nauru pcg meeting minutes and mould report
TRANSCRIPT
![Page 1: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/1.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 1
![Page 2: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/2.jpg)
Nauru RPC - PCG No. 53 Meeting Minutes 2
remaining stages
AI – RPC1 Room rectification - Issue advice to Canstruct that post A/C control works to undertake an inspection of each room when installing underfloor insulation so as to identify and additional building fabric remediation work (rolling program). Priority is to be given to fast track variation works in the mess and kitchen. (Refer AI below). Inspection completed by and last week. to circulate updated rectification works requirements.
29 Jan 16
1.3 PCG#52 – 17 Dec 15
Canstruct have developed options for the Waste Water Treatment Plant which was planned to be installed at the Nauru Primary School. AI - An option to use the existing WWTP at the RoN Hospital is to be developed. NPS will revert to storage of effluent.
29 Jan 16
1.4 PCG#53 – 19 Jan 16
AI - TWG want to pull Acute down and want the ability to connect Acute and maternity to sewer treatment plant and water. to provide pricing.
requires confirmation for lead lining works. Needs approval in 2 weeks. Post meeting note – this has been provided
Construction of the Surgical Facility was physically completed on 31 Dec 15 with minor defects rectification underway. It was agreed with ABF that handover of the facility to the RoN would be delayed to align with the handover of the Medical Facility which is on scheduled for the end of Jan 16. The Ambulance Shelter and Security Office will remain incomplete at handover due to being bumped off Christmas ships.
AI – to detail requirements for specialist tradesman to install the operating table, anaesthetic machine and theatre lights.
AI – to provide a price to convert the temporary buildings at the RoN Hospital into permanent facilities. This will be incorporated in the Stage 2 works
AI – to provide revised locks for future RPC3 Resettlement Accommodation
and are meeting with the lands department to discuss the proposed Nurses accommodation site
AI – to provide A/C and insulation solution for the interview buildings (A/C in 1 and fans in the other).
Note Note
Note Note Note
29 Jan 16 29 Jan 16 29 Jan 16
s. 22(
s. 22(
s. 22
s. 22(
s. 22(
s. 22(s.
22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 3: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/3.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 4: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/4.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 2
![Page 5: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/5.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 6: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/6.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 7: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/7.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 8: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/8.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 3
![Page 9: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/9.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 10: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/10.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 11: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/11.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 12: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/12.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 13: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/13.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 14: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/14.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 4
![Page 15: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/15.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 16: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/16.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 17: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/17.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 18: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/18.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 19: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/19.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 5
![Page 20: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/20.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 21: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/21.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 22: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/22.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 23: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/23.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 6
![Page 24: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/24.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 25: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/25.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 26: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/26.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 27: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/27.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 7
![Page 28: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/28.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 29: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/29.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 30: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/30.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 31: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/31.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 32: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/32.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 8
![Page 33: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/33.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 34: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/34.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 35: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/35.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 36: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/36.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 9
![Page 37: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/37.jpg)
Nauru RPC - PCG No. 61 Meeting Minutes 2
AI – to notify Jacobs of the outcome when received.
advised that Jacobs will start the registration process with the firsttax payment to be made in Oct 16.
Note
20 Oct 16
1.3 PCG #57 – 24 May 16
AI – to discuss with if the CRC is exempt from the for consumables.
3/8/16 Update – ABF are in the process of writing to the GoNhowever status of letter is unknown. ABF to provide update on status24/8/16 Update – TP confirmed ABF have put forward a businesscase to the GoN but at the time of the meeting hadn’t yet heardanything back.
has written to RonPhos requesting the program for the RPC2/3Access Road works however he hasn’t received a response.Update 22/9/16 – ABF need to decide whether or not the works are toproceed by 30 Sep 16 to ensure they can be completed prior toCanstruct decanting from island. If a decision is not made, thebudgeted money will be returned to the project bottom line.AI - to follow up internally and notify Jacobs of the direction toproceed
20 Oct 16
27 Jun 16
30 Sep 16
1.4 PCG #59 – 3 Aug 16
advised that the lease for portion 60 has been extended byCanstruct until 20 Dec 16.
AI – requested that write to ABF to notify of the issuesassociated with the temporary certification of the buildings on Portion60 if they are left in place.
20 Oct 16
s. 22
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(1)(a)(ii)
s. 22(
s. 22(
s. 47G(1)(b)
s. 22(1)(a)(ii)
s. 33(a)(iii)
s. 22(
s. 22(
s. 22(
s. 22(
s. 47G(1)(a)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 38: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/38.jpg)
Nauru RPC - PCG No. 61 Meeting Minutes 3
1.5 PCG #60 – 24 Aug 16
AI - ABF to notify Jacobs of who they are going to hold liable at asenior level if the RPC1 works are delayed.
confirmed providing services to portion 60 is un-budgeted andcurrently out of scope. FS raised the concern that she believes theseworks may be a priority and will advise of action in due course.AI - FS and to discuss offline and report back to Jacobs. tofollow up.AI – During the next stakeholder meeting, is to make it clear to theRoN Hospital and stakeholders that they will not have power/sewer orwater to the Portion 60 buildings when its disconnected post 20 Dec16.
AI – ABF to confirm the IMHS room air conditioner temperaturecontrol.
22 Sep 16
30 Sep 16
30 Sep 16
30 Sep 16
1.6 PCG #61 – 22 Sep 16
informed the team that Canstruct intend to hold the NRC CrusherAssistance participation certificate presentation on the 6th of October.
noted there is an opportunity for an ABF on island representativeto attend this presentation.AI – to discuss internally and advise if ABF wish to attend thispresentation.
In regard to the demobilisation strategy, noted we will need signoff from the Minister if we are disposing of Government Assets.AI – to review the current version of the demobilisation plan,discuss the disposal strategy with Jacobs then write arecommendation report to David Nockel’s.AI – Jacobs to issue a Variation Order to Canstruct to proceed withthe relocation of the offices etc. as part of the Demobilisation Strategywith prices to be confirmed.
confirmed Canstruct are to remove the generators from the CRConce NUC have finished installing the permanent power. This isanticipated to be completed on Sunday therefore generators are to beremoved on Monday.AI - Once the permanent power is installed, is to give the GoN theHOM and security services will cease.
bought to the attention that ABF still have not defined how theywant to maintain warranties of plant, equipment and buildings postdemobilisation from island. noted we need to discuss this andresolve it now so the issue doesn’t arise in 12 months when Canstructare decanted from island.
Note
30 Sep 16
30 Sep 16
22 Sep 16
26 Sep 16
s. 22(
s. 22(
s. 22(
s. 22(
s. 22
s. 22
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(1
s. 22(
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 39: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/39.jpg)
Nauru RPC - PCG No. 61 Meeting Minutes 4
AI – Jacobs and ABF to discuss offline and report back.
AI – to confirm if a formal dispensation letter is required as aresult of removing the PWD toilets from the RoN Hospital.
AI – and to visit the NPS to determine if additional works arerequired to ‘make good’ the ATCO toilets.
30 Sep 16
20 Oct 16
22 Sep 16
s. 22(
s. 22(
s. 22(
s. 22(1)(a)(ii)
s. 22(
s. 22(1
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 40: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/40.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 41: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/41.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 10
![Page 42: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/42.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 43: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/43.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 44: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/44.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 45: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/45.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 11
![Page 46: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/46.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 47: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/47.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 48: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/48.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 49: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/49.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 12
![Page 50: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/50.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 51: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/51.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 52: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/52.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 53: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/53.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 54: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/54.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 13
![Page 55: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/55.jpg)
Update 8 Feb 17 – Jacobs has retracted the VO for these works. To close this item, ABF to provide GoN formal notification. Update 3 Mar 17 – ABF confirmed this will not occur. Item is closed.
Note
1.5 PCG #61 – 22 Sep 16
In regard to the demobilisation strategy, noted we will need sign off from the Minister if we are disposing of Government Assets. AI – to provide direction in regards to the disposal strategy with Jacobs then write a recommendation report to David Nockel’s. Update 1 Dec 16 - mentioned we may have issues with relocating the 180t crane to the Demobilisation laydown area as it cannot be driven across the RonPhos bridge due to weight restrictions. It was agreed the Garrison Support provider may need to look into leasing land down by the Port to store the crane.
- Update 3 Mar 17 – ABF confirmed 180T crane to remain at the port. ABF to confirm process regarding disposal of assets. Canstruct noted that they maintain security for assets currently. 180T crane and Ned Kelly barge currently on NPA land. AI - bought to the attention that ABF still have not defined how they want to maintain warranties of plant, equipment and buildings post demobilisation from island. Update 1 Dec 16 – The Canstruct RR is currently sitting with ABF for approval. A response is anticipated to be provided early in Jan 17. Update 8 Feb 17 – noted that Canstruct presence and crane crew have last day on 22 Mar 17, it is preferable that the ABF provide comment by the 20 Feb 17 for Canstruct Island presence and 1st of March for crane crew. Update 3 Mar 17 – ABF to confirm when Canstruct required to leave island. AI – Canstruct to provide a formal dispensation letter for the removal of the PWD toilets from the RoN Hospital. to issue for ABF approval if required. Update 1 Dec 16 – confirmed they are currently preparing this and a letter for the SAA works to address the cypher locked door at the entrance. Update 8 Feb 17 – Updated handover date on the 12 Mar 17. Dispensation letter for SAA changes currently resting with ABF for approval. Update 2 Mar 17 – ABF confirmed dispensation letter for the SAA and the K-Block Modifications will be provided prior to completion documentation handover on 13 March 17.
9 Dec 16
8 Mar 17
12 Mar 17
1.7 PCG #63 – 1 Dec 16
highlighted that the stormwater drain that travels from the RoN Hospital out to sea is currently blocked and will cause flooding of the hospital if not remediated by the next large rain.
s. 22(
s. 22(
s.
s.
s.
s.
s. 22(
s.
s. 22(
s.
s. 22(
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 56: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/56.jpg)
Update 8 Feb 17 – ABF to continue raising this issue with the GoN Update 3 Mar 17 – Item is closed.
Note
1.8 PCG 64 – 8 Feb 17
AI - Jacobs stated during inspections, DFAT noted there are no divider curtains or associated rails between the beds in the hospital. Canstruct to provide price and schedule for ABF approval. Update 3 Mar 17 – ABF approved supply and install of the curtains. Jacobs to issue a VO on Team Binder.
Jacobs stated that at RoN Hospital near the A&E entrance, it was noted that aggregate can be used to cover the car park. Jacobs to provide further information to ABF on Canstruct proposal as included in scope. Update 3 Mar 17 – Item can be closed.
10 Mar 17
PCG 65 – 2 Mar 17
AI – ABF to provide advice to the Government of Nauru regarding Hospital Stage 2. Jacobs to provide completion documentation after CAD files are provided by Canstruct.
Canstruct queried payment of invoices. ABF confirmed that payment will be made, with internal signoff expected 3 Mar 17.
Service Delivery: it was noted that advice needs to be provided with service provider regarding cracks in the loading dock. Recommend that a formal letter be provided to the Contractor to ensure service delivery is being met.
AI - ABF to review Demobilisation Plan Revision 5 and provide approval / comments to Jacobs.
AI – Canstruct to develop Warranty procedures for post-demobilisation and confirm/communicate defect liability form procedure.
AI – Canstruct to provide updated list to Jacobs of potentially unserviceable assets as 8 March 17.
Canstruct confirmed final personal leaving site 29 Mar 17.
AI – Canstruct to provide recommendation report to Jacobs regarding Curtains in OPC1 with signs of mould spores. This will be a component of the final Completion Documentation for RPC1 Remediation works.
AI –
Note
Note
17 Mar 17 8 Mar 17 10 Mar 17 10 Mar 17 8 Mar 17 13 Mar 17 17 Mar 17
s.
s.
s. 22(
s.
s. 22(
s.
s. 22(
s. 22(1)(a)(ii)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 57: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/57.jpg)
Next PCG Meeting – last week of March 29 – 31 on Nauru.
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 58: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/58.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 14
![Page 59: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/59.jpg)
AI – Jacobs to write to ABF with its positon on the ABF advice. Canstruct to provide Jacobs with its position and provide to Jacobs to include in its response.
10 Apr 17
1.2 PCG #61 – 22 Sep 16
In regard to the demobilisation strategy, noted we will need sign off from the Minister if we are disposing of Government Assets. AI – to provide direction in regards to the disposal strategy with Jacobs then write a recommendation report to David Nockel’s. Update 1 Dec 16 - mentioned we may have issues with relocating the 180t crane to the Demobilisation laydown area as it cannot be driven across the RonPhos bridge due to weight restrictions. It was agreed the Garrison Support provider may need to look into leasing land down by the Port to store the crane.
Update 3 Mar 17 – ABF confirmed 180T crane to remain at the port. ABF to confirm process regarding disposal of assets. Canstruct noted that they maintain security for assets currently. 180T crane and Ned Kelly barge currently on NPA land. AI - bought to the attention that ABF still have not defined how they want to maintain warranties of plant, equipment and buildings post demobilisation from island. Update 1 Dec 16 – The Canstruct RR is currently sitting with ABF for approval. A response is anticipated to be provided early in Jan 17. Update 8 Feb 17 – noted that Canstruct presence and crane crew have last day on 22 Mar 17, it is preferable that the ABF provide comment by the 20 Feb 17 for Canstruct Island presence and 1st of March for crane crew. Update 3 Mar 17 – ABF to confirm when Canstruct required to leave island. 30 Mar 17 – Dispensation letters for the SAA and RAA have been signed and returned. Final COO for the RAA has been issued. SAA COO should be available 3 Apr 17.
Note
9 Dec 16
8 Mar 17
1.3 PCG 64 – 8 Feb 17
AI - Jacobs stated during inspections, DFAT noted there are no divider curtains or associated rails between the beds in the hospital. Canstruct to provide price and schedule for ABF approval. Update 3 Mar 17 – Jacobs to provide approval on Team Binder.
Update 30 Mar 17 – Curtains installed.
s.
s.
s.
s. 22(
s.
s.
s. 22(
s. 22(
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 60: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/60.jpg)
1.4 PCG 65 – 2 Mar 17
AI – ABF to provide advice to the Government of Nauru regarding Hospital Stage 2. Jacobs to provide completion documentation after CAD files are provided by Canstruct.
Update 30 Mar 17 – All documentation has been received. Hard copy has been issued to RoN. Soft copy is to be supplied to ABF for hand over during official opening ceremony.
Canstruct queried payment of invoices. ABF confirmed that payment will be made, with internal signoff expected 3 Mar 17.
Update 30 Mar 17 – Payments made.
Service delivery: it was noted that advice needs to be provided to service provider regarding cracks in the loading dock. Recommend that a formal letter be provided to the contractor to ensure service delivery is being met.
AI - ABF to review Demobilisation Plan Revision 5 and provide approval / comments to Jacobs.
Update 30 Mar 17 –
AI – Canstruct to develop Warranty procedures for post-demobilisation and confirm/communicate defect liability form procedure.
Update 30 Mar 17 – Canstruct to update the Recommendation Report and re submit.
AI – Jacobs to provide list to ABF of potentially unserviceable assets.
Update 30 Mar 17 – List of potentially unserviceable assets was issued to ABF via Team Binder on the 15 Mar 17.
Update 30 Mar 17 – This list will be updated prior to completion to reflect any additional plant added.
Canstruct confirmed final personal leaving site 29 Mar 17.
Update 30 Mar 17 –
AI – Canstruct to provide recommendation report to Jacobs regarding Curtains in OPC1 with signs of mould spores.
Update 30 Mar 17 – Report, recommendations and maintenance guidance is in the RPC1 Remediation MDR. Canstruct to supply copy of report separately.
Note
10 Mar 17 03 Apr 17 03 Apr 17 20 Apr 17 31 Mar 17
s.
s.
s.
s. 22(
s.
s. 47G(1)(a)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 61: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/61.jpg)
AI –
Update 30 Mar 17 – Project financial close out will now take place in May 17. All works completed will be closed out. A very small number of outstanding items will be listed with known amounts with final claim.
May 17 May 17
1.5 PCG 66 – 30 Mar 17
AI – Discussion regarding a facility on Portion 93 to be built which would suit the Service Provider to move their trades into. The materials for the facility are to come from existing stocks. Approval is sort for a small amount of aggregate and reinforcing mesh. These are the only materials not in the stocks within the container compound.
31 Apr 17
Next PCG Meeting – 4 May in Canberra.
s. 22(1)(a)
s.
s.
s. 47G(1)(a)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 62: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/62.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 15
![Page 63: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/63.jpg)
Update 4 May 17 –
AI – ABF to provide response to Jacobs Update 4 May 17 -
AI -
Update 4 May 17 -
12 May 17
19 May 17
30 May 17
1.2 PCG #61 – 22 Sep 16 In regard to the demobilisation strategy, noted we will need sign off from the Minister if we are disposing of Government Assets. Update 3 Mar 17 – ABF confirmed 180T crane to remain at the port. ABF to confirm process regarding disposal of assets. Canstruct noted that they maintain security for assets currently. 180T crane and Ned Kelly barge currently on NPA land. Update 4 May 17 – noted the lease on the port for the space allocated for the Crane and Barge will cease on 30 June 17. AI - ABF to advise if action is required. Update 4 May 17 – Jacobs noted 19 June 17 Canstruct will be leaving island, and 30 June 17 is current date for project close.
Note
31 May 17
1.3 PCG 65 – 2 Mar 17
ABF to review Demobilisation Plan Revision 5 and provide approval / comments to Jacobs. Update 30 Mar 17 –
Update 4 May 17 – confirmed that the handover component of the Demob including dates (31 May 17) has been provided to Service Delivery and they have acknowledged it. Update 30 Mar 17 – List of potentially unserviceable assets was issued to ABF via Team Binder on the 15 Mar 17.
Note
s. 22(1
s.
s. 22(1
s.
s. 22(
s.
s. 22(
s. 47G(1)(a)
s. 33(a)(iii)
s. 33(a)(iii)
s. 47G(1)(a)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 64: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/64.jpg)
Update 5 May 17 - This list will again be updated prior to completion to reflect any additional plant added. AI – Canstruct to update unserviceable assets list as at 31 May 17 and distribute to project team. Update 5 May 17 –
30 May 17 30 May 17
1.4 PCG 67 – 4 May 17 Jacobs suggested to ABF to consider that a Deed of Variation (DoV) be executed for the Level 0 Crane Support Services, noting a Variation Order under the current contract has been issued to the contractor to undertake these services until 30 June 17. AI – Jacobs to issue draft DoV to ABF who will consult with internal procurement / legal team. ABF noted the documentation is currently listed on Team Binder and when project closes there will need to be a full extract done to maintain internal records. AI - Canstruct to look at Team Binder closeout options and send through to ABF / Jacobs.
12 May 17 30 May 17
Next PCG Meeting – 7 June in Canberra, to be followed by Lessons Learnt session.
s.
s.
s. 22(
s.
s. 47G(1)(a), s. 33(a)(iii)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 65: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/65.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 16
![Page 66: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/66.jpg)
AI – ABF to provide response to JacobsUpdate 4 May 17 -
AI - ABF to follow up with GoN in relation to formal exemption letterand provide advice to Jacobs / Canstruct.Update 15 June 17 -
30 June 17
30 June 17
30 June 17
1.2 PCG #61 – 22 Sep 16
In regard to the demobilisation strategy, noted we will need signoff from the Minister if we are disposing of Government Assets.Update 3 Mar 17 – ABF confirmed 180T crane to remain at the port.ABF to confirm process regarding disposal of assets.Canstruct noted that they maintain security for assets currently. 180Tcrane and Ned Kelly barge currently on NPA land.Update 4 May 17 – noted the lease on the port for the spaceallocated for the Crane and Barge will cease on 30 June 17.Update 15 June 17- AI - Canstruct to confirm costs to extend lease onPortion 208 at the Port until the 31 October. ABF to Approve ifrequired.
30 June 17
1.3 PCG 65 – 2 Mar 17
ABF to review Demobilisation Plan Revision 5 and provide approval /comments to Jacobs.Update 30 Mar 17 –
Update 4 May 17 – confirmed that the handover component of theDemob including dates (31 May 17) has been provided to ServiceDelivery and they have acknowledged it.Update 30 Mar 17 – List of potentially unserviceable assets wasissued to ABF via Team Binder on the 15 Mar 17.Update 5 May 17 - This list will again be updated prior to completionto reflect any additional plant added.Update 15 June 17 - Canstruct tabled unserviceable assets list as at13 June 17 and will distribute to project team.AI – Canstruct to issue via Team Binder to Jacobs. Jacobs to review
Note
21 June 17
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(
s. 22(1)(a)(ii)
s. 22(
s. 22(1)(a)(ii)
s. 47G(1)(a)
s. 33(a)(iii)
s. 47G(1)(a)
s. 47G(1)(a)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 67: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/67.jpg)
and issue to ABF.
1.4 PCG 67 – 4 May 17Jacobs suggested to ABF to consider that a Deed of Variation (DoV)be executed for the Level 0 Crane Support Services, noting a VariationOrder under the current contract has been issued to the contractor toundertake these services until 30 June 17.
ABF noted the documentation is currently listed on Team Binder andwhen project closes there will need to be a full extract done tomaintain internal records.Update 15 June 17 – AI – Canstruct to provide pricing to extendTeam Binder to 31 October. ABF to approve if required.
23 June 17
1.5 PCG 68 – 15 June 17
Project Construction Insurance – Jacobs to check the expiry date ofthe current insurance. Currently estimated to be 30 Sep 17. Jacobs toreview with ABF if an extension of the Project Construction Insuranceis required to 31 Oct 17.AI – Jacobs and Canstruct to check Construction Insurance. Canstructto provide advice as to cost of extension to 31 Oct 17 if required byABF..
23 June 17
s. 22(
s. 22(1)(a)(ii)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
![Page 68: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/68.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 18
![Page 69: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/69.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 19
![Page 70: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/70.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 20
![Page 71: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/71.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 21
![Page 72: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/72.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 22
![Page 73: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/73.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 23
![Page 74: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/74.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 24
![Page 75: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/75.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 25
![Page 76: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/76.jpg)
SECTION – D1
ERONMOR POST REMEDIATION VERIFICATION CERTIFICATE
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 26
![Page 77: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/77.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 27
![Page 78: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/78.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 28
![Page 79: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/79.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 29
![Page 80: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/80.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 30
![Page 81: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/81.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 31
![Page 82: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/82.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 32
![Page 83: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/83.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 33
![Page 84: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/84.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 34
![Page 85: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/85.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 35
![Page 86: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/86.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 36
![Page 87: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/87.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 37
![Page 88: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/88.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 38
![Page 89: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/89.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 39
![Page 90: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/90.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 40
![Page 91: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/91.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 41
![Page 92: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/92.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 42
![Page 93: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/93.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 43
![Page 94: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/94.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 44
![Page 95: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/95.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 45
![Page 96: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/96.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 46
![Page 97: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/97.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 47
![Page 98: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/98.jpg)
SECTION – D1
ERONMORE POST REMEDIATION VERIFICATION CERTIFICATE
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 48
![Page 99: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/99.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 49
![Page 100: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/100.jpg)
SECTION – D1
ERONMORE POST REMEDIATION VERIFICATION CERTIFICATE
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 50
![Page 101: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/101.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 51
![Page 102: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/102.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 52
![Page 103: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/103.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 53
![Page 104: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/104.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 54
![Page 105: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/105.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 55
![Page 106: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/106.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 56
![Page 107: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/107.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 57
![Page 108: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/108.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 58
![Page 109: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/109.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 59
![Page 110: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/110.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 60
![Page 111: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/111.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 61
![Page 112: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/112.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 62
![Page 113: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/113.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 63
![Page 114: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/114.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 64
![Page 115: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/115.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 65
![Page 116: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/116.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 66
![Page 117: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/117.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 67
![Page 118: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/118.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 68
![Page 119: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/119.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 69
![Page 120: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/120.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 70
![Page 121: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/121.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 71
![Page 122: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/122.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 72
![Page 123: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/123.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 73
![Page 124: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/124.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 74
![Page 125: Nauru PCG Meeting Minutes and Mould Report](https://reader030.vdocuments.net/reader030/viewer/2022012719/61b15e04af7ee00ce56e6dec/html5/thumbnails/125.jpg)
Re
lea
sed
by
De
pa
rtm
en
t of
Ho
me
Aff
air
s u
nd
er
the
Fre
ed
om
of I
nfor
mat
ion
Act
198
2
DOCUMENT 75