national railway infrastructure company

11
NATIONAL RAILWAY INFRASTRUCTURE COMPANY

Upload: boone

Post on 05-Feb-2016

51 views

Category:

Documents


0 download

DESCRIPTION

NATIONAL RAILWAY INFRASTRUCTURE COMPANY. TEN-T Comprehensive Network. All main Bulgarian railway sections are included in the comprehensive network Intermodal terminals – Sofia , Plovdiv , Varna , Burgas , Ruse , Vidin , Lom , Dragoman , Svilengrad and Gorna Oryahovitsa. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

NATIONAL RAILWAY INFRASTRUCTURE COMPANY

Page 2: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

All main Bulgarian railway sections are included in the comprehensive network

Intermodal terminals – Sofia, Plovdiv, Varna, Burgas, Ruse, Vidin, Lom, Dragoman, Svilengrad and Gorna Oryahovitsa

TEN-T Comprehensive Network

Page 3: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

Ongoing projects2007-2013

• Plovdiv-Svilengrad Railway Electriffication & Upgrading of Corridors IV and IX

• Phase 1 – Kruomovo - Parvomai: Contractor Terna – Greece

– Contract value: 99 792 441 € – financing under ISPA programme

• Phase 2 – Parvomai – Dimitrovgrad: Contractor Astaldi – Italy

– Contract value : 68 000 000 € – financing under ISPA programme

• Phase Systems – Plovdiv-Svilengrad-turkish border: Contractor Thales-Alcatel-Lucent – Austria

– Contract value : 35 557 047, 06 € – financing under ISPA programme

• Phase 3 – Svilengrad – turkish border: Contractor OHL ŽS – Czech Republic

– Contract value: 69 999 666 BGN without VAT – financing under Operational Programme on Transport

• Phase 4 – Dimitrovgrad - Svilengrad: completed tender procedure, expected contract signing on 3 implementation positions.

Page 4: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

Ongoing projects 2007-2013

• Rehabilitation of Railway Infrastructure along Sections of the Plovdiv-Burgas Railway Line

• Total investment value: 316 968 850,42 BGN without VAT

• Main contractor: G.S.F. S.p.A – SK 13 – Trace Railinfra

• Modernization of the railway section Septemvri-Plovdiv

• LOT 1 – Septemvri – Pazardzhik: Contractor Swietelsky – RVP Köhne

• LOT 2 – Pazardzhik – Stamboliyski: Contractor IGA Rail Infra

• LOT 3 – Stamboliyski – Plovdiv: Contractor Porr Bau GmbH

• Total contracts value: 157 860 835,75 BGN without VAT

Page 5: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

Ongoing projects 2007-2013

• Construction of an Intermodal terminal in South-Central planning region of Bulgaria

• Forthcoming activities

– Preparation of Detailed Structural Plan and Plot Plan for expropriation procedures

– Technical design

– Construction

• Indicative budget: 16 166 249 BGN without VAT

• Design and implementation of geographical information system (GIS) for the NRIC needs

• Total investment value: 12 000 000 BGN

• Main Contractor: Consortium „EuroGeoRail“

• Project completion date: April 2011

Page 6: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

2014-20202014-2020 priority implementation projects priority implementation projects

The projects are grouped in to A, B and V direction for effective management and operability achievement

Page 7: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

National Railway Infrastructure Company

Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengrad and Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X;

1. Modernization of Sofia – Dragoman Railway Line

• Preparation of Environmental impact assessment (EIA) report and technical design: 2007-2013

• Construction: 2014 – 2020

• Indicative budget: 132 260 000 €

2. Modernization of Sofia – Plovdiv Railway Line

• Technical design for Sofia – Septemvri railway section : 2007-2013

• Preparation of Environmental impact assessment (EIA) report of Elin-Pelin – Septemvri railway section: 2007-2013

• Construction of Sofia – Septemvri railway section : 2014 – 2020

• Indicative budget: 1 081 000 000 €

Page 8: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

National Railway Infrastructure Company

Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengrad and Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X;

3. Projects of Plovdiv – Burgas section completion – Corridor VIII• Indicative budget: 82 700 000 €• Including projects:

• Construction of optic cable along Plovdiv-Burgas railway line, indicative budget:15 512 000 €. Construction: 2014-2020;

• Introduction of interlockings in Karnobat-Burgas section, indicative budget: 5 466 000 €. Construction: 2014-2020;

• Development of Burgas Railway Junction, indicative budget: 20 000 000 €. Design and construction: 2014-2020;

• Rehabilitation of Plovdiv-Orizovo railway section, indicative budget: 30 677 000 €. Construction: 2014-2020;

• Modernization of sections along Plovdiv-Burgas railway line (Orizovo – Mihaylovo, Yambol – Zimnitsa, etc.), indicative budget: 10 000 000 €, Technical design: 2007-2013. Construction: 2014-2020;

Page 9: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

National Railway Infrastructure Company

Group B projects – To the direction Vidin-Sofia-Radomir-Kulata part of the transeuropean transport corridor IV;

1. Modernization of Vidin-Sofia Railway Line

• Preparation of Environmental impact assessment (EIA) report and technical design: 2007-2013

• Construction of separate sections along the route will start in 2014-2020 programming period:

• Modernization of Vidin – Medkovets railway section 62,5 км;

• Modernization of Medkovets – Ruska Byala/Mezdra railway section 84,3 км;

• Modernization of Ruska Byala/Mezdra – Stolnik railway section 76,3 км;

2. Modernization of Sofia –Pernik – Radomir Railway Line

• Technical design: 2007-2013

• Construction: 2014 – 2020

• Indicative budget: 359 576 884 €

Page 10: NATIONAL RAILWAY  INFRASTRUCTURE COMPANY

National Railway Infrastructure Company

Group V projects – Passangers and freights intermodality projects

1. Development of Sofia Railway Junction

• Technical design: 2007-2013

• Design and construction: 2014 – 2020

• Indicative budget: 309 847 000 €

2. Construction of an Intermodal terminal in Sofia

• Indicative budget: 31 345 000 €

• IProject preparation will be implemented in 2007-2013

3. Construction of an Intermodal terminal in Central-Nord planning region of Bulgaria-Ruse

• Fisibility study and preliminary design: 2007-2013

• Design and construction: 2014 – 2020