name: bahamas water and sewerage corporation · instantaneous fbw rate to jfk low instantaneotb fbw...

5
Name: Bahamas Water and Sewerage Corporation Address: 87 Thompson Blvd, Nassau, Bahamas Contact Person: Gregory R. Stubbs, Senior Engineer, Department Head - Sewerage Services, Electrical and Mechanical Maintenance Phone/email: 242-341-2881, [email protected] Project period: Phase I Feb 2011 to July 2012 - ongoing maintenance Phase II – SCADA Expansion (5 new master sites) - ongoing Type: Complete SCADA / Telemetry System Design Project(s) Est. Cost: $450K Star Controls has completed one project (Phase I) and is engaged in two additional projects for this customer. Two projects include installation, programming, and training of a complete monitoring system for several booster stations, water tanks, and other equipment. The project . Phase II – SCADA Expansion project includes monitoring the fresh water distribution system for leaks and helping with gauging of Non-Revenue Water. Star Controls has interfaced with various field instrumentation, such as pressure and level sensors, flow meters, generators, automatic transfer switches, smart pump control devices such as VFDs and soft starters, and others. Screenshot from VTSCADA

Upload: others

Post on 20-Oct-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Name: Bahamas Water and Sewerage Corporation · Instantaneous fbw rate to JFK LOW InstantaneotB fbw rate 24" pipe from BHTS LOW Station Setpoints 09:36 AM Aug 12 BWSC BWSC BWSC 2389

Name: Bahamas Water and Sewerage Corporation

Address: 87 Thompson Blvd, Nassau, Bahamas Contact Person: Gregory R. Stubbs, Senior Engineer, Department Head -

Sewerage Services, Electrical and Mechanical Maintenance Phone/email: 242-341-2881, [email protected] Project period: Phase I Feb 2011 to July 2012 - ongoing maintenance Phase II – SCADA Expansion (5 new master sites) - ongoing Type: Complete SCADA / Telemetry System Design Project(s) Est. Cost: $450K Star Controls has completed one project (Phase I) and is engaged in two additional projects for this customer. Two projects include installation, programming, and training of a complete monitoring system for several booster stations, water tanks, and other equipment. The project

. Phase II – SCADA Expansion project includes monitoring the fresh water distribution system for leaks and helping with gauging of Non-Revenue Water. Star Controls has interfaced with various field instrumentation, such as pressure and level sensors, flow meters, generators, automatic transfer switches, smart pump control devices such as VFDs and soft starters, and others.

Screenshot from VTSCADA

Page 2: Name: Bahamas Water and Sewerage Corporation · Instantaneous fbw rate to JFK LOW InstantaneotB fbw rate 24" pipe from BHTS LOW Station Setpoints 09:36 AM Aug 12 BWSC BWSC BWSC 2389
Page 3: Name: Bahamas Water and Sewerage Corporation · Instantaneous fbw rate to JFK LOW InstantaneotB fbw rate 24" pipe from BHTS LOW Station Setpoints 09:36 AM Aug 12 BWSC BWSC BWSC 2389

Screenshot from VTSCADA

Screenshot from VTSCADA

Page 4: Name: Bahamas Water and Sewerage Corporation · Instantaneous fbw rate to JFK LOW InstantaneotB fbw rate 24" pipe from BHTS LOW Station Setpoints 09:36 AM Aug 12 BWSC BWSC BWSC 2389

Screenshot from VTSCADA

Screenshot from VTSCADA

Page 5: Name: Bahamas Water and Sewerage Corporation · Instantaneous fbw rate to JFK LOW InstantaneotB fbw rate 24" pipe from BHTS LOW Station Setpoints 09:36 AM Aug 12 BWSC BWSC BWSC 2389

Screenshot from VTSCADA