national institute of metrology (nim), china
TRANSCRIPT
Time KeepingØ UTC(NIM) : Time and Frequency Primary Standard in ChinaØ Clock ensemble: 6 active H-masers(MHM2010)+ 7 Cs Frequency Standards(5071A) Master clock-- H maser(No.35) 2 new H-masers(VCH 1003M) have joined the clock ensemble this year.
BIPM G1 Calibration
BIPM 2016 G1 calibration in July
3 receivers at NIM have been calibrated by BIPM. Preliminary results are reasonably in line with the 2014 results.
TWSTFT system of NIM
u NIM01: AM22 linku NIM02: China sat-10u Temperature control
system: 25±1℃
NIM02NIM01
NIM01
NIM02
The uncertainty @ 1σ (Type A, Type B and link between NIM5 and H-271)
MJD y(NIM5-UTC) [×10-15] Duty cycle [%] utotal [×10-15]
57459.0 - 57479.0 -1.05 99.2 1.75
57604.0 - 57629.0 -0.53 96.9 1.52
57634.0 - 57654.0 0.68 97.5 1.53
NIM5 reports published on circular T
uA [×10-15] 0.6
uB [×10-15] 1.4
ulink/lab [×10-15] 0.2
utotal [×10-15] 1.5
Typical uncertainty budget of NIM5
Fountain NIM5
Strontium Optical Clock I
• NIM's first Sr clock– run out of Sr after 10 years,
build a new Sr oven and refill Sr
– leakage on the vacuum system, replace those old parts, better vacuum pressure, 2×10-10 Torr
– a new clock laser based on a 30 cm long reference cavity is being built
Strontium Optical Clock II
• NIM is going to build the second Sr clock on NIM's Changping Campus
• The vacuum system is under constructing• The laser system is under designing