European Workgroup
European Workgroup
5th June 2014
Code Status Update
Code Current Status Implementation date
Congestion
Management
(CMP)
Implemented 1st October 2013 (Fixed)
Capacity
Allocation
Mechanism
(CAM)
CAM approved for EU wide implementation at relevant EU IPs. 1st November 2015
(Fixed)
Gas Balancing
(BAL)
BAL approved for EU wide implementation 26th March 2014 (Commission
Regulation (EU) No 312/2014 establishing a Network Code on Gas Balancing of
Transmission Networks.)
1st Oct 2015 (subject to
NRA approval for
additional 12 months)
(Fixed)
Interoperability
& Data
Exchange (INT)
In comitology. Comitology meetings postponed from 28th April and 11th July 2014,
now to take place July and September/October 2015 (dates TBC).
Q4 2015 (Estimated)
Tariffs Under development. Code to be submitted 31st December 2014. Estimated earliest mid
January 2017. Applicable
from October 2017.
Incremental
Capacity
Under development. Incremental Capacity to be introduced via combination of
new articles in CAM Network Code and via Tariffs Network Code. Code
amendment to be submitted 31st December 2014.
Applicable from March
2017
Gas Codes Timeline
Status of Development of European Gas Network Codes
Future dates are subject to change KEY
Dates shown in italics are best approximations based on current understanding. Activities undertaken by ACER
It has been necessary to 'round' some dates for the benefits of the diagram Activities undertaken by ENTSOG
Activities undertaken by European Commission
TODAY
Mar
Ap
r
May
Ju
n
Ju
l
Au
g
Se
p
Oc
t
No
v
De
c
Jan
Fe
b
Mar
Ap
r
May
Ju
n
Ju
l
Au
g
Se
p
Oc
t
No
v
De
c
Jan
Fe
b
Mar
Ap
r
May
Ju
n
Ju
l
Au
g
Se
p
Oc
t
No
v
De
c
Jan
Fe
b
Mar
Ap
r
May
Ju
n
Ju
l
Au
g
Se
p
Oc
t
No
v
De
c
Jan
Fe
b
Mar
Ap
r
May
Ju
n
Ju
l
Au
g
Se
p
Oc
t
No
v
De
c
Stakeholder Workgroups
ACER Develops
Framework
Guidelines on
Interoperability &
Data Exchange
Interoperability & Data
Exchange
Tariffs
Go
Liv
e
Balancing
ACER
ReviewPost-Comitology
Capacity Allocation
Mechanisms (CAM)
ENTSOG Drafting
Cons
ultatio
n
Network Code / Guideline
Congestion Management
Principles (CMP)
Next Step
Implementation of CMP
obligations for 1st October
2013
Comitology
2014
Finalise
drafting
Comitology
2012 2013
ACER
Review
ENTSOG
revision
of Code
Initial
draftin
g
ACER Review
Go
Liv
e (
?)
FG Extension
20162015
Go
Liv
e
Cons
ultati
on
Finalise
drafting
Comitology Phase
ACER Develops
Framework
Guidelines on
Tariffs
ACER ReviewComitology
ENTSOG Drafting
Initial draftingConsu
ltation
Go
Liv
e (
?)
Go
Liv
e
ENTSOG Drafting
ACER Review
Finalise
drafting
Comitology
(duration unknown)
Comitology
(duration unknown)
Initial drafting
Road Map
Notes: 1) Long term capacity auctions may need to be delivered in conjunction with short term auctions
CAM & Bacton UNC Modifications
First Modification Development Workgroup held 3 June
2014
Key principles CAM Mod 500
Key principles Bacton split Mod 501
Next Workgroup planned for early July 2014 (date to be
confirmed)
8
Consultation on Capacity Booking Platforms
ENTSOG press release 16th May 2014
ENTSOG launched consultation on Capacity booking
platforms
The consultation started 19 May 2014 and will be open until
30 June 2014
ENTSOG website can be found at http://www.entsog.eu/
9
EU Tariff Code update
Draft TAR NC completed and approved by ENTSOG
Board 28th May
Draft Code and supporting document published end
May
http://www.entsog.eu/publications/tariffs
Public Consultation on the draft TAR NC will take place
from the end of May to the end of July
Next Stakeholder Workshop – 25th June
EU Incremental Amendment update
Draft INC Amendment now completed and approved by
ENTSOG Board 28th May.
Draft Code and supporting document published end
May
http://www.entsog.eu/publications/incremental-capacity
Public Consultation on the draft INC amendment will
take place from the end of May to the end of July
Next Stakeholder Workshop – 24th June
For further information, please contact Colin Hamilton [email protected], 07971 760360)
Phase 2 UNC Modifications
Potential Timescales
EU Network Code Area of change Panel Submission
Workgroup
Development
UNC
Consultation
Gas Balancing (BAL) Information Provision March 2014 2 Months June 2014
SMP Buy & Sell April 2014 1 Month June 2014
Nomination Process at IP’s April 2014 6 - 9 Months Q4 -2014
Capacity Allocation
(CAM)
CAM / CMP Compliant
Capacity Auctions
Q2 - 2014 6 - 9 Months Q4 - 2014
Interoperability &
Data Exchange (INT)
OBAs / allocations Jul/Aug 2014 6 Months Q1 - 2015
Interconnection
Agreements/Contract
Changes
(facilitating Modification )
Q1 - 2015 3 Months Q2 - 2015
Data Exchange Q3 - 2014 3 Months Q4 - 2014
Draft Tariff Code – Walk Through
Colin Hamilton
ENTSOg publishing document Friday
30th May therefore not available until
Monday 2nd June
REMIT
Insider InformationWholesale Energy Market
TransactionsTransparency
Standard Contracts
Jan 2015
NG’s Spectron etc
Data feed to ACER
Jan 2015
Non Standard Contracts
Jun 2015
NG’s OM Contracts
Primary Capacity Trades
Jan 2015
NG’s & others Xoserve
Secondary Capacity Trades
Jan 2015
Market Participants
Buybacks ( Xoserve on behalf of
market participants)
Balancing Services
April 2017
NG’s & others
Non Xoserve
Fundamental Data
Jan 2015
Nomination Data
NG or Xoserve
REMIT: Secondary Trade Reporting
TSOs not obligated to provide secondary capacity trading data - we are not one of the counter-parties and therefore do not hold the relevant data.
Those trading on the secondary market need to provide this data.
However, NG are very happy to work with market participants to find an effective solution to provide this data to ACER.
We suggest that one solution could be for Xoserve to become the delivery agent for secondary data in much the same way as it will become for primary data as per the NG project.
NG is now beginning work with Xoserve on designing the IT systems to provide primary data to ACER. We offer shippers and traders an opportunity to collaborate with our REMIT reporting project such that it could become a solution to secondary reporting requirements for GB markets participants.
However, Xoserve would need the price data which it does not currently hold.
If market participants wanted Xoserve to provide this REMIT data service on their behalf, they may need to formally contract Xoserve to do so. Confidentially assurances on how Xoserve would deal with and store the relevant price data may be needed.
Bridge to 2025 and GTM
Bridge to 2025
Bridge to 2025 consultation closes 16 June 2014
Consultation can be found here:
http://www.acer.europa.eu/Media/Events/Launch-of-Energy-Regulation-A-Bridge-to-2025/default.aspx
Final bridge paper to be published September 2014
Gas Target Model (GTM) update
Comments on GTM invited now
Latest slides and updates from 15 May workshop can be found here:
http://www.acer.europa.eu/Media/Events/3rd-Gas-Target-Model-Stakeholders-Workshop/default.aspx
Final GTM to be published September / October 2014
EU Gas Quality Harmonisation
CEN has issued its draft gas quality standard for public consultation to national standardising bodies
BSI has published the standard on its website at https://drafts.bsigroup.com/Home/Details/53031
BSI committee GSE/4 will co-ordinate GB comments on the standard
BSI deadline for comments is 31st August 2014
CEN deadline for BSI to send GB comments is 8th October 2014
The EC are proposing to hold a Gas Quality workshop in Brussels on 1st July 2014
For further information, please contact [email protected] (01926 653432)