1 | Page Draft Trelawny WS PPLan – October 12 2011 NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN

Upload: dotuong

Post on 22-Mar-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

1 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

TRELAWNY PARISH PLAN

Page 2: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

2 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

1. Introduction

Trelawny is located on the North Western side of the Jamaica and is bordered on the east by St. Ann, on the West by St. James and on the South by the parishes of Manchester and St. Elizabeth; the Caribbean Sea forms the northern boundary of the parish. The southern section of Trelawny is part of the Cockpit Country, and is uninhabitable. It is a natural reserve for flora and fauna; most of Jamaica's twenty-seven endemic bird species can be found there, along with yellow snakes, and the giant swallowtail butterfly, the largest butterfly in the western hemisphere.

Most of the parish has the typical limestone features of cockpits, sinkholes, caves and underground passages. There are about forty-eight caves, most with phosphate gatherings. These include the Windsor Cave and Carambi Cave, known for its beauty and phosphate deposits.

The principal towns are Falmouth, Jackson Town, Albert Town, and Duncan.

The tourism industry plays a major role in the economic activity of the Parish. It has a

deep water pier at Falmouth, located in the town, where cruise ships and other vessels

dock daily. Three major hotels are located along the coastline.

Apart from tourism, the parish also is home to the annual jazz and blues festival; there

is major sugar factory in the parish. Trelawny is known for its sugar estates and yam

farming.

A Water Supply Improvement Plan (WSIP) has been prepared for the parish and is

presented in this document. The WSIP for the parish will involve an expenditure of

$6.59 billion in carrying out a number of water supply rehabilitation and upgrading

works. A substantial portion of the proposed works is aimed at addressing the

unacceptable level of NRW, through the replacement of major sections of the aged and

undersized water supply infrastructure and improvement in water supply pressure

management. It is planned to increase water supply coverage to at least 93% of the

parish population by end 2030, reduction in NRW to 30% and service reliability to 24

hours per day.

Page 3: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

3 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

2. Existing Water Supply System

National Water Commission (NWC) produces approximately 3,891 million gallons

(17,699 million cubic meters) of water per year in Trelawny through seven (7) wells and

nine (9) surface sources.

2.1 Water Resources

Surface Water

Some 50% of the water abstracted in the parish is obtained from surface sources. The

following are the main surface sources in the parish:

Wilson Run Spring

Green Town Spring

Troy Spring

Ulster Spring

Worsop Spring

Sherwood Content Blue Hole

Rio Bueno (that supplies the Dornoch Water Treatment Plant )

Martha Brae River (that supplies the “old” and “new” Martha Brae Water

Treatment Plant)

The Martha Brae/Dry Harbour Mountain basin which has a yearly reliable surface yield

of (32.96 billion) per year and provides the combined output from the nine water

production facilities that are supplied by surface sources is (5.38 million) gallons per

day.

Ground Water

The parish of Trelawny is supplied with potable water from (7) wells, with a combined average output of 5.40mgd (24,464 cubic meter per day).

Barnstaple Well

Clarks Town Well

Duansvale Well

Page 4: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

4 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Ettingdon Well

Queen of Spain Well Nos.1, 2 and 4

2.2 Water Supply System

The water supply network throughout the parish is aged and undersized, which has

resulted in unacceptable level of service being provided. Information on the water

supply network is summarized in table 2.1 below. Total length of pipeline within the

parish is 406 km with the varying material types from CI, AC, GI, PVC, ST and DI.

NWC now provides water to some 73% of the population in Trelawny, which is an

improvement over that in 2001 when the level of coverage was 64%. The reliability of

service to those who are served by NWC is estimated to average 19 hours per day. The

average utilization rate of the production facilities in the parish is 42%.

Table 2.1 – Summary Information on Trelawny Pipe Network

Pipe Diameter

(inches)

Approximate

Length (km)

Portion of the Network

(%)

1/2 1.027 0.22

3/4 5.629 1.22

1 39.806 8.65

1.5 12.472 2.71

2 154.767 33.63

3 59.438 12.91

4 70.362 15.29

6 33.566 7.29

8 25.797 5.60

10 0.307 0.07

12 7.521 1.63

14 7.219 1.57

Page 5: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

5 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

16 0.736 0.16

20 21.505 4.67

24 6.634 1.44

30 13.488 2.93

Page 6: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

6 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Figure 2.1 – Trelawny Water Supply

Page 7: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

7 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

3. Non-Revenue Water Level

Set out in figure 3.1 is the annual water balance for Trelawny. This was derived from the

water balances that were prepared for each of the water supply systems in the parish. The

water balances were prepared based on measurements of flows at production facilities and

into sections of the water supply network and analyst of customer records.

NWC water production facilities provide approximately 3,991 million (17,699 million cubic

meters) of water per year to the water supply network in Trelawny. Physical losses amount

to 1,061.8M (4,826 cubic meters) 431.2M gallons per year. This represents 27% of the

amount produced.

Revenue water in the parish is 1,339,580 (6,089 cubic meters) cubic meters which is only

31.7% of the water produced.

It should be noted that 2.38M cubic meters of water is attributed to unauthorized

consumption (i.e. 36.2% of production). This is largely due to illegal connections to some

of the transmission pipelines to obtain water in pink areas.

4. Water Requirement

4.1 Parish Population

General

In 2001 the population in Trelawny was 73,066, which was a 1.03% increase over the

71,203 in 1991. Based on an annual population growth rate of 1.03%, it is estimated that

the population in the parish in 2010 is 74,783 persons.

There were 18,266 households in 2001 of which 11,691 had piped water (64%). There are

now 12,433 customer accounts of which some 8,738 are domestic accounts. Based on this

information, it is estimated there was a 15% increase in the number of dwellings with piped

since 2001, an average annual increase of 1.5%. It is estimated that 72.89% of the

population of the parish now has piped water.

Demand Centres

The enumeration districts (EDs) that were used in the 2001 population census was used to

establish priority areas that will be targeted to be provided with water supply. EDs with

Page 8: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

8 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

population densities in excess of 150 persons per square kilometres were grouped to form

these demand centres.

Figure 4.1 – Demand Centres

EnumerationDistrict (ED)- Population Data

Pipeline

Pump Station

Subdivision

WATER DEMAND CENTRESLight Blue Shaded EDs-Pop > 150p/sq Km-Priority given to fully supply

TYPES OF DATA

As far as possible, each demand centre (DC) is linked to a water supply system. It is

related to a water distribution system that now serves it or has the potential to serve by it.

Set out in table 4.1 is information showing the population in each DC, indicating estimates

for 2010, 2015, 2030.

Table 4.1 – Population Projection

Name of Water Supply

System 2010 2015 2020 2025 2030

WILSON RUN 1,677 2,113 2,662 3,355 4,227

GREEN TOWN 6,722 8,470 10,672 13,447 16,943

SHERWOOD 3,646 4,594 5,788 7,293 9,190

TROY 782 985 1,242 1,564 1,971

ULSER SPRING 10,179 12,826 16,160 20,362 25,656

Page 9: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

9 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

WARSOP 4,649 5,858 7,381 9,300 11,718

DORNOCH 9,586 12,078 15,219 19,176 24,161

MARTHA BRAE (NEW) 6,100 7,686 9,684 12,202 15,375

MARTHA BRAE (OLD) 9,630 12,134 15,289 19,264 24,272

BARNSTAPLE 9,105 11,472 14,455 18,213 22,949

CLARKS TOWN 8,438 10,632 13,396 16,879 21,268

DUANVALE 8,010 10,093 12,717 16,023 20,189

ETTINGTON 2,850 3,591 4,525 5,701 7,183

QUEEN OF SPAIN #1, 2 & 3 4,786 6,030 7,598 9,574 12,063

TOTAL 86,160 108,562 136,788 172,352 217,164

Page 10: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

10 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

4.2 Current Water Requirement

Table 4.2-Current (2010) Water Requirement

TRELAWNY - YR 2010

Supply System

Designed

Supply

(gal/day)

Production

gal/day) Population

Domestic

Water

Requirement

(gal/day)

Commercial &

Other Water

Requirement

(gal/day)

Technical

Losses

(gal/day)

Total Water

Requirement

(gal/day)

Supply

Surplus/Deficit

(gal/day)

WILSON RUN 150,000 9,403 1,677 67,080 7,453 2,821 77,354 (67,951)

GREEN TOWN 250,000 41,615 6,722 268,880 29,876 12,485 311,240 (269,625)

SHERWOOD 250,000 6,132 3,646 145,840 16,204 1,839 163,884 (157,752)

TROY 250,000 12,646 782 31,280 3,476 3,794 38,549 (25,903)

ULSER SPRING 250,000 66,994 9,179 367,160 40,796 20,098 428,054 (361,060)

WARSOP 200,000 532 3,649 145,960 16,218 160 162,337 (161,805)

DORNOCH 750,000 373,716 8,586 343,440 38,160 112,115 493,715 (119,999)

MARTHA BRAE (NEW) 6,000,000 4,767,613 6,100 244,000 176,690 1,430,284 1,850,974 2,916,639

MARTHA BRAE (OLD) 1,500,000 103,024 9,630 385,200 278,938 30,907 695,045 (592,021)

BARNSTAPLE 480,000 232,746 7,105 284,200 31,578 69,824 385,602 (152,856)

CLARKS TOWN 750,000 730,428 8,438 337,520 37,502 219,129 594,151 136,278

DUANVALE 480,000 235,251 4,010 160,400 17,822 70,575 248,798 (13,547)

ETTINGTON 500,000 165,525 2,850 114,000 12,667 49,658 176,324 (10,799)

QUEEN OF SPAIN #

1, 3 & 4 5,000,000 3,881,738 4,786 191,440 138,629 1,164,522 1,494,590 2,387,148

TOTAL 16,810,000 10,627,364 77,160 3,086,400 846,008 3,188,209 7,120,617 3,506,747

As illustrated in the table above the current water supply situation in Trelawny is that,

overall, there is insufficient water in the parish to meet the water requirement, even with

the existing technical losses (leaks, tank overflows, etc). The average daily water

production in the parish is 10.6 million gallons; the average day water requirement

(domestic, commercial, institutional, etc), which is based on 72.89% supply coverage, is

estimated to be 3.92 million gallons and the technical water losses is estimated to be

3.19 million gallons per day. Based on average daily water requirement, there is an

estimated supply surplus of some 3.5 million gallon daily. This is largely due to the

output from the Martha Brae Water Treatment Plant which has a supply surplus of 2.92

million gallon daily in the demand centre (DC) in Trelawny. However some…… million

gallon daily of water from this system is exported to St. James, to augment the supply

from the Great River system. It should be noted that eleven (11) of fourteen (14) supply

have water supply deficits.

Page 11: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

11 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

4.3 Water Requirement

Table 4.3 provides information on the water supply distribution for the water supply in

Trelawny in 2030, if the current water supply situation remains. It is seen that the water

supply deficits in the eleven (11) supply zones decreases, the overall supply surplus

decreases to 2.52 million gallon daily.

Table Projected 4.3-Estimated Water Requirement in 2030 (No … improvement works)

TRELAWNY - YR 2030

Supply System

Designed

Supply

(gal/day)

Production

gal/day) Population

Domestic

Water

Requirement

(gal/day)

Commercial &

Other Water

Requirement

(gal/day)

Technical

Losses

(gal/day)

Total Water

Requirement

(gal/day)

Supply

Surplus/Deficit

(gal/day)

WILSON RUN 150,000 9,403 2,098 83,921 9,325 2,821 96,067 (86,664)

GREEN TOWN 250,000 41,615 8,410 336,386 37,376 12,485 386,247 (344,631)

SHERWOOD 250,000 6,132 4,561 182,455 20,273 1,839 204,567 (198,436)

TROY 250,000 12,646 978 39,133 4,348 3,794 47,275 (34,629)

ULSER SPRING 250,000 66,994 11,484 459,340 51,038 20,098 530,476 (463,483)

WARSOP 200,000 532 4,565 182,605 20,289 160 203,054 (202,522)

DORNOCH 750,000 373,716 10,742 429,665 47,741 112,115 589,520 (215,804)

MARTHA BRAE (NEW) 6,000,000 4,767,613 7,631 305,259 221,050 1,430,284 1,956,593 2,811,020

MARTHA BRAE (OLD) 1,500,000 103,024 12,048 481,909 348,969 30,907 861,786 (758,762)

BARNSTAPLE 480,000 232,746 8,889 355,552 39,506 69,824 464,882 (232,136)

CLARKS TOWN 750,000 730,428 10,556 422,259 46,918 219,129 688,305 42,123

DUANVALE 480,000 235,251 5,017 200,670 22,297 70,575 293,543 (58,292)

ETTINGTON 500,000 165,525 3,566 142,621 15,847 49,658 208,126 (42,600)

QUEEN OF SPAIN #

1, 3 & 4 5,000,000 3,881,738 5,988 239,503 173,434 1,164,522 1,577,459 2,304,280

TOTAL 16,810,000 10,627,364 96,532 3,861,281 1,058,409 3,188,209 8,107,899 2,519,465

Page 12: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

12 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Table 4.4 Estimated water Requirement with Increase and Improvement Works

TRELAWNY - YR 2030 - NRW Reduced to 30%

Supply System

Production

gal/day) Population

Domestic

Water

Requirement

(gal/day)

Commercial

& Other

Water

Requirement

(gal/day)

Technical

Losses

(gal/day)

Total Water

Requirement

(gal/day)

Supply

Surplus/Deficit

(gal/day)

WILSON RUN 142,500 2,098 83,921 9,325 28,500 121,746 20,754

GREEN TOWN 237,500 8,410 336,386 37,376 47,500 421,262 (183,762)

SHERWOOD 237,500 4,561 182,455 20,273 47,500 250,228 (12,728)

TROY 237,500 978 39,133 4,348 47,500 90,981 146,519

ULSER SPRING 237,500 11,484 459,340 51,038 47,500 557,878 (320,378)

WARSOP 190,000 4,565 182,605 20,289 38,000 240,895 (50,895)

DORNOCH 712,500 10,742 429,665 47,741 142,500 619,906 92,594

MARTHA BRAE (NEW) 5,700,000 7,631 305,259 221,050 1,140,000 1,666,309 4,033,691

MARTHA BRAE (OLD) 1,425,000 12,048 481,909 348,969 285,000 1,115,878 309,122

BARNSTAPLE 456,000 8,889 355,552 39,506 91,200 486,258 (30,258)

CLARKS TOWN 712,500 10,556 422,259 46,918 142,500 611,676 100,824

DUANVALE 456,000 5,017 200,670 22,297 91,200 314,167 141,833

ETTINGTON 475,000 3,566 142,621 15,847 95,000 253,468 221,532

QUEEN OF SPAIN #1, 3 & 4 4,750,000 5,988 239,503 173,434 950,000 1,362,937 3,387,063

TOTAL 15,969,500 96,532 3,861,281 1,058,409 3,193,900 8,113,589 7,855,911

Table 4.4 reflects the expected supply in 2030 if:

(a) The production facilities are rehabilitated and restored to operate at utilization

level of at least 95%.

(b) The level of technical loses is reduced to no more than 30% of production

Page 13: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

13 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

5. Water Supply Improvement Plans

The NWC is committed to the reduction of the high level of NRW, extension of service

to new areas and improvement in the reliability of the water supply in the parish. The

project has seven (7) broad will include seven components and the estimated capital

requirement is $6.59 billion. The broad components and the key activities involved are

outlined below:

5.1 Component A

• Water Treatment Plant and Intake Works Rehabilitation

o Redesign and rehabilitation of Intake Works

o Provision of stand-by Generators

5.1 Component A (cont’d)

o New High – lift motors

o Refurbishing of Water Treatment Facilities

5.2 Component B

• Rehabilitation, Construction and Expansion of Reservoir

o Expansion of Reservoir storage capacity at Georgia.

o Expansion of storage capacity at Bounty Hall.

o Expansion of Stewart Town tank.

o Expansion of Gun Hill tank.

o Expansion of Troy tank #1.

o New Tank at Farm Town and Sherwood.

o Rehabilitate Peru and Spicy Hill tank.

o Installation of New 100k gallon tank at Duanvale.

o Construction of 50,000 gallon tank to serve the Blackwood & Wood Grove

communities.

5.3 Component C

Page 14: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

14 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

• Water Supply Enhancement

o Upgrading 7km of transmission pipe, storage and pumping station in Daniel

Town.

o Pumping system from the Gun Hill Reservoir to Greenside subdivision.

o 2km of new 100mm pipe in Holland area.

o 3km of new 100mm pipe from Old Martha Brae Bridge to Rafting Village.

o Upgrading and extension of distribution pipe in Dee Side and Drumily.

o Rehabilitation of Belfield Well.

o New 150mm from Baron Hill Tank to Jackson Town and Albert Town.

o Rehabilitate Peru Well with new Pumping system to Sherwood.

o Forestry, watershed and Development South Trelawny

o Electrification of Warsop.

o Interconnect Coral Spring and Braco with distribution to 500mm pipe.

5.4 Component D

• General NRW reduction

o Creation of new flow/pressure zones and installation valves

o Detailed micro DMA investigation (technical/commercial)

o Reconfigure sections of the distribution system

o Controls for pumps within the distribution

o House to house service connection investigation and replacement

o Meter installation and replacement; Geo referencing of all customers

o CS Analysis

o Updating Hydraulic Model to further simulate the distribution

o Installation of SCADA system

Page 15: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

15 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

5.5 Component E

• Pipeline Replacement Plan

o 7.5 km of 12" AC from Clarkston to Silver Sands entrance in Duncan’s.

o 1 km of 3” CI to 100mm from Clarks Town to Duanvale Town DMA boundary.

o 3km of 100mm to serve Campbell’s and Red Hills communities

o 4 km of 2" GI line with 100mm in Ettington.

o 1 km of 32" DI from Greenwood tee off to Long Bay 32” In-line valve

o 3.5 km Network upgrade in Down Town Falmouth.

o 5km of 12’’ CI/AC to 300mm from Old Martha Brae T/P to Gun Hill.

o 0.9 km of 8” CI with 200mm pipe from Star Fish to FDR Pebbles.

o 2km of 3’’ GI with 100mm in Dee Side.

o 1km of 2’’ GI with 100mm in Wakefield square.

o 3.2km of high pressure 10inch pumping main from Dornoch to baron Hill

Tank

o 4km of 3’’ CI with 150mm from baron hill tank to Rio Bueno

o 3km of 3’’ CI with 150mm from baron hill tank to Samuel Prospect

o 3 km of 2”GI with 100mm in Warsop.

o Extension 2 km of 2” GI in Warsop.

5.6 Component F

• Regularization of Informal Settlements

o Low Income settlement (Red area) water supply and billing improvement.

o Reduction Water consumed or wasted at low income settlements to reduce

the high NRW ratio

o Improve service by giving one connection per property with meter.

o Abatement of Illegal Connections and conversion to active accounts

Page 16: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

16 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

5.7 Component G

• Pumping Station and Well Rehabilitation

o Clarks Town Well.

o Ettington Well.

o Queen of Spain Wells.

o Barnstaple Well.

o New Forrest Well and extend to Sherwood.

o Green Town, Troy, Wilson Run, Ulster Spring and Warsop Pumping Station.

Cost for Improvements - Summary

Item No. Proposed Project for NRW Reduction in St. James Budget Cost in $JB

1 Component A

Water Treatment Plant and Intake Works Rehabilitation 0.84

2

Component B Rehabilitation, Construction and Expansion of Reservoir

0.872

3 Component C Water Supply Enhancement

0.9521

4

Component D Supply of materials and Equipment and do General NRW reduction

0.4192

5 Component E Pipeline Replacement Plan

1.7068

6 Component F

Low Income Settlement Improvement 0.27

Cost for Improvements - Summary (cont’d)

Item No. Proposed Project for NRW Reduction in St. James Budget Cost in $JB

7 Component G Pumping Station and Well Rehabilitation

0.43

Page 17: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

17 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Sub-Total - Works

5.4901

8

Consultancy Engineering Designs: Consultancy, audit, Engineering Designs and Construction Supervision Services ~ 20%

1.098

Budget : Grand Total

6.58812

6. Water Supply Improvement Projects

6.1 Introduction

Based on the supply deficiencies identified in the water supply system in Trelawny in

satisfying the water requirement in each, set of improvement works were developed and

are presented in anis diction. These projects are broadly defined and provide the

framework for developing in capital works programme in the coming years.

6.2 Audit of Trelawny Water Supply System

The detailed audit of the Trelawny Water Supply system will provide information that will

be used to help in defining detailed NRW reduction intervention activities. The result of

the audit will be to target the most critical sections of the parish water supply system

that require attention and assist in scheduling of the required works.

The information will be used to populate the asset database for the parish which form a

critical part of the asset management system (AMS) that will be established for

Trelawny. A fully functional AMS will be a valuable operational tool that can be used to

sustain the benefits that will be derived from the various projects and activities that are

set out in this document.

Page 18: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

18 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.2 Audit of Trelawny Water Supply System (cont’d)

Improved network infrastructure

o DMAs, pressure zones, SCADA etc.

Improved network data quality (GIS)

Improved asset management planning

High quality and continuous water supply service

Hydraulic network model

Extension of Service areas

Operational Improvements and Energy savings

Utility staff development

o Specialist technical and managerial know-how

o New technology and the know-how to use it efficiently

Page 19: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

19 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.3 Wilson Run Water Supply

6.3.1 System Description

The Wilson Run Water Supply System is located in the south of the parish and it is

served by a spring source via a small water treatment plant. The estimated yield of this

service is 150,000 imp. gallons per day. It is seasonal and the supply is reduced during

the dry season.

6.3.2 Service Area

The communities served include; Wilson Run and Crown Lands the estimated

population 1,677

6.3.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.3.4 Addressing the Supply Deficiencies

It is proposed to ……………………………..

� Treatment Plant and Intake Works Rehabilitation (0.04B)

I. It is planned to repair damaged sections of the intake and carry out

other works of the intake and carry out other works to sustain this

supply

II. The Wilson Run Water Treatment Plant will be rehabilitated. This will

include refurbishing the filtration system and replacement of sections of

the pipeline to and from the plant. This will be done to maximise

production.

� Water Supply Enhancement (0.04B)

I. Forestry, Water and Development: Development of framework for

community forestry, integration of tree growing into rural development

initiatives and identification of mechanisms to allow rural communities

to share equitably in benefits of forest utilization. Support to special

forms of forest management, such as buffer zones, as part of protected

area management.

Page 20: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

20 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

II. Investigations required establishing alternate source which may exists

with a view of supplementing supply.

6.3.5 Cost of Improvement

The estimated total cost for the improvement works is $1,056M as shown blow

Activity Cost ($Billions)

Filter Plant and Intake Rehabilitation 0.04

Water Supply enhancement 0.04

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.008

Subtotal 0.088

Engineering and other cost 0.0176

Total 0.1056

Page 21: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

21 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Page 22: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

22 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.4 Green Town Water Supply

6.4.1 System Description

The Green Town Water Supply is from a spring located in Green Town the design

capacity of this facility is 250,000 gallons per day that is obtained. The supply is

inconsistent during the dry periods resulting in water restrictions in the service area. The

pipelines in this system are mainly old galvanized pipes steel which leak badly and

break frequently. The water tank located at Backwoods is old and badly corroded and

has been abandoned, thus affecting the reliability of supply to the Backwoods and

Wood Grove communities.

6.4.2 Service Area

The communities served by the system includes; Green Town, Litchfield, Wait-a-bit, Joe Hut, Backwoods, Wood Grove, Lowe River with an estimated population of 5,864.

6.4.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.4.4 Addressing the Supply Deficiencies

The proposed water supply improvement works to address and identified the

deficiencies are outlined below;

� Pumping Station and Intake Works Rehabilitation (0.02B)

I. Sections of the Intake are in need of repairs and this will be done to

maximise inflow to the system

II. The pumping station which is located adjacent to the spring, will be

refurbished to maximise production capacity

� Expansion of Tank (0.03B)

Page 23: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

23 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

I. The old horizontal metal tank will be replaced with a new 50,000

GPD storage water tank

� Pipeline Replacement The following pipeline replacement have been identified

I. Replacement of 3km of 4inch transmission line with 150mm/100mm pipelines

II. Replacement 6km of 2” pipelines with150mm/100mm pipelines and

interconnect with Ulster Spring system. Provision will be made to carry out other pipeline replacement based on the detailed NRW and .1

� Water Supply Enhancement (0.090B)

I. Forestry, watershed and Development: Development of framework

for community forestry, integration of tree growing into rural

development initiatives and identification of mechanisms to allow

rural communities to share equitably in benefits of forest utilization.

Support to special forms of forest management, such as buffer

zones, as part of protected area management.

II. Investigations will be done to establish alternate source which may exists with a view to supplement the supply

III. Investigate the possibility of additional sources within the area which

may augment the existing supply

IV. Construction of 100,000 gallon bolted steel tank to serve the community of Bamboo Spring

6.4.5 Cost of Improvement

The estimated total cost for the improvement works is $3,204M as shown blow

Activity Cost ($Billions)

Pump Station and Intake Works Rehabilitation 0.02

Expansion of Tank 0.03

Water Supply enhancement 0.090

Supply of Materials and Equipments and do general Non-Revenue Water 0.009

Page 24: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

24 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Reduction NRW

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.11

Low Income Settlement Environmental Improvement 0.008

Subtotal 0.267

Engineering and other cost 0.0534

Total 0.3204

Page 25: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

25 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Green Town Service Area

Page 26: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

26 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.5 Sherwood Content Water Supply

6.5.1 System Description

The Sherwood Content community is served by a blue hole with an estimated yield of

220,000 gallons per day. The supply from this source is unreliable due to water

turbidity issues.

6.5.2 Service Area

The communities served by this system includes; Sherwood, Coxheath, Reserve the

estimated population 3,646

6.5.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.5.4 Addressing the Supply Deficiencies

The following water supply improvement work to address and identified the

deficiencies are outlined below;

� Water Supply Enhancement (0.1B)

It is planned to activate the Peru well to replace the supply from the Sherwood Content Blue Hole. This will require rehabilitating the well arranging for 3-phase power to be provided to the area if the Peru Well and to provide a pump station there. Some 2km of 150mm pipeline will be installed to the existing Sherwood treatment plant and installation of new Booster Station and new reservoir. A distribution network will be established to serve the Peru Community.

� Expansion of Reservoir (0.08B)

Installation of new tank in Sherwood and rehabilitation of Peru tank.

� Low Income Settlement Environmental Improvement (0.01)

I. Low Income settlement (Red area) water supply and billing

improvement.

II. Reduction Water consumed or wasted at low income settlements to

reduce the high NRW ratio

III. Improve service by giving one connection per property with meter.

Abatement of Illegal Connections and conversion to active accounts

Page 27: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

27 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.5.5 Cost of Improvement

The estimated total cost for the improvement works is $2,424M as shown blow

Activity Cost ($Billions)

Expansion of Reservoir 0.08

Water Supply enhancement 0.1

Supply of Materials and Equipments and do general Non-Revenue

Water Reduction NRW

0.012

Low Income Settlement Environmental Improvement 0.01

Subtotal 0.202

Engineering and other cost 0.0404

Total 0.2424

Page 28: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

28 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Sherwood Content Distribution Area

Page 29: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

29 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.6 Troy Water Supply

6.6.1 System Description

The Troy System is served by a spring located in the south of the parish. It has an

estimated yield of 250,000 imp. gallons per day. Chlorine injection is the form of

treatment used. The source is seasonal and the supply is unreliable during the dry

period.

6.6.2 Service Area

The communities served include; Troy and New Hope with an estimated population of

1,782 persons.

6.6.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.6.4 Addressing the Supply Deficiencies

� Pumping Station and Intake Works Rehabilitation (0.02B)

I. Rehabilitation of Intake Works

II. Rehabilitation of Pumping Station to maximise production capacity

� Expansion of tank (0.04B)

I. Expansion of tank with new roof at Troy Pumping Station

� Water Supply Enhancement (0.04B)

I. Forestry, watershed and Development: Development of framework

for community forestry, integration of tree growing into rural

development initiatives and identification of mechanisms to allow rural

communities to share equitably in benefits of forest utilization. Support

to special forms of forest management, such as buffer zones, as part

of protected area management.

II. Investigations required to establish alternate source which may exists with a view of supplementing supply

� Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network (0.0972B)

I. Replacement of 2km, 4 inches transmission pipeline

Page 30: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

30 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

II. Replacement and extension of 6km of distribution pipeline from 2 inches and 4 inches

� Low Income Settlement Environmental Improvement (0.008B)

I. Low Income settlement (Red area) water supply and billing

improvement

II. Reduction Water consumed or wasted at low income settlements to

reduce the high NRW ratio

III. Improve service by giving one connection per property with meter.

IV. Abatement of Illegal Connections and conversion to active accounts

6.6.5 Cost of Improvement

The estimated total cost for the improvement works is $2,558 M as shown blow

Activity Cost ($Billions)

Pump Station and Intake Works Rehabilitation 0.02

Expansion of Tank 0.04

Water Supply enhancement 0.04

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.008

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.0972

Low Income Settlement Environmental Improvement 0.008

Subtotal 0.2132

Engineering and other cost 0.0426

Total 0.2558

Page 31: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

31 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Distribution Area and Network

Page 32: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

32 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.7 Ulster Spring Water Supply

6.7.1 System Description

The system is located in the south of the parish. It is supplied by a spring source with

chlorine injection. However, the supply is unreliable during periods of drought

6.7.2 Service Area

The communities served include; Ulster Spring, Albert Town, Bamboo, Freeman's Hall,

Lot, German Town with an estimated population of 10,179 persons.

6.7.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.7.4 Addressing the Supply Deficiencies

� Pumping Station and Intake Works Rehabilitation (0.02B)

It is planned to rehabilitate the intake and the pumping station

I. Rehabilitation of Intake Works

II. Rehabilitation of Pumping Station to maximise production capacity

� Water Supply Enhancement (0.090B)

I. Forestry, watershed and Development: Development of framework

for community forestry, integration of tree growing into rural

development initiatives and identification of mechanisms to allow

rural communities to share equitably in benefits of forest utilization.

Support to special forms of forest management, such as buffer

zones, as part of protected area management

II. Investigations required to establish alternate source which may exists with a view of supplementing supply

III. See Dornoch for option to bring water from Baron Hill through

Jackson Town.

IV. Investigate the possibility of additional sources within the area which may augment the existing supply

V. Construction of 100,000 gallon bolted steel tank to serve the

community of Bamboo Spring

Page 33: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

33 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

� Supply of Materials and Equipments and do general Non-Revenue Water Reduction NRW (0.009B)

I. Active leak detection and Repair of detected leaks

II. Creation of new flow/pressure zones and installation of gate valves, check valves, flow control valves, pressure sustaining valves, control mate, air valves throughout distribution

III. Detailed micro DMA investigation (technical/commercial)

IV. Reconfigure sections of the distribution system

V. Controls for all pumps within the distribution with pressure switch,

timer, surge vessel to reduce energy and water loss

VI. House to house service connection investigation, replacement,

repairing leaks on service connection and Consumer to Customer

conversion.

VII. To reactivate and install new telemetry system for flow, level,

pressure and water quality and to create an electronic library

including flow, level and pressure data collected in the past years.

VIII. Metering and Geo referencing of all customers. Macro and micro metering, sizing, maintenance and replacement

IX. CS Analysis

X. Updating Hydraulic Model to further simulate the distribution.

XI. Installation of SCADA (Supervisory control and data acquisition) system to monitor Flow, pressure, water quality and level in real time

� Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe Network (0.0972B)

The following pipeline replacement works are planed with 150mm/100mm PVC pipeline

I. Replacement of 3km of 4inch transmission line with

Page 34: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

34 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

II. Replacement of 5km of 4inch distribution lines with 150mm/100mm pipelines provisions has been made to install score of 2km of 2 inches diameter PVC pipes into the “off road” areas

Page 35: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

35 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.7.5 Cost of Improvement

The estimated total cost for the improvement works is $2,558 M as shown blow

Activity Cost ($Billions)

Pump Station and Intake Works Rehabilitation 0.02

Water Supply enhancement 0.09

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.009

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.0972

Low Income Settlement Environmental Improvement 0.008

Subtotal 0.2242

Engineering and other cost 0.0448

Total 0.269

Page 36: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

36 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Distribution Area and Network

Page 37: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

37 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.8 Worsop Water Supply

6.8.1 System Description

The Worsop System is located in the south of the parish and supplied by a spring source

with an approximate yield of 200,000 imp. gallons per day. It is a very remote Diesel plant

station which operates approximately eight (8) hours each day. However, the source is

unreliable in time of drought to the point where operations is limited to approximately 2

hours daily.

6.8.2 Service Area

The communities served are Warsop, All Sides, New Roads and Lodge with a total

estimated population of 4,649

6.8.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is expected

to increase to …….. by 2030. The estimated water requirement in the Demands Zone

is………mgd and this is expected to increase to……… by 2030 if the level of technical

losses remains as they are at present

6.8.4 Addressing the Supply Deficiencies

� Pumping Station and Intake Works Rehabilitation (0.014B)

I. Rehabilitation of Intake Works

II. Rehabilitation of Pumping Station to maximise production capacity

� Water Supply Enhancement (0.12B)

I. Forestry, watershed and Development: Development of framework for

community forestry, integration of tree growing into rural development

initiatives and identification of mechanisms to allow rural communities to

share equitably in benefits of forest utilization. Support to special forms of

forest management, such as buffer zones, as part of protected area

management

II. Investigate the possibility of additional sources within the area which may augment the existing supply

III. Electrification of the plant.

� Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe

Network (0.061B) It is planned ……………………..

Page 38: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

38 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

I. Replacement of 3km of 2 inches with 100 mm distribution

II. Extension of 2km of 2 inches distribution

6.8.5 Cost of Improvement

The estimated total cost for the improvement works is $9,132M as shown blow

Activity Cost ($Billions)

Pump Station and Intake Works Rehabilitation 0.014

Water Supply enhancement 0.12

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.009

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.061

Low Income Settlement Environmental Improvement 0.008

Subtotal 0.761

Engineering and other cost 0.1522

Total 0.9132

Page 39: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

39 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Worsop Distribution Area

Page 40: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

40 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.9 Dornoch Treatment Plant

6.9.1 System Description

The Dornoch Treatment Plant located on the eastern end of the parish and has a design

capacity of 750,000 gallon per day. The plant is almost 80 years old and is in urgent need

of rehabilitation. In addition the transmission main between the treatment plant and the

storage tank has a high level of technical losses due to the leaking on the aged lead

jointed pipeline. Water is pumped to this storage tank which is located at Baron Hill. There

are a large number of leaks on the distribution mains.

6.9.2 Service Area

Areas supplied by this system includes; Rio Bueno, Braco, Calabar, Brampton,*Jackson

Town, Samuel Prospect Vale Royal, Hatfield, **Farm Town, Arcadia, Grove, Middlemost

6.9.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is expected

to increase to …….. by 2030. The estimated water requirement in the Demands Zone

is………mgd and this is expected to increase to……… by 2030 if the level of technical

losses remains as they are at present.

Addressing the Supply Deficiencies

� Treatment Plant

It is important to address the poor condition of the Dornoch Water Treatment Plant.

It is proposed to repair the water intake and thereby maximise the inflow to the

treatment plant and prevent further deterioration of this facility. The plant facilities

such as this sedimentation, and filtration system, will be extensively over handed.

� Water Storage Facilities

It is proposed to construct a new water storage tank at Baron Hill to increase the storage capacity there to 500,000 gallons. A new 100,000 gallon tank is planned for Farm Town to improve service reliability and reduction in pumping cost.

� Pipeline Replacement

It is planned to replace the pipelines as a fist step in reducing the high level of technical losses on this supply system.

The following pipeline replacement works are proposed:

I. installation of 2km of 300mm pipeline from the Dornoch WTP to Baron Hill to replace the badly leaking 250mm cast 1km pipeline

Page 41: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

41 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

II. installation of 4km of 200mm/150mm/100mm pipeline from the Baron Hill tank to Rio Bueno, and within Rio Bueno

III. Installation of 3km of 150mm pipeline from Baron Hill to Samuel Prospect and

within Samuel Prospect

Provisions have been made to carry out pipeline replacement in other sections of the Demand Area.

� Water Supply Enhancement (0.15B)

It is planned to install a new 150mm pipeline from Baron Hill Tank to Jackson Town and establish a pumping system at Jackson Town to supply Albert town. This project will include 15km of 150mm pipe line, two booster stations and a water tank

6.9.5 Cost of Improvement

The estimated total cost for the improvement works is $2,846M as shown blow

Activity Cost ($Billions)

Treatment Plant and Intake works Rehabilitation 0.22

Rehabilitation and Expansion of Reservoir 0.12

Water Supply Enhancement 0.15

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.02

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.105

Low Income Settlement Environmental Improvement 0.007

Subtotal 0.622

Engineering and other cost 0.1244

Total 0.7464

Page 42: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

42 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Dornoch Supply Area

Page 43: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

43 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.10 Martha Brae No.2 Treatment Plant

6.10.1 System Description

The Martha Brae No.2 treatment plant has a capacity of 6 million gallons daily. They

are combined to provide water to the Martha Brae demand zone and are strategically

located on south coast of the parish. The supply from this system stretches along the

north coast to as far as Discovery Bay, St. Ann in the east and the Terminal Reservoir

in St. James the west. The improvement works would have positive impacts in NRW

reduction, operational improvement and Increase in Revenue energy savings.

6.10.2 Service Area

The Communities served by the Martha Brae system include Falmouth, Greenwood,

Rose Hall, Coral Gardens, Ironshore, Granville, Green Park, Schawfield, Salt Marsh,

Davis Pen, Wiltshire, Scarlett Hall, Rhyne Park, Lilliput, Barrett Hall, Spot Valley,

Pumps into Terminal Reservior, Salt Spring, Brandon Hill, Rosemount, Felicity,

Glendevon, Sun Valley Road, Catherine Mount, Mount Salem, Albion, part of Down

Town MoBay, Flower Hill, Cornwall Courts, Rose Heights, Rosemount Gardens,

Bottom Rd, Norwood Housing Scheme, Norwood Capture Land, Meggie Top, Flower

Hill, New Town, Hague, Retreat, Silver Castle, Carey Park, Silver Sands, Duncans

Bay, Star Fish, Pebbles, Hamony Cove, Duncans, Runaway Bay, Discovery Bay with

a total estimated population of 84,100

6.10.3 Water Requirement

The population in the Martha Brae Demand Zone is 15,730 and this is expected to

increase to ……… by 2030. The estimated 2010 water requirement including

technical losses is…….mgd. This is expected to increase to ………..mgd if the current

level of technical losses remains at the same level. Based on the average output from

both the Martha Brae No.1 and No.2 and the current water requirement that is seen is

that, there is a supply surplus in the Zone. Some of the water from this system is in

fact expected to serve sections of Montego Bay via St. James via the terminal

reservoir and to some communities in St. Ann.

6.10.4 Addressing the Water Supply Deficiencies

The main water supply challenges faced by NWC and the customers in the Martha

Brae Demand zone are:

(a) Unreliability of the supply from the Martha Brae No.2 treatment plant, mainly

due to issues with the intake for the plant. During the rainy period, the intake

often gets blocked, thereby reducing the flow into the plant

Page 44: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

44 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

(b) Inadequate water storage capacity and the poor state of some of the water

tanks

(c) Poor state of the transmission and distribution network, resulting in high level of

water losses and inadequate transfer of water across sections of the supply

system

6.10.4 Addressing the Water Supply Deficiencies (cont’d)

(d) Inadequate pressure management, largely due to non-functioning pressure

reducing valves and defective boundary valves

(e) Use of water from NWC system through illegal means, particularly in informal

settlement.

It is planned to address the deficiencies by carrying out the following improvement

works for the:

� Martha Brae No.2 Treatment Plant

I. Redesign of the intake arrangement for the treatment plant and construction

of this arrangement.

II. Replace high lift pumping equipment

III. Provide additional standing electricity generator

� Rehabilitation and expansion of Water/Tanks

The following works are proposed:

I. Rehabilitation of Ironshore storage tank

II. Replacing the 30,000 gallon Torado Heights No… Tank with a 100,000

gallon tank

III. Construction of a new 100,000 gallon tank at the Torado Heights No.3

location.

� Water Supply Enhancement (0.55B)

The following works are proposed to improve the service levels across the

Demand Zone, by upgrading pipelines and pumping equipment:

I. Upgrading transmission pipe from 100mm CI to 150mm, tank capacity and

pumping station at Torado Heights.

II. Pumping system from the new 200 mm DI at Iberiostar to supply Barrett Hall

and Greenwood High elevated areas. This project will include 2km of

Page 45: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

45 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

200mm pumping main along with distribution, Booster Station and a new

reservoir.

III. Installation of new tank and pumping main in Lilliput

IV. Upgrade of Rhyne Park #1 & 2 pumps

V. Interconnect Coral Spring to New 500mm pipe and lay 3km of 100mm

distribution main.

VI. Interconnect Braco to New 500mm pipe and lay 3km of 100mm distribution

main.

� Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network (0.5476B)

The following activities are proposed to be undertaken to reduce the level of

technical losses:

I. Replacement 3 km of Pipe 3’’ GI to 150mm DI From Rosevale to Barrett

Town inclusive of PRV’s to improve supply to Siagon and surrounding

areas

II. Replace/upgrade 2 km of the 6" ac/pvc that runs along the old road near

to the sea, from the Palm club where Phil ended the new 4" DI, up to

Flamingo Villa where it is connected the new 8" DI

III. Network upgrade in Down Town Falmouth: 3.5 km of Pipe replacement

in downtown, 2”, 2 ½” and 3" distribution lines with 4” PVC plus isolation

valves installation.

IV. Replace/upgrade 10 km of the 20" DI transmission main from Marta

Brae that runs from Ritz Carlton along the highway towards Terminal to

new 24” DI.

V. Replace/upgrade 1 km of the 32" DI transmission main from Marta Brae

that runs from Greenwood tee off towards Long Bay 32” In-line valve.

VI. Provision for other pipeline replacement.

� Low Income Settlement Environmental Improvement (0.07B)

6.10.5 Cost of Improvement

The estimated total cost for the improvement works is $7,08M as shown blow

Activity Cost ($Billions)

Treatment Plant and Intake Works 0.22

Rehabilitation of Reservoir 0.12

Page 46: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

46 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Supply of Materials and Equipments and do general Non-Revenue

Water Reduction NRW

0.02

Rehabilitation and Reinforcement of Small, Medium and Large

Diameter Pipe Network

0.18

Low Income Settlement Environmental Improvement 0.05

Subtotal 0.59

Engineering and other cost 0.118

Total 0.708

6.10.5 Cost of Improvement (cont’d)

The estimated total cost for the improvement works is $2.3731B as shown blow

Activity Cost ($Billions)

Treatment Plant and Intake Works 0.4

Rehabilitation of Reservoir 0.2

Supply of Materials and Equipments and do general Non-Revenue

Water Reduction NRW

0.28

Rehabilitation and Reinforcement of Small, Medium and Large

Diameter Pipe Network

0.5476

Low Income Settlement Environmental Improvement 0.07

Subtotal 1.9776

Engineering and other cost 0.3955

Total

Page 47: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

47 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Martha Brae # 1Supply Area

Martha Brae Distribution Area

Page 48: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

48 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.12 Barnstaple Deep Well Pump Station

6.12.1 System Description

The Barnstaple well provides some 0.48 mgd of water to its supply system. The

water supply network comprises mainly cast iron pipes, ranging in size from 3inches

diameter to 8inches.

6.12.2 Service Area

The communities served by this system include Westwood, Stewart Town,Jackson Hill, Mahogony Hall and Biddiford Tank.

6.12.3 Water Requirement

The 2010 population estimation for the Barnstaple Demand Zone is 9,105 persons.

This is expected to increase to ……… by 2030. The water requirement is 0.39 mgd

and this is expected to increase to ………..mgd in 2030 if the supply situation

remains the same.

6.12.4 Addressing the Supply Deficiencies

The Barnstaple well is crocked and sections of the casing are badly deteriorated. As a result of adjustments that were made to this well depth the production from this well has been reduced by over 30%. It will be necessary to conduct a detailed inspection of this well to determine the action that should be taken to ensure a sustained supply. His will form part of the island wide well inspection and rehabilitation programme. Some option includes the construction of a replacement well.

� Rehabilitation/Expansion of Water Tanks

It is planned to increase the water storage capacity of the tank located at Stewart Town to 100,000 gallons. The tank at Biddiford is in a bad condition and it is planned to have it cleaned and repaired.

� Pipeline Replacement

It is planned to replace sections of the transmission and distribution network in order to reduce the level of technical losses.

Those identified for immediate actions are:

I. Replacement of 3km of 3 inches diameter cast iron pipeline with 150mm and 100mm iron pipeline in Jackson Town

Page 49: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

49 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

II. Replacements of 6 kilometer of the 6 inches diameter pipeline between Barnsstable and Stewart Town.

Provision is made to replace other sections of the supply network.

� Supply Extension

Service to Bidiford will be strengthened by installing some 0.8km of 100mm pipeline.

6.12.5 Cost of Improvement

The estimated total cost for the improvement works is $2,846M as shown blow

Activity Cost ($Billions)

Deep Well Works Rehabilitation 0.04

Expansion of Reservoir 0.08

Supply of Materials and Equipments and do general Non-Revenue

Water Reduction NRW

0.0012

Rehabilitation and Reinforcement of Small, Medium and Large

Diameter Pipe Network

0.113

Low Income Settlement Environmental Improvement 0.003

Subtotal 0.2372

Engineering and other cost 0.0474

Total 0.2846

Page 50: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

50 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Barnstaple Distribution Area

Page 51: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

51 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.13 Clarks Town

6.13.1 System Description

The Clarks Town Deep Well is located within the South West belt of Trelawny and has

a design capacity of 750,000 gallons per day. A brief description of the operational

and Physical Problems/Challenges of the Water Supply Scheme:

I. Old 12 inches diameter asbestos cement (AC) pipe line that’s leaks and has

to be repaired every week

II. Inadequate water storage capacity

III. High pressures in some sections of the water distribution network

6.13.2 Service Area

The communities served by the system includes: Clarkes Town, Duncan’s, Hyde,

Kinloss, Kelits, Crawle, Gibralta, Georgia, Long Pond Housing Scheme, Campbell’s

and Red Hills. The Estimated Population is 8,468 persons

6.13.3 Water Requirement

The current population of this supply area presently (2010) requires a total of 594,151

gallons per day with an average production of 730,428 this system has a surplus of

136,278. However the projections show that by 2030 the demand will increase to

688,305 and a surplus of 42,123 persons.

6.13.4 Addressing the Supply Deficiencies

Although there is a supply surplus in this zone, there are certain works that are

required to ensure sustainability of supply and to decrease operational inefficiencies.

� Deep Well Works Rehabilitation

I. Part of island wide rehabilitation programme

II. Rehabilitation of pumping station and to maximise production

capacity

� Expansion of Georgia Reservoir

I. The capacity of the Georgia water stand will be increased from………

gallons to …………

II. This water will provide an improved supply buffer and provide water for emergency

� General Non-Revenue Water Reduction NRW (0.009B)

Page 52: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

52 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

I. DMA will be established in the water supply network as well as the

replacement of isolating valves, pressure control valves, air valves

etc.

� Pipeline Replacement

II. 7.5 km Replacement of the 12 inches AC line from Clarkston towards

Clock tower of Duncan’s, the pipe should be at least 300mm to

Georgia Chamber, also to replace 2.5km of distribution 4 inches line

in the surroundings, interconnected with the new main through two

new PRV. To interconnect the new 4 inches PVC at the clock with a

3 inches or 4 inches PRV

III. 3 inches pipeline replacement to 1km of 4 inches D.I. from Clarks

Town towards Duanvale DMA boundary.

IV. Extension of 3km of 100mm pipeline to serve Campbell’s and Red

Hills communities.

6.13.5 Cost of Improvement

The estimated total cost for the improvement works is $6,132M as shown blow

Activity Cost ($Billion)

Deep Well Rehabilitation 0.01

Expansion of Georgia Tank 0.08

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.009

Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe

Network

0.251

Low Income Settlement Environmental Improvement 0.08

Subtotal 0.511

Engineering and other cost 0.102

Total 0.6132

Page 53: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

53 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Page 54: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

54 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.14 Duanvale Deep Well Pump Station

6.14.1 System Description

The Duansvale Deep well has a design capacity of 480,000 gallons per day; however, full production is deliberately restricted due to challenges with the state of the distribution network and the integrity pipeline infrastructure and inadequate storage facilities. The distribution system is inadequate to carry the required flows volumes as well as withstand the supply pressure that is needed to serve the area.

6.14.2 Service Area

The communities served include Duansvale, Duansvale H/S, New Forrest, Chester Relift, Perth Town, and Sections of Kinloss. The Estimated Population is 8,000 however this estimate does not include the additional 3,646 in Sherwood Content System which is considered for incorporation into the service.

6.14.3 Water Requirement

The estimate of the 2010 population in this Demand Zone is………… and this is

expected to increase to …….. by 2030. The estimated water requirement in the

Demands Zone is………mgd and this is expected to increase to……… by 2030 if the

level of technical losses remains as they are at present.

6.14.4 Addressing the Supply Deficiencies

It is planned to undertake the following water supply improvement in order to address

and indentifies the supply deficiencies.

� Deep Well Works Rehabilitation (0. 2B)

The well at New Forrest which has been capped will be activated to augment

the Demand well supply. The Duanvale Well will be inspected and rehabilitated

and in the inspection findings the install pumping station and lay 3km of 150mm

pipe to new Tank site in Sherwood. To also include distribution for extension of

service.

� Expansion of Reservoir (0.1B)

Page 55: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

55 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

A new 100,000 GPD at an elevation higher than the existing tanks in order to

improve water storage capacity and improve reliability of service.

� Pipeline Replacement

The following are immediately works that are planned to reduce the level of

technical losses on this supply system:

I. Replacement of 0.7 km of Pipe 4’’ CI with 150mm From Deep Well to Tank (0.007B)

II. Replacement of 4.4 km of Pipe 2’’ GI with 100mm From Duanvale Tank to Perth Town Tank (0.044B)

III. Replace 5.5 km of 2” GI with 100mm pipe from Duanvale Tank to Clarks Town boundary valve (0.0605B)

� Supply Enhancement

A pump station to be established at New Forest and a 3km pumping main and (150mm) installed to Sherwood.

6.14.5 Cost of Improvement

The estimated total cost for the improvement works is $5,496M as shown blow

Activity Cost ($Billions)

Deep Well Work Rehabilitation 0.2

Expansion of Reservoir 0.1

Supply of Materials and Equipments and do general Non-Revenue

Water Reduction NRW

0.015

Rehabilitation and Reinforcement of Small, Medium and Large

Diameter Pipe Network

0.133

Low Income Settlement Environmental Improvement 0.01

Subtotal 0.458

Engineering and other cost 0.0916

Total 0.5496

Page 56: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

56 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Duansvale Distribution Area

Page 57: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

57 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

6.15 Ettingdon Water Supply (T.13)

6.15.1 System Description

Description Operational and Physical Problems/Challenges of the Water Supply

Scheme:

I. Inadequate storage for water supply scheme

II. Sections of the water distribution system experience excessively high pressures and the distribution pipes are small

The improvement works will have positive impact on NRW Reduction, increase in

revenue, operational improvement and energy savings. Service will be extended to

some new areas.

6.15.2 Service Area

The Communities that will be served are; Refuge, Spicy Hill, Logwood Walk, Stewart

Castle.

6.15.3 Water Requirement

The estimated population of the supply area in (2010) is 2,850 persons and the

estimated average water requirement is 176,324 gallons per day. Average production

is 165,525 which translate into a daily supply deficit of 10,799 gallons per day. The

projections show that by 2030 the water requirement will increase to 208,126 gallons

per day and a deficit of 42,600 gallons per day.

6.15.4 Addressing the Supply Deficiencies

The proposed improvement wish are set out below are:

� Deep Well Works Rehabilitation

The Ettingdon well will be inspected and rehabilitated as deemed appropriate

� Rehabilitation of Reservoir

Sections of the Spicy Hill water tank is in need of repairs and it is therefore

planned to carry out extensive rehabilitation of this tank

� General Non-Revenue Water Reduction NRW (0.009B)

� Pipeline Replacement

Page 58: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

58 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

I. km Replacement of the 2" GI line with 100mm within the distribution.

II. It is planned to replace some 3km of old and leaking 2 inches diameter

pipelines with 150 mm and 100 mm pipelines.

� Regularization of Informant Settlement

� Name Informal Settlement That Will Be Targeted

6.15.5 Cost of Improvement

The estimated total cost for the improvement works is $208.3M as shown blow

Activity Cost ($Billions)

Deep Well Rehabilitation 0.01

Rehabilitation of Reservoir 0.012

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.009

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.0486

Low Income Settlement Environmental Improvement 0.004

Subtotal 0.1736

Engineering and other cost 0.0347

Total 0.2083

Page 59: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

59 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

Page 60: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

60 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

Page 61: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

61 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

16.16 Queen of Spain Wells # 1, 3 & 4

16.16.1 System Description

The Queen of Spain Water Supply System comprises four wells and they are located

within the Wakefield/Georges Valley area. They are designated the Queen of Spain

wells No. 1, 2, 3 and 4 and have a combined output of 5mgd. The well was taken out of

operation some years ago due to intrusion by “dunder” from the sugar factory located

near the well. This well field is adversely affected by turbidity of water during period of

rain.

16.16.2 Service Area

The communities’ serve by this Supply System includes; Wakefield, Deeside, Bunkers

Hill, Friendship, Unity, Dromilly, Bounty Hall, Hammersmith, New Cargen, Hampden,

Green Park, Bounty Hall Reservoir, Salt Marsh, Greenwood, Rose Hall, Lilliput, Barrett

Hall, Coral Gardens, Ironshore, Rhyne Park # 1 & 2, Providence Heights, Flankers and

Terminal with an Estimated Population of 24,786 persons.

16.16.3 Water Requirement

The 2010 population in the Queen of Spain Demand Zone in estimated to be

……………… persons. This is expected to increase to …………. by 2030. The ….

water demand (domestic, commercial and other customers) is estimated to be 0.32mgd.

It is estimated that technical losses amount to 1.16 mgd of water, mainly due to the

leaks from the Supply System; the estimated 2010 water requirement is therefore

1.48mgd. There is a Supply System for this Demand Zone and this is now being used

to augment the Martha Brae Water Supply Zone to strengthen the supply to Montego

Bay.

It is planned to carry out works to reduce the estimated level of technical losses from

the current estimated level of 65% down below 30%. This would reduce losses due to

leaks, etc. to below 0.95mgd.

Addressing the Supply Deficiencies

The main issues to be addressed under the proposed water supply improvement work

include;

Well inspections and rehabilitation of all five (5) wells. This will form part of an island

wide well inspection and rehabilitation programme, which will include:

� Expansion of Reservoir (0.18B)

Expansion of storage capacity at Bounty Hall tank from ………mg

to……….mg to serve Bounty Hall community which are directly serve by it.

� Pipeline Replacement

Page 62: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

62 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

I. Replacement of transmission main between Dee Side and Drumily.

II. Rehabilitation of Belfield Well and reintroduce to the Queen of Spain Water Supply to meet demand along the North Coast general Area expansion.

� Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network (0.0364B)

I. Replacement of 2km of pipeline 3 inches GI with 150mm and 100mm in Dee Side

II. Replacement of 1km of Pipe 2 inches GI with 150mm and 100mm in Wakefield square

16.16.5 Cost of Improvement

The estimated total cost for the improvement works is $7,08M as shown blow

Activity Cost ($Billions)

Deep Well Works Rehabilitation 0.06

Expansion of Reservoir 0.18

Water Supply Enhancement 0.15

Supply of Materials and Equipments and do general Non-Revenue Water

Reduction NRW

0.01

Rehabilitation and Reinforcement of Small, Medium and Large Diameter

Pipe Network

0.0364

Low Income Settlement Environmental Improvement 0.003

Subtotal 0.5294

Engineering and other cost 0.1058

Total 0.6353

Page 63: NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN … - PDF/Draft... · NATIONAL WATER COMMISSION TRELAWNY PARISH PLAN . 2 | Page ... the parish also is home to the annual jazz and blues

63 | P a g e

D r a f t T r e l a w n y W S P P L a n – O c t o b e r 1 2 2 0 1 1

NATIONAL WATER COMMISSION

PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

SUMMARY PROJECT PROFILE

The Queen of Spain Wells service areas