  • 8/9/2019 Nagle Place Meeting

    1/23

    1

    Sound Transit University LinkCapitol Hill Station

    Nagle place Extension WorkshopAugust 3, 2010

  • 8/9/2019 Nagle Place Meeting

    2/23

  • 8/9/2019 Nagle Place Meeting

    3/23

    3

    3.15-mile extension of Initial

    Segment and Airport Link Capitol Hill Station

    UW Station

    Schedule

    Design: complete Construction: 6.5 years

    System testing: 6 months

    Open for service: 2016

    Adds 70,000 daily riders,114,000 riders systemwide

    University Link

  • 8/9/2019 Nagle Place Meeting

    4/23

    4

    Capitol Hill Station

    Broadway and John St.

    Underground station, 3entrances

    Ridership: 20,000 dailyboardings

    Travel time:

    3 minutes to downtown Seattle(University St.)

    3 minutes to UW Station

  • 8/9/2019 Nagle Place Meeting

    5/23

    5

  • 8/9/2019 Nagle Place Meeting

    6/23

    2009 2010 2011 2012 2013 2014 2015 2016 2017

    Demolition

    Excavation & Tunneling

    Station Construction

    Systems & Testing

    Station Opens

    Project Schedule

    6

  • 8/9/2019 Nagle Place Meeting

    7/23

  • 8/9/2019 Nagle Place Meeting

    8/23

    8

    TOD process

    Community Forums (2009)

    Sound Transit plans to implement/require in TOD:

    Farmers Market

    Limited parking

    Some affordable housing

    City establishes Urban Design Framework

    Selected developer plans will determine :

    Actual retail and housing type and size

    Potential for community space

    Building design and construction elements Other elements based on market at time of RFQ/RFP

    Guided by UDF

  • 8/9/2019 Nagle Place Meeting

    9/23

    TOD constraints

    Cant interfere withstation maintenanceor operations

    Transit supportive

    Fair Market value Public competitive

    process

    Occupied by 2017

    9

  • 8/9/2019 Nagle Place Meeting

    10/23

    10

    TOD Work Program Schedule

    2009 2010 2011 2012 2013 2014 2015 2016 2017

    Address Issues and Concepts

    Public Policy & Land Use Issues

    RFP / RFQ process

    Design, permitting and construction

    Station Opens

  • 8/9/2019 Nagle Place Meeting

    11/23

    TOD CHampions

    11

  • 8/9/2019 Nagle Place Meeting

    12/23

    12

    TOD Outreach

    Community StakeholderGroup

    Sound Transit quarterlycommunity forums

    September 2009 Charrette

    2010: further refine TOD

    concepts and UrbanDesign Framework

  • 8/9/2019 Nagle Place Meeting

    13/23

    Nagle Place ExtensionEarly Concept

    13

    Nagle Place Extension

  • 8/9/2019 Nagle Place Meeting

    14/23

    Nagle Place ExtensionCurrent Design

    14

  • 8/9/2019 Nagle Place Meeting

    15/23

    15

    Nagle Place ExtensionCurrent Design

  • 8/9/2019 Nagle Place Meeting

    16/23

    September 2009 Community CharretteRequests related to Nagle Place Extension

    Farmers Market

    Daylight

    Pedestrians only Smaller development sites

    Mid-block crossings

    Streetcar conflict

    16

  • 8/9/2019 Nagle Place Meeting

    17/23

    September 2009 Community CharretteIssues still to be addressed

    Integrating Denny &Nagle Place Extension

    South-facing open space

    on Denny Weather protection

    Denny closure

    Nagle Place Extensionretail

    Denny retail

    Performance artist(s)space

    Architectural variety

    Pedestrian sidewalk

    experience

    17

  • 8/9/2019 Nagle Place Meeting

    18/23

    Small Group Discussions

    18

  • 8/9/2019 Nagle Place Meeting

    19/23

    19

  • 8/9/2019 Nagle Place Meeting

    20/23

    Urban Design Framework

    Purpose and Intent: To establish a sharedprogramming and design vision for the SoundTransit owned properties on Capitol Hill andadjacent streets such that it is implemented

    through the disposition and eventualdevelopment of those properties.

    20

  • 8/9/2019 Nagle Place Meeting

    21/23

    Capitol HillTransit Oriented

    Development

    Sites

    21

    I b dd d i h U b

  • 8/9/2019 Nagle Place Meeting

    22/23

    Items to be addressed in the UrbanDesign Framework:

    Desired uses on sites including housing,affordable housing, retail, affordable retail andcommunity space

    Streetscape and Public Realm Design Quality

    22

  • 8/9/2019 Nagle Place Meeting

    23/23

    23

    How to Stay Informed

    Sound Transit Capitol Hill TOD websitewww.soundtransit.org/CapitolHillTOD

    Monthly electronic newsletters

    www.soundtransit.org/subscribe

    Sound Transit and CHampions contacts Sound Transit Outreach Rhonda Dixon, Community

    Outreach Coordinator, [email protected]

    Capitol Hill CHampions Cathy Hillenbrand,[email protected]

    http://www.soundtransit.org/CapitolHillTODhttp://www.soundtransit.org/subscribemailto:[email protected]:[email protected]:[email protected]:[email protected]://www.soundtransit.org/subscribehttp://www.soundtransit.org/CapitolHillTOD