my_cv(1)

3
: E-mail [email protected] : Phone 0092 332 928 4987 : Address House no 212/33, Street 17-B, Gulbahar no 2, Peshawar, Pakistan 25000 ZTE Corporation April 2015 — Present ZTE Corporation September 2014 — March 2015 WARSAK Power Station August 2013 — September 2013 BS-Electrical Engineering September 2010 — June 2014 Higher Secondary School Certificate September 2008 — May 2010 Jawad Ali Khan Objective Obtain a challenging leadership position applying creative problem solving and lean management skills with a growing company to achieve optimum utilization of its resources and maximum profits. Work experience CORE Transmission Engineer Maintenance of PTCL DWDM 40x80G project, OSNR Maintenance, MSP configuration, testing of faulty boards, version upgradation of the cards and maintenance of PTCL project PTCL DWDM 40x80G Lambda's Upgradation are the routine tasks after successful nationwide completion of project. In short, maintenance of the project to ensure constant and required OSNR and reduced BERs. Trainee Transmission Engineer The job included Installation, Patching, Commissioning, OCI Integration and Optical Power Debugging of the new DWDM ZXONE8000 and SDH S-385 in north and central region of Pakistan. Moreover, MSP configuration, testing of faulty boards, version upgradation of the cards and maintenance of PTCL project PTCL DWDM 40x80G Lambda’s Upgradation were the main tasks after successful nationwide completion of project. Intern Engineer The job included Protection and Instrumentation jobs. Testing of various kind of distance, over current, earth fault, deferential REF, O/Voltage and under voltage relays. Education NUCES FAST Specialization: Electronics Major Course: Power Electronics, Digital System Designing, Opto-Electronics, VLSI Designing Other Courses: Programming in C and C++, Digital Signal Processing, Computer Logic Designing, µ- Processor Interfacing, Feedback Control Systems, ElectroMechanical Systems.. Final Year Project: Wind Speed Data Recording System for remote areas Edwardes College, Peshawar Area: Pre-Engineering Jawad Ali Khan 1

Upload: jawad-khan

Post on 03-Aug-2015

143 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: My_CV(1)

:E-mail [email protected] :Phone 0092 332 928 4987:Address House no 212/33, Street 17-B, Gulbahar no 2, Peshawar, Pakistan 25000

ZTE Corporation April 2015 — Present

ZTE Corporation September 2014 — March 2015

WARSAK Power Station August 2013 — September 2013

BS-Electrical Engineering September 2010 — June 2014

Higher Secondary School Certificate September 2008 — May 2010

Jawad Ali Khan

ObjectiveObtain a challenging leadership position applying creative problem solving and lean management skills with a growingcompany to achieve optimum utilization of its resources and maximum profits.

Work experience

CORE Transmission EngineerMaintenance of PTCL DWDM 40x80G project, OSNR Maintenance, MSP configuration, testing of faulty boards, versionupgradation of the cards and maintenance of PTCL project PTCL DWDM 40x80G Lambda's Upgradation are the routinetasks after successful nationwide completion of project.In short, maintenance of the project to ensure constant and required OSNR and reduced BERs.

Trainee Transmission EngineerThe job included Installation, Patching, Commissioning, OCI Integration and Optical Power Debugging of the new DWDMZXONE8000 and SDH S-385 in north and central region of Pakistan. Moreover, MSP configuration, testing of faultyboards, version upgradation of the cards and maintenance of PTCL project PTCL DWDM 40x80G Lambda’s Upgradationwere the main tasks after successful nationwide completion of project.

Intern EngineerThe job included Protection and Instrumentation jobs. Testing of various kind of distance, over current, earth fault,deferential REF, O/Voltage and under voltage relays.

Education

NUCES FASTSpecialization: Electronics Major Course: Power Electronics, Digital System Designing, Opto-Electronics, VLSI Designing Other Courses:Programming in C and C++, Digital Signal Processing, Computer Logic Designing, µ- Processor Interfacing, FeedbackControl Systems, ElectroMechanical Systems..Final Year Project: Wind Speed Data Recording System for remote areas

Edwardes College, PeshawarArea: Pre-Engineering

Jawad Ali Khan 1

Page 2: My_CV(1)

Secondary School Certificate April 2006 — May 2008Edwardes College School, PeshawarArea: Science

ProjectPTCL DWDM 40x80G Lambda's UpgradationIn this project of PTCL, ZTE is providing PTCL with DWDM equipments for the multiplexing different wavelengths andthen transmit to the client by cascading ZXONE8000 with SDH (Synchronous Digital Hierarchy) Rack. The main ofoperation of DWDM is based on the Multiplexing and De-Multiplexing phenomena. There are two cards installed in theZXONE8000 named as ODU (Optical De-multiplexing Unit) and OMU (Optical Multiplexing Unit) which are used formultiplexing and demultiplexing processes. Two way traffic is collected at ODU which separates the desired traffic fromthe multiplexed traffic and passes the remaining traffic to OMU with the data that has to be transmitted with previouslyreceived data. The traffic is then sent to the next site in the ring.

Power Transfer though Direct Induction (Wireless) This project was the semester project, on individual basis, when we were taught course of ELECTROMAGNETICTHEORY. Our instructor assigned us to implement what we studied in the course. I selected to work on the wirelesspower transfer. The main idea was derived from the working principle of transformer i-e Mutual Induction between primaryand secondary coils. The given task was simulation based but however, I continued working on it as soon as semesterwas over. Results were obtained with almost 10% error but range was up to few centimeters

Wind Speed Data Recording System for Remote Areas (Final Year Project) This project was a fine combination of analog and digital electronics. This project was designed so as to fulfill therequirements of the current energy crisis in Pakistan. The function of the project is to decide whether an area is suitablefor installation of Wind Power Generation System. Yearly data is recorded for the specific area and data is sent to themonitoring room via GSM for analysis by experts. Also EEPROM is used on major basis for storage purpose in caseGSM is crashed.

Hands On SoftwaresNetnumen U31E300 DEV-C++ MATLAB PLC (Programmable logic Controller) ModelSim - Verilog/VHDL MicroWind DSCH Dreamweaver Keil µ-vision Arduino LAB View

ReferencesMuhammad Nouman Khan Regional Project Manager, ZTE Pakistan Email: [email protected] Contact number: 0092 301 5226633

Jawad Ali Khan 2

Page 3: My_CV(1)

Bai Goufang Technical Resource Department, ZTE Pakistan Email: [email protected] Contact number: 0092 314 5111092

Jawad Ali Khan 3