national bim standard -us nbims project committee ballot presentations august 1-2, 2011
DESCRIPTION
National BIM Standard -US NBIMS Project Committee Ballot Presentations August 1-2, 2011. National Institute of Building Sciences – August 1-2, 2011 . Presentation Recordings for Aug 1. 9:05 - 9:15:05David Morris / Deke Smith Introduction - PowerPoint PPT PresentationTRANSCRIPT
National BIM Standard -USNBIMS Project
CommitteeBallot Presentations
August 1-2, 2011
National Institute of Building Sciences – August 1-2, 2011
9:05 - 9:15 :05 David Morris / Deke Smith Introduction 9:15 - 10:00 :45 Mark Butler (V2-001 thru V2-007) 10:00 - 10:30 :30 Kimon Onuma (V2-023) 10:30 - 11:15 :45 Richard See (V2-028 thru V2-030) 11:15 -11:30 :30 Dominique Fernandez Overview
Commenting 12:30 -1:00 :30 Phillip Cousins (V2-034) 1:00 - 1:30 :30 Roger Grant (V2-043) 1:30 - 2:00 :30 James Vandezande (V2-011 and V2-025) 2:00 - 2:30 :30 Greg Ceton (V2-035 thru V2-040) 2:30 - 3:00 :30 Chris Moor (V2-017) 3:00 - 3:45 :45 Bill East (V2-019)
Presentation Recordings for Aug 1
Click on hyperlink for associated authors video presentation
9:15 9:45 :30 John Messner (V2-021and V2-022) 9:45 10:00 :15 Greg Schleusner (V2-012) 10:00 10:15 :15 Tammy McCuen (V2-008r1, V2-009) 10:15 11:00 :45 Dianne Davis
(V2-013 and V2-020) 11:00 11:30 :30 David Morris (V2-044) 11:30 11:45 :15 Kristine Fallon (V2-016)
Presentation Recordings for Aug 2
Click on hyperlink for associated authors video presentation
Note: You may also access these videos on the portal under Presentations in the NBIMS-Project Committee. The files have not yet been post processed to clip out un-necessary pre-presentation discussions. This will be done, but I wanted to get the presentations posted as soon as possible.
NBIMS-US Ballot Overview (Slides 6-12)
Please click on square above to start video.
NBIMS-US Ballot Overview (Slides 13-22)
Please click on item above to start video.
Ballot Review Period◦ Technical Subcommittee and Workgroups Ballot Reviews &
Recommendations◦ Ballot Review Results
Ballot Comment Period◦ Accessing & Viewing Submitted Ballots ◦ Reviewing Submitted Ballots◦ Commenting on Submitted Ballots in Comment Tracker
Future Milestones◦ Ballot Comment Review and Summary Period◦ Ballot Comment and Discussion Meeting◦ Ballot Preparation Period◦ Ballot Voting Period
AGENDA
National Institute of Building Sciences - August 1_, 2011
Ballot Review Period
National Institute of Building Sciences – August 1-2, 2011
Received 44 Submissions*◦ 35 - Ballot Submissions◦ 9 - Blue Sky submissions
*One ballot was removed –duplicate submission
Two levels of Reviews◦ 1st Level of Review - Technical Subcommittee (makes
recommendations to workgroups) 23 Ballots Reviewed by Technical Subcommittee for conformance to:
Information Exchange Standard Submission Requirements Reference Standard Submission Requirements Practice Standard Submission Requirements
◦ 2nd Level of Review – Workgroups (make recommendation to Project Committee) 25 Ballots Reviewed by WG-1 Design Workgroup 0 Ballots Reviewed by WG-2 Procure Workgroup 4 Ballots Reviewed by WG-3 Assemble Workgroup 6 Ballots Reviewed by WG-4 Operate Workgroup
Technical Subcommittee & Workgroups Reviews & Recommendations
National Institute of Building Sciences - August 1_, 2011
35 Ballot Submissions Categorized by Type◦ 10 - Commentary – Update of V1P1 Chapters◦ 6 - Information Exchange Standards
V2-017 IDM – Steel V2-019 COBie V2-023 BIM XML V2-028 IDM/MVD Design to Spatial Program Validation V2-029 IDM/MVD Design to building Energy Analysis V2-030 IDM/MVD Design to Quantity Take off
◦ 4 Practice Standards V2-016 Planning, Executing and Managing Information Handovers V2-021 BIM Project Execution Planning Guide V2-022 BIM Project Execution Plan Content V2-021 MEP Coordination Requirements for BIM
Technical Subcommittee & Workgroups Reviews & Recommendations
National Institute of Building Sciences - August 1_, 2011
35 Ballot Submissions Categorized by Type –cont.◦ 11 - Reference Standards
V2-012 IFC 2x3 V2-013 W3C XML Specification and Validation V2-018 Stakeholder Provisioned Internet Accessible Information V2-025 National CAD Standard V2-032 OGC Discussion Papers V2-035 OmniClass Table 13 V2-036 OmniClass Table 21 V2-037 OmniClass Table 22 V2-038 OmniClass Table 23 V2-039 OmniClass Table 32 V2-040 OmniClass Table 36
◦ 4 - Terminology Standards V2-011 BIM Use Definitions V2-014 BIM File Naming V2-020 Level of Development V2-043 V1P1 – Appendix C IFD Library
Technical Subcommittee & Workgroups Reviews & Recommendations
National Institute of Building Sciences - August 1_, 2011
Approved – No changes necessary. The ballot item will be forwarded to the NBIMS PC as-is
Approved as Noted – Minor changes have been agreed upon by the Workgroup and the author. The ballot item will be forwarded to the NBIMS PC with approved revisions incorporated in the ballot Item Submittal. Minor changes will be documented by the Workgroup on the portal and in the Workgroup Review Sheet of the Ballot Submittal Form.
Revise/Resubmit - Errors or omissions are substantial. The author needs to revise the ballot item and resubmit it. A list of errors or omissions, with recommended changes, will be provided to the author by the Workgroup.
Rejected – The ballot item is not in the best interest of the NBIMS. Rejected ballot items can be resubmitted by petition to the NBIMS Planning Committee for consideration.
Ballot Review Results
National Institute of Building Sciences - August 1_, 2011
Workgroup Recommendations:◦ 23 Submission are “Approved” or “Approved as Noted”◦ 3 Submissions have been merged into one and “Approved as
Noted”◦ 5 Submissions are “Revise/Resubmit” with the recommendation to
either resubmit for V3 cycle (2012) or resubmit as a “Blue Sky”
◦ 2 Submissions have been withdrawn by the authors of the submissions and resubmitted as “Blue Sky”
◦ 1 Submission has been “Withdrawn” by its author◦ 1 Submission is “Rejected”
Ballot Review Results
National Institute of Building Sciences - August 1_, 2011
Ballot Comment Period
National Institute of Building Sciences – August 1-2, 2011
Accessing and ViewingSubmitted Ballots
National Institute of Building Sciences – August 1-2, 2011 - August 1_,
Portal Home Page
Accessing and ViewingSubmitted Ballots
National Institute of Building Sciences - August 1_, 2011
Submitted Ballots Table
Reviewing Submitted Ballots
National Institute of Building Sciences - August 1_, 2011
View Ballot – click on title
Reviewing Submitted Ballots
National Institute of Building Sciences - August 1_, 2011
Review Comments – click on reply to comment
Reviewing Submitted Ballots
National Institute of Building Sciences - August 1_, 2011
Review Comments
View Ballot
Comment on Submitted Ballots
National Institute of Building Sciences - August 1_, 2011
Submit Comment
Collaboration Portal -Access
National Institute of Building Sciences
Member Portal Login at:www.buildingsmartalliance.org/index.php/nbims/
◦ Ballot Comment Review and Summary Period – Sept. 2-18◦ Ballot Comment and Discussion Meeting – Sept. 19-20◦ Ballot Preparation Period – Sept. 21-27◦ Ballot Voting Period – Sept. 28 – Oct. 27
Future Milestones
National Institute of Building Sciences - August 1_, 2011
Questions?Thank you!
National Institute of Building Sciences – August 1-2, 2011