na review process overview mb mv.2 1.4.13 909am

12
+ GASPS Needs Assessment Review Process Jan 7, 2013 Presented by the GSU CITF TA/ Training Team The GASPS NA review process of the Needs Assessment reports will take place during the month of January, 2013. GASPS Needs Assessment Review

Upload: progroup

Post on 29-Nov-2014

1.690 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Na review process overview mb mv.2 1.4.13 909am

+

GASPS Needs Assessment Review Process

Jan 7, 2013Presented by the GSU CITF TA/ Training Team

The GASPS NA review process of the Needs Assessment reports will take place during the month of January, 2013.

GASPS Needs Assessment Review

Page 2: Na review process overview mb mv.2 1.4.13 909am

+Purpose of the Peer Review

The purpose of conducting a Peer Review Process is for providers to gain knowledge and exchange ideas, experiences, and information while also providing constructive feedback to their peers.

Page 3: Na review process overview mb mv.2 1.4.13 909am

+Objective of the Peer Review

The objective of this process is for reports to be reviewed for adherence to the Needs Assessment Report Template and Data Collection Guidance, and to be certain that there has been adequate consideration in identifying high-need areas and at-risk populations, as per the State’s selected goals.

Page 4: Na review process overview mb mv.2 1.4.13 909am

+Process Overview

Needs Assessment (NA) Review Process Highlights

All NA related documents should be uploaded to Lunch-Box

Needs Assessment Review Process is two levels: Peer Review and State Review

Peer Review Starts: Jan 7, 2013 – Ends: Jan 18, 2013

State Review Starts: Jan 7, 2013 – Ends: Jan 31, 2013

Each provider (PC) will be signed a maximum of two (2) NA reports to review and provide feedback.

RPS will act as a conduit for the review process. All review documents, notes, and other related items should be sent to RPS.

Review documents and tools are available at gasps.org

Video overview of tools are available at gasps.org

Page 5: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

OPSP / RPS will assign the report you are to review. Please look for this information from OPSP on your

assigned report(s).

Required Items:

1. Completed assigned report(s) (provided by RPS and OSPS)

2. Needs Assessment Review Process Document (pg. 1, at ga- sps.org) This is a guide, and does not need to be submitted to your RPS.

3. Needs Assessment Review Process Tool (Pgs 2, 3 & 4) (at ga.sps.org) This will be submitted to your RPS / OPSP.

Page 6: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

Review Question Sections:

Introduction

Community Mobilization and Resource Assessment

Purpose

Methodology

Results and Findings

Challenges and Barriers

Page 7: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

3-Tier Rating Scale:

Outstanding - All elements are clearly addressed, well conceived, thoroughly developed, and well supported. Documentation and required information are specific and comprehensive. Minimum or no revisions required.

Satisfactory - Elements are addressed (although some do not contain necessary detail and/or support). Most documentation and required information are present and acceptable. Some revisions and information are required. Submit updated report.

Marginal - Few, if any, elements are addressed. Documentation and required information are deficient or omitted. Substantial revisions and inclusion of missing documents required. Need to revise and re-submit report.

State of Georgia
The time alotted to revise and resubmit will be determined on a case-by-case and the RPS and coaches will work with each provider in the process to assure that no one gets behind.Providers will not be stopped from moving forward as long as there is a commitment to continue making progress
Page 8: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

First, sign the confidentalty aggreement…

Please sign the confidentiality statement below and submit to the RPS with all the Needs Assessment reviewed documents.

Confidentiality Statement

I understand that the Needs Assessment report and required attachments are to be kept private and confidential. I attest that I will not share any information or documents provided to me with anyone. I will be mindful and respectful to the confidentiality and protection of my peers’ privacy.

___________________________________________________________ Organization’s Director or Manager (on behalf of the review panel)

Page 9: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

Fill out the Peer Review Assessment page

Peer Review Form for Needs Assessment Report

Name of Reviewing Community: X-ville GA (example)

Name of Reviewer/Organization: CITF TA Team (example)

Page 10: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

Review and score - matrix

State of Georgia
You are missing page 4 with questions to be addressed.Also, they need to understand that The state will do the review pairing
Marcus Bouligny
Yes, I added this languge to the next slide.
Page 11: Na review process overview mb mv.2 1.4.13 909am

+Review Tools

Review and score - additional questions

State of Georgia
You are missing page 4 with questions to be addressed.Also, they need to understand that The state will do the review pairing
Marcus Bouligny
Yes, I added this languge to the next slide.
Page 12: Na review process overview mb mv.2 1.4.13 909am

+Next Steps

Please hold your ECCO Requests on the review process until you have received your assigned report.

Your assigned reports will be e-mailed to you this week. The state will do the review and paring reviewers to communities

If you receive a large report and you are not able to complete your review by Jan 18th, please contact your RPS.

You can find the review tools at the ga-sps.org website; please download and review them.

When review is complete, send your completed review sheet to your RPS. Please do not share your feedback with others, with the exception of the RPS and OPSP state office.