  • 8/10/2019 NAM Road Project Technical Specification

    1/6

    Name of the Project :

    Client :

    Independent Engineer :

    Concessionaire :

    EPC Contractor :

    REFERENCE SPEC.LIMIT

    IS: 2720 (Part-28) Min. 95%

    IS: 2720 (Part-28) Min. 97%

    IS: 2720 (Part-8) Min.1.55 gm/cc

    IS: 2720 (Part-8) Min.1.63 gm/cc

    IS: 2720 (Part-8) Min.1.783 gm/cc

    IS: 2720 (Part-5) Max.70%

    IS: 2720 (Part-5) Max. 45%

    IS: 2720 (Part-40) Max 50%

    IS: 2720 (Part-16)/AASHTO

    T193-93Min 10%

    IS: 2720 (Part-4) Not specified

    IS: 2720 (Part-2) Field test

    IS: 458 - 2003 NP-4

    IS: 2720 (Part-28) Min. 98%

    As Per MoRT&H Table400-1of Grade -I

    IS: 2720 (Part-8) Nil

    IS: 2720 (Part-5) Max. 25%IS: 2720 (Part-5) Max. 6 %

    IS: 2720 (Part-2) Field test

    IS: 2386 (Part-3) Max. 2.0 %

    IS: 2720 (Part-16) Min. 30%

    IS: 2386 (Part-5) As Per MoRT&H

    BS: 812 (Part-111) Min 50 KN

    GRANULAR SUB BASE

    Compaction:

    (As per MoRT&H/ Technical Specification)

    Design, Construction, Finance, Operation and Maintenance

    Addanki - Medarametla Road (SH-2) from km 0.000 to 212.50

    under Public Private Partnership on DBFOT(Toll) Basis.

    ANDHRA PRADESH ROAD DEVELOPMENT CORPORATION

    M/s SMEC International Pty. Ltd.

    QUALITY CONTROL TESTS FREQUENCY/INSPECTI

    FSI of Expansive soil

    CBR TEST:

    Lab. CBR for Subgrade

    Gradation

    Moisture content

    RCC HUME PIPE

    N.A.M Expressway Limited

    Ramky Infrastructure Limited

    DESCRIPTION

    i) Embankment

    ii) SG/Shoulder

    a) Emb. Upto 3m ht

    MDD/OMC:

    Consistancy:

    FREE SWELL INDEX:

    SAND CONTENT:

    OTHER TESTS:

    b) Emb. Above 3m ht

    c) SG/Shoulder

    Liquid Limit

    Plasticity Index

    EARTH WORK

    Water absorption

    CBR

    Soundness(5cycle)

    10% fines

    Compaction

    Gradiation

    MDD/OMC

    Liquid LimitPlasticity Index

    Moisture content

  • 8/10/2019 NAM Road Project Technical Specification

    2/6

    IS: 2720 (Part-28) Min.98%

    As Per MoRT&H Cl.406.2.1.2/Table 400 -11

    IS: 2720 (Part-8) Nil

    IS: 2720 (Part-5) Max.25%

    IS: 2720 (Part-5) Max 6 %

    IS: 2386 (Part-4)Max 30% for AIV & 40% for

    LAV

    IS: 2386 (Part-1) Max 30%

    IS: 2386 (Part-3) Max 2.0 %

    IS: 1201 to 1220 Bitumen Emulsion

    As Per MoRT&H 6 to 9kg/10sqm

    IS: 1201 to 1220 Bitumen Emulsion

    As per MoRT&H 2.0 to 2.5 kg/10 m2

    As per MoRT&H 2.5 to 3.0 kg/10 m2

    IS: 1201 to 1220 IS: 73 - 2006

    IS: 2386 (Part-4)Max 30% for AIV & 40% for

    LAV

    IS: 2386 (Part-1) Max 30%

    IS: 6241- 1971 Min retained coating 95%

    IS: 2386 (Part-5) As Per MoRT&H

    IS: 2386 (Part-3) Max 2.0 %

    IS: 2720 (Part-5) Max 4 %

    ASTM D1075 Min. 80% ret.

    As per MoRT&H Table 500-4 Clause 504.2.4

    AASHTO DT 164-94&ASTM DD

    2172-88As per JMF

    IS: 1201 to 1220 IS: 73 - 2006

    IS: 2386 (Part-4)Max 27% for AIV & 35% for

    LAV

    IS: 2386 (Part-1) Max 30%

    IS: 6241- 1971 Min retained coating 95%

    IS: 2386 (Part-5) As per MoRT&H

    IS: 2386 (Part-3) Max 2.0 %

    IS: 2720 (Part-37) Min. 50%

    IS: 2720 (Part-5) Max 4 %

    As per MoRT&H Table 500-10 Clause 507.2.5

    As per MoRT&H/MS-2 MoRT&H Table 500-11

    ASTM/D1075 Min. 80% retained

    AASHTO DT 164-94&ASTM DD

    2172-88As per JMF

    Min 98%

    PROFILE CORRECTIVE COURSE (BITUMINOUS MA

    PRIME COAT

    TACK COAT

    DENSE BITUMINOUS MACADAM

    Quality of binder

    Agg. Impact /Los Angeles Value

    FI & EI

    Stripping value

    Compaction

    Gradation

    WET MIX MACADAM

    Soundness(5cycle)

    Water absorption

    Plasticity Index

    Water sensivity

    Mix gradiation

    Extraction

    MDD/OMC

    Liquid Limit

    Plasticity Index

    Agg. Impact /Los Angeles Value

    FI & EI

    Water absorption

    Density of compacted layer

    Quality of binder

    Rate of spread of Binder

    Quality of binder

    Rate of spray (Normal Surface)

    Rate of spray (Hungry Surface)

    Sand equivalent Test

    Plasticity Index

    Mix gradiation

    Stability of mix

    Water sensivity

    Extraction

    Quality of binder

    Agg. Impact /Los Angeles Value

    FI & EI

    Stripping value

    Soundness(5cycle)

    Water absorption

  • 8/10/2019 NAM Road Project Technical Specification

    3/6

    IS: 1201 to 1220 IS: 73 - 2006

    IS: 2386 (Part-4)Max 24% for AIV & 30% for

    LAV

    IS: 2386 (Part-1) Max 30%

    IS: 6241 - 1971 Min retained coating 95%

    IS: 2386 (Part-5) As Per MoRT&H

    IS: 2386 (Part-3) Max 2.0 %

    ASTM/D1075 Min. 80% retained

    IS: 2720 (Part-5) Max 4 %

    As Per MoRT&H MoRT&H Table 500-18

    As per Concessionaire

    Agreement1800 mm/km

    IS: 2720 (Part-37) Min. 50%

    T-1642,T-30 As per JMF

    As per MoRT&H Min 98%

    As per MoRT&H MoRT&H Table 500-19

    B.S 812 Part 114 Min 55 %

    IS: 12269 & IS: 8112 as per spec.

    IS: 2386 (Part-1) as per spec.

    IS: 2386 (Part-3) Max 2.0 %

    IS: 2386 (Part-4) Max 30.0 %

    IS: 2386 (Part-4) Max 30.0 %

    IS: 2386 (Part-5) as per spec.IS: 2386 (Part-7) Clause 1007 & 1008

    IS: 2386 (Part-1) 2.0 to 3.5

    IS: 456 as per spec.

    IS: 516 as per spec.

    IS: 1199 as per spec.

    IS: 2386 (Part-1) Max 35.0 %

    As per MoRT&H Minimum 97 %

    IS-516 As per MoRT&H

    BITUMINOUS CONCRETE (BC)

    CONCRETE

    Quality of binder

    Agg. Impact /Los Angeles

    FI & EI

    Stripping value

    Soundness(5cycle)

    Water absorption

    Density of compacted layer

    Stability of Mix

    Polished Stone Value

    Cement

    Coarse & Fine aggregate for gradation

    Water absorption

    Water sensivity

    PI

    Mix gradiation

    B.I.(surface regularity)

    Sand Equivalent Test

    Extraction

    CUBE TEST

    Strength of concrete for PQC

    Workability of fresh concrete

    Flakiness index

    Compaction for DLC

    Los Angeles Abrasion

    Aggregate impact value

    Soundness(5cycle)Alkali aggregate reactivity

    Fineness Modulus of sand

    Water

  • 8/10/2019 NAM Road Project Technical Specification

    4/6

  • 8/10/2019 NAM Road Project Technical Specification

    5/6

    One test per 500 m2

    One test per100 m3

    As Required

    One test per 100 m3

    One test per 100 m3

    One test per 200 m3

    One test per 200 m

    3

    As Required

    one sample/lot

    one test per 500Sq.m or two tests per

    day

    One sample/lot

    one test per 500Sq.m or two tests per

    day

    one test per 500Sq.m or two tests per

    day

    One sample / lot

    One test per 50 m3

    One test per 50 m3

    One set per source

    As Required

    One set per source

    One set per source

    As Required

    2sets per plant per day(400T per set)

    2sets per plant per day(400t per set)

    One sample / lot

    One test per 50 cum.

    One test per 50 cum.

    One set per source

    As Required

    one set per source

    As Required

    As Required

    2sets per plant per day (400T per

    set)

    2sets per plant per day (400T per

    set)

    As Required

    2sets per plant per day(400t per set)

    One test per 250 m2& 10% at edges

    ADAM )

  • 8/10/2019 NAM Road Project Technical Specification

    6/6

    One sample / lot

    One test per 50 m3

    One test per 50 m3

    One set per source

    As Required

    One set per source

    As Required

    One set per source

    2sets per plant per day(400T per set)

    1test./500m

    As Required

    2sets per plant per day(400T per set)

    1 test/250m2& 10%@edges

    2 sets per plant per day(400T per

    set)

    One set per source

    Once for each batch

    One test per day

    One test for CA / two tests for FA /

    source

    Once for each soiurce

    Once for each soiurce

    As Required

    Once for each source

    one test per day

    Once for each soiurce

    6 pairs cubes & 6 pairs beams per