilty sand, trace of clay and gravel, compact, brown.
FillSilty sand, trace of gravel, compact, brown.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was encountered at 1.8 m below existing site grades.
JC015
JC016
G
G
![Page 24: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/24.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH9
EBL Midlane, Monch St.
91.55
90.20
1.35
0.00
0.30
0.90
2.00
3.00
Ground Surface
Asphalt40 mm
FillGravelly sand, compact, brown.
FillSand with gravel, trace of cobbles, compact, brown.
FillClay with silt, some sand and gravel stiff, dark brown.% Passing JC0024.75 mm = 88.075 um = 73.05 um = 51.0 LSFH2 um = 48.0Moisture Content = 20.9%
TillSilt with gravel and sand, compact, grey.% Passing JC0044.75 mm = 80.075 um = 53.05 um = 0.0 MSFH2 um = 0.0Moisture Content = 9.8%
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was encountered at 1.35 m below existing site grades.
JC001
JC002
G
SS
![Page 25: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/25.jpg)
Log of Borehole:
Project No.: 18523-1
Project: Russell/Napeir/Monck Reconstruction
Client: Municipality of Brighton
Location:
Ground Elevation (masl):
Water Elevation (masl):
Depth to Water (m):
Drilled By: G.E.T. Drilling Ltd.
Drill Method: Truck Mounted CME 55
Drill Date: May 14, 2018
Project Engineer: Lois-Ann Hayes, P.Eng
Project Technician: Joshua Charlton
Sheet: 1 of 1
Ainley Group1-50 Grant Timmins DriveKingston, OntarioK7M 8N2
SUBSURFACE PROFILE SAMPLE
Dep
th
0 0ft m
1
1
2
2
3
3
4
5
6
7
8
9
10
11
Ele
vatio
n
Description
Num
ber
Typ
e
Gro
undw
ater
Symbol Log
BH10
EBL Midlane, Monch St.
92.50
NA
NA
0.00
0.28
0.93
1.80
3.00
Ground Surface
Asphalt50 mm
FillGravelly sand, compact, brown.
FillSand with gravel, trace of cobbles, compact, brown.
FillClay with silt, some sand and gravel stiff, compact, brown.
TillSilt with gravel and sand, compact, grey.
End of Borehole at 3.0 m below existing site grades.Note: Groundwater infiltration was not encountered during the borehole investigation.
JC003
JC004
G
SS
![Page 26: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/26.jpg)
The Municipality of Brighton Ainley Group Project No. 18523-1
Final Geotechnical Report August 2018
Reconstruction of Russell, Napier and Monck Streets
Appendix B
Grain Size Distribution Results
![Page 27: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/27.jpg)
•)) SNC • LAVALIN
SAMPLE
INFORMATION
JC009
JC005
JC006
JC007
JC012
JC013
JC014
JC016
JC002
JC004
Lab# 17947
Project #18-1690-06 Client: Ainley
Project Name: 18523-1 Brighton Date:May 14, 2018
MASS OF MASS OF MASS OF MASS OF
SAMPLE SAMPLE SAMPLE WATER DRY SOIL
WET& DRY & (g) (g)
TARE 111') TARE (g) A 533.4 416.1 117.3 313
B 445 438.2 6.8 384.8
C 418.9 397.7 21.2 261.3
D 669.1 594.3 74.8 458.4
E 483.3 474.4 8.9 335.9
F 567 501.4 65.6 363.4
G 575.3 497.5 77.8 358.7
H 379.2 374.2 5 247.5
I 635.2 549.1 86.1 412.6
J 678.8 630.4 48.4 493
MASS OF MOISTURE
TARE CONTENT
(g) (%)
103.1 37.5
53.4 1.8
136.4 8.1
135.9 16.3
138.5 2.6
138 18.1
138.8 21.7
126.7 2.0
136.5 20.9
137.4 9.8
![Page 28: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/28.jpg)
bN:?�VAIJN SNC-LAVALIN
(.')
....
w
w
UNIFIED SOIL CLASSIFICATION SYSTEM
SAND CLAY & SILT
Fine Medium Coarse
GRAIN SIZE IN MICROMETERS SIEVE DESIGNATION (Metric)
GRAVEL
Fine Coarse
4µm 30µm 40µm 75µm 150µm 3DOµm 600µm 1.18mm 2.36mm 13.2mm 26.5mm 53.0mm 75.0mm
1 2µm 3µm 5µm 10µm 20µm 53µm 106µm 250µm 425µm 850µm 2.0mm 4.75mm 9.5mm 19.0mm 37.5mm 63mm
00
I I I I I I 111 I I 111 I I I I I 1111 L I I I I I I I I I I I I I I I I I I I I
90
80 • -
70 +-
60
50
40
30
20
10
0
% +3"
---I 1--1-1---------1-
�
3
I-
, _ '-+---
I -I 1---l • •
f-1 I I II -,
-
-I ---1-
-• �
--• -
I -
I-
I-- - - � - I - l---------i- -1-1 I -
,� ,�-t -I I - I I �- I 1 --1 - I 1 --
_,
-1 -----I 1 --
-
�·
-
-I -t I -
-• Job Lab No Borehole Depth Sample
SAMPLE DATA : 18-1690-06 : 17947-A :2 : 1.8-3.0m : JC009
f--•- '
L.O
4 5 10 20 30 40 270 200 140 100 60 50 40 30 20 16 10 B 3/8' 1/2" 3/4" 1" 1.5" 2" 3"
SIEVE DESIGNATION (Imperial)
% Gravel % Sand % Fines Course Fine Course Medium Fine Silt l
0 0 0 1 3 56 l
Client: Ainley
SNC-LAVALIN GRAIN SIZE DISTRIBUTION Project: 18523-1
1164 Clyde Court Kingston, Ontario K?P 2E4 CLAY SILT Location: Brighton
Clay 40
Trace Sand Date:May 14,2018 !Moisture Content 37.5%
![Page 29: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/29.jpg)
•)) SNC • LAVALIN
SNC-Lavalin GEM Ontario Inc.
1164 Clyde Court
Kingston, Ontario K7P 2E4
� (613) 389-178 a (613) 389-4204
Grain Size Analysis Test Report Project No.: Project Location:
!SAMPLE DATAMaterial:Date Sampled:Time Sampled:Sample Type:Sample Location:Lot:Source:Sampled By:
!LAB DATA
Lab No.:
Specification:
I
18-1690-06 Project Description: Lab Testing
I Soil
May 14, 2018
Borehole
JC005 BH#3 0.05-0.3.0M
Sublot:
Ainley Brighton
Client
17947-B Date Tested: May 31, 2018
OPSS, Granular A
!PARTICLE ANALYSIS I !WASH PASS 0.075mm
Date: May31,2018
Contract No.: Grain Size Analysis
Sieve Percent Passing Sizes (mm) Sample Specification
150.0 -
100.0 -
75.0 -
53.0 -
50.0 -
37.5 -
26.5 89.2* 100 - 100
25.0 -
19.0 81.9* 85 - 100
16.0 -
13.2 55.8* 65 - 90
9.5 45.3* 50 - 73
6.7 -
I 4.75 36 35 - 55
2.36 TEST Sample Specification I TEST I Sample I Specs I -
2.00 Percent Crushed: 60 !Wash Pass 0.075 mm: I I I -
1.18 22.4 15 - 40 % Asphalt Coated: 30 !FINENESS MODULUS I 3.03 I 0.600 -
% Flat and Elongated 0.425 -
0.300 11.7 5- 22Comments: Moisture Content is 1.8% 0.150 -
0.075 6.4 2 - 10
* Indicates Out of SpecificationSample: ...........................•.. Specs:
100 / '
/ /
90 / '
/ ,/ /
p 80 ,' / ,,/
E //
70 / i I
I
C / I
E 60 / /1 / N / V
-··
,'/ 50 ..
.. I/ p .•
... ... /' 40
/./' / ,, ..
s .. -·· • -1"
s ...
.. • .,,.�:· .. -' 30
__ .,.. .. -··
.. ---··· / ,•
N ,. .,· .. -· 20
-- .. ----- / - ...
-------· ,..
... ------- , . ..
...........
... ----------- .. - ..10
-·-·-·-· _.
------·--· ... -- _. .. -··-·
-· -···- .. ···-· -
0
10
20 p E
30 R
40 EN
50 T
R60 E
T70AI
N 80 E
90
� }
O 0.075 0.150 0.425 0.600 1.18 2.00 4.75 6.7 9.5 13.2 ;y 25.0? __. 00
16 37. \ 53.
0 0�50.0
Data presented h8'eon is for_the sole use of the SUpulated chent SNCL ,s not responsible, nor can be hod hable , for use made of !his report by anyotha, p"1y, with ocwithout the ( ty knowledge of SN CL.The testing services reported herein have been p«iocmed by a SNCL technician to recognized industry standa""ds, unless otherwise noted No other warranty
is made This dat!I does not include or relJ'"esent any interpretation or opinion of spec1fication comph!nC6 or material suitability Should engmeenng interpretation be requi"ed, SNCL w1U pro111de 11 upon wnllen request
Project Manager: Mark McClelland, C.E.T
Infrastructure @
![Page 30: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/30.jpg)
•)) SNC • LAVALIN
SNC-Lavalin GEM Ontario Inc.
1164 Clyde Court
Kingston, Ontario K7P 2E4
� (613) 389-178 '5 (613) 389-4204
Grain Size Analysis Test Report Project No.: 18-1690-06 Project Description: Lab Testing Date: Jun01,2018
Project Location:
!SAMPLE DATA Material: Date Sampled: Time Sampled: Sample Type: Sample Location: Lot: Source: Sampled By:
ILAB DATA Lab No.:
Specification:
I
IS oil
May 14, 2018
Borehole
JC006 BH#3 0.3-0.9M Briqhton
Sublot: Ainley
C lient
17947-C Date Tested: Jun 01, 2018
OPSS1010, Granular B Type I
I PARTICLE ANALYSIS I IWASH PASS 0.075mm
Contract No.: Grain Size Analysis
Sieve Percent Passing Sizes (mm) Sample Specification
150.0 100 100 - 100
100.0 -
75.0 -
53.0 -
50.0 -
37.5 -
26.5 100 50 - 100
25.0 -
19.0 -
16.0 -
13.2 -
9.5 -
6.7 -
I 4.75 82.4 20 - 100
2.36 TEST Sample Specification TEST I Sample I Specs I -
2.00 Percent Crushed: Wash Pass 0.o75 mm:
% Asphalt Coated: 30 !FINENESS MODULUS% Flat and Elongated
Comments: Moisture C ontent is 8.1 %
Sample: .. . ............ Specs: -·····
100 /
/ 90
p 80 / ,,...i.----
E / ,.,./",,
/
R 70 / ,,.,.,, .....
/ __,,...--· E 60 ,/ N ' ,/
[,/ 50 '
p // ' /
/
40 s /
/
s '
__ ,.,,,..,.,.,,.
. 30 I ... ��,,.--
20···-�·<· ,,
G -___ ... -·
I ,• , --· ,.. 10, ..• ------
0 0.075
. ··- ·-··-�··
0.150 -- --
0.425
.-· -·····
0.600 1.18 2.00 4.75
I I I 1.17
____ .,,. ..
.... ---·····
,, ,,
6.7 9.5
Data presented hereon 1s foc the sole use of the stipulated client SNCL 1s not responsible, nor can be held liable, for use made of this report by any other party, with or w�t the knowledge of SNCLThe testing seMces reported herein have been performed by a SNCL technician to re<:ognized industry standards, unless otherNise noted. No other w anty IS made This data does not include Of represent any interpretation or opinion of specification compliance Of material suitability Should engineering interpretation be requied, SNCL wiD proVlde ii upon written request
I -
1.18 64.4 10 - 100
I 0.600 -
0.425 -
0.300 36.6 2 - 65
0.150 -
0.075 20.7* 0- 8
* Indicates Out of Specification
... L-----
--- /
/
/ /
V /
/ /
/
/ /
/
.,,,v---' / \ / .2 19.0 25.0\ 37.5 /30 .50 100.0
16.0
V/ Project Manager: Mark McClelland, C.E.T
Infrastructure
0 .., /
10
20 pE
30 R
40 E
50 T
R60 E
70 AlN
80 E D
90
100 150.0
@
![Page 31: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/31.jpg)
b:��
100
90
80
70
'-'
f-
w
CLAY & SILT
GRAIN SIZE IN MICROMETERS 4µm
2µm 3µm 5µm
I -I -----1--1-111 1 -t I I
-, -I I-,,
-• --I -1-1 I 11-1 -•,
10µm
SNC-LAVALIN
UNIFIED SOIL CLASSIFICATION SYSTEM
30µm 40µm 75µm
20µm 53µm 106µm
Fine
150µm
SAND
Medium Coarse
300µm
250µm 425µm
SIEVE DESIGNATION (Metric) 600µm 1.18mm 2.36mm
850µm 2.0mm
- -
4.75mm
-1- � I -1 -- 1-- I-
Fine
GRAVEL
Coarse
13.2mm 26.5mm 53.0mm 75.0mm 9.5mm 19.0mm 37.5mm 63mm
• -· -· - - H 1J1 _-1 J _-1 -n·-1=- J _J _1- u _ 1 · - . ,_,
-1-1-1 1-1 1---11 I -1- I 1-1 I I I I- 1-
-1 -1- -I I•- I- 1-
-I 1 .. - I- I
-,- 1-
1-1---1 1-1 I --I --1--I -I- I- --I- I l----1--1 - -w
40
I l--1 �1
30
20 _, l-1 I 11
10
0
2 3 4 5 10 20 30 40 270
% +3" % Gravel Course Fine
0 34
SNC-LAVALIN 1164 Clyde Court Kingston, Ontario K7P 2E4
- --1- I
200 140 100 60 50 40 30 20 16 10 8
Job Lab No Borehole Depth Sample
SAMPLE DATA : 18-1690-06 : 17947-D :3 : 0.9-2.4m : JC007
""'CJ"
3/8" 1/2" 3/4" 1" 1.5" 2" 3"
SIEVE DESIGNATION (Imperial)
% Sand % Fines
Course Medium Fine Silt r 23 8 13 17 1
GRAIN SIZE DISTRIBUTION Client: Ainley
Project: 18523-1
GRAVELLY SAND Location: Brighton
Clay 5
Some Silt,Trace Clay Date:May 14,2018 !Moisture Content 16.3%
![Page 32: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/32.jpg)
+)) SNC • LAVALIN
SNC-Lavalin GEM Ontario Inc.
1164 Clyde Court
Kingston, Ontario K7P 2E4
,� (613) 389-178 a (613) 389-4204
Grain Size Analysis Test Report Project No.: 18-1690-06 Project Description: Lab Testing Date: Jun01,2018 Project Location:
ISAMPLE DATA I Material: Soil Date Sampled: May 14, 2018 Time Sampled: Sample Type: Borehole Sample Location: JC012 BH#6 0.07-0.75M Lot: Source: Sampled By:
ILAB DATA
Lab No.:
Specification:
Ainley Client
I 17947-E
OPSS, Granular A
!PARTICLE ANALYSISTEST Sample Specification
Percent Crushed: 60
% Asphalt Coated: 30
% Flat and Elongated
Comments: Moist ure Content is 2.6%
Sample: 100
90
p 80
Sublot:
Date Tested: Jun 01, 2018
I IWASH PASS 0.075mm
I TEST I Sample I !Wash Pass 0.075 mm: I I !FINENESS MODULUS
I 2.10
Specs:
/
Contract No.: Grain Size Analysis
Sieve Percent Passing Sizes(mm) Sample Specification150.0 -
100.0 -
75.0 -
53.0 -
50.0 -
37.5 -
26.5 100 100 - 100 25.0 -
19.0 92.9 85 - 100 16.0 -
13.2 80 65 - 90 9.5 73.2* 50 - 73 6.7 -
I 4.75 57* 35 - 55 Specs I 2.36 -
I 2.00 -
1.18 41.7* 15 - 40 I 0.600 -
0.425 -
0.300 24.8* 5 - 22 0.150 -
0.075 7.2 2 - 10 • indicates Out of Specification
/ I/ / I
/ /
/ V I
/' ,l// /
R 70 / ;' /
C ,,f' E 60 /'/" N v/"/---T
---::::.::---/· 50---/ .. -····
I p ........... :...--
... ---:-:---···· V A 40 /
...-'°':::.-/·-I
s /
/
.-· -·s __ .,,.,._ /
•'
30I /<>··· /
N _.,/<��--.-· ,.
20•'
�r,:::-::=;-··· ,•
-· /
10 >"' ;;>
'"' _____ .....................
- - -·. -··-·· -- --
V ' - ·-
09.5 /'.2 19.0 0075 0.150 0.425 0.600 1.18 2.00 4.75 6.7 25.1 37.5 53.
/ 75.0 100.0
16.0 Data presented hereon is for the sole use of the stipulated client SNCL 1s not responsible, nor can be held liable. for use made of this repc:,t by any other party, with or wii::t
1the
/� knowledge of SNCL The tes�ng S8f'Vlces reported herein have been perfcrmed by a SNCL technician to recognized industry slandsds, unless otherwise noted No other w nty is made This data does not include or re?'esent any interpretation or opinion of specifica�on compliance or material suitability Should engineering interpretation be req..ired, ISNCL will provide ii upon written request Project Manager:,&.ffi'rk McClelland, C.E.T
Infrastructure
0
10
20 pE
30 R
40 EN
50 T
R 60 E
T70AI
N
80 ED
90
100 150.0
@
![Page 33: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/33.jpg)
�;��VAIJN
CLAY & SILT
GRAIN SIZE IN MICROMETERS
100
90
80
-
- -
- --
2µm 3µm
- --
--
- -
- ,_,_
4jJm 5µm
-
- - -
� -
10µm
- -
� -
SNC-LAVALIN
UNIFIED SOIL CLASSIFICATION SYSTEM
SAND
Fine
30µm 40µm 75µm 150µm
20µm 53µm 106µm
- -
300µm
250µm 425µm
- -V
- , __ -
I- � -
- ,_ f-- -
Medium Coarse
SIEVE DESIGNATION (Metric) 600µm 1.18mm 2.36mm
850µm 2.0mm 4.75mm
- - - -
- -
- - -
GRAVEL
Fine Coarse
13.2mm 26.5mm 53.0mm 75.0mm 9.5mm 19.0mm 37.5mm 63mm
-- - - -- -
-- - --f---- - --
� , __ -
- ·- �- -- - -- - -
I- - - - - - - -
70 - -
(9 60 --z
- -
f-- -z w -w
40 -
--30 -
20 -
10 � -
0
1 2
% +3"
SNC-LAVALIN 1164 Clyde Court Kingston, Ontario K7P 2E4
- �-
- ·-
, -�
I- �-
-
- f--
,-- � -.
- � -f--
-
f--
"'"' ...... I-'"' """' _..,.
-
-
--
-- .
--
-·
-
-
-
-
-
-
7 l7
-
-· ,--
I- -
�
-
,_
-
j_� -
- -
-f--
- -- �l - -
.,, ,, - - --
,/ """'
--
-
-
- -
3 4 5 10 20 30 40 270 200 140 100
% Gravel Course I Fine Course
0 I 1 1
-- -
- -
-
- -
- -
-
-
-
60 50 40
- - - -
- - -- - - -
- - - -
- - -- -
- - -
- ·- - - - -
- - - -
- -- - -
- - SAMPLE DATA -� Job : 18-1690-06
Lab No : 17947-F -Borehole :7- - Depth : 0.6-1.Sm
- - Sample : JC013
..• 30 20 16 10
B 4 3/8" 1/2" 314" 1" 1.5" 2"
SIEVE DESIGNATION (Imperial)
% Sand % Fines Medium I Fine Silt I
2 I 41 48 I
GRAIN SIZE DISTRIBUTION Client: Ainley
Project: 18523-1
SILT SAND Location: Brighton
-
-
-
-
3"
Clay 8
Trace Clay,Trace Gravel Date:May 14,2018 !Moisture Content 18.1%
![Page 34: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/34.jpg)
bN:tVAIJN SNC-LAVALIN
('.) z
Q_
z
Q_
UNIFIED SOIL CLASSIFICATION SYSTEM
SAND
CLAY & SILT
Fine Medium Coarse
GRAIN SIZE IN MICROMETERS SIEVE DESIGNATION (Metric)
GRAVEL
Fine Coarse
4µm 30µm 40µm 75µm 150µm 300µm 600µm 1.18mm 2.36mm 13.2mm 26.5mm 53.0mm 75.0mm
100 2µm 3µm 5µm 10µm 20µm 53µm 106µm 250µm 425µm 850µm 2.0mm 4.75mm 9.5mm 19.0mm 37.5mm 63mm
90 �� -1· 1-
80
1-- ,_
I I 1----t-l -1�1 I I I __J __
70 J-..--- 1-1-1
50 1 -
40
30 � -
20
,_ --1-- 1 -
10 - l__.._j
I-- I - -I I I· -
- -1- 1 - I - -•-
1-- 1- 1 I �
e-- , _
I� L-
- I· I - --I I-
Job Lab No Borehole Depth Sample
-1--1 1--
�I- --I I_,
I· -I -1-
�
SAMPLE DATA : 18-1690-06 : 17947-G :7 : 1.8-3.0m : JC014
I
l--4-
I I I I 11111 11111 I I I I 11111 I I I I I I I I I I I 11 'd· 1 0
3/8" 1/2" 3/4" 1" 1.5" 2" 3" 4 5 10
% +3" % Gravel
0 tCourse
20 30 40 210 200 140 100
Fine Course
0 0
60 50 40 30 20 16 10 8
SIEVE DESIGNATION (Imperial)
% Sand % Fines
Medium T Fine Silt T 1 15 62 1
Client: Ainley
'I
SNC-LAVALIN Project: 18523-1 1164 Clyde Court Kingston, Ontario K7P 2E4 Location: Brighton
Clav 22
GRAIN SIZE DISTRIBUTION
CLAY
With Silt, Some Sand Date:May 14,2018 !Moisture Content 21.7%
![Page 35: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/35.jpg)
•)) SNC • LAVALIN
SNC-Lavalin GEM Ontario Inc.
1164 Clyde Court
Kingston, Ontario K7P 2E4
,� (613) 389-178 5 (613) 389-4204
Grain Size Analysis Test Report Project No.: 18-1690-06 Project Description: Lab Testing Date: Jun 01, 2018 Project Location: !SAMPLE DATAMaterial:Date Sampled:Time Sampled:Sample Type:Sample Location:Lot:Source:Sampled By:
!LAB DATA
I Soil May 14, 2018
Borehole JC016 BH#8 0.5-0.75M
Sublot:
Ainley Client
I Lab No.: 17947-H Date Tested: Jun 01, 2018 Specification: OPSS1010, Granular B Type I
!PARTICLE ANALYSISTEST Sample Specification
Percent Crushed: % Asphalt Coated: 30
% Flat and Elongated
Comments: Moisture Content is 2.0%
100
90
p 80 E R 70
60 N
T 50
p A 40 s
s 30
N ' G 20 '
' 10, ,/ ,,,-
.I
'
' ' '
,. ...... ---
-· ·-·.
'
Sample:
' '
' '
'
_,,,,,, /-----
-- -· ·-··· -·
/
/ /
/
.,..,.,.,,"
,,,,,/
------· ---·····
/ ,. /
/
/ //
/
--· _ .. ------
I !WASH PASS 0.075mm TEST
Wash Pass 0.o75 mm:
'FINENESS MODULUS
Specs: /
/
____ ..... -"
..... ----.. -_,,-
,,,, ...
/
-----·--
... .. ... --"
... --"
I I Sample I Specs I
I I I
I 1.78 I
/ /
/
/ /
/ /
/
/
/
1........-
Contract No.: Grain Size Analysis
Sieve Percent Passing Sizes (mm) Sample Specification
150.0 100 100 - 100 100.0 -
75.0 53.0 -
50.0 -
37.5 -
26.5 100 50 - 100 25.0 -
19.0 -
16.0 -
13.2 -
9.5 -
6.7 -
4.75 56 20 - 100 2.36 -
2.00 -
1.18 42.7 10 -100 0.600 -
0.425 -
0.300 23.7 2 - 65 0.150 -
0.075 5 0-8* Indicates Out of Specification
/
// /
/
/ /
/ /
/
/ /
/
-- ' O, O.Q75 0.150 0.425 0.600 1.18 2.00 4.75 6.7 9.5
X 19.0
21 37.5
/0 75.0 100.0
16.0 Cata presented hereon is for.the sole use of the stipulated client SNCL is not responsible, nor ca� be held liable, for use made of this repoct by any other party, with or wit�{/he
/� knowledge of SNCL The testing services reported herein have been performed by a SNCL techmetan to recognized industry standards, unless otherwise noted No other w1r1 nty is made. This data does not include or re?"esenl any interpretation or opinion of specification compliance or material suitability. Should engineering interpretation be requred,
/ 0 /
/ 10
20 p E
30 R
40 E N
50 T
R60 E
T 70Ai
N
80 E
90
100 150.0
SNCL will provide 1f upon written request Project Mana,9er_;,,Mark McClelland, C.E.T £/
Infrastructure @
![Page 36: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/36.jpg)
�=?�VAIJN SNC-LAVALIN
C)
w
w
UNIFIED SOIL CLASSIFICATION SYSTEM
SAND CLAY & SILT
Fine Medium Coarse
GRAIN SIZE IN MICROMETERS SIEVE DESIGNATION (Metric)
GRAVEL
Fine Coarse
4µm 30µm 40µm 75µm 150µm 300µm 600µm 1.18mm 2.36mm 13.2mm 26.5mm 53.0mm 75.0mm
100 2µm 3µm 5µm 10µm 20µm 53µm 106µm 250µm 425µm 850µm 2.0mm 4.75mm 9.5mm 19.0mm 37.5mm 63mm
90
80
70
60
40
30
20
10
0
- --+- ---I I -
-I 1 -1 -1 1--1 1 -1 -1-------1 -I -I -l--1 I -1 - I I 1 -1 -I I- I
1-I I I I
-1llll 4 5
,_ -
___J - -1· , _, f-
-I -1- 1-----1-1-1-11- I- ---1
•- I I· 1 ---1- • -
f- I-
---
1- ---'-
1 11 11 I I I 1 11111 I I I I I 10 20 30 40 270 200 140 100 60 50
I -1- I - - I
I I I I I 40 30 20 16 10 B
1-1-
Job Lab No Borehole
-• Depth Sample
I �
SAMPLE DATA : 1 8-1690-06 : 17947-1 :9
: 0.9-2.0m : JC002
---I· I I
=
3/8" 1/2" 3/4" 1" 1.5" 2" 3"
SIEVE DESIGNATION (Imperial)
% Gravel % Sand Course Fine Course Medium Fine
% +3" % Fines
Silt 1 4 8 7 7 2 24 I
Client: Ainley
SNC-LAVALIN Project: 18523-1 1164 Clyde Court Kingston, Ontario K7P 2E4 Location: Brighton
Clay 48
GRAIN SIZE DISTRIBUTION
CLAY
With Silt, Some Sand,Some Gravel Date:May 14,2018 I Moisture Content 20.9%
![Page 37: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/37.jpg)
�=?�VAllN SNC-LAVALIN
'-"
UNIFIED SOIL CLASSIFICATION SYSTEM
SAND CLAY & SILT
I I Coarse Fine Medium
GRAIN SIZE IN MICROMETERS SIEVE DESIGNATION (Metric)
GRAVEL
Fine I Coarse
4µm 30µm 40µm 75µm 150µm 300µm 600µm 1.18mm 2.36mm 13.2mm 26.5mm 53.0mm 75.0mm
100 2µm 3µm 5µm 10µm 20µm 53µm 106µm 250µm 425µm 850µm 2.0mm 4.75mm 9.5mm 19.0mm 37.5mm 63mm
----l-. ,_, 90 +- --I- -I I -l-1
80
70
60
50
40
30
20
10 +-
% +3"
-1- I --+------I 1-1 I ----f- I ,_,
1----l-
• --l -1 1 -1 I -l- 1· 1 -1 1·
-•-+--
4 5 10
% Gravel
Course
9
-I 1-1· ,_, • -
20 30 40 270 200 140 100
Fine Course
11 4
, _ , _ I - I I -
+ • - 1--
I- I- l�I - I-• --
�- -
-•·
Job
I---,
I l-1 -I
-• -I - • _, -·
-I I I ----t •�
SAMPLE DATA : 18-1690-06
: 17947-J
:10
Lab No Borehole Depth Sample
: 1.8-3.0m
: JC004 11 1 1 1 1 1 '
2.� 1 11 60 50 40 30 20 16 10 8 3/8" 1/2" 3/4" 1" 15" 2" 3"
SIEVE DESIGNATION (Imperial)
% Sand % Fines
Medium Fine Silt
9 13 53
Client: Ainley
SNC-LAVALIN Project: 18523-1 1164 Clyde Court Kingston, Ontario K7P 2E4
GRAIN SIZE DISTRIBUTION
SILT
With Gravel, With Sand
Location: Brighton
Gia
0
Date:May 14,2018 I Moisture Content 9.8%
![Page 38: Municipality of Brighton€¦ · stem augers were used to complete the boreholes with grab sampling procedures used to secure the ... referenced to the MTM Geodetic Coordinate system](https://reader035.vdocuments.net/reader035/viewer/2022070915/5fb5e196220ed07c5169b7e3/html5/thumbnails/38.jpg)
Job# :
Project Client:
Project :
Location :
Specimen#
17947-A 17497-D 17497-G
60
50
40
x-w C
� 30 �
a. 20
10
0 0
18-1690-06 Ainley 18523-1 Brighton Boreholes
Sample#
JC009 JC007 JC014
�-····
-····· ........ ---
SNC-LAVALIN
PLASTICITY CHART
I
Depth LL%
1.8-3.0M 28.0 0.9-2.4M 30 1.8-3.0M 46
I
I
I
i
. .... ,
-······ ··-···· ····-·-·
! i
I
CL or OL I
!
14.f> I
TEST RESULTS
PL%
13.5 16 22
I
i
I
...........
I
'
Pl
14.5 14 24
• 1794 7-A JC009
WL=50
... .. ··-·"
• 2L
Fines W%
+
CH or OH
! I
I
I
I •··
!
I
I
I
MH or OH
I !
CL-ML / I ! I
I
ML or OL I
10 20 30 40 50 60 70
LIQUID LIMIT, LL
•)) SNC• LAVAI..IN
Lab# : 17947 Technician : cos
Manager JU Date : 14/5/2018
Classification Remarks
CL Moisture 37.5% CL Moisture 16.3% CL Moisture 21.7%
I
I
I
·•· I 'A' Line Pl = 0.73(LL-20}
I
I
I
80 90 100