BHEL SPEC Rev. No.: D TECHNICA C. NO. :PE-TS-4 Dated : AL SPECIFICA T TEC FGUTP 401-600-C002 ATIONS Techni CHNICAL CON BOP CIVIL P STAGEIV (1 TECHNIC S ical Co NDITIONS OF WORKS PAC 1X 500 MW) Section A: CAL CONDITIO CONTRACT Section onditio CONTRACT CKAGE AT UNCHAHA ONS OF D R n A ons of C AR DOC. NO.: NBP Rev. No.: Contra PPL-004-302-P4 act C-A-001 Page No.: N 1 of 38

Upload: others

Post on 19-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

 

 

BHEL SPECRev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated : AL SPECIFICA

T

TEC

FGUTP

401-600-C002

ATIONS

Techni

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNIC

S

ical Co

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: CAL CONDITIOCONTRACT

Section

onditio

CONTRACTCKAGE AT UNCHAHA

ONS OF DR

n A

ons of C

AR 

DOC. NO.: NBPRev. No.:

Contra

 

PPL-004-302-P4

act

C-A-001

Page No.: N 1 of 38

 

 

BHEL SPECRev. No.: DTECHNICA

Sl. No.

1.00

2.00

3.00

4.00

5.00

6.00

 

C. NO. :PE-TS-4Dated : AL SPECIFICA

Project In

Scope of

Construct

T&Ps to b

Time Sch

Other Req

Annexure

• ACi

• ABe

TEC

FGUTP

401-600-C002

ATIONS

DES

nformation

Works

tion Facilitie

be deployed

hedule

quirements

es

nnexure - A ivil Site Lab

nnexure – Be Arranged B

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNIC

SCRIPTION

es

by Contract

: List Of Eboratory

B : IndicativeBy Contract

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: CAL CONDITIOCONTRACT

INDEX

N

tor

quipment’s F

e List Of T&or

CONTRACTCKAGE AT UNCHAHA

ONS OF DR

P

P

P

Pa

Pa

Pa

For Pa

&P To Pa

AR 

DOC. NO.: NBPRev. No.:

Page

Page 1 to 1

Page 1 to 9

Page 9 to 11

age 12 to 12

age 13 to 15

age 15 to 30

ge 31 to 33

ge 34 to 36

 

PPL-004-302-P4

NBPPL

Page N

N 3 to

N 3 to N

N 11 to

2 N 14 to

5 N 15 to

0 N 17 to

N 33 to

N 36 to

C-A-001

Doc.

No.

N 3

N 11

N 13

N 14

N 17

N 32

N 35

N 38

Page No.: N 2 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

Clause N1.0 1.1

2.0

2.1

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

No. PROFero(2X2Ltd. (1X2

The STAProje The bounlocat UnchNortLuck The

SCO

Civil The archistruc

TEC

FGUTP

401-600-C002

ATIONS

OJECT INFoze Gandhi210MW) wa

and therea210MW).

present exp

AGE-IV (1x5ect Private L

FGUTPP (1nded by villated at a dista

hahar railwathern railwaknow at a dis

latitude and

OPE OF WO

l, Structural

broad scopeitectural woctures/ substr

The broaand archisystems,

• Plan

• Site

• Exca

• CW

acce

sump

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

FORMATIOi Unchaharas implemenafter NTPC

pansion pro500 MW) to Limited (NBP

1X500MW)ages khanpurance of abou

ay station onay (NR) is stance of app

longitude of

ORK

and Archite

e of work urks related tructures, bui

ad scope of witectural worstructures/ s

nt Road Layo

leveling and

avation, bed

pump hous

ess ladder fo

p

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

DescrON r Thermal ted by UPRV implement

posal is forbe owned b

PPL) is the p

is located inr, Faridpur a

ut 3 Kms from

n Allahabad2 KMs aw

proximately

f Site are 25

ectural works

nder this pato, but not lildings and f

work under trks related tosubstructures

out and Cros

d Grading of

preparation

se including

or flow mete

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

ription

Power SVN. Furtherted Stage-II

r setting upby NTPC Ltdprime contra

n Raebareli dand khaliqpum plant.

d- Raebareli way. The ny 110 Km fro

◦ 54' 50” to

s

ackage shall limited to, tfacilities in p

this package o, but not lims, buildings

ss Section.

f the BOP ar

n and back fi

control roo

er, CW duc

AR 

OC. NO.: NBPPLv. No.: ge 1 of 36

Station (FGr, it was takeI (2X210M

p of a coal d... The NTPactor of this

district of Uur khurd. Mu

board gaugnearest airpoom the proje

o 81◦19' 50”

include civthe followingplant area.

shall includmited to, theand facilitie

reas.

lling of CW

om, pit along

ct encasing,

 

L-004-302-P4C-A

GUTPP) Sten over by N

MW) & Stag

based FGUPC BHEL Pproject.

Uttar Pradeshustafabad tow

ge(BG) sectioort is locatect site.

respectively

vil, structurag areas, sys

de civil, struce following as in plant are

W Piping.

g with canop

thrust block

A-001

tage-I NTPC ge-III

UTPP Power

h. It is wn is

on of ed at

y.

al and tems,

ctural areas, ea.

py &

k and

Page No.: N 3 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

TEC

FGUTP

401-600-C002

ATIONS

• CW

• Raw

• PT p

• O &

• Clar

• CWT

• Cont

• RO-

MCC

equi

• CPU

build

• Hyd

build

• Fire

• Foam

• Fire

• Fire

• Fire

• Cont

• Fuel

• LDO

sepa

• Serv

• Port

• Plan

exist

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

fore bay and

w water pump

plant control

& M store

rified water d

TP building

trol Chlorina

DM Plant in

C buildin

ipment platfo

U regeneratio

ding

drogen gene

ding

water pump

m pump hou

booster pum

water tank f

station build

trol cum MC

l oil Pump ho

O Tank Fo

arator pit.

vice water su

able water ta

nt drainage

ting/owner’s

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

d CW chann

p house mod

l cum MCC b

distribution

including co

ation buildin

ncluding she

ng, Misc.

orm, laborat

on building

eration buil

p house and S

use,

mp house and

foundations,

ding.

CC building

ouse. and co

oundation,

ump, tank an

ank.

Layout an

s system/netw

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

nel and interc

dification wo

building if r

chamber and

ontrol room

ng and contr

eds, control

Tank foun

ory etc.

and Contro

lding (inclu

SWGR. Bui

d MCC build

,

in makeup w

ontrol cum M

Tank unloa

nd pump hou

nd detail a

work.

AR 

OC. NO.: NBPPLv. No.: ge 2 of 36

connection.

orks

required.

d pump hou

(CW treatm

rol cum MCC

room includ

ndations, p

ol , battery

uding fenc

ilding

ding

water pump

MCC buildin

ading platf

use

and its con

 

L-004-302-P4C-A

se.

ment building

C building

ding control

aving, tren

room cum M

ing) and M

house

ng

form, Oil w

nnection to

A-001

g)

l cum

nches,

MCC

MCC

water

o the

Page No.: N 4 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

TEC

FGUTP

401-600-C002

ATIONS

• Plan

• Plan

its co

• Cont

pum

• ETP

cont

• Pipe

• Pipe

hous

cros

• Pavi

in

• Pipe

• Cabl

• Cabl

requ

• Civi

• Layi

• Duct

• Any

Fenc

com

area

• Can

scop

desi

spec

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

nt drainage su

nt sewage lay

onnection to

trol cum M

mp house

P waste wate

trol cum MC

e and cable r

e pedestals

se to main p

sing of pipe

ing and Misc

e and cable tr

le trench fro

le trench in

uired.

il works pert

ing of Earthi

t-banks, cab

y other build

cing etc. th

mplete the ci

.

nteen buildi

pe of work a

gn procedu

cification

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ump

yout and sew

o the existing

CC building

er sump, ETP

CC building

ack structure

including in

plant, Pipe

etc.

c. Equipmen

renches inclu

m transform

n TG Hall,

taining to Se

ing mat.

ble pits, Misc

dings, facili

hough not

ivil structura

ng includin

also include

ures includi

and

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

wage water p

g/owner’s sy

g for Coolin

P pipe pede

e and founda

nterconnecti

crossing ov

nt Foundatio

uding pedes

mer yard to sw

Boiler area,

ewage piping

c. sumps etc

ities, founda

specifically

al and asso

ng MCC ro

es architectu

ing rain wa

coordinat

AR 

OC. NO.: NBPPLv. No.: ge 3 of 36

pump house

ystem/netwo

ng tower an

stal, trenche

ations.

ion from R

ver fore bay

ons, trenches

tals, pits etc

witch yard

, ESP and

g, Culverts

.

ations and s

y covered b

ociated work

oom (Green

ural (as per

ater harves

tion w

 

L-004-302-P4C-A

(if required

ork.

nd clarified w

es, Sheds etc

Raw water p

y channels,

s, pits, sump

.

Chimney ar

structural w

but, require

ks of main

n Building)

r energy effi

sting etc. as

with va

A-001

d) and

water

c. and

pump

Road

ps etc

rea if

works,

ed to

plant

) The

icient

s per

rious

Page No.: N 5 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

2.2

2.2.1

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

The SupeTemStaffor spworkWorkDrawownethe rStruc

The manpfor fo

ab

TEC

FGUTP

401-600-C002

ATIONS

elect

ECB

BHE

conc

the

Gre

sum

for

pain

The

roun

inter

cons

• Con

own

works to beervision, Ma

mporary Workf, Temporarypecified but k in all respeks, Preparat

wings, Prepaer before corates of itemctural Fabric

Contractor upower for a

following ser

a. Store Assb. Skilled w

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

trical/mech

BC GUIDEL

EL/NBPPL/

cerned govt

architectu

en Building

m basis is inc

various it

nting brick

battery lim

nd the plint

rconnecting

struction of

ducting CBR

ner.

e performed aterial, Scaffks, Temporay Site officereasonably

ects. Testingtion of Bar aration of Faommencemenms of work.cation Drawi

under this cototal period rvices:

sistant for wworkers for w

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

anical agen

LINES, dra

/NTPC, ob

t. authoritie

ural works

g consultant

cluded in th

tems like

work etc. sh

mit for this l

th of Cante

g gallery to

f rain water

R test and s

under this cfolding, Conary Storage es, Transport

implied or g of all mate

Bending Sabrication Drnt of fabrica. Works shings and App

ontract shall of 130 man-

working in stoworking in st

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

ncies) desig

awing prepa

btaining r

s regarding

including

t for constr

his B.O.Q. it

involved li

hall be mad

lump sum p

een building

power hou

harvesting.

submission/a

contract connstruction Eq

Sheds, Temtation and alnecessary f

erials, ConcSchedules onrawings, getation/erectiohall only beproved RCC

also provide-months exc

ores. tores/office.

AR 

OC. NO.: NBPPLv. No.: ge 4 of 36

gned with

aration and

required a

g energy effi

supervision

ruction to b

tem (Howev

ike concret

de in releva

package sha

g excluding

use but incl

.

approval of

nsist of provquipment’s, T

mporary Cololl incidental for the proprete, Earthwn the basis tting the samon at site etce carried outC Constructio

e free of costclusively for

 

L-004-302-P4C-A

conformanc

d approval

approvals

icient rating

n by design

be done on l

ver the pay

ting, plaste

ant BOQ ite

all be 5.00 m

g car parkin

luding desig

the report t

viding all LaTools and P

ony for Laboitems not sher completio

work Other Aof Constru

me approved c. are includt with Appron Drawings

t services ofuse by NBP

A-001

ce to

from

from

g. All

nated

lump

ment

ering

ems.).

m all-

ng &

gn &

to the

abour, lants,

our & hown on of

Allied uction

from ded in roved s

f PPL

Page No.: N 6 of 38

NBPPL6
Typewritten text
- 40 man-months
NBPPL6
Typewritten text
- 90 man-months

 

 

BHEL SPEC Rev. No.: DTECHNICA

2.3

2.4 2.5 2.6 2.7

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

PersoWorkexpeextenIn caNBPthe rmontprevabov

For t& Stthe Eno ex The objecdispo All pstonefounduly perso All tEngi Layo Befoestabby thEngicontrequipshallconssuchthemand prote

TEC

FGUTP

401-600-C002

ATIONS

ons so deplokmen provid

erienced in thnded up to thase contractoPPL, the latterisk and cost ths as per thailing minim

ve plus 10%

the works, thtructural SteEmployer’s sxtra cost to t

area of wctionable mosed of as di

precious mees, coils, tre

nd in or uponpreserve the

ons as NBPP

the works arineer-in-Cha

out and Lev

ore start of blished by Nhe Contractineer with bractor shallpment, matel be responstruction. Thh approved rm without the

pillars alreaected and ma

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

oyed have toded as per thhe nature of he extended or fails to proer shall haveof the contr

he above provmum wages a

will be mad

he materials el, the biddestores and trthe employer

work shall bmatter, and irected by th

etal, oil or oeasures, relicn the site she same and fPL may from

reas shall bearge when th

vels

the work, NBPPL. Permtor at suffiench marks l provide aerials and lansible for

he contractorreference line prior approady establisaintained by

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

work in exthe above prowork for whperiod of co

ovide above-e right to hireractor. Howevision, fully at FGUTPP,

de from the fi

issued by ther shall be reransport it tor (Store shal

be cleared materials r

he Engineer-i

other minercs, antiques,hall be the pfrom time to

m time to tim

e adequatelyhe work is in

one referenmanent baseiciently closat all end p

at his expeabour for est

their mainr shall maintnes, marks aoval of the Eshed by NBy the contract

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

tended hoursvisions shall

hich they areontract. -mentioned e such servicever, if NBPy or partly, re, Unchahar ffinal bill of th

he Employeresponsible too the works ll be located

of all vegremoved, shin-Charge.

rals of any , and other sproperty of Oo time delive

me appoint to

y flood lightn progress du

nce line ande lines and crse intervals points to servense all temtablishing th

ntenance dutain a certifiand levels a

Engineer-in-CBPPL in thetor. He shal

AR 

OC. NO.: NBPPLv. No.: ge 5 of 36

s whenever rl be fully trae deployed. T

man-power ces from oth

PPL does notecovery at thfor the categohe contracto

r e.g. Cemeno get the matsite for execinside the p

getation, rubhall be bur

description similar thingOwner. Theer the same to receive the

ted to the sauring the nig

d two benchross lines shas may be

ve as `Refermplates, pilhe Grid lineuring the eied copy of dand shall noCharge. Thee works arell repair and

 

L-004-302-P4C-A

required. ained and This shall be

as required bher agencies t utilize the mhe rate of theories stated

or.

nt, Reinforceterial issued cution of wo

plant premise

bbish and rnt or other

and all pregs which mae contractor to such pers

e same.

atisfaction oht shifts.

h marks wihall be establ

directed byrence Grid’. llars and ss and Pillarentire periodrawing sho

ot remove ane reference pea shall be d rebuild the

A-001

e

by at

man-e

ement from

ork at es).

other rwise

ecious ay be shall

son or

of the

ill be lished y the The

stakes s and

od of owing ny of points

fully same

Page No.: N 7 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

2.8 2.9 2.10 2.11 2.12

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

in ca The conscorrefact Char The linesby th Setti The work The numbshallwork All trepremain No sbe mthe u The labounatur In caand w In caSectwill The ment

TEC

FGUTP

401-600-C002

ATIONS

ase of any da

contractor sultation witectness of althat the sam

rge.

contractor ss and gradeshe Engineer-

ing of labor

contractor sk site as per

laboratory bers to carryl ensure thatk to avoid sto

the tests shaesentative anntained, and

separate paymmade. The counit rates ten

unit rates ur, temporarre necessary

ase of any cowill be bindi

ase of any cion 'D' the be binding.

unit rates qutioned in Se

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

amage

shall layouth the Engll measurememe might h

hall be resps as may be -in-Charge fr

ratory :

shall set upthe direction

shall be eqy out all the t the equipmoppage of w

all be carriend a joint reavailable wi

ment for theost of these

ndered for th

shall includry works an

y for the com

onflict, the ring.

conflict betwrequiremen

uoted for varction C and

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ut the workineer-in-Chaents and anyave been ch

onsible for tspecified in

from time to

his own labns of Engine

quipped withtests as requ

ment is avaiwork on this a

ed out by thecord of all oith the Engin

ese operationoperations se different it

de all tools,nd everythin

mpletion of th

equirements

ween the reqnts as stipu

rious items ospecification

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

k from thearge and shy connectionhecked by t

the proper en the drawintime.

boratory in teer-in-charge

h latest testuired under ilable well iaccount.

he contractoobservationsneer.

ns/tests and fshall be deemtems under b

tackles, mng whether he job in all

s stipulated b

quirementsulated in Se

of B.O.Q shans and nothi

AR 

OC. NO.: NBPPLv. No.: ge 6 of 36

ese referenchall be respn therein, notthe staff of

xecution of ng or establis

the very close at his cost.

ting equipmthe contract

in advance o

or in presens and results

for setting omed to have bill of quanti

material, equof permanerespects..

by Vol. III B

s of Section ection 'C' sh

all include aing extra sha

 

L-004-302-P4C-A

ce base lineponsible fortwithstandinthe Enginee

the work toshed or indi

se vicinity o

ment in suffit. The controf starting o

ce of Engins thereof sha

f laboratory been includ

ities.

uipment, fixtent or temp

BOQ shall pr

'C' and thohall prevail

all the stipulaall be paid ex

A-001

es in r the

ng the er-in-

such icated

of the

ficient ractor of the

neer’s all be

shall ded in

tures, orary

revail

ose of l and

ations xcept

Page No.: N 8 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

in B. No sdurinEmpinclu Purche thfinalBidd The himslaw know The bid:

Apprany m The not bitemjob a The invosite/c TheScheincom

TEC

FGUTP

401-600-C002

ATIONS

.O.Q rates.

separate payng the execuployer and thusive of all s

chaser reservhinks fit, to fl and bindingder.

Contractor mself fully wiand order

wledge abou

bidder shall

Name & preparatio

• Name & Energy mBuilding

roval of Engmaterials for

scope of wobe specificas not specifias a whole al

scope of wolved. The sconstruction

work undeedule. In casmplete, the d

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

yment for dution of workhe rates in thuch dewater

ves the unilatfacilitate theg on the bidd

must visit thth the naturand other s

ut the site con

l necessarily

credentials oon of fabrica

credentials modeling, dECBC guid

gineer In chr civil works

ork will also ally mentionfied but reasoll as desired

ork covered cope of wor

n requiremen

er this contse the descrdecision of t

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ewatering ok including he B.O.Q foring, if neces

teral right toe ease of hander. The sam

he site prior e, type and site conditionditions shal

y submit foll

of the agencation drawing

of agenciesday lightingdelines

harge (EIC) s.

include sucned in the aonably impland as direc

above is nork may vary

nts for which

tract shall bription / spethe employer

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

of sub-soil omonsoon pe

or various itssary.

o split the pandling of theme shall nee

to submittinscope of woons. Any all not be ente

lowing docu

cies proposedgs.

s proposed fg simulation

is to be obt

ch other relatabove paragrlied and neccted by the E

ot a comprehy considerab

h no extra co

be carried ocifications ar shall be fin

AR 

OC. NO.: NBPPLv. No.: ge 7 of 36

or surface weriod ) wouldtems would

ackage in whe package. Ded explicit co

ng his quotaork and invo

additional clertained.

uments/detai

d to be engag

for Architectn & analysi

tained before

ted works alraph and al

cessary for cEngineer In c

hensive list bly dependi

ost shall be p

out as per Bas per BOQnal and bindi

 

L-004-302-P4C-A

water (if reqd be made bbe deemed

hatsoever maDecision shaoncurrence o

ations to acqolvement thelaim for lac

ils along wit

ged for desig

tural & planis as per G

e procureme

lthough theyl such incid

completion ocharge(EIC)

of items of ing on the apaid.

BOQ Cum Q are found

ing.

A-001

quired by the to be

anner all be of the

quaint erein, ck of

th the

gn

nning, Green

ent of

y may dental of the .

work actual

Rate to be

Page No.: N 9 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

2.21 2.22

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

Quanvariachanas peshallpaymindicindiv Unleitemfollo

1

2

3

4

5

6

TEC

FGUTP

401-600-C002

ATIONS

ntities mentiation due to nges in desiger advice of l be workedments will cated againsvidual items

ess otherwiss mentioned

owing.

1. Furnishinequipmenwater, tratemporarnecessaryworks, econtract Engineer

2. Furnishin(EIC) forsamples works.

3. Furnishincalled focharge(E

4. Giving ageneral crequired

5. Arranginmanufact

6. Carrying and coorcoordinatout the lmarking

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ioned in thechange of

gn etc. The tEngineer In

d out on thalso be regst each itemshall remain

e specified, d in the “Bill

ng all labnt, supplies, ansit and stry works noy for the proexcept in acdocuments a

r In charge(E

ng samples r testing / imay be reta

ng test reporor the spec

EIC).

all notices, pconditions offor all work

ng manufactuturer’s speci

out topogrardinates at tes furnishedlocations anof reference

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

e rate scheduscope of wotenderers shacharge(EIC

he basis of gulated for m may varyn firm throug

the work tol of Quantitie

our, materitransport, to

torage insuraot shown ooper compleccordance wand additionEIC) during t

of all materinspection aained by the

rts for the pcifications o

paying all ff contract or s including t

urer’s superfications wh

aphic surveysuitable in

d by the cund levels of e pillars and

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

ules are appork / variatioall undertake

C) and accordquantities athe same

y to any exghout the va

o be provides” shall inc

ials, supervo and from tance and al

or specified tion, mainte

with the stinal stipulatiothe course o

rials requiredand approvae engineer f

products useor if so de

fees, taxes ein any other

temporary w

rvision for hen so specif

y of the wontervals fromstomer estab

f proposed sother identif

AR 

OC. NO.: NBPPLv. No.: ge 8 of 36

proximate onon in schedue to executedingly the finactually execaccordinglyxtent; howealidity of con

ded by the cclude but not

vision, conthe site, fuelll other inci

but reasonenance and hipulations laons as may bf works.

d by the Enal for use infor final inco

ed or intendesired by t

etc., in accor tender docu

works.

items of wfied.

ork area andm existing blished bencstructures, cfication work

 

L-004-302-P4C-A

nly and liablule of quant

e actual quannal contract cuted at site

y. The quanever the ratntract.

contractor fot be limited t

nstruction pl, compressedental items

nably impliehandling oveaid down inbe provide b

ngineer In chn the works.orporation i

ded to be usethe Enginee

ordance withuments, thos

work done a

d establish lgrid levels

ch marks, seconstructionsks etc.,

A-001

le for tities, ntities price

e and ntities e for

or the to the

plans, ed air, s and ed or er the n the

by the

harge . The in the

ed, if er In

h the se are

s per

levels s and etting s and

Page No.: N 10 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

3.0 3.1

3.2

3.3

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

7

8

CON

Land

1

2

3

Con The conswatcprov Elec

1

TEC

FGUTP

401-600-C002

ATIONS

7. The conassistancrequired weight or

8. Providingimplied accordan

NSTRUCTId

1. Dependinand otherextent avuse the eland by oplant maerections

2. The contover to h

3. Area witharea etc. free of co

struction of

contractor struction of ch and wardvided by cont

ctricity

1. Contractoworks. Hprovided availabilidraw elec

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ntractor shae, instrumenfor examinir quantity of

g all incideor necessar

nce with contION FACIL

ng upon ther facilities wvailable/ conexisting landother civil /mchineries an

s agencies.

tractor will bim by EMPL

hin plant prefor constru

ost.

f temporary

shall arranhis temporad of all thetractor at his

or shall havHowever ele

free of coity. Bidders ctricity.

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

all providents, machineng, measurinf any materia

ental items nry for the tract.

LITIES

e availabilitywill be allocnsidered necd inside the mechanical/

nd materials.

be responsibLOYER/Cus

emises for fauction purpo

y office, stor

nge at his ary office, ste above. Mas own cost.

e to deploy ectricity (foost at emplhave to ma

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

e the custoes, labour anng and testinal used.

not shown successful c

y, Land forcated with ccessary. The project preelectrical co The existin

ble for handistomer.

abrication, bose shall be

res etc.

own cost tores, cemenaterials requ

the DG setor constructloyer’s singake his own

AR 

OC. NO.: NBPPLv. No.: ge 9 of 36

omer/EMPLnd materialsng any work

or specifiedcompletion

r contractor’ertain time e contractor emise considontractors an

ng land shall

ing back all

batching planprovided as

cleaning ont godown uired for th

s for carryintion purposegle point son distribution

 

L-004-302-P4C-A

LOYER sucs as are normk and the qu

d but reasonof the wor

’s office, stoframe and thas to plan

dering the und the storal be shared b

lands, as ha

nt, office, stos per availa

of area alloetc. and als

he same sha

ng out the tee only) maource subjen arrangeme

A-001

ch a mally

uality,

nably rk in

orage to the n and use of age of by all

anded

orage ability

otted, o the

all be

ender ay be ect to ent to

Page No.: N 11 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

3.4

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

2

3

4

5

6

7

8

Wat

TEC

FGUTP

401-600-C002

ATIONS

2. Contractoduring cotemporardifferent workmenquoted rarequiremmaintaine

3. Supply oInstallatiocontractosame madeviationreserve th

4. For chimcapacity arrangem

5. DemobiliContracto

6. The biddpoint wh

7. The powbe respointerrupticompenssuch nongrounds.

8. The contrin the evelectric sresponsibrestoratioaffected.

ter

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

or will haveonstruction rry pole light

floors/workn till the permate. The illum

ment as specied.

of electricityon Rules an

or shall ensuy be audited

n from normhe right to im

mney work itto be installe

ment.

ization of thors scope.

der shall haverever huma

er supply wionsible for ion of powation for del

n-supply on

ractor shoulvent of powsupply, if tbility of theon of electr

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

e to procureright from stting, portabking areas fmanent illummination shified by Indi

y shall be gnd other Ru

ure usage of d by EMPLO

mally acceptempose penalt

is a mandated for chimn

he facilities

ve to providan operated e

ill be from tany inconv

wer supply/lay in work the grounds

d ensure thawer breakdothe progresse contractor ic supply s

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

e & install tart of his wo

ble lighting for executiomination systould be suchian standard

governed byules and Reelectricity in

OYER time ted norms is ty as deemed

tory requiremney passenge

after comp

de earth leakelectrical dri

the availablevenience or / variation can be claim

s of idle lab

at the work iown. In the s of work i

to step up o that over

AR 

OC. NO.: NBPPLv. No.: ge 10 of 36

general illuork. This sytowers with

on of the wtem is establh that minim

ds for genera

y Indian Eleegulation asn an efficiento time. In cobserved, Ed fit for such

ment that DGer lift operat

pletion of w

akage circuitives/ T&Ps a

e grid. EMPLr delay cau

in voltagemed by the

bour, machin

in critical areevent of b

is hamperedthe progre

rall progress

 

L-004-302-P4C-A

umination system will in

h dg back-uwork & safe

lished, withimum illuminal illuminati

ectricity Act applicable.

nt manner ancase of any mEMPLOYERh cases.

G set of adetion as a stan

works shall b

t breaker at are deployed

LOYER shaused due toe level andcontractor d

nery or any

eas is not hereakdown in

d, it will bess of work

s of work i

A-001

ystem clude

up for ety of in the nation ion is

t and . The nd the major R will

quate nd-by

be in

each d.

all not o any d no

due to other

eld up n the e the after

s not

Page No.: N 12 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

3.5

3.6

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

1

2

3

4

Com ContTelep Com

1

2

3

TEC

FGUTP

401-600-C002

ATIONS

1. Contractodrinking etc. Necedone by water tesemployerfrom all undertakiauthoritieemployerrequired respectiv

2. Contractocolony.

3. EMPLOYcaused dclaim noContractoseparate p

4. Contractoday requwater to m

mmunication

tractor will phone, fax, i

mpressed Ai

1. Contractoequipmenpipes, va

2. Installatiosame wil

3. Contractothe above

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

or has to mwater by re

essary netwothe bidder asted and appr shall acqui

local, statings in thees or unders name fofor the perfo

ve obligation

or should ar

YER shall ndue to any Ino compensaor may mapayment sha

or will haveuirement. Bimeet the req

n Facilities

have to arrainternet, intr

r Supply

or will havent required flves, storage

on of the abl be in contr

or will have e system dur

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

make his osorting to th

ork for constat his own coproved by tire and pay fte or natione country wertakings reqr the execu

ormance by bns under the c

rrange on th

not be responterruption oation for d

ake standby all be made b

e to arrange idder will e

quirement of

ange for all ranet, e-mail

e to arrange for compresse systems etc

bove systemractor’s scop

to arrange fring the cont

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

own arrangehe methods truction & drost. Contracthe customefor all perminal govt. auwhere the squire the eution of coboth the concontract).

heir own, dr

onsible for of water supdelay in w

arrangemenby EMPLOY

for storage ensure adeqf water durin

l necessary cl etc. for prop

for Supply sor and comc.

m and operatpe.

for Supply otract period.

AR 

OC. NO.: NBPPLv. No.: ge 11 of 36

ement for clike bore werinking watector is to geter at his owits, approvaluthorities osite is locatemployer toontract (Thentractor and e

rinking wate

any inconvepply and the

work for sunt for wateYER.

of water to quate supplyng major con

communicatper site oper

of Compresmpressed air

tion and ma

of the all the

 

L-004-302-P4C-A

constructionell, water taner system shat the constru

wn cost. Howls and/or lic

or public seted, which o obtain iney include employer of

er in their la

enience or e contractor uch interruper for whic

meet the day of construncreting.

tion facilitierations.

ssor and all system inclu

aintenance o

consumable

A-001

n and nkers all be

uction wever enses

ervice such

n the those

f their

abour

delay shall

ption. ch no

ay-to-uction

es i.e.

other uding

of the

es for

Page No.: N 13 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

4.0 4.1 4.2

4.3

4.4

4.5

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

T&PTentwork It maThe specinstrcompactivadditQuotcontr In thsustathe camoucontrprogcontrotherbill. contr T&Prequand EMPT&Pwith FurthcontrentirEMPextraregar

TEC

FGUTP

401-600-C002

ATIONS

PS TO BE Dtative list of k is given in

ay be noted contractor

ified to beuments & pletion of to

vities may hational T&P. ted rate shractor shall s

he event of ain desired wcontract on tunt of the coractor to de

gress, EMPLractor includr agency & Decision o

ractor.

P shown in irement .Actmaterial av

PLOYER siPs, and the out written a

her requiremractor will pre work wPLOYER. Aa cost to EMrding capaci

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

DEPLOYEDT&P to be Annexure –

that the listis required

e provided handing eq

otal work asave to pre-po

hall be inclsubmit deplo

any failure work progresthis ground,ontract from eploy necessOYER will ding transpocharges as

of EMPLOY

the Annextual Mobilizvailability ate periodicasame have approval of E

ment of T&provide add

within schedAll other T&MPLOYER. Vity etc. prior

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

D BY CONTdeployed by

–B.

t is not exhato provide

by EMPLOquipment’s ts per contracone. In such

usive of suoyment plan

on the partss, EMPLOY after givingthe scope of

sary and sufbe at liberty

ortation cost applicable s

YER in thi

xure –B arezation scheduat site is toally from tito be adherEMPLOYER

P will be rditional T&Pdule time w

&Ps shall be Vendor willto dispatch

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

TRACTORy contractor

austive and ie all necessOYER, if ato maintainct. In case o

h cases the co

uch emerginn of all T&P

t of the conYER may atg due noticef the contracfficient T&P

y to arrange tof same fro

shall be dedis regard w

e tentative ule, based ono reviewed ime to timered to and nR site.

reviewed froP/ equipmenwithout anprovided by

l give advanof heavy equ

AR 

OC. NO.: NBPPLv. No.: ge 12 of 36

R for successf

is only for gsary T&P (oany) measun work progof project reontractor ma

ng requiremalong with t

ntractor to dt his discretioe, and take octor. In the eP/ IMTEs tthe same at tom any of Educted from will be fina

based on pn front availand mutua

e for mobilino change w

om time to nt’s to ensurny financialy the contra

nce intimatiouipment’s.

 

L-004-302-P4C-A

ful completi

general guidother than

uring (calibrgress for tiequirement, ay have to de

ments. Howtender bid.

deploy T & on also termout any or wevent of failuo maintain the risk & co

EMPLOYERcontractor’

l & bindin

planned prolability, drawally agreed ization of m

will be perm

time at sitere completiol implicatioactor withouon & certific

A-001

on of

dance. those rated) imely some eploy

wever,

P to minate whole ure of work ost of

R site/ s RA

ng on

ogress wings

with major mitted

e and on of

on to ut any cation

Page No.: N 14 of 38

TECHNICAL CONDITIONS OF CONTRACT

BOP CIVIL WORKS PACKAGE FGUTPP STAGE-IV (1X 500 MW) AT UNCHAHAR

BHEL SPEC. NO. :PE-TS-401-600-C002 Rev. No.: Dated :

Section A: TECHNICAL CONDITIONS OF

CONTRACT

DOC. NO.: NBPPL-004-302-P4C-A-001Rev. No.:

TECHNICAL SPECIFICATIONS Page 13 of 36

5.0 TIME SCHEDULE 5.1 5.2 5.3

Mobilization Contractor shall mobilize necessary resources within 2weeks from the date of issue of LOI or as per the directive of Project Manager / Construction Manager. Such resources shall be progressively augmented to match the schedule of milestones and completion. Completion Schedule

1. Entire work as detailed in tender specification shall be completed within 18 months from the scheduled date of Issue of LOI.

2. In order to meet above schedule in general, and any other intermediate

targets set, to meet customer/ project schedule requirements, contractor shall arrange & augment all necessary resources from time to time on the instructions of EMPLOYER.

3. The work under the scope of this contract is deemed to be completed in

all respects, only when all the works are carried out as per satisfaction of EMPLOYER. The decision of EMPLOYER on completion date shall be final and binding on the contractor.

Milestones

Sl. No.

Activity Time from date of LOA

1.0.0 Date of LOA Zero date 2.0.0 Mobilisation Within 2 Weeks 3.0.0 CW System 3.1.0 Start Civil Works for CW Pump House Building Within 1 Month 3.2.0 Start of Civil Works of Fore bay from CW Pump

House Up to CW Outlet Within 1Month

3.3.0 Completion of Civil Works of Fore bay from CW Pump House Up to CW Outlet

Within 12Months

3.4.0 Readiness of CW Pump House for Erection of EOT Crane

Within 10 Months

3.5.0 Readiness of CW Pump House for Erection of CW Pumps

Within 14 Months

4.0.0 RO+DM Building

4.1.0 Start of foundations for RO+DM building Within 2 Months

Page No.: N 15 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

4.2

5.05.15.25.35.4

5.5

5.6

6.0

7.0

BaseworkThesprog Biddsubmactiv

a

b

Exte

1

2

TEC

FGUTP

401-600-C002

ATIONS

2.0 Complestart of

0.0 Fire Fi1.0 Start of2.0 Start of3.0 Start of4.0 Comple

House 5.0 Comple

House 6.0 Comple

House 0.0 Compl

steel wPlant

0.0 ComplFaciliti

ed on the abk program (Lse documentgram shall be

der to note thmission and fvities requirea) Getting th

specified same appdifferent

b) Submissisame app

ension Of Ti

1. If the combeyond thextensionthe contr

2. Based on

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ete Handing of equipment erighting Systef Civil Worksf Civil Worksf Civil Worksete Handing O

ete Handing O

ete Handing O etion of Pipeork from Wa

ete handing ies and comp

bove milestoL2 network)ts shall be sue finalized w

hat, during Mfinalisation/ ed to be comhe Concrete in Section-C

proved from grades of co

ion of detailsproved from

ime For Co

mpletion of he contract/cn of the conact.

n the review

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

over of RO+Drection m Buildings

s for Fire booss for Fire Wats of Foam PumOver of Fire W

Over of Fire b

Over of Foam

e Rack includater System u

over of Miscpletion of pun

one the biddalong with Tubmitted by

with the owne

Mobilisation completion

mpleted for exMix Design

C (Specific Towner. The

oncrete separs of Agency the owner fo

mpletion

work as detcompletion p

ntract and EM

ws jointly si

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

DM building f

ster Pump Hoter Pump Hoump House Water Pump

booster Pump

m Water Pump

ding Structurup to Main

c. Buildings &nch points

der shall furT&P list for

y the bidder er within 15

period the bof following

xecution of wn done from Technical ReMix design rately each fproposed to

or preparatio

tailed in theperiod, the cMPLOYER

igned, the w

AR 

OC. NO.: NBPPLv. No.: ge 14 of 36

for Within

ouse Withinuse Within

WithinWithin

p Within

p Within

ral Withi

& Withi

rnish the der completion along with days of plac

bidder shall hg activities bwork: the reputed equirementsshall be got

for OPC ando be engagedon of fabrica

e scope of wcontractor sh

at its discre

works balan

 

L-004-302-P4C-A

n 8 Months

n 2 Months n 3 Months n 6 Months n 8 Months

n 8 Months

n 10 Months

n 12 Months

n 18 Months

etailed quan of the workthe bid. Thecement of aw

have to ensubesides other

agencies as s) and gettingt done for d PPC. d & getting thation Drawin

work gets dehall request fetion may ex

nce at the en

A-001

s

s

ntified ks. e said ward.

ure r

g the

he ngs.

layed for an xtend

nd of

Page No.: N 16 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.0 6.1

6.2

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

3

4

5

6

OTHCapCapacontrBHEQualcons Mat

TEC

FGUTP

401-600-C002

ATIONS

original shall be required this perioportion oextensionbe worke

3. Howevercontinuatattributabthe rightattributabEMPLOY

4. A joint pcompleteresourcesReview o

5. During thresources

6. At the echarge(Eextensionand (iii) Eexhaustedthe sum the schedcontract. attributabcontracto

HER REQUacity of Bidacity of prosract based on

EL and as aplified’ as pesidered.

erials

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

contract perquantified,

for completod of ‘Time of backlog n’ or ‘Time eed out simila

r if any ‘Timtion of woble to the cots of EMPble to the YER may w

programme sed during ths to be depof the progra

he period os as per mutu

end of totaEIC), and upns attributabEMPLOYERd in the samof (i), (ii) aduled date oLD shall be

ble to contraor. UIREMENTdder: spective biddn the ‘Assespplicable in r the assessm

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

riod less theand the nu

tion of the sextension’, attributable

extensions’ aarly.

me extensionork and comontractor aloLOYER to

contractorish to take a

shall be drawe period of ployed by tamme and re

of ‘Time extually agreed

al work copon analysisble to (i) CoR, shall be w

me order. Theand (iii) abovof completioe imposed/ lactor and re

TS

ders shall be ssment of Cathe similar ment carried

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

e backlog aumber of mame shall bthe contracto the con

at the end of

n’ is granted mpletion ofone, then it so impose pr, in additiat the risk an

wn for the b‘Time Exte

the contractecord of shor

tension’, cod program.

ompletion ass of the totaontractor, (iiworked out ae total periove and shallon and the alevied for thecoverable fr

assessed byapacity of Btype of jobs

d out for thi

AR 

OC. NO.: NBPPLv. No.: ge 15 of 36

attributable tmonths of ‘e jointly wo

ctor is boundntractor. Anf the previou

to the contrf contract, shall be withenalty/ LD ion to any

nd cost of con

alance amouension’, alontor as per srtfall shall be

ontractor sha

s certified al delay, thei) Force majand shall be

od of time exl be equal toactual date ohe portion offrom the due

y NBPPL befidder’ proces. If the biddis tender, his

 

L-004-302-P4C-A

to the contrTime exten

orked out. Wd to completny further ‘us extension

ractor to facidue to bac

hout prejudifor the d

y other acntractor.

unt of work ng with matcspecified foe done.

all maintain

by Engineee portion of ajeure condit

considered xtensions shao period betof completiof time extenes payable t

fore awardinedure followder is founds bid shall n

A-001

ractor nsion’

Within te the Time

n shall

ilitate cklog ice to

delays ctions

to be ching

ormat.

their

er In f time tions, to be all be tween on of

nsions to the

ng the wed by d ‘Not not be

Page No.: N 17 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

1

2

3

4

5

TEC

FGUTP

401-600-C002

ATIONS

1. The contrmaterialsreinforce

2. All storebest kindor as per by the EEngineer

3. The ContEngineerworks. Tof samplto the Conot. If samsupply tocomplyinin approcontracto

4. The Engior all ofin accordcharacterthe part oIn chargeThe Engproper mthe Contrby other substituti

5. The Conemployeeinfringemdesign ripayable iin the Cobrought EMPLOYContracto

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ractor shall, s other thaement steel, c

es and materd in conform

relevant IndEngineer In r In charge(E

tractor shall,r In charge (EThe Engineeles or withiontractor in mples are noo the Engineng with the oval of samor eligible fo

ineer In chaf the materdance with r or quality of the Contre (EIC) shallgineer In chamaterial to be

ractor refusimeans. All

ion, shall be

ntractor shaes against

ment or use ghts and shain respect oontract. In tagainst EM

YER in resor shall imm

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

at his own ean the free cement etc. r

rials to be prmity with thdian standardcharge(EIC

EIC) that the

, at his own EIC) sampler In charge(in such furthwriting, wh

ot approved,eer In chargspecification

mples (originor any compe

arge(EIC) shrials broughtthe Contracto samples aractor in rel be at libertarge (EIC)

e substituted ng to complcosts, whichborne by the

all indemnifany actio

of any patenall pay any f any articlthe event of

MPLOYER ospect of mediately b

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

expenses (Inissue mat

required for

rovided by the specificatid and the Co

C), furnish e materials so

expense andes of materiaEIC) shall w

her period ashether samp, the Contracge (EIC) forns laid downnal or freshensation.

hall have fult to site by t

ct specificatapproved byemoving rejety to have thshall have ffor rejected

ly; he may ch may attende Contractor

fy EMPLOYon, claim nt or design royalties or le or materf any claim or any age any suc

be notified

AR 

OC. NO.: NBPPLv. No.: ge 16 of 36

nclusive of Tterials like the work.

the Contractions laid dowontractor shproof to th

o comply.

d without deals proposedwithin sevens he may reqples are appctor shall forr his approvn in the Conh ones) sha

ll powers fothe Contract

ations or doy him. In cected materi

hem removedfull powers

d materials ancause the samd upon such r.

YER, its reor proceed or any alother charg

rial or part being madent, servant h matters athereof, pro

 

L-004-302-P4C-A

Taxes), provistructural

tor shall be own in the conhall, if requhe satisfacti

elay, supply td to be used in days of suquire will intproved by hrthwith arranval fresh samntract. Any

all not mak

or removal otor which aro not conforcase of defauials, the Engd by other mto procure

nd in the eveme to be supremoval an

epresentativeding relatinlleged paten

ges which mthereof inc

e or action or employe

as aforesaidovided that

A-001

ide all steel,

of the ntract

uested ion of

to the in the upply timate him or nge to mples delay

ke the

of any re not rm in ult on gineer

means. other

ent of pplied nd / or

es or ng to nt or

may be luded being ee of

d, the such

Page No.: N 18 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

6

7

8

9

1

TEC

FGUTP

401-600-C002

ATIONS

indemnitcomplyinContractoany suchonly if thsubmissio

6. The Engispecifiedother thalready bshall prrequire fsuch tesall facilitshall be in tests otherwise

7. In additiotests / samthe materin such te

8. Material supplied approvedthe respo

9. EMPLOYany timeon the wplace(s) wat any pobtained required

10. All mateof EMPLprior writhe Worksuch matforthwith

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

y shall not ng with the or shall payh use, the ahe use was thon of the ten

ineer In chard in the Conhan those fbeen furnisherovide at hfor the purpts are requties requiredborne by thshall be boe provided.

on, the Conmples as marials used byests/ samples

required foby EMPLOY

d by the Engonsibility of t

YER's office to inspect works, eitherwhere such mplace (s) w

and the for such insp

rials broughLOYER anitten approvaks are finallyterial is full

h remove fro

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

apply whenspecific dir

y any royaltiamount so phe result of ander.

rge(EIC) shntract for anfor which, ed, at the co

his expenspose. If no uired by thed for the puhe Contractorrne by th

ntractor shallay be requirey the compas.

or the worksYER, shall bgineer. Storathe contracto

cials concernand examiner on the Sitmaterials ar

where these Contractor pection and

ht to the Sitend shall noal of the Ey completed ly recoveredom the Site a

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

n such infrinrections issuies or other paid being any drawing

hall be entitleny materials

as stated aost of the Ce all facilititests are sp

e Engineer, urpose and r only. The

he Contracto

l perform / ed by the Enany except fo

s, whether bbe stored by age and safeor.

rned with thee any materite or at fa

re assembledare lying orshall give examination

e shall becomot be removEngineer In and advanc

d, the Contraall surplus m

AR 

OC. NO.: NBPPLv. No.: ge 17 of 36

ngement hasued by EMPcharges payreimbursed

gs / specifica

ed to have tesupplied b

above, satisfContractor anies which thpecified in tthe Contrac the chargee cost of maor in all ca

submit at hngineer In chor the costs

brought by ty the Contrace custody of

e Contract shials intendeactory or wod, fabricated,r from whichsuch facilit

n.

me and remved off the Scharge(EIC

ce, if any, inactor shall at

material origi

 

L-004-302-P4C-A

s taken plaPLOYER buyable in resp

to the Contrations issued

ests carried oby the Contrfactory proond the Contrhe Engineerthe Contract

ctor shall pres for these aterials consases except

his own costharge (EIC) oof materials

the Contractctor only at pf material sh

hall be entited to be usedorkshop or , manufacturh these are ties as may

main the proSite withou). But whe

n respect oft his own expinally suppli

A-001

ace in ut the ect of ractor

d after

out as ractor of has ractor r may t, and rovide

tests umed when

t such out of s used

tor or places all be

tled at d in or

other red or being

y be

operty ut the never f any pense ied by

Page No.: N 19 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.3 6.4 6.5

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

Exec

1

2

Setti

1

2

Site

TEC

FGUTP

401-600-C002

ATIONS

him and the prop

cution Of W

1. The worksatisfactitender. Inshall be f

2. The Enginstructio"Work Sivisit thissigning thor notice

ing Out

1. All the windicatedand set oshall be mThis refecontract points hoEMPLOYdo workestablishecontractoproperly its own e

2. The contprecautioposition accident deemed expenses

Drainage

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

upon such erty of the C

Work

k shall be exon of the Enn case of cofinal & bindi

gineer In ons to the Coite Order Bo office dailyhe relevant s in writing

works shall d on the drawout the worksmade availerence linesand the cont

orizontal andYER well ink in the areed by him ar

or to proceelocated may

expenses.

tractor shall ons to prese

In the evenor due to necessary p

s.

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

removal, thContractor.

xecuted in angineer and aonflict, the ding.

charge(EIC)ontractor in ook” maintaiy and shall entries in thwithin the in

be set out wing. The cs. Only oneable for sett shall be utractor has td vertical conn advance of ea allotted re checked b

ed with the y be removed

at his own erve and m

nt of these any other

placed by E

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

he same sh

a workman las per techn

decision of th

) will comrespect of thined at his oconfirm rec

his book. Suntent and me

to the truecontractor e grid referting out the

used as datuto establish fntrol points.

f the times &to him so

by EMPLOYworks. And and / or di

expense takmaintain thes

marks beinr cause whaEMPLOYER

AR 

OC. NO.: NBPPLv. No.: ge 18 of 36

hall re-vest

like manner nical specifiche Engineer

mmunicate he executionffice and theceipt of suchuch entries weaning of the

e lines, gradshall be resprence line works und

um for the for his work. The contra

& places at wthat suitab

YER / Custony work donismantled by

ke all properse datum mng disturbedatsoever, theR / Custom

 

L-004-302-P4C-A

in and be

and to the ecation issuedr In charge (

or confirmn of the worke Contractorh instructionwill rank as ese condition

des and elevponsible to land bench

der the conworks unde

k area at avaactor shall in

which he wishble datum pomer to enabne without y the contrac

r and responmarks to itsd or obliterate same may

mer at contra

A-001

ecome

entire d with (EIC)

m his k in a r shall ns by order ns.

vation locate mark

ntract. er the ailable nform hes to points

ble the being

ctor at

nsible s true ted by y be actor's

Page No.: N 20 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.6 6.6.1 6.6.2 6.7 6.7.1

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

All wprogshallEngiwatepumpplantin qu Retu Retu Sealeof co15 dcondidentto habags Retu

1

2

3

Cem Cem

1

2

TEC

FGUTP

401-600-C002

ATIONS

water includgress of the wl be removeineer In chaer all the fouping out, wt site. All suoted rates.

urn Of Mate

urn Of Ceme

ed cement bompletion or

days from asdition of thetified withinandling and s will be take

urn Of Steel I

1. All surpweighme

2. Surplus, returned the projehandling

3. All wastato the staccountinadditiona

ment And St

ment Consum

1. The theor

2. For desig

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ing sub-soil works or in tred by the carge(EIC). Itundation pits

well point sysuch expendi

erials

ent

ags remaininr terminationsessment) if

e cement. Ren the projectincidental ch

en back on w

Including Sc

plus steel anent basis.

unused andseparately fo

ect area; Reand inciden

age/ scrap (itores on weng purposesal cost due h

eel Consum

mption

retical consu

gn mix concr

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

water whichrenches and contractor frt will also bs, trenches wstem etc. iture on de-w

ng unused ann of the conf EMPLOYEeturn of suct area by Engharges. Surp

weighment b

crap

nd all wast

d un-tamperefor a place dieturn of sucntal charges.

including waeighment ba. Return of andling and

mption And W

umption of c

rete as per ap

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

h may accumd excavationsfrom the Sitbe responsibwith suitablConsideringwatering sha

nd in perfectntract shall bER / Enginech cement togineer/ EMPplus sealed aasis.

tage materi

ed steel shalirected by Ech materials

astage, unusasis and a rsuch materitransportati

Wastage

cement shall

pproved des

AR 

OC. NO.: NBPPLv. No.: ge 19 of 36

mulate on ths, includingte to the satbility of the le de-waterig the depth all be deeme

tly good conbe returned peer is satisfieo the projecPLOYER wand good co

ials will be

ll be sorted MPLOYERwill not be

sable scrap) receipt obtaial will not bon and incid

be based on

sign mix.

 

L-004-302-P4C-A

he Site durin monsoon ptisfaction ofcontractor ting methodsof water tabed to be inc

ndition at thepromptly, (wed of the phyt stores/ plaill not be en

onditioned ce

e taken bac

section-wisR /Engineer w

e entitled to

shall be retuined for mabe entitled todental charge

n the followi

A-001

ng the period f the to de-s like, ble at luded

e time within ysical ace as ntitled ement

ck on

e and within o any

urned aterial o any e.

ing.

Page No.: N 21 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.7.2 6.7.3

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

3

4

5

Cem

1

2

Sl.NC-1

C-2

C-3

Rein

1

TEC

FGUTP

401-600-C002

ATIONS

3. For nomi

as approv

4. For itemEMPLOYcement cConsump2013 unlcontract o

5. Actual creturned be taken

ment Wastage

1. Allowablconsumpspecifica

2. For any and whicrecovery

No. Cement

Theoretiany wasActual chalf percconsumpActual cpercent

nforcement S

1. The theoMS rounbending weights contracto

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

inal mix conved by Engin

m of works, YER, for maconsumptionption” attachless otherwior mutually

consumptionin good conback by EM

e

le wastage:ption of cemtion.

material issch is not accfor such ma

consumptio

ical consumpstage or loss)consumptioncent (+1.5%ption towardconsumption(+1.5%) of a

Steel & MS

oretical consnd shall be schedule. Was per India

or for any

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ncrete work,neer-in-char

where voluasonry workn shall be ghed to the Dse specifiedagreed by E

n = Issue –ndition by co

MPLOYER).

One and ment unless

ued by EMPcounted for aterial shall b

on

ption (witho). n being Limi) of aforesai

ds allowablen beyond oneabove (C-1).

Round Cons

sumption of based on a

Weight shall an standardsdeviation in

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

, as per minrge.

ume mix is ks, plaster otgoverned byDelhi schedud in the specEngineer-in-c

– Surplus/ ontractor to s

half perces specified

PLOYER toby the cont

be affected a

out consideri

ited to one anid theoretica wastage. e and half .

sumption

various diaapproved co

be calculats. No extra n weights f

AR 

OC. NO.: NBPPLv. No.: ge 20 of 36

imum cemen

permitted ither miscellay the “Stateule of Ratescifications ocharge and c

unused quastore. (No sw

ent (+1.5%otherwise

o the contratractor to EMat Recovery

Basis recove

ing Free

nd al

Free

Recov

ameters of reonstruction ted considercost shall b

for the diff

 

L-004-302-P4C-A

nt as specifi

n writing baneous item

ement of Ces of CPWDDor the drawicontractor.

antity of ceweep cemen

%) of theorin the tech

actor free of MPLOYER,rates.

of issue & ery

very rate

einforcemendrawing andring the sectbe payable tferent proce

A-001

ied or

by the ms, the

ement DSR- ng of

ement nt will

retical hnical

f cost, , then

nt and d bar tional to the edures

Page No.: N 22 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.7.4 6.7.5

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

2

3

4

Rein

1

2

Sl.N

R-1

R-2

R-3

Stru

1

2

3

4

TEC

FGUTP

401-600-C002

ATIONS

adopted including

2. Actual co

3. Surplus contracto

4. Wastage

nforcement S

1. Allowablconsidere

2. Wastage

No. Reinforc

TheoretiwastageWastageaforesaitowards Wastagetheoretic

uctural Steel

1. The theoapproved

2. Weights Indian stpayable procedurconsump

3. Actual co

4. Surplus =EMPLOY

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

for issue g rolling tole

onsumption

= Un-tampeor to EMPLO

= Actual co

Steel & MS R

le wastage: ed as allowa

and scrap sh

cement steel

ical consume and scrap oe limited to pd theoretiAllowable w

e beyond focal consump

l Consumpt

oretical cond drawings.

shall be catandard as to you fores adopted

ption includin

onsumption

= UntempereYER store.

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

and calculerances.

= Issue – Su

ered and unOYER store

nsumption –

Round Wast

(+4%) of ble wastage.

hall be as pe

l

mption (withor loss) plus four perical consuwastage.

four percentption above (

tion

nsumption o

alculated comentioned

r any deviad for issueng rolling to

= Issue – Su

ed, unused, u

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

lation of th

urplus.

nused quantalong-with r

– Theoretica

tage

the theore.

er actual weig

out conside

rcent (+4%) umption (R

t (+4%) of (R-1).

of various

onsidering thin relevant

ation in wee and calcolerances.

urplus.

uncut quanti

AR 

OC. NO.: NBPPLv. No.: ge 21 of 36

he theoretic

tity of steel relevant doc

al consumpti

etical consu

ghment basi

Basis recove

ring Free

of R-1)

Free

the Recov

sections sha

he sectionalt clause. Noeights for thculation of

ity of steel re

 

L-004-302-P4C-A

cal consum

returned bcuments.

on.

umption sha

is.

of issue & pery

very rate

all be base

l weights ao extra shahe two diff

the theor

eturned by y

A-001

mption

by the

all be

penal

ed on

as per all be fferent retical

you to

Page No.: N 23 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.7.6 6.8

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

5 Stru

1

Sl.N

S-1

S-2

S-3

2

Reco

1

2

3

TEC

FGUTP

401-600-C002

ATIONS

5. Wastage

uctural Steel

1. Allowablshall be cmeasuredmaterialsto 0.5% (considereshall be percent).

No. Structur

Theoretiany was& drg. Wastagethe aforetowards Wastageaforesai

2. All wastreturned

onciliation O

1. The contrissued toBill.

2. The contspecifiedbalance m

3. If it is recovery for the exbill.

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

= Actual co

l Wastage

le wastage: considered. d as per acs due to gas (zero point fed for recon

considered

ral steel and

ical consumpstage, scrap o

e limited to pesaid theoretallowable w

e beyond foud theoretical

tage reinforto EMPLOY

Of EMPLO

ractor shall so him every

tractor shall d herein to tmaterial are

noticed by at the pena

xcess wastag

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

nsumption –

4% (four pWastage is

ctual weightcutting, stra

five percent)nciliation pud to be inc

SS liner

ption (withoor loss) as pe

plus four pertical consum

wastage. ur percent (4l consumptio

rcement, MYER.

OYER Issued

submit a recmonth. The

properly acthe satisfactavailable wi

EMPLOYEal rate, then ge as per pe

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

– Theoretica

percent) of further classtment basis.aightening o) of theoreticurposes onlycluded in a

out considerier specificat

rcent (+4%) mption (S-1)

4%) of the on (S-1).

MS round an

d Materials

conciliation se same may

ccount for thtion of EMPith contracto

ER that theEMPLOYE

enal recovery

AR 

OC. NO.: NBPPLv. No.: ge 22 of 36

al consumpti

the theoretisified as cut. Invisible w

of edges etc.cal consumpy. But this iallowable w

Basis recove

ing tion

Free

of Free

Recov

nd structura

statement ofbe submitte

he material PLOYER ce

or’s custody

e wastage isER will procy rates as sp

 

L-004-302-P4C-A

on.

ical consumt pieces and wastage (lo) shall be lim

ption and shinvisible wa

wastage (i.e.

of issue & pery

very rate

al steel sha

f cement anded along wit

issued to hiertifying thaat site.

s high and ceed for recpecified from

A-001

mption scrap

oss of mited all be

astage four

penal

all be

d steel th RA

im as at the

calls overy m RA

Page No.: N 24 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.9 6.10 6.11

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

4

Reco If wamade Reco Sl.N

1 2 3

Insp All apprto thnoticthe qdispuconc Unco

1

2

TEC

FGUTP

401-600-C002

ATIONS

4. The apprthe purpo

overy Of M

astage exceee from mont

overy Rate O

No. Cement ReinforcStructur

pection And

work embraoval at each

he Engineer ce being recquality and eute, the deciclusive.

overing And

1. The Coopeningsdirect forthe satisbeen covand is suwith the in or throEMPLOYContracto

2. If neitherof constrwhose d

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

roved drawinose of reconc

aterial

eds the specthly RA bill

Of Materials

(OPC/ PPC/cement steelral steel mate

Stage Appr

acing more th stage thereo

In charge (eived, the Eextent thereoision of the

d Making G

ontractor shas in or througr his verificasfaction of vered up or pubsequently

Contract, though, reinstaYER. In anor.

r drawing noruction whicdecision sha

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ngs/ bar benciliation of m

cified limit, at the penal

Item /PSC). l and MS roderials.

roval Of Th

than one proof and the C(EIC) when

Engineer In cof at any timEngineer In

Good

all uncover gh the same ation and sha the Engine

put out of vifound on un

he expensesating and m

ny other case

or specificatich in the opill be final

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

nding schedumaterials.

the recoveryrate stipulat

d etc.

he Work

ocess shall bContractor sh

each stage charge (EIC)

me he may chn charge (EI

any part oas the Engall reinstateeer In chargiew after beincovering tos of uncovermaking goode all such ex

ion contain ainion of thand conclu

AR 

OC. NO.: NBPPLv. No.: ge 23 of 36

ules are to b

y of excess ted below.

Rec7500/-58,00070,000

be subject tohall give due

is ready. In) shall be enhoose and inC) thereon s

of the Workineer may fe and make gge(EIC). If aing approved

o be executedring and / ord the same sxpenses shal

any mentionhe Engineeusive, are

 

L-004-302-P4C-A

be considere

wastage sha

covery rate (R- per MT 0/- per MT0/- per MT

examinatioe notice in wn default of ntitled to appn the event oshall be fina

ks and/or from time to good such pany such pard by the Engd in accordr making opshall be bornll be borne b

n of minor der In chargereasonable

A-001

ed for

all be

Rs)

n and writing f such prove

of any al and

make time

part to rt has gineer dance ening ne by by the

details (EIC) and

Page No.: N 25 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.12 6.13 6.14 6.15

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

Nuis The do ownegene Mat Matepropcharg Trea All remashallContotherimmchargdispo Prot

1

2

3

TEC

FGUTP

401-600-C002

ATIONS

obviouslysuch detaas if thincluded

sance

Contractor sanything whers, tenants

erally.

erial Obtain

erials of anyperty of EMPge(EIC) may

asure, Trove

fossils, coains or thingl be the absotractor shallr person fro

mediately upoge(EIC) withosal of the sa

tection Of W

1. Trees deduring thsuch treprotected

2. The contguards, fthe Enginsafety an

3. The contit is final

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

y and faails shall be hey were in the scope

shall not at ahich shall cor occupiers

ned From E

y kind obtaPLOYER / iy direct, at n

e, Fossils Et

oins, articlegs of geologolute propertl take reasonom removingon discoveryh such discoame.

Works

esignated byhe course ofee shall nod by providin

tractor shall fencing and neer In char

nd convenien

tractor shall lly taken ove

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

airly intendprovided byspecially

e.

any time do,cause unnecs of other pr

Excavation

ained from eits client andno extra cost.

tc.

es of valugical or archty of EMPLnable precaug or damag

y thereof andovery and ca

y the Enginef the Work

ot be chargeng tempora

provide andwatching wrge(EIC) for

nce of those e

have total reer by the EM

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

ded for satisy the contramentioned

cause or pecessary disturoperties nea

excavation od shall be di.

ue or antiquhaeological iLOYER / EMutions to pr

ging any sd before remoarryout the E

eer shall bks and earth led. Where nary fencing.

d maintain awhen and wh

r the protectemployed on

esponsibilityMPLOYER.

AR 

OC. NO.: NBPPLv. No.: ge 24 of 36

sfactory comactor withou

and shall b

ermit any nuurbance or

ar the Site an

on the Site isposed of a

uity and struinterest discoMPLOYER'srevent his such articleoval acquainEngineer's di

be protectelevel withi

necessary, su

at his own ehere necessartion of the Wn the Works

y for protect No claim w

 

L-004-302-P4C-A

mpletion of wut any extra be deemed

uisance on Sinconvenien

nd to the p

shall remais the Engine

uctures and overed on ths client andworkmen o

e or thing, nt the Engineirections as t

ed from dan 1 meter ofuch trees sha

expense all lry or requireWorks or fo or the publi

ting his workwill be entert

A-001

work, cost, to be

Site or nce to public

in the eer In

other he site d the r any shall

eer In to the

amage f each all be

lights, ed by or the ic.

ks till tained

Page No.: N 26 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.16 6.17 6.18 6.19

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

Prot The In cgreasdirecto be Clea Contworkconsobstrthe s Qua The testinpropline has tbe dois resame Com

TEC

FGUTP

401-600-C002

ATIONS

by the Econtractocompletecomply wto the cohis supewith thethe repairof such immediatsuch disp

tection Of E

contractor scharge(EIC),sing, rappincted by Engie included in

arance Of Si

tractor has tk is to be cstruction mruction in thsite, this will

ality Assuran

contractor hng of civil

per quality, gwith approv

to submit deone as per Iquired by the shall be bo

mpletion Of

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

Engineer In or's works ae restorationwith the speontractor's wrvision or c

e party conr of such dadisputes.

tely and no putes.

Embedment

shall ensure of all bol

ng them withineer In cha

n the rates qu

ite And Rep

to clear the commenced

materials andhe erection l be done at h

nce

has to establconstruction

grade and sved field quaetailed reportS code spec

he engineer torne by the c

Work

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

charge(EICand the con of the damecifications aworks occucontrol, the ncerned. Thamaged work

The contracause thereo

’s Bolts Etc

proper protets, inserts, h gunny bagrge(EIC). C

uoted for the

pairs.

site / area w/ or in pro

d equipmen work withinhis risk & co

ish / arrangen materials strength of tality check lt for testing ifications/ Eto be carriedontractor.

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

C) for any ontractor shmaged workand drawingur because

contractor she contractorks because oactor shall pof will be as

c.

ection to theembedmentgs or canva

Cost of suche item.

where mechaogress. The nt lying in n 24 hrs. Nost by EMPL

e at site thand concre

the materiallist of EMPLof all mater

EMPLOYERd from outsi

AR 

OC. NO.: NBPPLv. No.: ge 25 of 36

damage orhall be reks to its origgs. Should a

of other shall make hr shall not caof any delayproceed to ssigned pend

e satisfactiont etc. from as or by anyh protections

anical and e contractorthe vicinityotice, In casLOYER.

he field tesete cubes s used in th

LOYER/ its rial used etc.R's quality plide laborator

 

L-004-302-P4C-A

r loss to esponsible foginal conditiany such daparty not u

his claim dirause any del

y in the resolrepair the

ding resoluti

n of the Engweather et

y other meas shall be de

electrical erer shall rey and case he fails to

sting facilitiefor ensurin

he constructiclient. Contr All testinglan. If furthery, the cost o

A-001

the or the ion to amage under rectly lay in lution work

ion of

gineer tc. by ans as eemed

ection move

ausing clear

es for ng the ion in ractor

g shall er test of the

Page No.: N 27 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.20 6.21

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

1

2

3

Meth MethCode Heal

1

2

3

TEC

FGUTP

401-600-C002

ATIONS

1. The workcharge(Ein the Coequipmenthings shall wastethe Engin

2. EMPLOYtime to tsatisfactinot be treto the sashall com

3. The Engwhich the

hod Of Mea

hod of measues / CPWD c

lth, Safety &

1. The contAccounta

2. The contmanagemthem. Tsafety angood sanand planThe Engwhich, incase theprecautioaccount s

3. The contrwho sha

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ks shall be cEIC) and in aontract, andnt, temporarhall be rem

e materials aneer In charg

YER shall htime such seon of the Eeated as havatisfaction o

mmence only

ineer In chae work is co

asurement

urements if ncodes.

& Environm

tractor shall ability;

tractor will ment at site he contracto

nd preventionitary conditint operation gineer In chn the E I/C’e contractorons and anyshall not affe

ractor shall aall have fu

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ompleted toaccordance wd all unusery buildingsmoved and tand deliveredge(EIC) at th

have power ections of th

Engineer In cve been compof Engineer y after handin

arge(EIC) shmpleted and

not specified

ment manag

comply wi

be responsifor the con

or shall conton of humanions in and amust be car

harge(EIC) rs opinion, i

r must immy delays attect the agree

appoint dediull authority

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

o the entire swith the comed stores as, site officethe site and d up clean ahe Contracto

to take ovehe work ascharge(EIC)pleted until In charge(E

ng over of th

hall certify td the date the

d in the tend

gement

ith following

ible for Heanstruction actinuously takn and equipmaround the sirried out in reserves thes being perfmediately atributed to ed contractua

icated full-tiy to ensure

AR 

OC. NO.: NBPPLv. No.: ge 26 of 36

atisfaction ompletion scheand matere, labour huwork cleare

and tidy to tor's expenses

er from the have been

). Such wothe extra woEIC). The Ghe entire wo

to the contrereof.

der, shall be

g towards S

alth, Safety ctivities to bke special cment accideite. All the c the safest pe right to sformed dangadhere the the work s

al finishing d

ime Qualifiee that all n

 

L-004-302-P4C-A

of the Engineedule as specrials, tools, putments and ed of rubbishthe satisfactis.

Contractor completed t

ork however orks are exeGuarantee p

orks.

actor the da

as per releva

Safety and S

& Environbe carried oucare to ensurents and maiconstruction possible mastop any prgerously. In

requisite sstoppage ondates.

ed Safety Offnecessary s

A-001

eer In cified plant, other h and ion of

from to the

shall ecuted period

ate on

ant IS

Social

nment ut by re the intain work

anner. ocess n this safety n this

fficers safety

Page No.: N 28 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

4

N

N

N

D

N

D

M

N

A

i

&

A

h

S

c

T

A

&

D

W

s

M

A

b

TEC

FGUTP

401-600-C002

ATIONS

precautiocontractoof all per

4. Some of follows:-

Nobody is al

Never enter w

No climbing/

Do not excee

No debris ob

Do not walk

Maintain goo

No photograp

All Site sup

mparted stru

& record to b

Availability

hours.

Site Safety t

cover every w

Tools box tal

All accident

& procedure

Daily Safety

Weekly co-o

safety officer

Monthly safe

All Safety e

before use.

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

ons are obsors. These arsonnel withi

the commo-

llowed to ent

work area w

/working all

ed the speed

bstacles allow

on pipelines

od Housekee

phy/ Videog

pervisors &

uctured tra

be maintaine

of qualified

training to b

worker.

lk (5-15 min

/ incidents(N

should be f

Checking b

ordination m

r.

ety meeting w

equipment m

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

served by appointees shin the contra

n safety rule

ter at constru

without Safety

lowed withou

limit 25 Km

wed on the ro

s or false cei

eping at wor

graphy allow

& engineers

aining on con

ed.

& trained S

be imparted

nutes) by sup

Near Miss)

finalized)

y Each Site

meeting of a

with Site In-

must be ISI

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

the Contrahall have fulactor's area o

es to be foll

uction site w

y helmet & c

ut proper sa

mph within p

oads & pass

iling.

rk site.

wed without p

(including

nstruction sa

Site Enginee

to all work

pervisor prio

to be report

Engineer alo

all Safety en

-charges.

marked &

AR 

OC. NO.: NBPPLv. No.: ge 27 of 36

actor's emplll responsibiof the works

lowed durin

without Safet

chin strap in

fety belt abo

premises.

sages.

permission

g subcontrac

afety before

er at site dur

kers & plan

or to start of

ted & invest

ong with Saf

ngineers with

checked by

 

L-004-302-P4C-A

loyees and lity for the s.

ng working a

ty Shoe.

n place.

ove 2 m. heig

ctors) must

start of the

ring all work

to be made

any job.

tigated.(form

fety enginee

h EMPLOY

y Safety offi

A-001

sub-safety

are as

ght.

be

job

king

e to

mats

er.

YER

ficer

Page No.: N 29 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

T

B

L

G

f

S

c

D

a

D

T

P

m

D

F

m

F

i

C

c

5

A

B

C

TEC

FGUTP

401-600-C002

ATIONS

Tag system f

Bamboo/woo

LPG cylinde

Good House

flammable m

Safety awar

competitions

Deployment

at work site.

Display of L

Testing certi

Provision &

material stor

Display of em

For work in

motors or ele

For confined

ntervals.

Checking &

cutting set et

5. Contracto

A. Contracto& other including

B. Contractoworkers.

C. Contracto

nurse & This eme

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

for erection &

oden Scaffol

rs not allow

keeping. Sep

material.

eness progr

s, talks etc.

of Safety S

ist of First A

ficates for li

& maintenan

es.

mergency te

n confined sp

ectric tools w

d space ent

tag of equip

tc. by superv

or shall ensu

or has to maultra-mode

g Ambulance

or has to en

or has to enambulance

ergency set-u

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

& use of sca

lding materia

ed for gas cu

parate waste

rams for wo

upervisors f

Aid trained p

fting tools &

nce of fire

lephone num

pace use 24

with max. 24

try Gas test

pment like gr

visors before

ure following

aintain contaern medical e.

nsure pre-em

nsure that adare availab

up should inc

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

affoldings.

al not allowe

utting.

e bins to be u

orkers by d

for every 25

persons.

& tackle.

extinguishe

mbers at vari

4 V lamp fi

4 V.

t must be

rinding mac

e use.

g:

act with locfacilities r

mployment m

dequate Firsle at work clude, but no

AR 

OC. NO.: NBPPLv. No.: ge 28 of 36

ed.

used for flam

display of b

50 workers a

ers at const

ious location

itting & use

done before

hine, weldin

cal hospital hrequired du

medical chec

st Aid facilisite for emeot limited to

 

L-004-302-P4C-A

mmable & n

boards, post

and part ther

truction site

ns.

e tools with

e & at regu

ng machine,

having scanuring emerge

ck for all sta

ities with trergency pur

o, followingA-001

non-

ters,

reof

e &

air

ular

gas

nning ency

aff &

ained rpose.

Page No.: N 30 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

6

7

8

TEC

FGUTP

401-600-C002

ATIONS

Male n Oxyge Breath Eye w Stretch Traum Medic

6. The Contor his agobservancompensrequirem(EIC).

7. The amoContractothe safetybe final a

8. The coAccounta

(a) The age ihavebearsubsfami

(b) The abid

(c) The stipuAbo

(d) The and failu

(e) The (Reg

(f) The Wag

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

nurse (in shien set up hing apparatu

wash facilityher

ma blanket cines

tractor shall gents or wornce of the ation for inj

ments will res

unt towards or. The amouy activities aand binding o

ntractor shability;

contractor sin pursuant te been engagring his edustantiate appily enabling contractor

de by abolitiocontractor

ulated in thlition) Act 1Contractor shall be li

ure in meetinContractor

gulation & AContractor s

ges Act 1948

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

ifts)

us

be fully resprkmen’s negsafety requ

juries. It masult in penal

penalties wunt so collecat site. The on the Contr

hall compl

shall not empto ILO convged , the Coucation expepropriate edu

to bear the cshall not en

on of Bondedshall main

he Contract 1970. shall abide iable for D

ng with relevshall abide

Abolition) Acshall abide b8, payment o

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

ponsible forgligence or cuirements aay be noted

action as de

will be deduccted above wdecision of

ractor.

ly with f

mploy any emvention. If anntractor shaenditure whucation or emchild educatingage Forced Labour Sy

ntain Healtht and Contr

by UN conDiscriminatiovant requireme the requict, 1970 for by the statutoof Wages Ac

AR 

OC. NO.: NBPPLv. No.: ge 29 of 36

r accidents ccarelessness

and shall bthat non-comecided by En

cted from runwill be utilizf EMPLOYE

following

mployee lessny child laboall be levied hich will inmploy any ion expendited/Bonded Lystem (Abolih & safety ract Labour

nvention w.ron/Corporal ments. irement of working houory requiremct 1936.

 

L-004-302-P4C-A

caused due tos in regard tbe liable tompliance to ngineer In ch

nning bills oed for suppo

ER on above

towards S

than 15 yeaour were fouwith expens

nclude stipenother membture. Labour and ition) Act, 1

requiremenr (Regulatio

r.t Human Rpunishmen

Contract Laurs.

ment of Mini

A-001

o him to the o pay

HSE harge

of the orting e will

Social

ars of und to ses of nd to ber of

shall 976. nt as on &

Rights nt for

abour

imum

Page No.: N 31 of 38

 

 

BHEL SPEC Rev. No.: DTECHNICA

6.22

 

C. NO. :PE-TS-4Dated :

AL SPECIFICA

Disc

1

2

3

4

TEC

FGUTP

401-600-C002

ATIONS

(g) The & w

crepancies A

1. The seveexplanatopreferencto scale a

2. In case respect tterms of order of and GCC(a) Tech

SectiSectiSecti

(b) Techspeci

(c) Spec(d) Tend

(e) Gen

3. If there aforming deciding

4. Any erroomissionfrom the therein aobligatio

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAC

Contractor sworkers.

And Adjustm

eral documenory of onece to small sand special c

of discrepanto any item conditions, preference w

C being the lehnical Specifion-C(Speciion-B(BOQ)ion-D(Generhnical condifications)

cial Conditioder Drawingeral conditio

are varying part of the authority wi

or in descrn therefrom s

execution according tons under the

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: AL CONDITION

CONTRACT

shall arrange

ment Of Err

nts forming e another, scale drawin

conditions in

ncies betwedescription

the documewithin( SCCeast preferrefications (TSfic Technica) ral Technicaditions of

ons of Contras

ons of contra

or conflictincontract, th

ith regard to

ription, quashall not vit of the who

o the drawine contract.

CONTRACTCKAGE AT UNCHAHA

NS OF DORevPag

e potable dri

rors

the Contracdetailed dr

ngs and figun preference

een the diffen, quantity, ent should bC being the med documentS) : al requireme

al specificaticontract

act (SCC)

act (GCC)

ng provisionhe Engineer o the docume

antity in sctiate the conole or any

ngs and spec

AR 

OC. NO.: NBPPLv. No.: ge 30 of 36

inking water

ct are to be rawings beures dimensito general c

ferent tenderpayment tee considered

most preferrt):-

ents)

ion) (Section-A

ns made in ar In charge(Eent.

chedule of ntract or rele

part of the cifications o

 

L-004-302-P4C-A

r to its emplo

taken as mueing followions in prefeonditions.

r documentsrms and or d in the folled/final doc

of Tech

any one docEIC) shall b

quantities oease the cont

works comor from any

A-001

oyees

utually wed in ference

s with other

lowing ument

hnical

ument be the

or any tractor

mprised of his

Page No.: N 32 of 38

 

 

BH RTE

SL

 

HEL SPEC. NO. :Pev. No.:  Dated ECHNICAL  SPEC

 

COL NO. NA

1 InitCon

2 ShrAut

3 Abr

4 Aggtest

5 Aggtest

6 Flak

7 Elo

8 Bulbulk

9 Con

10 Cemcast

11 Co

12 Wo

13 Speagg

14 Cemvibr

 

PE‐TS‐401‐600‐C:  IFICATIONS 

ONCRETE TAME OF TEtial & final snsistency of rinkage of to Clave Tes

rasion value

gregate Impt

gregate crust

kiness index

ngation Indelk density, king appratu

ncrete Comp

ment motting

oncrete Cube

orkability of

ecific gragregates ment morrating

TECM

FGUTP

C001

LIST OF E

TESTING EEST

etting time, cement cement ,

st

test

pact value

shing value

x

ex voids and

us

pressive test

tor cube

e casting

f concrete

avity of

rtor cube

CHNICAL CONMAIN PLANT CPP STAGE‐IV (

TECHNICA

EQUIPMEN

EQUIPMENNAME OVicat Apppot Le ChatAuto ClavLos Anglemachine Aggregatetesting macounter

Crushing v

ThicknessmeasuringElongation

Measuring

Digital Testing MKN capaci

Mortor Cu

Concrete C

Slump con

Pycnomete

Motorisedmachine fo

 NDITIONS OFCIVIL WORKS(1X 500 MW)

Section A:AL CONDITIONS 

ANNEXURE‐A

ANNEXURNTS FOR C

NT F EQUIPMparatus with

telier's appve Equipmenes Abrasion t

e Impact achine with

value appara

gauge g flakiness inn guage

g cylinders

ComprMachine with

ity.

ube mould

Cube Mould

ne

er

d vibfor cement te

F CONTRACTS PACKAGE ) AT UNCHAH

OF CONTRACTA 

RE- A IVIL SITE

MENT SIZh desk Sta

paratus nt Sta

testing Sta

value h blow Sta

atus Sta

for ndex Sta

Sta3, cyl

ressive h 2000 200

70.mindes

d

15020 conmajactStanos

Sta

bration esting Sta

HAR 

DOC. NO.: NBNo.: Page 31 of 36

LABORAT

ZE OF EQI

andard

andard

andard

andard

andard

andard

andard 5,10 &

linders

00KN capac

.6 x 70.6 x nimum 0sired. 0x150x150m

sets nsidering Tajor cotivity. andard, at s.

andard, atlea

andard

 

BPPL‐4‐301‐P4C

TORY

IPMENT

15 liters

city

70.6 mm, 06 sets

mm, min. desired

TG Raft oncereting

least 04

ast 02 nos.

C‐M‐001 Rev. 

IS REF.

IS 5513

IS 5514

IS 2386

IS 9377

IS 2386

IS 2386

IS 2386

 

IS 2505

IS 10086

IS 10086

IS 456

IS 383

IS 4031

Page No.: N 33 of 38

 

 

BH RTE

 

HEL SPEC. NO. :Pev. No.:  Dated ECHNICAL  SPEC

 

Soi1 Liq

2 Cor

3 Pro

4 Mo

Pr

1 Ho

2 Ele

3 Ph

4 Th

5 Po(Co

15 CoanaRoa

16 Finana

17 Seiv18 Silt

19 Ulttest

 

PE‐TS‐401‐600‐C:  IFICATIONS 

il Testing Equid limit tes

re Cutter tes

octor density

oisture Conte

ocess Contr

ot air oven

ectronic bala

ysical balan

hermometer

ker Thermomoncrete Roa

ourse aggregalysis (Conad Works)

e aggregaalysis

ve Shaker t content chetrasonic pult

TECM

FGUTP

C001

quipment (Lst

st

y test

ent

rol Accessor

ance

ce

meter d)

gate Sieve ncrete &

ate sieve

eck lse velocity

CHNICAL CONMAIN PLANT CPP STAGE‐IV (

TECHNICA

Leveling & Liquid

core cu

Std proapparat

Rapid m

ries Temperto 300°

3 nos

5 kg capTemper150° C Temper50° C &

Sieve set

Sieve set

MotorizedSand silt c

UPV appa

 NDITIONS OFCIVIL WORKS(1X 500 MW)

Section A:AL CONDITIONS 

ANNEXURE‐A

Grading) limit appara

utter apparatu

octor Compatus

moisture me

rature range C

pacity rature range

rature range & 150° C

d Sieve shakecontent beak

aratus for con

F CONTRACTS PACKAGE ) AT UNCHAH

OF CONTRACTA 

atus St

us Rco

action St

eter Stno

50° C 60(m6050W

0° C to D

0° C to 02

450Siz75 40 12.mm200siev2.3mic15075 cov

er Mfker Sta

ncrete Sta

HAR 

DOC. NO.: NBNo.: Page 32 of 36

tandard Rammer, 6 noore cutter mo

tandard

tandard, at leos.

00x600x600min.size) 00gx0.01g, 10 kg

Weights upto

Digital

2 nos each re

0mm dia Gze: 125 mmmm, 63 mmmm, 20 mm

.5 mm, 10 mm, Pan and c0 mm dives; Size 4

36 mm, 1.18cron, 300 0 micron, 75

micron, ver fg. Catalogueandard

andard

 

BPPL‐4‐301‐P4C

os of std ould, dolly

east 04

0mm

10g and

5 kg

equired

GI Frames , 90 mm,

m, 53 mm, m, 16 mm, mm, 4.75 over ia Brass 4.75 mm, 8 mm 600

micron, 5 micron, Pan and

e

C‐M‐001 Rev. 

IS 2720

IS 2720

IS 2720

IS 2720

 

 

 

 

IS 383

IS 383

 

Page No.: N 34 of 38

 

 

BH RTE

 

HEL SPEC. NO. :Pev. No.:  Dated ECHNICAL  SPEC

 

6 Me

7 Ga

8 Sp

9 Sta10 Ve11 Dig12 Dig

13 Digme

14 GI

15 Ele

16 Re

17 Scr

18

Digmeconme

*The abo

*The depimplemen

* Any adany extra

 

PE‐TS‐401‐600‐C:  IFICATIONS 

easuring jars

auging trowl

atula

ainless steel ernier calipergital pH metgital micromgital paint theter for steel

tray

ectric morter

ebound hamm

rew Gauge

gital paint theter for masancrete paintieasurement

ove list of eq

ployment of ntation sche

dditional equa cost to NBP

TECM

FGUTP

C001

s

ers

scoop rs ter

meter hickness

r mixer

mer test

hickness anory/ ing

quipment is m

equipment’sdule.

uipment requPPL

CHNICAL CONMAIN PLANT CPP STAGE‐IV (

TECHNICA

2 nos se

4 nos

2 nos ea

2 nos ea2 nos ea01 nos 01 no

02 nos.

02 nos.

01 no

01 no

02 nos.

02 nos.

minimum/ te

s shall be ma

uired shall be

 NDITIONS OFCIVIL WORKS(1X 500 MW)

Section A:AL CONDITIONS 

ANNEXURE‐A

et of each siz

ach size

ach ach

each

entative.

ade as per ac

e deployed b

F CONTRACTS PACKAGE ) AT UNCHAH

OF CONTRACTA 

ze 10&10w10ww2 12.00.

50

6045300.Dha0.co

15

ctual require

by bidder as

HAR 

DOC. NO.: NBNo.: Page 33 of 36

00ml, 200ml& 1000 ml

00mm & 200with wooden

00mm & 200with long bladwooden handl

kg and 5 kg2 and 6" Siz

01 mm least .01 mm least

00 micron R

00x450x50m50x300x40m00x250x40m.25 CUM ca

Digital Rebouammer .1 mm-10mmount 0.05

50 micron ra

ement at site

s per site req

 

BPPL‐4‐301‐P4C

l, 500ml

0 mm handle 0 mm de le

g es " count t count

Range

mm, mm, mm apacity und

m, Least

ange

to meet proj

quirement wi

C‐M‐001 Rev. 

 

 

 

 

 

IS 13311

 

 

ject

ithout

Page No.: N 35 of 38

 

 

BHEL SPEC.  Rev. No.:  DTECHNICAL  

1. B2. T3. P4. A5. C6. R7. E8. D9. P10. D11. T

p12. C

m13. C

u14.

15. S16. D17. 18. M

S19. P20. V21. V22. C23. E24. T25. C26. A

s27. D28. T

w

 

NO. :PE‐TS‐401‐Dated :   SPECIFICATION

INDICAT

Batch mixinTransit mixePre-mix planArrangemenConcrete puRoad auto pExcavator (MDe-wateringPay Loader Dumpers/TrTruck mounplacing boomConcrete cutmake) Concrete corupto 75mm 10 HP subm1040+ of KiSelf-primingDozer. 12 / 20mm tMS scaffoldSystem Power driveVibromax (eVibro compaCompressionElectric winTheodolite 1Concrete cubAdequate nosite Drinking waTruck mounwith sprinkle

TEC

FGUTP

‐600‐C002 

IVE LIST O

Majng plant (Miner (Minimumnt nt for controlumps (Minimaver Minimum 1 g pumps (ele

rippers nted concretem minimum tting power

re Cutting mdia along wi

mersible monirloskar or eqg dewatering

thick Ply shuding pipe / A

n earth rammearth compacactor/ plate cn testing ma

nch with buil1 second accbe moulds o. of small tr

ater tank – 50nted water taner arrangem

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAL CA

ANNOF T&P TO

jor T&P itemnimum 30 cum 5 cum/hr c

lled blastingmum 30 CUM

CUM capacectrical & sta

e mixer cum 40 m hightools (DD2E

machine for dith diamond

no-block elecquivalent) g pump 2 HP

uttering boarAcrow Pipe P

mer cter) compactor –

achine (200 Tding hoist

curacy

rucks 2T/5T

000 lit. nk (minimument.

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: ONDITIONS OF CANNEXURE –B 

NEXURE –BO BE ARRA

ms um/hr capacicapacity)

g including cM capacity)

city) and by diesel

pump along

E of HILTI/B

drilling in cobits

ctric pump (K

P (diesel/ ele

rd (4500 sqmPreferably Cu

– drum widthT cap)

for moveme

m 5000 lit) C

CONTRACTCKAGE AT UNCHAHA

CONTRACT DORePa

B ANGED BY

ity)

ompressor

l)

gwith

BOSCH

oncrete

KOS-

ectric)

m) up Lock

h 750mm

ent within

Capacity

AR 

OC. NO.: NBPPLev. No.: age 34 of 36 

Y CONTRA

Qty. to be

0

As per si

10 (10

30

As per si

 

‐004‐302‐P4C‐A

ACTOR

e deployed(n2 4 1

02 Sets 2

ite requirem3

HP to 50HP2

10 1

1

1

1

2 1

0,000 RM

4 1 2 1 3 1

80 ite requirem

2 1

A‐001 

nos.)

ment

P)

ment

Page No.: N 36 of 38

 

 

BHEL SPEC.  Rev. No.:  DTECHNICAL  

29. 30. C

31. C32. C33. S34. E35. H36. P37. E38. M39. W40. T

b41. S

to

42. J43. P44. P45. U46. S47. M48. D49. H50. M51. H52. S53. L54. M55. R56. S57. P

SDCWF

 

NO. :PE‐TS‐401‐Dated :   SPECIFICATION

125KVA EleConcrete vib

Crawler mouCrawler mouSumitomo cElec. GantryHyd. Crane/Passenger cuElectro hyd.Magnetic baWelding genTorque tightbolt tighteniSufficient qutop of each eof columns. Jack hammePower winchPower winchUltra-sonogrSubmerged aMIG/CO2 wDC Arc welHoisting eqpMechanizedHeavy plate Shearing maLathes Milling macRotary HydrSlip Form ShPortable fireSoda acid Dry chemicaCO2 Water & sanFire hose wi

TEC

FGUTP

‐600‐C002 

ectric Generbrator with a

unted Crane unted Crane rane or equi

y crane(40 M/Escort/Tata um goods lif Pipe bend m

ase drill macnerator (320 tening m/c. (ng) uantity of steerected colum

ers/pavementh – 2T/3T/5Th – 10T/15Traphy testingarc welding

welding machding rectifiept.

d modular unbending ma

achines

chines raulic Rig huttering

e extinguishe

al powder

nd bucket (4 ith nozzle (5

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAL CA

rator adequate nee

(75 MT cap100 MT valent Capa

MT) P&H320 or

ft machine hine (All CuAmp.)

(2 no. Capac

eel ladders fomn to be req

t breakers. T for structu

T for structurg machine fomachine hine

er

nits of Scaffoachines

ers as below

buckets in o0 M length)

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: ONDITIONS OF CANNEXURE –B 

edle

pacity)

city- 250 MT

equivalent

ut)

city up to 30

for approach quired during

ural erectionral erection or structural

olding and sh

:

one stand)

CONTRACTCKAGE AT UNCHAHA

CONTRACT DORePa

T

dia HSFG

up to the g erection

work.

huttering

AR 

OC. NO.: NBPPLev. No.: age 35 of 36 

(2-diese

14T

As per si

 

‐004‐302‐P4C‐A

1 7

l & 5- electr4 1 1 3

T-2 & 8T-3 1 2 4

40 4

2

2 5 2 1 2

10 6 8

ite requirem2 2 2 2 1

01 set

10 sets 10 sets 5 sets 5 sets 4 sets

A‐001 

ric)

ment

Page No.: N 37 of 38

 

 

BHEL SPEC.  Rev. No.:  DTECHNICAL  

*The abo

*The depimplemen

* Any adany extra

 

NO. :PE‐TS‐401‐Dated :   SPECIFICATION

ove deploym

ployment of ntation sche

dditional equa cost to NBP

TEC

FGUTP

‐600‐C002 

ment is minim

T&P shall bdule.

uipment requPPL.

CHNICAL CONBOP CIVIL 

P STAGE‐IV (1

TECHNICAL CA

mum/tentativ

be made as p

uired shall be

 NDITIONS OF WORKS PAC1X 500 MW) 

Section A: ONDITIONS OF CANNEXURE –B 

ve.

per actual req

e deployed b

CONTRACTCKAGE AT UNCHAHA

CONTRACT DORePa

quirement at

by bidder as

AR 

OC. NO.: NBPPLev. No.: age 36 of 36 

t site to meet

per site requ

 

‐004‐302‐P4C‐A

t project

uirement wit

A‐001 

thout

Page No.: N 38 of 38