MVCO Test Install Martha’s Vineyard CODAR Site June 30-July 1, 2009 Goals: Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site New site will provide additional regional coverage New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down

Upload: reuben

Post on 24-Feb-2016

25 views

Category:

Documents


0 download

DESCRIPTION

MVCO Test Install. Goals: Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site New site will provide additional regional coverage New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Goals:

Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site

New site will provide additional regional coverage

New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down

Page 2: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 3: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 4: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 5: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Thank You:

-John Varkonda, Correllus State Forest. Provided Accommodations

-Chris Jakubiak, SMAST. Preformed Install

-Ethan Handel, Rutgers. Preformed Install

-Janet Fredericks, WHOI. Logistical Support

-Dennis Arnold, South Beach Staff Director. Site Permissions