muon trigger
DESCRIPTION
Muon Trigger. ~ 6.5 m. ~ 5.5 m. Muon trigger system overview. Search for (muon) tracks in ~ 800 ns Deliver signals for single , like-sign and unlike-sign pairs, above 2 p T thresholds, each 25 ns. 72 RPC located on 8 independent half-planes (half-plane surface 2.7x6.5 m 2 ) - PowerPoint PPT PresentationTRANSCRIPT
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 1
Muon Trigger
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 2
~ 5.5 m
~ 6
.5 m
Muon trigger system overview
72 RPC located on 8 independent half-planes (half-plane surface 2.7x6.5 m2)
20992 strips and Front-End channels242 Local Trigger cards (VME 9U)16 VME crates for Local and Regional Trigger16 Regional Trigger cards1 Global Trigger card 2 DARC cards for DAQ interface1 JTAG card for Local Trigger card configuration1 Front-End Test (FET) pulse generator
Search for (muon) tracks in ~ 800 nsDeliver signals for single , like-sign and unlike-sign pairs, above 2 pT thresholds, each 25 ns
Clermont-Ferrand, mainly electronics Nantes, mainly electronics and DAQ
Alessandria and Torino, mainly detectors and mechanics
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 3
Electronics/DaQ diagram
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009
Muon Trigger status sur la base du cosmic run de Aout-Sept 09
• RPCs : 69 / 72 RPCs o.k. (72 / 72, suite aux maintenances après le cosmic run) Fonctionnement complet et satisfaisant, en mode avalanche, pour la 1ère fois
• FE electronics (21 kch): ~100% o.k. Seuils du FE = 10 mV, pas de voies bruyantes
• Trigger electronique et DaQ : ~100% o.k. Taux de trigger “Single Muon” ~ 0.23 Hz (traces quasi-horizontales)
• DCS: opérationnel• Alignment: o.k.
σH = 1,1 mm and σV = 1,5 mm
Le Muon Trigger a été stable et
opérationnel, en tant que détecteur
de trigger et de readout, tout au
long du cosmic run.
Il est prêt pour les premières collisions
Single muon trigger distribution (a.u.)
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 5
Pas toujours sans problème …
• Divers incidents en 2009 2 chassis pleins de cartes électroniques arrosés par une fuite d’eau importante … Inversion d’une phase sur l’alimentation du moteur pilotant l’ouverture du
détecteur … Etc …
• Problème lors du test d’injection d’Octobre 09Un événement complètement inattendu de très haute multiplicité (dump sur le TDI) est arrivé sur le Muon Trigger, le 25/10 à 21H11, alors que le détecteur était à HV nominale car le faisceau avait été annoncé pour après 22H ! Problèmes de communication HV & LV trip (OK) mais de nombreuses cartes FE
endommagées (1.7% des cartes FE, ¼ des spares…) Investigations techniques en cours pour mesurer et améliorer la robustesse du FE aux chocs électriques
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 6
Latence du L0 du Muon Trigger
Extraction test (beam dumped on TED, July 11-12th, 2009) summary : http://indico.cern.ch/conferenceDisplay.py?confId=64299
T0 zero BCSPD +7 BC (jitters)
V0 +8 BCMuTr +11 BCZDC +21 BC
T0 zero BCSPD +7 BC (jitters)
V0 +8 BCMuTr +11 BCZDC +21 BC
Latence du L0 du Muon Trigger, de la collision au CTP :• 860 +/- 10 ns (Juillet 2009) • 830 +/- 10 ns (Novembre 2009)• 800 +/- 10 ns (Novembre 2009
si connexion directe sur le CTP !)• vs. 800 ns, req. !!
Acceptable par la collaboration ?
(à priori oui, proposition du coordonateur ALICE Trigger, du 10 Nov 2009)
proposed new L0 timingArrival at CTP = 835 ns
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 7
Muon Trigger Shifts
MU TRG
( 2009-07-09 ~ 2009-11-02 ) past / future ( 2009-11-02 ~ 2009-12-31 )
Institute shift oncall allContribution (past/future)
Contribution (all)
Clermont-Fd 67 / 45 40 / 18 107 / 63 49.5 % / 42.0 % 46.4 %
Nantes 18 / 18 0 / 0 18 / 18 8.3 % / 12.0 % 9.8 %
Torino 49 / 44 25 / 18 74 / 62 34.3 % / 41.3 % 37.2 %
Kangnung 17 / 7 0 / 0 17 / 7 7.9 % / 4.7 % 6.6 %
Total 151 / 114 65 / 36 216 / 150
• Contribution bien équilibrée entre instituts, compte tenu des responsabilités de construction
• Nécessité d’avoir une personne en permanence sur site
(ALICE-INT-2009-011) : 218 (299) Shifts dus par Clermont en 2009 (2010) !!
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 8
Summary
• Muon Trigger complètement opérationnel
• 4 semaines de cosmic run en Aout-Septembre 2009 Prises de données avec dipole On/Off Muon Trigger et Tracking stables, en configuration quasi nominale,
avec une efficacité de prises de données de 80% ~98% matching des traces MTK => MTG
• En cours Amélioration de la robustesse du FE aux grands chocs électriques Segmentation de la distribution des seuils du FE Configuration plus robuste et plus rapide de l’électronique de trigger Améliorations des softws online/offline etc
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 9
Spares
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 10
ALICE@LPC Clermont-Fd
• Personnels (2 CNRS, 7 Univ., 2 post-doc, 4 doctorants, + ST)
1 Poste MC ouvert à l’UBP (cascade suite départ en retraite de A. Devaux)
2 nouveaux doctorants en 2009 : X. Zhang (cotutelle avec Wuhan, financement ambassade + FCPPL) et S. Ahn (cotutelle avec Seoul, financement Coréen). Les 2 autres doctorants soutiennent en 2010.
1 post-doc (Y. Baek) mis à la disposition du projet Muon Trigger, coordonateur de run
Besoin recrutement CNRS sous 2 ans: dernier rentré, Philippe Crochet en 1998 !!
1 sujet de thèse proposé au LPC en 2010 sur les performances du Muon Trigger (incluant les corrections d’efficacité) , contact en cours avec Dario Berzano, Turin
• Programmes internationaux : 2 LIAs FCPPL et FKPPL, HP-FP7 Retequarkonia, PICs LPC-Dubna, partenaire associé EMMI (ExtreMe Matter Institute)
• Région Auvergne, pôles d’excellence : « Soutien aux Analyses de Physique auprès du LHC »
Financement de 3 allocations doctorales (ATLAS 2009, ALICE 2010 et LHCb 2011)
Co-financement (Région, Feder, IN2P3, LPC) d’un Tier3 (total ~250 k€ sur 3 ans)
P. Dupieux, LPC Clermont-Fd, ALICE France, 13 Nov 2009 11
Status of Trigger Electronics
All the trigger electronics is operational Very few algorithm errors for some well identified Local cards Readout of Regional boards not possible at present New : DARC FPGA programming possible from the CR
Global algo errors (from Global input
patterns) : no errors
see next slide
Local algo errors typically < 0,1%
Whole decision chain (from Local input patterns
to Global decision)typically < 0,1%
(from MOOD, not yet implemented in QA
Algorithm errors from QA analysis : Run 85949 (summer 09)