Nature’s Cove Plate
Table of Contents
Preliminary Plat (this section)
Letter of introduction .............................................2
Contact Information ................................................2
Preliminary Plat Submittal ......................................5
Preliminary Engineering ..........................................10
Environmental Checklist .........................................14
Vierbicher Review letter .........................................17
1986 CSM demonstrating Wilson lot line ...............23
1984 letter granting permission to Reuter to
access garage in the rear of their property ............24
Lawson / Atterbury letter .......................................25
Maps (11 x 17)
Preliminary Plat .......................................................1
Overall site plan ......................................................2
Street “A” Plan and Profile (1) ................................3
Street “A” Plan and Profile (2) ................................4
Street “A” Plan and Profile (3) ................................5
Street “B” Plan and Profile (1) ................................6
Street “B” Plan and Profile (2) ................................7
Existing Watershed map .........................................8
Proposed Watershed map ......................................9
Lawson / Atterbury map .........................................10
Page 2 of 28
Page 3 of 28
Page 4 of 28
Page 5 of 28
Page 6 of 28
Page 7 of 28
Page 8 of 28
Page 9 of 28
Page 10 of 28
Page 11 of 28
Page 12 of 28
Page 13 of 28
Page 14 of 28
Page 15 of 28
Page 16 of 28
999 Fourier Drive, Suite 201
Madison, Wisconsin 53717 (608) 826-0532 phone (608) 826-0530 FAX www.vierbicher.com
December 30, 2014 Chair and Members of the Town Plan Commission Town of Middleton 7555 W. Old Sauk Road Verona, WI 53593 Re: Karls Lands Preliminary Plat Town of Middleton Dear Ms. Schmidt and Plan Commission Members: The above-referenced preliminary plat was received in our office. The lots are situated on two new roadways between Keewatin Trail and Old Sauk Road and along a portion of the existing Keewatin Trail. The Preliminary Plat proposal is being made by D’Onofrio Kottke and Associates, Inc. on behalf of Richard Karls. We have completed our review of the following documents for the preliminary plat of Karls Lands:
• Letter of Application (Received November 12, 2014) • Preliminary Plat Submittal Application (Received November 12, 2014) • Preliminary Engineering Report (Received November 12, 2014)
o Includes Preliminary Checklist for Environmental Assessment of Land Divisions and Community Development Plans
o Includes preliminary stormwater report • Preliminary street plan and profiles (Received November 12, 2014) • Preliminary Plat (Received December 17, 2014)
This preliminary plat is accompanied by, and should be addressed subsequent to modifications to two lots from CSM 13282, providing for a lot line adjustment with a neighboring property owner that will affect proposed lots 3 and 4 of the plat. Preliminary Plat 1. The Preliminary Plat consists of 12 lots, with an area of approximately 25 acres including right-of-
way. Lots will be accessed by two new roadways from Keewatin Trail and Old Sauk Road, as well as from Keewatin Trail itself. A short stub street is also proposed to provide future access to unplatted lands immediately west of the proposed plat. The plat is being proposed as a traditional subdivision, with the 12 single family lots all exceeding the 65,000-square foot minimum size.
vision to reality
R e e d s b u r g ( 6 0 8 ) 5 2 4 - 6 4 6 8 | M a d i s o n ( 6 0 8 ) 8 2 6 - 0 5 3 2 | P r a i r i e d u C h i e n ( 6 0 8 ) 3 2 6 - 1 0 5 1
Page 17 of 28
December 30, 2014 Page 2
2. The existing homes will remain on proposed Lots 2 and 9.
3. Currently, the property where the proposed plat is located is zoned A-1 (Agriculture District). No rezoning is proposed or required for a single family residential subdivision.
4. In unsewered traditional subdivisions, the minimum lot size is 65,000 square feet and development densities must not exceed a ratio of 1 dwelling unit per 75,000 square feet of land, inclusive of public streets, parkland, and open space. The smallest proposed lot is 65,013 square feet, and the proposed development density is 1 lot per 90,873 square feet, and is therefore acceptable.
5. As noted above, a street stub is proposed to run west off of Keewatin Trail to provide a future street connection to unplatted lands to the west of the proposed plat. The street stub follows an officially mapped roadway adopted by the Town Board on October 7, 2013.
6. A right of way dedication width of 66’ is shown for the two proposed roads on the preliminary plat. This width is acceptable.
7. The Town trails plan does not indicate any planned trails in the area of this subdivision.
8. The Town should determine if parkland is to be dedicated with this plat. If a parkland dedication is required, 5,000 square feet per new lot or 50,000 square feet total for the 10 new lots would be required. If no dedication is required, a fee in lieu of equal to $2255 per lot for ten new lots (two lots already exist) will be required. The $22,550 will be due before the Town signs the plat.
9. Prior to final plat approval, the plat shall be forwarded by the developer’s surveyor to the utility companies to solicit their comments and to request easements necessary to serve the plat. Evidence that this has been done shall be provided to the Town Engineer.
10. A maintenance agreement with the Town will be required for all stormwater facilities.
11. The soil types and their boundaries shall be added to the preliminary plat per Town ordinances.
12. Each lot will be required to have adequate area and suitable soils for the septic systems required by Dane County.
13. The preliminary and final plats and plans shall show and dimension proper sight triangles at the intersection of proposed “A” Street and Keewatin Trail, the intersection of proposed “B” Street and Old Sauk Road, and the intersection of proposed “A” Street and proposed “B” Street. Vision triangles are not provided on the preliminary plat for any intersections. In addition to the vision triangle, a Clear Sight Window for Intersection Sight Distance may also be required to complete the Vision Corner. A Vision corner note shown on the preliminary plat shall be included to record as follows:
“Vision Corner: No structure, berm or vegetation of any kind, which exceeds a height of 2.5 feet above the average elevation of the roadway and driveway within the vision corner, except for necessary highway and safety signs or approved public utility lines, shall be permitted within the vision corner. No plant material which obscures safe vision of the approaches to the intersection shall be permitted. Grasses and similar turf, however, would be considered acceptable.”
Vision corners at the intersection of proposed “B” Street and Old Sauk Road will need to be
Page 18 of 28
December 30, 2014 Page 3
addressed further due to the desired vision corner crossing land outside the plat on both the east and west sides of the proposed street. Several Options are discussed in the Street Plans and Profiles section below.
14. The Applicant will be required to remove or cut back vegetation along both proposed streets “A” and “B”, and possibly Keewatin Trail to ensure that the Town’s minimum Clear Zone of 7-10 feet from the edge of the travel lane is provided. Distances greater than the minimum may be required if it is determined that overhanging branches are found to create an issue.
15. The invert elevations of any culvert pipes adjacent to the plat, along with any existing utilities whether overhead or underground shall be added to the preliminary plat.
16. Two (2) permanent benchmarks and the datum used per the ordinance shall be added to the preliminary plat.
17. The boundary of the plat in the vicinity of CSM 13282 is proposed to be modified by a lot line adjustment. It is recommended that a new CSM be approved and recorded over Lots 1 and 2 of CSM 13282 to take into account this lot line adjustment before one of the lots that is proposed to be adjusted is included into this plat. The Town should obtain assurances from the applicant that the CSM with the lot-line adjustment will not be recorded unless the Plat is also recorded immediately afterward. This will require that the plat and CSM are both approved and recorded or neither is approved and recorded.
18. The final subdivision plat shall be fully compliant with Chapter 236, Wis. Stats., Dane County Subdivision Ordinances, and Town of Middleton Subdivision Ordinance.
19. Under Town ordinances, four (4) hard copies and one (1) electronic copy of a current title commitment or adequate title report shall be submitted with preliminary plat applications. The Town Attorney will determine the adequacy of the information submitted. This information shall be updated and resubmitted in the future in conjunction with a future final plat submittal.
20. Proper title work will reveal any mortgages of record on the property. If any liens exist, a Consent of Mortgage Certificate will be required due to the dedication of additional right-of-way.
21. Landscape buffers are required across the entire frontage on collectors like Old Sauk Road. However, because the only portion of the plat fronting Old Sauk Road is the strip to be dedicated as proposed “B” Street, no landscape buffers will be required on created lots.
22. A 66’ wide access easement exists on the proposed lots 4 and 5. The Applicant shall be responsible for recording a vacation or release of the access easement. Another access easement exists for the neighboring Lawson parcel, which follows approximately the proposed “A” Street. It will be confirmed with the Town Attorney to what, if any, of this easement must be vacated.
23. As “A” Street could remain a dead end for quite some time, the Town should consider whether to require dedication of a cul-de-sac right of way or temporary turnaround easement at the west end of proposed “A” Street.
24. The Town recommends a 50’ front yard setback. The Town should determine if such a setback is required for this preliminary plat. This exceeds the minimum front yard setback of 30’ required by Dane County zoning ordinances.
25. All existing utilities shall be shown on the Preliminary Plat. If no utilities exist, the developer is responsible for the extension of utilities to serve these lots.
Page 19 of 28
December 30, 2014 Page 4
26. Numerous trees exist on the plat. Town ordinances require that any native canopy tree with a diameter of 8” or larger be shown on the Preliminary Plat. The location of trees may dictate more restrictive building envelope placement and realignment of the north end of “B” Street.
27. The Town does not allow use or disturbance of land on hillsides with natural or manmade slopes of twenty percent (20%) or more. The preliminary plat indicates areas of slopes greater than 20%. The Town should consider if restrictions to building envelopes on those lots should be required. The 20% areas should be noted in the legend on the preliminary plat.
28. The proposed plat contains land currently labeled as “Oak Forest – Savanna Restoration Sites” and “Five Sinks Oak Forest” in the Kailing and Zimmerman report. The preferred use in these areas is large-lot residential with integrative native landscaping. Clustered residential development at forest margins is acceptable.
29. The application letter suggests that vehicular access to between proposed “B” Street and Old Sauk Road be restricted to right-in, right-out. Further study should be required and a note to this effect shall be added to the notes on the final plat.
30. Stormwater drainage easements shall be shown along all lot lines where drainage swales/pipes
are shown on the preliminary stormwater report. The exact width of the easements will be determined when final construction plans are prepared and a final plat submitted. The preliminary plat should show the basin on lot 12 and should indicate access in provided to the basin on lots 10 and 11. A note should be included on the preliminary plat that states stormwater management facilities are to be maintained by either lot owners or a private homeowner association. It should also indicate that the Town of Middleton has an easement over the stormwater easement areas.
31. Once the lot line adjustment of the two lots of CSM 13282 is recorded in the northeast corner of this plat, the Final Plat shall be updated with regards to the CSM 13282 lot adjustments.
Preliminary Engineering Report and Environmental Checklist
1. The applicant’s environmental assessment preliminary checklist indicated the project site does not involve a drainage way for 5 or more acres of land. This is incorrect and should be addressed.
2. It is suggested the applicant contact Dane County and the Department of Natural Resources to evaluate proposed well systems.
Street Plans and Profiles
1. Overhead utilities exist in the “A” and “B” Street right of ways. These utilities may have to be modified to accommodate the new street and clear zones. If these utilities lie on easements, it will be necessary for the owner of the easement to take a secondary position behind the Town for rights to the right of way.
2. The driveway for the existing home at the end of the long driveway located in Street “A” is proposed to be directly across from “B” Street. At this time, this alignment is preferable.
3. The Lot numbers are mis-numbered on plan sheet 4 of 7.
4. A cul-de-sac with a 36’ pavement radius is shown at the west end of “A” Street. A temporary cul-de-sac easement or permanent cul-de-sac dedication shall be shown on the plans and preliminary plat.
Page 20 of 28
December 30, 2014 Page 5
5. As noted earlier, a stormwater easement shall be shown on Lot 12 on the preliminary plat. Runoff from the north ditch of “A” Street and from the stormwater facility on Lot 12 will discharge from the plan to the north along the right of way. Applicant shall demonstrate how runoff will be discharged at this location without causing any damage to downstream properties.
6. The grade at the west end of proposed “A” Street is appropriate for future connection to Windermere Court.
7. The driveway for the existing home on proposed Lot 9 shall be relocated. The new location shall be such that no 20% slopes are disturbed. Construction plans will be reviewed when driveway relocation plans are completed.
8. The intersection details for the intersection of Old Sauk Road and “B” Street must be worked out. At the Town Board meeting on September 17, 2012, a motion was made to approve the connectivity plan and move forward to officially map two roadways for the Keewatin-Windermere area with two points of ingress and egress on Old Sauk Road (of which one point is Keewatin Trail), represented here by the two proposed streets. The motion stated that at the time the land division is proposed in this area, the Town Board is to determine whether the north-south road ("B" Street on the preliminary plat) is to be constructed as a road or an emergency access.
We offer a number of options for the Town Board to consider for the construction of the proposed intersection of Old Sauk Road and "B" Street, as follows.
Option 1: Construct intersection as a normal intersection with no restrictions. It appears this can be accomplished according to all DOT restrictions, with the exception of a small variance to the vision corners which cross over onto the adjacent property owners’ land to both the east and west of the proposed intersection.
Option 2A: Construct intersection with right-in right-out restrictions, controlled with appropriate signage. This option is desired by the Applicant.
Option 2B: Construct intersection with right-in right-out restrictions, controlled with a median.
Option 3: Construct “B” Street to end on its south end with a cud-de-sac, which would then be connected to Old Sauk Road by an emergency access lane, which would be maintained by a private homeowner’s association.
If the Board prefers option 1, it will be necessary for the applicant to provide current Old Sauk Road topography to confirm it meets all Town requirements and how much of a variance for the vision corner will be required.
9. A stormwater drainage easement shall be shown on the Lot 10/11 lot line that will convey runoff from the low point on “B” Street to the stormwater management facility at the west end of the Lot 10/11 lot line. This easement may need to be wide enough to accommodate access to the stormwater management facility from “B” Street.
10. It may be desirable for the Wilson property driveway located just west of the proposed intersection of Street “B” and Old Sauk Road to be relocated off of Old Sauk Road and to connect with proposed "B" Street if "B" Street is constructed as a standard roadway intersecting with Old Sauk Road. This would require voluntary cooperation from the Wilsons as their property lies outside of the proposed plat.
Page 21 of 28
December 30, 2014 Page 6
Preliminary Stormwater Report
1. There is an acre difference between the pre-developed and post-developed condition. This can be addressed in the final stormwater management report.
2. We have no additional comments.
Miscellaneous
1. A draft developer agreement will be prepared and forwarded to the developer after the Preliminary Plat is approved by the Town Board. This shall be approved and executed by the Town prior to final plat recording.
Sincerely,
Colin Punt CP cc: Town of Middleton Board
David Shaw, Administrator, Town of Middleton Tom Voss, Town Attorney, Erbach & Voss, SC Richard Karls, 4105 Keewatin Trail, Verona, WI 53593 Ronald Klaas, PE, D’Onofrio Kottke and Associates, Inc. Stephen Tunbush, Attorney, Murphy Desmond, SC Rod Zubella, PE, Vierbicher Mike Ziehr, PLS, Vierbicher
M:\Middleton, Town of\140005_2014 Engineering Review\Task 6 Dick Karls Subdivision\Plan Commission Ltr re Karls Preliminary Plat_December 2014.docx
Page 22 of 28
Page 23 of 28
Page 24 of 28
Page 1 of 4 | January 20, 2015
To: Town Board
From:
Ardith Lawson (4057 Keewatin Trail)
We attended the January 7, 2015 Plan Commission meeting and expressed some of
our concerns regarding the Proposed Preliminary Plat submitted by D'Onofrio, Kottke
and Associates on behalf of Richard Karls on November 12, 2104. Our reason for
writing this is not because we are against the potential development of this property,
but we do believe that there are a number of significant concerns that need to be
memorialized in the Town Board's action(s) related to this proposal. We request that
the Town Board require the following (listed in prioritized order of importance) in
regards to this Proposed Preliminary Plat:
1. That storm water discharge from any redevelopment does not exacerbate an
already problematic storm water runoff situation onto the multiple property
owner's that surround this Proposed Plat — particularly the discharge onto
the Lawson, Atterbury and Piper properties. We're particularly concerned with
the location, sizing and discharge of the three storm water retention areas. Our
specific concerns include the following:
a) Drainage areas east and south of the proposed subdivision that drain through
the proposed subdivision and ultimately through the Lawson and Atterbury
properties have not been accounted for in the storm water calculations. Failing
to account for these flows can ultimately lead to the failure of the basins to
perform according to their design for both rate control and treatment. This
would adversely impact the downstream land owners (Lawson & Atterbury).
The attached document, dated January 20, 2015, shows the Proposed
Preliminary Plat, the extent of the drainage areas that flow toward the Lawson
and Atterbury properties through the proposed subdivision, the three distinct
areas of storm water run-off (labeled A, B & C), and arrows indicating the flow
of storm water from the drainage areas onto the Lawson and Atterbury
properties. Storm water management basins should be increased in capacity
to accommodate the storm water run-off from these additional drainage areas.
Lee Atterbury (7873 Windemere Court)
RE: Karls Preliminary Plat Proposal, dated November 12, 2014
Date: January 20, 2014
Page 25 of 28
Page 2 of 4 | January 20, 2015
b) Storm water run-off in the northwest corner of the proposed development (Lots
1, 2 & 3) are not proposed to be controlled at all in the Proposed Preliminary
Plat, This should be corrected to protect the downstream land owner (Ardith
Lawson) where drainage runs within at ravine that is within 15 feet of her
homes foundation. Without control of this run-off from the northwest corner of
this subdivision there will be a significant increase in the amount of storm water
flowing in the ravine beside her house and a direct impact on her home.
c) Storm water from Lot 6 releases uncontrolled toward the Lawson property and is
not being treated due to the lack of a storm water basin at the low point of the
proposed lot. The increase in storm water when Lot 6 is developed will impact
Ardith's ability to develop the southeast corner of her property in the future. The
lack of storm water control off of Lot 6 should be corrected by adding a storm
water basin at the southwest corner of the lot (low point) so that the
improvements to the lot can be drained to this basin and collected prior to
discharge onto the Lawson property.
d) The normal design standards require controlled release at the predevelopment
rate up to the 25 year event and that is what is being proposed by the
developer — although, as mentioned above in item 'a', only for areas within the
proposed subdivision, Due to the slopes involved and the sensitivity of the
downstream site to erosion and peak flows, control of more significant events
(50 or 100 year) should be considered to lessen the impacts on downstream
land owners (Lawson & Atterbury). We request that the Town Board require the
developer to control water for 50 year storm events or greater. We believe if
basins are increase in size this may also help control the spring floods as snow
melts and spring rains occur when the ground is still frozen.
e) The location of the north storm water management basin (along Street A) is
located in a position where it will have minimal impact on the area it is designed
to control and treat the runoff. It should be located close to the downstream end
of the drainage area not in the center where it is currently located on the
Proposed Preliminary Plat.
f) The proposed discharges to the Lawson property should be in the same general
locations as the existing condition and serve approximately the same area. The
attached document shows the three general areas of discharge onto the
Lawson property. If a discharge point serves a larger area than existing —
which is what is proposed with the north basin location along Street A, existing
grades within the development area should be modified so that runoff is
directed to the basin. We do not believe that the north storm water basin will
collect and discharge the area that it is designed to accommodate without
significant modifications to the existing grades on lots 1, 2, 3, & 6.
Page 26 of 28
Page 3 of 4 | January 20, 2015
g) The town should in the developers agreement limit development on the lots
to the impervious areas used in the calculations or require additional
detention/treatment.
h) Street ditches should be designed to maintain and properly contain storm water
run-off.
In the Town Board's review of this Preliminary Plat we request that the Board
consider adding more stringent storm water requirements to this Plat than what is
required by Town ordinance or Dane County — ideally, requiring storm water
retention/detention areas that do not allow water to migrate out of the basins. We
also request that the development proposer further analyze storm water discharge
from not only the proposed development Plat area, but also from adjoining existing
properties that shed storm water onto the Plat in assessing, locating, sizing and
designing the storm water management areas within this Plat and require that soil
testing be provided prior to approval of the final plat to confirm that infiltration of
water can be accomplished in the location of the proposed storm water
management locations. If done right, the storm water runoff for the development
can be managed and directed to appropriately placed storm water management
reas to contain and infiltrate the storm water.
2. That the northern end of proposed Street "B" be shifted to the east to
intersect Street "A' away from the entrance to the Lawson property. The
Lawson's area very concerned with vehicular traffic if their driveway off of Street
"A" is at the intersection of Street "A" and "B" and would prefer a solution where
the driveway is not at this intersection.
3. That the extension of proposed Street "A" along the northern edge of Lot 12
not be constructed at this time and that Street "A" flow onto Street "B"
without the need for a cul-de-sac where the two streets intersect. This request
has many benefits including a significant reduction in additional street length (over
360 feet) and the amount of impervious surface being added in the area of the
Plat. This street extension, if constructed, will only increase the storm water within
the development without benefit to any lot proposed within the development and
with really no use at this time. We do request that if Street "A" is not extended that
the proposed storm water management area in Lot 12 be sized and constructed
appropriately to handle the storm water from any future extension of Street "A"
along the northern boundary of Lot 12.
4. That a home owner's association be required to maintain all storm water
management areas within the Plat on an annual basis. Vierbicher's letter dated
December 30, 2014, Item 30 under Preliminary Plat indicates that `stormwater
management facilities are to be maintained by either lot owners or a private
homeowner's association'. In this case, with the significant storm water issues
Page 27 of 28
Page 4 of 4 | January 20, 2015
prevalent surrounding the Plat area, we believe that a homeowner's association
would be more dependable in hiring appropriate contractor(s) to annually maintain
and remove sediment that will collect within the storm water management facilities
to ensure there proper functioning over time.
5. That a fence be installed between the Karl's Plat along the eastern and
southern boundaries of Ardith Lawson's property.
Page 28 of 28
1158
1160
1165
1170
1175
1180
1185
1190
1195
1200
1158
1160
1165
1170
1175
1180
1185
1190
1195
1200
9+75 10+00
1201.03
1201.03
1200.21
1200.03
1199.16
1199.03
1197.65
1197.91
11+00
1196.16
1196.56
1194.40
1194.97
1192.62
1193.15
1190.65
1191.22
12+00
1188.82
1189.28
1187.03
1187.34
1184.86
1185.40
1182.62
1183.47
13+00
1180.61
1181.53
1178.57
1179.59
1176.62
1177.65
1175.64
1175.84
14+00
1174.02
1174.25
1172.12
1172.88
1171.19
1171.73
1169.98
1170.80
15+00
1168.49
1170.07
1168.06
1169.37
1167.39
1168.67
15+75
1166.06
1167.97
-
7
.7
5
%
-4
.0
0
%
GRADE BREAK STA = 10+00.00
ELEV = 1201.03
K:28.28
LVC:140.00
PVI STA = 14+18.46
PVI ELEV = 1172.35
LP STA = 14+88.46
LP ELEV = 1170.39
PV
C S
TA
=
13+
48.46
PV
C E
LV
=
1177.77
PV
T S
TA
=
14+
88.46
PV
T E
LV
=
1170.39
K:26.67
LVC:100.00
PVI STA = 11+00.10
PVI ELEV = 1197.02
HP STA = 10+50.10
HP ELEV = 1199.02
PV
C S
TA
=
10+
50.10
PV
C E
LV
=
1199.02
PV
T S
TA
=
11+
50.10
PV
T E
LV
=
1193.15
1
0
+
0
0
1
1
+
0
0
12+
00
1
3
+
0
0
14+
00
1
5
+
0
0
1
6
+
0
0
22'
22'
22'
0 20' 40'
PROPOSED CL
EXISTING CL
BIORETENTION BASIN
EXISTING CULVERT
3' SHOULDER (TYP.)
"A
S
T
R
E
E
T
"
REMOVE EXISTING DRIVEWAY
AND RECONNECT TO "A
STREET" AS SHOWN ON PAGE 4
1140
1145
1150
1155
1160
1165
1170
1175
1180
1140
1145
1150
1155
1160
1165
1170
1175
1180
15+50
1167.39
1168.67
1166.06
1167.97
16+00
1166.02
1167.27
1165.96
1166.57
1165.17
1165.87
1164.18
1165.17
17+00
1164.05
1164.47
1164.03
1163.77
1164.01
1163.07
1163.02
1162.37
18+00
1162.63
1161.67
1162.07
1160.97
1161.99
1160.27
1161.38
1159.57
19+00
1159.90
1158.87
1158.05
1158.17
1157.35
1157.47
1155.95
1156.77
20+00
1154.41
1156.07
1153.35
1155.37
1152.93
1154.67
1151.99
1153.97
21+00
1152.54
1153.27
1152.40
1152.57
21+50
1152.47
1151.87
-2.8
0%
22'
2
1
+
9
6
16+
00
17+
00
18+
00
19+
00
2
0
+
0
0
2
1
+
0
0
CL-CL
21+96.16
20+75.15
22'
22'
0 20' 40'
PROPOSED CL
EXISTING CL
BIORETENTION BASIN
CB #3
RIM=1168.00
I.E.=1164.00
19' - 36" STORM SEWER @ 0.5%
36" ENDWALL
I.E.=1163.90
EXISTING DRIVEWAY TO BE
REMOVED AND RECONNECTED
TO "A STREET"
18" CULVERT
3' SHOULDER (TYP.)
"A
ST
RE
ET
"
"
B
S
T
R
E
E
T
"
NEW
DRIVEWAY
1130
1135
1140
1145
1150
1155
1160
1165
1170
1130
1135
1140
1145
1150
1155
1160
1165
1170
21+25
1152.40
1152.57
1152.47
1151.87
1151.92
1151.17
22+00
1151.58
1150.47
1150.45
1149.77
1148.17
1149.07
1147.01
1148.37
23+00
1146.00
1147.67
1146.36
1146.97
1147.32
1146.27
1148.16
1145.57
24+00
1150.12
1144.87
1153.64
1144.17
1156.05
1143.47
1155.56
1142.77
25+00
1152.70
1142.07
1149.38
1141.37
1145.97
1140.67
1143.84
1139.97
26+00
1141.77
1139.27
1140.40
1138.57
1139.26
1137.87
1138.24
1137.17
27+00
1137.53
1136.47
27+25
1136.89
1135.77
-2.8
0%
GR
AD
E B
RE
AK
S
TA
=
24+
80.13
ELE
V =
1142.62
22+
00
23+
00
24+
00
25+
00
26+
00
27+
00
22'
0 20' 40'
PROPOSED CL
EXISTING CL
CB # 2
RIM=1150.00
I.E.=1146.00
BIORETENTION BASIN
10' - 24" STORM SEWER @ 0.5%
24" ENDWALL
I.E.=1145.90
22'
22'
3' SHOULDER (TYP.)
"A
ST
RE
ET
"
24" CULVERT
10+
00
11+
00
12+
00
13+
00
14+
00
15+
00
16+
00
EXISITING DRIVEWAY TO BE REMOVED
1150
1155
1160
1165
1170
1175
1180
1185
1190
1150
1155
1160
1165
1170
1175
1180
1185
1190
10+00
1188.81
1187.74
1190.81
1186.88
1189.17
1185.82
11+00
1186.83
1184.48
1184.97
1182.82
1182.80
1180.85
1179.37
1178.57
12+00
1175.25
1176.08
1172.11
1173.58
1168.84
1171.08
1166.34
1168.58
13+00
1163.85
1166.09
1161.58
1163.80
1159.65
1161.75
1158.13
1159.94
14+00
1157.25
1158.38
1156.43
1157.06
1155.96
1155.98
1155.82
1155.15
15+00
1155.85
1154.57
1156.00
1154.22
1156.74
1154.12
1157.04
1154.27
16+00
1157.93
1154.65
-2.0
0%
-4
.0
0
%
-
1
0
.
0
0
%
GRADE BREAK STA = 10+11.96
ELEV = 1188.00
GRADE BREAK STA = 10+31.96
ELEV = 1187.60
K:25.63
LVC:425.00
PVI STA = 15+03.90
PVI ELEV = 1145.69
LP STA = 15+47.75
LP ELEV = 1154.12
PV
C S
TA
=
12+
91.40
PV
C E
LV
=
1166.94
K:20.00
LVC:120.00
PVI STA = 11+20.00
PVI ELEV = 1184.08
HP STA = 10+60.00
HP ELEV = 1186.48
PV
C S
TA
=
10+
60.00
PV
C E
LV
=
1186.48
PV
T S
TA
=
11+
80.00
PV
T E
LV
=
1178.08
0 20' 40'
PROPOSED CL
EXISTING CL
3' SHOULDER (TYP.)
"B STREET"
18" CULVERT
16+
00
17+
00
18+
00
1
9
+
0
0
2
0
+
0
0
2
1
+
0
0
2
1
+
9
6
20+00
2
1
+
0
0
C
L
-
C
L
2
1
+
9
6
.
1
6
2
0
+
7
5
.
1
5
1150
1155
1160
1165
1170
1175
1180
1185
1190
1150
1155
1160
1165
1170
1175
1180
1185
1190
2.0
0%
6
.5
8
%
-3.31%
16+00
1157.93
1154.65
1158.86
1155.28
1159.92
1156.16
1161.58
1157.28
17+00
1163.89
1158.64
1167.01
1160.23
1169.40
1161.84
1169.97
1163.18
18+00
1170.00
1164.21
1169.95
1164.93
1168.68
1165.34
1167.08
1165.44
19+00
1166.25
1165.24
1165.40
1164.72
1163.59
1163.93
1161.94
1163.10
20+00
1160.20
1162.28
1161.05
1161.45
1162.00
1160.62
1162.01
1159.79
21+00
1161.64
1158.96
1159.57
1158.13
1157.16
1157.30
1154.62
1156.48
22+00
GR
AD
E B
RE
AK
S
TA
=
21+
76.14
ELE
V =
1156.44
GR
AD
E B
RE
AK
S
TA
=
21+
96.14
ELE
V =
1156.84
K:25.63
LVC:425.00
PVI STA = 15+03.90
PVI ELEV = 1145.69
LP STA = 15+47.75
LP ELEV = 1154.12
PV
T S
TA
=
17+
16.40
PV
T E
LV
=
1159.67
K:20.22
LVC:200.00
PVI STA = 18+37.75
PVI ELEV = 1167.65
HP STA = 18+70.75
HP ELEV = 1165.45
PV
C S
TA
=
17+
37.75
PV
C E
LV
=
1161.07
PV
T S
TA
=
19+
37.75
PV
T E
LV
=
1164.34
0 20' 40'
PROPOSED CL
EXISTING CL
3' SHOULDER (TYP.)
"
B
S
T
R
E
E
T
"
18" CULVERT
REMOVE EXISTING DRIVEWAY AND
RECONNECT WITH "A STREET" AS
SHOWN ON PAGE 4
1S
Ex N
2S
Ex S
3S
Pro N
4S
Pro S
10S
Pro Mid
6P
N Pond
9P
S Pond
11P
Mid Pond
14L
Total
Routing Diagram for Storm WaterPrepared by Hewlett-Packard Company, Printed 11/12/2014
HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 2HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 5.92 cfs @ 12.10 hrs, Volume= 0.539 af, Depth= 0.36"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 1yr 24hr Rainfall=2.50"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 3HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 1.85 cfs @ 12.15 hrs, Volume= 0.203 af, Depth= 0.33"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 1yr 24hr Rainfall=2.50"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 4HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 7.41 cfs @ 12.09 hrs, Volume= 0.538 af, Depth= 0.57"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 1yr 24hr Rainfall=2.50"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 5HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 5.83 cfs @ 12.10 hrs, Volume= 0.434 af, Depth= 0.57"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 1yr 24hr Rainfall=2.50"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 6HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 2.75 cfs @ 12.07 hrs, Volume= 0.191 af, Depth= 0.57"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 1yr 24hr Rainfall=2.50"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 7HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 0.57" for 1yr 24hr eventInflow = 7.41 cfs @ 12.09 hrs, Volume= 0.538 afOutflow = 1.21 cfs @ 12.67 hrs, Volume= 0.355 af, Atten= 84%, Lag= 34.8 minPrimary = 1.21 cfs @ 12.67 hrs, Volume= 0.355 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,168.13' @ 12.67 hrs Surf.Area= 8,873 sf Storage= 9,133 cf
Plug-Flow detention time= 235.0 min calculated for 0.355 af (66% of inflow)Center-of-Mass det. time= 107.5 min ( 996.5 - 889.0 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=1.21 cfs @ 12.67 hrs HW=1,168.13' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 1.21 cfs of 40.11 cfs potential flow)
2=Orifice/Grate (Weir Controls 1.21 cfs @ 1.18 fps)
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 8HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 0.57" for 1yr 24hr eventInflow = 5.83 cfs @ 12.10 hrs, Volume= 0.434 afOutflow = 0.22 cfs @ 17.91 hrs, Volume= 0.209 af, Atten= 96%, Lag= 348.6 minPrimary = 0.22 cfs @ 17.91 hrs, Volume= 0.209 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,144.54' @ 17.91 hrs Surf.Area= 0 sf Storage= 12,680 cf
Plug-Flow detention time= 572.4 min calculated for 0.209 af (48% of inflow)Center-of-Mass det. time= 418.9 min ( 1,308.4 - 889.6 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=0.22 cfs @ 17.91 hrs HW=1,144.54' (Free Discharge)1=Culvert (Passes 0.22 cfs of 27.44 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)3=Orifice/Grate (Orifice Controls 0.22 cfs @ 1.84 fps)
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 9HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 0.57" for 1yr 24hr eventInflow = 2.75 cfs @ 12.07 hrs, Volume= 0.191 afOutflow = 0.49 cfs @ 12.58 hrs, Volume= 0.125 af, Atten= 82%, Lag= 30.1 minPrimary = 0.49 cfs @ 12.58 hrs, Volume= 0.125 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.08' @ 12.58 hrs Surf.Area= 3,370 sf Storage= 3,175 cf
Plug-Flow detention time= 229.9 min calculated for 0.125 af (65% of inflow)Center-of-Mass det. time= 101.1 min ( 989.1 - 888.0 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=0.49 cfs @ 12.58 hrs HW=1,150.08' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 0.49 cfs of 26.56 cfs potential flow)
2=Orifice/Grate (Weir Controls 0.49 cfs @ 0.94 fps)
Type II 24-hr 1yr 24hr Rainfall=2.50"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 10HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 0.37" for 1yr 24hr eventInflow = 1.68 cfs @ 12.64 hrs, Volume= 0.479 afPrimary = 1.68 cfs @ 12.64 hrs, Volume= 0.479 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 11HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 10.30 cfs @ 12.10 hrs, Volume= 0.810 af, Depth= 0.54"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 2yr 24hr Rainfall=2.90"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 12HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 3.38 cfs @ 12.13 hrs, Volume= 0.310 af, Depth= 0.50"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 2yr 24hr Rainfall=2.90"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 13HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 10.96 cfs @ 12.08 hrs, Volume= 0.755 af, Depth= 0.80"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 2yr 24hr Rainfall=2.90"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 14HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 8.64 cfs @ 12.09 hrs, Volume= 0.609 af, Depth= 0.80"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 2yr 24hr Rainfall=2.90"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 15HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 4.06 cfs @ 12.07 hrs, Volume= 0.268 af, Depth= 0.80"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 2yr 24hr Rainfall=2.90"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 16HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 0.80" for 2yr 24hr eventInflow = 10.96 cfs @ 12.08 hrs, Volume= 0.755 afOutflow = 3.89 cfs @ 12.32 hrs, Volume= 0.572 af, Atten= 64%, Lag= 14.3 minPrimary = 3.89 cfs @ 12.32 hrs, Volume= 0.572 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,168.28' @ 12.32 hrs Surf.Area= 9,101 sf Storage= 10,517 cf
Plug-Flow detention time= 170.5 min calculated for 0.572 af (76% of inflow)Center-of-Mass det. time= 69.4 min ( 946.6 - 877.2 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=3.89 cfs @ 12.32 hrs HW=1,168.28' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 3.89 cfs of 41.17 cfs potential flow)
2=Orifice/Grate (Weir Controls 3.89 cfs @ 1.74 fps)
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 17HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 0.80" for 2yr 24hr eventInflow = 8.64 cfs @ 12.09 hrs, Volume= 0.609 afOutflow = 0.45 cfs @ 15.03 hrs, Volume= 0.384 af, Atten= 95%, Lag= 176.3 minPrimary = 0.45 cfs @ 15.03 hrs, Volume= 0.384 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,144.72' @ 15.03 hrs Surf.Area= 0 sf Storage= 14,736 cf
Plug-Flow detention time= 431.0 min calculated for 0.384 af (63% of inflow)Center-of-Mass det. time= 302.3 min ( 1,180.0 - 877.7 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=0.45 cfs @ 15.03 hrs HW=1,144.72' (Free Discharge)1=Culvert (Passes 0.45 cfs of 28.19 cfs potential flow)
2=Orifice/Grate ( Controls 0.00 cfs)3=Orifice/Grate (Orifice Controls 0.45 cfs @ 2.34 fps)
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 18HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 0.80" for 2yr 24hr eventInflow = 4.06 cfs @ 12.07 hrs, Volume= 0.268 afOutflow = 1.74 cfs @ 12.25 hrs, Volume= 0.202 af, Atten= 57%, Lag= 10.9 minPrimary = 1.74 cfs @ 12.25 hrs, Volume= 0.202 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.19' @ 12.25 hrs Surf.Area= 3,467 sf Storage= 3,551 cf
Plug-Flow detention time= 165.9 min calculated for 0.202 af (75% of inflow)Center-of-Mass det. time= 63.3 min ( 939.5 - 876.2 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=1.74 cfs @ 12.25 hrs HW=1,150.19' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 1.74 cfs of 27.03 cfs potential flow)
2=Orifice/Grate (Weir Controls 1.74 cfs @ 1.44 fps)
Type II 24-hr 2yr 24hr Rainfall=2.90"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 19HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 0.60" for 2yr 24hr eventInflow = 5.49 cfs @ 12.30 hrs, Volume= 0.774 afPrimary = 5.49 cfs @ 12.30 hrs, Volume= 0.774 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 20HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 19.46 cfs @ 12.09 hrs, Volume= 1.371 af, Depth= 0.91"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 5yr 24hr Rainfall=3.60"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 21HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 6.69 cfs @ 12.12 hrs, Volume= 0.532 af, Depth= 0.86"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 5yr 24hr Rainfall=3.60"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 22HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 17.93 cfs @ 12.08 hrs, Volume= 1.183 af, Depth= 1.25"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 5yr 24hr Rainfall=3.60"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 23HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 14.14 cfs @ 12.09 hrs, Volume= 0.953 af, Depth= 1.25"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 5yr 24hr Rainfall=3.60"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 24HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 6.63 cfs @ 12.07 hrs, Volume= 0.420 af, Depth= 1.25"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 5yr 24hr Rainfall=3.60"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 25HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 1.25" for 5yr 24hr eventInflow = 17.93 cfs @ 12.08 hrs, Volume= 1.183 afOutflow = 11.70 cfs @ 12.20 hrs, Volume= 0.999 af, Atten= 35%, Lag= 7.2 minPrimary = 11.70 cfs @ 12.20 hrs, Volume= 0.999 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,168.59' @ 12.20 hrs Surf.Area= 9,556 sf Storage= 13,389 cf
Plug-Flow detention time= 115.4 min calculated for 0.999 af (84% of inflow)Center-of-Mass det. time= 42.8 min ( 905.7 - 862.9 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=11.69 cfs @ 12.20 hrs HW=1,168.59' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 11.69 cfs of 43.21 cfs potential flow)
2=Orifice/Grate (Weir Controls 11.69 cfs @ 2.52 fps)
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 26HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 1.25" for 5yr 24hr eventInflow = 14.14 cfs @ 12.09 hrs, Volume= 0.953 afOutflow = 2.79 cfs @ 12.52 hrs, Volume= 0.728 af, Atten= 80%, Lag= 26.1 minPrimary = 2.79 cfs @ 12.52 hrs, Volume= 0.728 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,144.97' @ 12.52 hrs Surf.Area= 0 sf Storage= 17,554 cf
Plug-Flow detention time= 288.1 min calculated for 0.728 af (76% of inflow)Center-of-Mass det. time= 191.1 min ( 1,054.5 - 863.4 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=2.79 cfs @ 12.52 hrs HW=1,144.97' (Free Discharge)1=Culvert (Passes 2.79 cfs of 29.18 cfs potential flow)
2=Orifice/Grate (Weir Controls 2.14 cfs @ 1.54 fps)3=Orifice/Grate (Orifice Controls 0.65 cfs @ 3.31 fps)
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 27HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 1.25" for 5yr 24hr eventInflow = 6.63 cfs @ 12.07 hrs, Volume= 0.420 afOutflow = 5.17 cfs @ 12.15 hrs, Volume= 0.353 af, Atten= 22%, Lag= 4.8 minPrimary = 5.17 cfs @ 12.15 hrs, Volume= 0.353 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.40' @ 12.15 hrs Surf.Area= 3,650 sf Storage= 4,283 cf
Plug-Flow detention time= 111.1 min calculated for 0.353 af (84% of inflow)Center-of-Mass det. time= 37.5 min ( 899.3 - 861.8 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=5.17 cfs @ 12.15 hrs HW=1,150.40' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 5.17 cfs of 27.89 cfs potential flow)
2=Orifice/Grate (Weir Controls 5.17 cfs @ 2.06 fps)
Type II 24-hr 5yr 24hr Rainfall=3.60"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 28HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 1.05" for 5yr 24hr eventInflow = 16.52 cfs @ 12.18 hrs, Volume= 1.353 afPrimary = 16.52 cfs @ 12.18 hrs, Volume= 1.353 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 29HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 28.43 cfs @ 12.08 hrs, Volume= 1.919 af, Depth= 1.27"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 10yr 24hr Rainfall=4.20"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 30HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 9.97 cfs @ 12.12 hrs, Volume= 0.752 af, Depth= 1.21"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 10yr 24hr Rainfall=4.20"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 31HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 24.46 cfs @ 12.07 hrs, Volume= 1.586 af, Depth= 1.67"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 10yr 24hr Rainfall=4.20"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 32HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 19.29 cfs @ 12.08 hrs, Volume= 1.278 af, Depth= 1.67"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 10yr 24hr Rainfall=4.20"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 33HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 9.02 cfs @ 12.07 hrs, Volume= 0.563 af, Depth= 1.67"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 10yr 24hr Rainfall=4.20"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 34HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 1.67" for 10yr 24hr eventInflow = 24.46 cfs @ 12.07 hrs, Volume= 1.586 afOutflow = 19.14 cfs @ 12.16 hrs, Volume= 1.403 af, Atten= 22%, Lag= 5.2 minPrimary = 19.14 cfs @ 12.16 hrs, Volume= 1.403 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,168.82' @ 12.16 hrs Surf.Area= 9,896 sf Storage= 15,624 cf
Plug-Flow detention time= 90.6 min calculated for 1.403 af (88% of inflow)Center-of-Mass det. time= 33.0 min ( 887.0 - 854.0 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=19.13 cfs @ 12.16 hrs HW=1,168.82' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 19.13 cfs of 44.67 cfs potential flow)
2=Orifice/Grate (Weir Controls 19.13 cfs @ 2.96 fps)
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 35HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 1.67" for 10yr 24hr eventInflow = 19.29 cfs @ 12.08 hrs, Volume= 1.278 afOutflow = 7.47 cfs @ 12.30 hrs, Volume= 1.053 af, Atten= 61%, Lag= 13.1 minPrimary = 7.47 cfs @ 12.30 hrs, Volume= 1.053 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,145.22' @ 12.30 hrs Surf.Area= 0 sf Storage= 20,402 cf
Plug-Flow detention time= 222.3 min calculated for 1.053 af (82% of inflow)Center-of-Mass det. time= 143.2 min ( 997.8 - 854.6 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=7.47 cfs @ 12.30 hrs HW=1,145.22' (Free Discharge)1=Culvert (Passes 7.47 cfs of 30.15 cfs potential flow)
2=Orifice/Grate (Weir Controls 6.67 cfs @ 2.25 fps)3=Orifice/Grate (Orifice Controls 0.80 cfs @ 4.09 fps)
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 36HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 1.67" for 10yr 24hr eventInflow = 9.02 cfs @ 12.07 hrs, Volume= 0.563 afOutflow = 8.05 cfs @ 12.12 hrs, Volume= 0.497 af, Atten= 11%, Lag= 3.1 minPrimary = 8.05 cfs @ 12.12 hrs, Volume= 0.497 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.54' @ 12.12 hrs Surf.Area= 3,771 sf Storage= 4,789 cf
Plug-Flow detention time= 86.6 min calculated for 0.496 af (88% of inflow)Center-of-Mass det. time= 28.2 min ( 881.2 - 853.0 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=8.04 cfs @ 12.12 hrs HW=1,150.53' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 8.04 cfs of 28.44 cfs potential flow)
2=Orifice/Grate (Weir Controls 8.04 cfs @ 2.39 fps)
Type II 24-hr 10yr 24hr Rainfall=4.20"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 37HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 1.48" for 10yr 24hr eventInflow = 26.77 cfs @ 12.15 hrs, Volume= 1.899 afPrimary = 26.77 cfs @ 12.15 hrs, Volume= 1.899 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 38HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 38.15 cfs @ 12.08 hrs, Volume= 2.517 af, Depth= 1.67"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 25yr 24hr Rainfall=4.80"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 39HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 13.54 cfs @ 12.12 hrs, Volume= 0.992 af, Depth= 1.59"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 25yr 24hr Rainfall=4.80"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 40HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 31.34 cfs @ 12.07 hrs, Volume= 2.015 af, Depth= 2.12"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 25yr 24hr Rainfall=4.80"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 41HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 24.71 cfs @ 12.08 hrs, Volume= 1.624 af, Depth= 2.12"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 25yr 24hr Rainfall=4.80"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 42HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 11.54 cfs @ 12.06 hrs, Volume= 0.715 af, Depth= 2.12"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 25yr 24hr Rainfall=4.80"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 43HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 2.12" for 25yr 24hr eventInflow = 31.34 cfs @ 12.07 hrs, Volume= 2.015 afOutflow = 24.37 cfs @ 12.16 hrs, Volume= 1.832 af, Atten= 22%, Lag= 5.3 minPrimary = 24.37 cfs @ 12.16 hrs, Volume= 1.832 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,169.06' @ 12.16 hrs Surf.Area= 10,260 sf Storage= 18,053 cf
Plug-Flow detention time= 74.9 min calculated for 1.831 af (91% of inflow)Center-of-Mass det. time= 27.7 min ( 874.7 - 847.0 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=24.37 cfs @ 12.16 hrs HW=1,169.06' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 24.37 cfs of 46.15 cfs potential flow)
2=Orifice/Grate (Orifice Controls 24.37 cfs @ 4.96 fps)
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 44HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 2.12" for 25yr 24hr eventInflow = 24.71 cfs @ 12.08 hrs, Volume= 1.624 afOutflow = 13.13 cfs @ 12.24 hrs, Volume= 1.398 af, Atten= 47%, Lag= 9.5 minPrimary = 13.13 cfs @ 12.24 hrs, Volume= 1.398 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,145.46' @ 12.24 hrs Surf.Area= 0 sf Storage= 23,491 cf
Plug-Flow detention time= 181.4 min calculated for 1.398 af (86% of inflow)Center-of-Mass det. time= 115.2 min ( 962.8 - 847.6 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=13.12 cfs @ 12.24 hrs HW=1,145.46' (Free Discharge)1=Culvert (Passes 13.12 cfs of 31.02 cfs potential flow)
2=Orifice/Grate (Weir Controls 12.20 cfs @ 2.75 fps)3=Orifice/Grate (Orifice Controls 0.92 cfs @ 4.71 fps)
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 45HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 2.12" for 25yr 24hr eventInflow = 11.54 cfs @ 12.06 hrs, Volume= 0.715 afOutflow = 10.72 cfs @ 12.10 hrs, Volume= 0.649 af, Atten= 7%, Lag= 2.5 minPrimary = 10.72 cfs @ 12.10 hrs, Volume= 0.649 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.65' @ 12.10 hrs Surf.Area= 3,871 sf Storage= 5,220 cf
Plug-Flow detention time= 71.3 min calculated for 0.649 af (91% of inflow)Center-of-Mass det. time= 23.2 min ( 869.3 - 846.0 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=10.71 cfs @ 12.10 hrs HW=1,150.65' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 10.71 cfs of 28.89 cfs potential flow)
2=Orifice/Grate (Weir Controls 10.71 cfs @ 2.63 fps)
Type II 24-hr 25yr 24hr Rainfall=4.80"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 46HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 1.93" for 25yr 24hr eventInflow = 34.60 cfs @ 12.13 hrs, Volume= 2.480 afPrimary = 34.60 cfs @ 12.13 hrs, Volume= 2.480 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 47HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 46.75 cfs @ 12.07 hrs, Volume= 3.046 af, Depth= 2.01"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 50yr 24hr Rainfall=5.30"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 48HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 16.67 cfs @ 12.11 hrs, Volume= 1.205 af, Depth= 1.94"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 50yr 24hr Rainfall=5.30"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 49HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 37.26 cfs @ 12.07 hrs, Volume= 2.388 af, Depth= 2.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 50yr 24hr Rainfall=5.30"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 50HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 29.39 cfs @ 12.08 hrs, Volume= 1.924 af, Depth= 2.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 50yr 24hr Rainfall=5.30"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 51HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 13.71 cfs @ 12.06 hrs, Volume= 0.848 af, Depth= 2.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 50yr 24hr Rainfall=5.30"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 52HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 2.52" for 50yr 24hr eventInflow = 37.26 cfs @ 12.07 hrs, Volume= 2.388 afOutflow = 27.31 cfs @ 12.17 hrs, Volume= 2.204 af, Atten= 27%, Lag= 5.9 minPrimary = 27.31 cfs @ 12.17 hrs, Volume= 2.204 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,169.34' @ 12.17 hrs Surf.Area= 10,691 sf Storage= 20,908 cf
Plug-Flow detention time= 66.2 min calculated for 2.204 af (92% of inflow)Center-of-Mass det. time= 25.2 min ( 867.3 - 842.1 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=27.31 cfs @ 12.17 hrs HW=1,169.34' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 27.31 cfs of 47.77 cfs potential flow)
2=Orifice/Grate (Orifice Controls 27.31 cfs @ 5.56 fps)
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 53HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 2.52" for 50yr 24hr eventInflow = 29.39 cfs @ 12.08 hrs, Volume= 1.924 afOutflow = 15.73 cfs @ 12.23 hrs, Volume= 1.698 af, Atten= 46%, Lag= 9.4 minPrimary = 15.73 cfs @ 12.23 hrs, Volume= 1.698 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,145.69' @ 12.23 hrs Surf.Area= 0 sf Storage= 26,686 cf
Plug-Flow detention time= 157.6 min calculated for 1.698 af (88% of inflow)Center-of-Mass det. time= 100.0 min ( 942.6 - 842.7 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=15.73 cfs @ 12.23 hrs HW=1,145.69' (Free Discharge)1=Culvert (Passes 15.73 cfs of 31.89 cfs potential flow)
2=Orifice/Grate (Orifice Controls 14.70 cfs @ 4.68 fps)3=Orifice/Grate (Orifice Controls 1.03 cfs @ 5.26 fps)
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 54HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 2.52" for 50yr 24hr eventInflow = 13.71 cfs @ 12.06 hrs, Volume= 0.848 afOutflow = 12.89 cfs @ 12.10 hrs, Volume= 0.781 af, Atten= 6%, Lag= 2.3 minPrimary = 12.89 cfs @ 12.10 hrs, Volume= 0.781 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.73' @ 12.10 hrs Surf.Area= 3,946 sf Storage= 5,551 cf
Plug-Flow detention time= 62.7 min calculated for 0.781 af (92% of inflow)Center-of-Mass det. time= 20.7 min ( 861.8 - 841.1 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=12.88 cfs @ 12.10 hrs HW=1,150.73' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 12.88 cfs of 29.22 cfs potential flow)
2=Orifice/Grate (Weir Controls 12.88 cfs @ 2.80 fps)
Type II 24-hr 50yr 24hr Rainfall=5.30"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 55HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 2.32" for 50yr 24hr eventInflow = 39.36 cfs @ 12.13 hrs, Volume= 2.986 afPrimary = 39.36 cfs @ 12.13 hrs, Volume= 2.986 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 56HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex N
Runoff = 59.28 cfs @ 12.07 hrs, Volume= 3.825 af, Depth= 2.53"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 100yr 24hr Rainfall=6.00"
Area (ac) CN Description* 17.570 66* 0.340 98 Ex Impervious* 0.230 98 Ex Impervious
18.140 67 Weighted Average17.570 96.86% Pervious Area0.570 3.14% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 57HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex S
Runoff = 21.30 cfs @ 12.11 hrs, Volume= 1.519 af, Depth= 2.44"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 100yr 24hr Rainfall=6.00"
Area (ac) CN Description* 7.360 66* 0.110 98
7.470 66 Weighted Average7.360 98.53% Pervious Area0.110 1.47% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
7.4 150 0.2667 0.34 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
17.8 800 Total
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 58HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Pro N
Runoff = 45.79 cfs @ 12.07 hrs, Volume= 2.929 af, Depth= 3.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 100yr 24hr Rainfall=6.00"
Area (ac) CN Description* 9.560 68* 1.820 98 16% Impervious
11.380 73 Weighted Average9.560 84.01% Pervious Area1.820 15.99% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.7 300 0.1625 0.47 Sheet Flow, Sheet
Grass: Short n= 0.150 P2= 2.90"4.2 350 0.0769 1.39 Shallow Concentrated Flow, Shallow
Woodland Kv= 5.0 fps14.9 650 Total
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 59HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 4S: Pro S
Runoff = 36.13 cfs @ 12.08 hrs, Volume= 2.360 af, Depth= 3.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 100yr 24hr Rainfall=6.00"
Area (ac) CN Description* 7.700 68* 1.470 98 16% Impervious
9.170 73 Weighted Average7.700 83.97% Pervious Area1.470 16.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 150 0.2667 0.49 Sheet Flow, SheetGrass: Short n= 0.150 P2= 2.90"
10.4 650 0.0431 1.04 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
15.5 800 Total
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 60HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pro Mid
Runoff = 16.83 cfs @ 12.06 hrs, Volume= 1.040 af, Depth= 3.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsType II 24-hr 100yr 24hr Rainfall=6.00"
Area (ac) CN Description* 3.390 68* 0.650 98 16% Impervious
4.040 73 Weighted Average3.390 83.91% Pervious Area0.650 16.09% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
4.1 230 0.0348 0.93 Shallow Concentrated Flow, ShallowWoodland Kv= 5.0 fps
9.7 770 0.0078 1.32 Shallow Concentrated Flow, DitchGrassed Waterway Kv= 15.0 fps
13.8 1,000 Total
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 61HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 6P: N Pond
Inflow Area = 11.380 ac, 15.99% Impervious, Inflow Depth = 3.09" for 100yr 24hr eventInflow = 45.79 cfs @ 12.07 hrs, Volume= 2.929 afOutflow = 31.29 cfs @ 12.18 hrs, Volume= 2.746 af, Atten= 32%, Lag= 6.6 minPrimary = 31.29 cfs @ 12.18 hrs, Volume= 2.746 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,169.75' @ 12.18 hrs Surf.Area= 11,349 sf Storage= 25,500 cf
Plug-Flow detention time= 57.7 min calculated for 2.745 af (94% of inflow)Center-of-Mass det. time= 23.3 min ( 859.5 - 836.3 )
Volume Invert Avail.Storage Storage Description#1 1,167.00' 28,361 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,167.00 7,300 0 01,168.00 8,680 7,990 7,9901,169.00 10,160 9,420 17,4101,170.00 11,741 10,951 28,361
Device Routing Invert Outlet Devices#1 Primary 1,164.00' 30.0" Round Culvert
L= 19.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,164.00' / 1,163.90' S= 0.0053 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf
#2 Device 1 1,168.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=31.28 cfs @ 12.18 hrs HW=1,169.75' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 31.28 cfs of 50.15 cfs potential flow)
2=Orifice/Grate (Orifice Controls 31.28 cfs @ 6.37 fps)
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 62HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 9P: S Pond
Inflow Area = 9.170 ac, 16.03% Impervious, Inflow Depth = 3.09" for 100yr 24hr eventInflow = 36.13 cfs @ 12.08 hrs, Volume= 2.360 afOutflow = 18.79 cfs @ 12.24 hrs, Volume= 2.134 af, Atten= 48%, Lag= 9.7 minPrimary = 18.79 cfs @ 12.24 hrs, Volume= 2.134 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,146.10' @ 12.24 hrs Surf.Area= 0 sf Storage= 32,157 cf
Plug-Flow detention time= 134.0 min calculated for 2.134 af (90% of inflow)Center-of-Mass det. time= 85.0 min ( 921.9 - 836.8 )
Volume Invert Avail.Storage Storage Description#1 1,143.25' 34,144 cf Custom Stage Data Listed below
Elevation Cum.Store(feet) (cubic-feet)
1,143.25 01,144.25 9,3681,145.25 20,7171,146.25 34,144
Device Routing Invert Outlet Devices#1 Primary 1,140.25' 24.0" Round Culvert
L= 45.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,140.25' / 1,140.00' S= 0.0056 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,144.75' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 1,144.25' 6.0" Vert. Orifice/Grate C= 0.600
Primary OutFlow Max=18.78 cfs @ 12.24 hrs HW=1,146.10' (Free Discharge)1=Culvert (Passes 18.78 cfs of 33.32 cfs potential flow)
2=Orifice/Grate (Orifice Controls 17.59 cfs @ 5.60 fps)3=Orifice/Grate (Orifice Controls 1.20 cfs @ 6.09 fps)
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 63HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Pond 11P: Mid Pond
Inflow Area = 4.040 ac, 16.09% Impervious, Inflow Depth = 3.09" for 100yr 24hr eventInflow = 16.83 cfs @ 12.06 hrs, Volume= 1.040 afOutflow = 14.59 cfs @ 12.12 hrs, Volume= 0.973 af, Atten= 13%, Lag= 3.6 minPrimary = 14.59 cfs @ 12.12 hrs, Volume= 0.973 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.01 hrsPeak Elev= 1,150.93' @ 12.12 hrs Surf.Area= 4,122 sf Storage= 6,351 cf
Plug-Flow detention time= 53.9 min calculated for 0.973 af (94% of inflow)Center-of-Mass det. time= 18.7 min ( 853.9 - 835.2 )
Volume Invert Avail.Storage Storage Description#1 1,149.00' 6,638 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)
1,149.00 2,500 0 01,150.00 3,296 2,898 2,8981,151.00 4,183 3,740 6,638
Device Routing Invert Outlet Devices#1 Primary 1,146.00' 24.0" Round Culvert
L= 10.0' RCP, end-section conforming to fill, Ke= 0.500 Inlet / Outlet Invert= 1,146.00' / 1,145.90' S= 0.0100 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf
#2 Device 1 1,150.00' 24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads
Primary OutFlow Max=14.59 cfs @ 12.12 hrs HW=1,150.93' TW=0.00' (Dynamic Tailwater)1=Culvert (Passes 14.59 cfs of 29.99 cfs potential flow)
2=Orifice/Grate (Orifice Controls 14.59 cfs @ 4.65 fps)
Type II 24-hr 100yr 24hr Rainfall=6.00"Storm Water Printed 11/12/2014Prepared by Hewlett-Packard Company
Page 64HydroCAD® 10.00 s/n 02063 © 2011 HydroCAD Software Solutions LLC
Summary for Link 14L: Total
Inflow Area = 15.420 ac, 16.02% Impervious, Inflow Depth = 2.89" for 100yr 24hr eventInflow = 45.42 cfs @ 12.15 hrs, Volume= 3.719 afPrimary = 45.42 cfs @ 12.15 hrs, Volume= 3.719 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-48.00 hrs, dt= 0.01 hrs
Drainage Area for Northern basin
11.38 Acres
Existing
27.20 x 0.9 = 24.48” of stay-on required
Proposed
7,300 square foot basin bottom = 26.48” stay-on which exceeds required 24.48” stay-on
Drainage Area for Middle Basin
4.04 Acres
Existing
27.15 x 0.9 = 24.44” of stay-on required
Proposed
8,400 square foot basin bottom = 26.47” stay-on which exceeds required 24.48” stay-on
Drainage Area for Southern Basin
9.17 Acres
Existing
27.07 x 0.9 = 24.36” of stay-on required
Proposed
8,400 square foot basin bottom = 26.95” stay-on which exceeds required 24.36” stay-on
Hydrologic Soil Group—Dane County, Wisconsin(Karls Keewatin Trail)
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
11/5/2014Page 1 of 4
4772
420
4772
510
4772
600
4772
690
4772
780
4772
870
4772
960
4773
050
4772
330
4772
420
4772
510
4772
600
4772
690
4772
780
4772
870
4772
960
4773
050
288820 288910 289000 289090 289180 289270 289360
288820 288910 289000 289090 289180 289270
43° 4' 51'' N89
° 3
5' 3
9'' W
43° 4' 51'' N
89° 3
5' 1
5'' W
43° 4' 27'' N
89° 3
5' 3
9'' W
43° 4' 27'' N
89° 3
5' 1
5'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS840 150 300 600 900
Feet0 50 100 200 300
MetersMap Scale: 1:3,580 if printed on A portrait (8.5" x 11") sheet.
MA
P LE
GEN
DM
AP
INFO
RM
ATI
ON
Are
a of
Inte
rest
(AO
I)A
rea
of In
tere
st (A
OI)
Soils So
il R
atin
g Po
lygo
nsA A
/D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Soil
Rat
ing
Line
sA A
/D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Soil
Rat
ing
Poin
tsA A
/D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Wat
er F
eatu
res
Stre
ams
and
Can
als
Tran
spor
tatio
nR
ails
Inte
rsta
te H
ighw
ays
US
Rou
tes
Maj
or R
oads
Loca
l Roa
ds
Bac
kgro
und A
eria
l Pho
togr
aphy
The
soil
surv
eys
that
com
pris
e yo
ur A
OI w
ere
map
ped
at 1
:15,
800.
War
ning
: Soi
l Map
may
not
be
valid
at t
his
scal
e.
Enl
arge
men
t of m
aps
beyo
nd th
e sc
ale
of m
appi
ng c
an c
ause
mis
unde
rsta
ndin
g of
the
deta
il of
map
ping
and
acc
urac
y of
soi
l lin
epl
acem
ent.
The
map
s do
not
sho
w th
e sm
all a
reas
of c
ontra
stin
gso
ils th
at c
ould
hav
e be
en s
how
n at
a m
ore
deta
iled
scal
e.
Ple
ase
rely
on
the
bar s
cale
on
each
map
she
et fo
r map
mea
sure
men
ts.
Sou
rce
of M
ap:
Nat
ural
Res
ourc
es C
onse
rvat
ion
Ser
vice
Web
Soi
l Sur
vey
UR
L:
http
://w
ebso
ilsur
vey.
nrcs
.usd
a.go
vC
oord
inat
e S
yste
m:
Web
Mer
cato
r (E
PS
G:3
857)
Map
s fro
m th
e W
eb S
oil S
urve
y ar
e ba
sed
on th
e W
eb M
erca
tor
proj
ectio
n, w
hich
pre
serv
es d
irect
ion
and
shap
e bu
t dis
torts
dist
ance
and
are
a. A
pro
ject
ion
that
pre
serv
es a
rea,
suc
h as
the
Alb
ers
equa
l-are
a co
nic
proj
ectio
n, s
houl
d be
use
d if
mor
e ac
cura
teca
lcul
atio
ns o
f dis
tanc
e or
are
a ar
e re
quire
d.
This
pro
duct
is g
ener
ated
from
the
US
DA
-NR
CS
cer
tifie
d da
ta a
s of
the
vers
ion
date
(s) l
iste
d be
low
.
Soi
l Sur
vey
Are
a:
Dan
e C
ount
y, W
isco
nsin
Sur
vey
Are
a D
ata:
V
ersi
on 1
2, S
ep 1
8, 2
014
Soi
l map
uni
ts a
re la
bele
d (a
s sp
ace
allo
ws)
for m
ap s
cale
s 1:
50,0
00or
larg
er.
Dat
e(s)
aer
ial im
ages
wer
e ph
otog
raph
ed:
Apr
29,
201
1—S
ep 1
0,20
11
The
orth
opho
to o
r oth
er b
ase
map
on
whi
ch th
e so
il lin
es w
ere
com
pile
d an
d di
gitiz
ed p
roba
bly
diffe
rs fr
om th
e ba
ckgr
ound
imag
ery
disp
laye
d on
thes
e m
aps.
As
a re
sult,
som
e m
inor
shi
fting
of m
ap u
nit b
ound
arie
s m
ay b
e ev
iden
t.
Hyd
rolo
gic
Soi
l Gro
up—
Dan
e C
ount
y, W
isco
nsin
(Kar
ls K
eew
atin
Tra
il)
Nat
ural
Res
ourc
esC
onse
rvat
ion
Serv
ice
Web
Soi
l Sur
vey
Nat
iona
l Coo
pera
tive
Soi
l Sur
vey
11/5
/201
4P
age
2 of
4
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Dane County, Wisconsin (WI025)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
BbB Batavia silt loam,gravelly substratum, 2to 6 percent slopes
B 10.2 39.2%
DnB Dodge silt loam, 2 to 6percent slopes
B 0.1 0.5%
DrD2 Dresden loam, 12 to 20percent slopes,eroded
B 3.3 12.8%
DrE2 Dresden loam, 20 to 30percent slopes,eroded
B 0.1 0.5%
DsC2 Dresden silt loam, 6 to 12percent slopes,eroded
B 9.0 34.5%
KrD2 Kidder soils, 10 to 20percent slopes,eroded
B 0.3 1.1%
MdC2 McHenry silt loam, 6 to12 percent slopes,eroded
B 0.1 0.3%
MhD2 Military loam, 12 to 20percent slopes,eroded
C 2.5 9.6%
RpE Rodman sandy loam, 12to 35 percent slopes
A 0.4 1.5%
Totals for Area of Interest 26.1 100.0%
Hydrologic Soil Group—Dane County, Wisconsin Karls Keewatin Trail
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
11/5/2014Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils areassigned to one of four groups according to the rate of water infiltration when thesoils are not protected by vegetation, are thoroughly wet, and receive precipitationfrom long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) andthree dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughlywet. These consist mainly of deep, well drained to excessively drained sands orgravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. Theseconsist chiefly of moderately deep or deep, moderately well drained or well drainedsoils that have moderately fine texture to moderately coarse texture. These soilshave a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consistchiefly of soils having a layer that impedes the downward movement of water orsoils of moderately fine texture or fine texture. These soils have a slow rate of watertransmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) whenthoroughly wet. These consist chiefly of clays that have a high shrink-swellpotential, soils that have a high water table, soils that have a claypan or clay layerat or near the surface, and soils that are shallow over nearly impervious material.These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter isfor drained areas and the second is for undrained areas. Only the soils that in theirnatural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Dane County, Wisconsin Karls Keewatin Trail
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey