Name of Project: REHABILITATION/ IMPROVEMENT ALONG LUBUAGAN-BATONG BUHAY- ABRA ROAD
K0458+376 to K0476+238, Intermittent SectionsLUBUAGAN & PASIL KALINGA
ITEM 505 - GROUTED RIPRAPcu.m. Quantity = 2,208.48 cu.m.
1 cu.m./man-day Duration = 2,208.48 cu.m. =
1.25 cu.m./hr.
No. ofPerson
1
2
8
No. ofUnits
0.1
0.05
1
1.00 3.00 /hr
/cu.m.
ln.m
sq.m
cu.m
cu.m.
cu.m
bags
17%
12%
Item Cost
Name of Project: REHABILITATION/ IMPROVEMENT ALONG LUBUAGAN-BATONG BUHAY- ABRA ROAD
K0458+376 to K0476+238, Intermittent SectionsLUBUAGAN & PASIL KALINGA
SPL- MOBILIZATION & DEMOBILIZATIONlot Quantity = 1.00 lot
cu.m./man-day Duration = 4.00 hrs.
No. ofPerson
1
1
2
No. ofUnits
2
1
7
2
0.00 3.00 /hr
33.00 275.00
Gravel Fill 33.13
8,404,162.55PhPTotal Unit Cost 3,805.41Php
Sub - Total for 3
9,075.00Php
OCM/CP 1,090,283.60PhP
VAT 900,445.99PhP
Cement 6,625.00 295.90 1,960,337.50Php
4,777,284.61PhP
Direct Cost 6,413,432.96PhP
Boulders 2,318.90 914.05 2,119,589.40Php
Name and Specification Unit Quantity Unit Cost Amount
3. Materials :
Weep Holes (4" diam.) 663.00 153.33
1,030.65 34,142.62Php
Sand 552.12 1,000.65 552,480.09Php
101,660.00Php
Filter Cloth
Sub - Total for 2 757,472.26PhpTotal (1+2) 1,636,148.35PhP
Output per hour =
Unit Cost = 740.85PhP
1-Bagger Mixer 1,767 172.00PhP 303,924.00Php
Minor tools (10% of Labor Cost) 87,867.61Php
Name and Capacity No. of Hours Hourly Rate Amount
Backhoe 1,767 1,537.00PhP 271,587.90Php
Water Truck 1,767 1,065.00PhP 94,092.75Php
2. Equipment :
Sub - Total for 1 878,676.09PhP
1. Labor :Construction Foreman 1,767 71.95PhP 127,135.65PhP
Skilled 1,767 52.06PhP 183,980.04PhP
Laborers 1,767 40.15PhP 567,560.40PhP
Unit of Measurement =
Output/hour =1767 hrs
1.25cu.m./hr
Designation No. of Hours Hourly Rate Amount
Laborers 4 40.15PhP 321.20PhP
1. Labor :
Construction Foreman 4 71.95PhP 287.80PhP
Skilled 4 52.06PhP 208.24PhP
Unit of Measurement =
Output/hour =
Designation No. of Hours Hourly Rate Amount
1,733.00PhP 6,932.00Php
Dumptrucks 4 1,352.00PhP 37,856.00Php
Sub - Total for 1 817.24PhP
Name and Capacity No. of Hours Hourly Rate Amount
2. Equipment :
Backhoe 4 1,537.00PhP 12,296.00Php
1-Bagger Conc. Mixer 4 172.00PhP 81.72Php
Sub - Total for 2 57,165.72Php
Total (1+2) 57,982.96PhP
Output per hour =
Pay Loader 4
-
7/29/2019 Mvuc Revised Final 02
2/7
Source = From Pinagan Gravel Pit
Hauling Distance = km. (mountainous)
Volume = cu.m.
1 Labor Cost
Breaking,Picking and Stockpiling
Labor Capacity = 1 cu.m./man-day due to multiple handling
No. of Laborers = 50
Total Output/day = 50 cu.m.
No. of days = 2,434.84 cu.m./ 50 = 49.00 days
2 Equipment Cost:
Loading Time = 6 min.
Unloading Time = 2 min.
Slack Time = 6 min.
0.5 km (Gravel Pit to Highway)
0.5 kms x 60 min/hr
15 kms/hr
0.5 kms x 60 min/hr
25 kms/hr (Pinagan Highway-Dangoy, Lubuagan)
PAVED(Mountainous) 12 km (Tomiangan to Dangoy)
12.00 kms x 60 min/hr
20 kms/hr
12.00 kms x 60 min/hr
35 kms/hr
(Dangoy Lubuagan to Project Site)
UNPAVED( Mountainous) 13.6 km (Dangoy to Project Site)
13.60 kms x 60 min/hr
15 kms/hr
13.60 kms x 60 min/hr
25 kms/hr
Total Cycle Time = 160.81 min.
8 hrs x 60 min/hr =
mins
Utilizing 2 Dumptrucks
cu.m.
2.98 trips/day x 20 cu.m.
Dumptrucks = 2.00 DTx P10,816 /day x 39.50 days =
Loader = 1 Loader x P13,864 /day x 39.50 days =
Aggregate Tax = 15.00 /cu.m.
Total Unit Cost of Boulders @ Project Site = 914.05 /cu.m.
P854,464.00
P547,628.00
P1,402,092.00
Total Cost = P2,189,056.50
Unit Cost =P2,189,056.50
= P899.05 /cu.m.2,434.84
No. of Trips/day = 2.98 trips160.8114286
No. of days Required =2,434.84
= 40.85 say 39.5 days
Loaded Trip = = 54.40 mins
Unloaded Trip = = 32.64 min.
Loaded Trip = = 36.00 mins
Unloaded Trip = = 20.57 min.
UNPAVED ROAD (mountainous)
Loaded Trip = = 2.00 mins
Unloaded Trip = = 1.20 min.
Labor = 50 Lab. X 49.00 days x 321.21 /day = P786,964.50
UNIT COST DERIVATION OF BOULDERS (Class "A")
0.5
2,318.90
-
7/29/2019 Mvuc Revised Final 02
3/7
Region : CAR Roadbed Width : 4-8 m.District : Pavement Width :
Name of Project : Rehabilitation/ Improvement along Lubuagan- Net Length : 651.50 m.: Batong Buhay-Abra Boundary Road Thickness :
Road Section I.D. : S00562LZ Type of Structure :Section : Dangoy-Balatoc Section Type of Substructure :Location : Lubuagan & Pasil ,Kalinga No. of Spans :Appropriation : No. of Piers :
Source of Fund : MVUC Fund Dimensions :Classification : No.of Days to Complete : 155.00 CD
Limits : K0458+376 to K0476+238 (I.S)Starting Date :
AVAILABLEWork Category 27: Rehabilitation plus Improvement
Facilities for the Engineers 0.40% 2
Provision for Safety and Health 0.35% Pay Loader 1
Roadway Excavation (Common Earth) 0.97% Dumptrucks 7
Structure Excavation 2.07% 1-Bagger Conc. Mixer 2
Embankment (Selected Fill) 2.09% Bar Cutter 1
Reinforcing Steel Bars (Grade 40) 2.96%
Structural Concrete (Class "A") 3.65%Reinforced Concrete Pipe Culvert (910mm) 1.96%
Grouted Riprap 84.89%
Mobilization & Demobilization 0.66%
100%
UNIT COST
Work Category 27: Rehabilitation plus ImprovementFacilities for the Engineers mos. 39,916.80
Provision for Safety and Health lot 34,624.08
Roadway Excavation (Common Earth) cu.m. 95,962.69
Structure Excavation cu.m. 205,382.83
Embankment (Selected Fill) cu.m. 206,628.39
Reinforcing Steel Bars (Grade 40) kgs. 292,776.49
Structural Concrete (Class "A") cu.m. 361,094.32Reinforced Concrete Pipe Culvert (910mm) ln.m. 194,528.80
Grouted Riprap cu.m. 8,404,162.55
Mobilization & Demobilization cu.m. 64,940.92
Total: 9,900,017.87
DIRECT COST1. Labor P 975,253.24
2. Equipment P 1,073,514.79
3. Material P 5,519,355.87
4. Project Supervision
Total Direct Cost P 7,568,123.91INDIRECT COST1. Mark-up (OCM, Profit) P 1,271,177.76
2. VAT P 1,060,716.20
3. Quality Control P
4. Eng'g & Administrative Overhead P 100,000.00
5. Construction Contingency P
6. Central Office Retention P
7. Road Right-of-Way P
8. Soil Exploration P
P
Total Indirect Cost P 2,431,893.96
TOTAL ESTIMATED PROJECT COST P 10,000,017.87
SAY P 10,000,000.00
Prepared by: Checked & Reviewed: Submitted by:
1.00 34,624.08
599.00 160.20
%
B.1
B.1
103
T O T A L
500a505
704.15 291.67
378.00 546.64
68.39
7,737.18
8,105.37
3,805.41
64,940.92
4,280.84
46.67
24.00
A.1 7,257.60
102a
PROGRAM OF WORK
Kalinga
By Contract
Upon Approval
ITEM NO. ITEMS OF WORK TO BE DONE %E Q U I P M E N T
DESCRIPTION NEEDED
10,000,000.00PhP
Backhoe
Spl
104a404a405
5.50
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSCordillera Administrative Region
Office of the District Engineer
Bulanao, Tabuk City, Kalinga
ESTIMATED COST OF PROPOSED WORKSQUANTITY UNIT COST
A.1
ITEM DESCRIPTION
2,208.48
1.00
102a103
104a404a405
500a505Spl
24.32%
100%
9. Survey Plan and Preparation
9.75%
1.00%
12.71%
10.61%
10.74%
55.19%
75.68%
-
7/29/2019 Mvuc Revised Final 02
4/7
ADJUSTED
COST
-
7/29/2019 Mvuc Revised Final 02
5/7
Calendar Days = (given reference amount x reference duration per km. of road)
estimated amount per km.of road
+ (duration of mob./demob. On the given reference amount)
NOTE: For Drainage & Slope Protection (Grouted Riprap)
Given Reference Amount = 10,000,000.00
Reference Duration/km. of Road = 16.00
Estimated amount per km. of road = 546,068.04
Mobilization/Demobilization = 15 days
(Up to P5 Million)
Calendar Days = 10,000,000.00 x 16.00 + 15.00 days
= 308.00 c.d.
say 309 days(for 20M/2) = 154.50
= 155.00 days
Prepared by: Checked/Reviewed by:
SAMUEL A. PAO-ITON RAFAEL L. FERNANDO
Engineer II Chief, Planning & Design Section
(Per D.O. No. 44, Series 2012)
546,068.04
COMPUTATION OF PROJECT DURATION
-
7/29/2019 Mvuc Revised Final 02
6/7
Stations: K0499+900 to K0508+100
Length : 8,200.00 m.
12% 10%
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)(5)X(8) 2%((5)+(9)
Act 309 : Other Traffic Devices
Spl Mobilizati 1.00 lot 6,022.90 - - - - 722.75
602a Reflectorized Thermoplastic Pavement
Markings ( 1,933.50 sq.m. ##### ##### ##### 22% ##### #####
602b Reflectorized Thermoplastic Pavement
Markings ( 150.00 sq.m. ##### ##### ##### 22% ##### #####
TOTAL = THREE MILLION, ONE HUNDRED SEVENTY THOUSAND, FOUR HUNDRED THIRTY ONE PESOS.
PREPARED BY: Recommending Approval:
SAMUEL EUGENE MICHAEL J. ESPITA JOEL G. BUCAO DOMIN
OIC-Asst.
ChairmanMem Member
Engin Engineer II Engineer II
Painting of Centerline and Edgelines along Kalinga-CaProject Name and Location
ITEM NO.DESCRIPTI
ONQty. UNIT
ESTIMATE
D DIRECT
COST
MARK-UPS IN
PERCENTTOTAL MARK-UP
VAT
OCM PROFIT % VALUE
APPROVED BUDGET FOR THE CONTRA
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CORDILLERA ADMINISTRATIVE REGION
OFFICE OF THE District Engineer
Bulanao, Tabuk City
-
7/29/2019 Mvuc Revised Final 02
7/7
Contract Duration:10.00 C.D.
(11) (12) (13) (14) (15)(9)+(10) (5)+(11) (12)/(3) (3)x(14)
722.75 6,745.65 6,745.65 6,745.00 6,745.00
###### ###### 1,516.48 1,516.00 ######
62,353.15 ###### 1,550.21 1,550.00 ######
P #######
APPROVED:
O A. ENCISO
District Engineer District Engineer
TOTAL
INDIRECT
COST
TOTAL
COST
UNIT
COST
ALEXANDER C. CASTA
ayan Road
ADJUSTE
D UNIT
COST
ADJUSTE
D TOTAL
COST