nc rifsganttchart rollup 04-17-2013

Upload: wholmes5924

Post on 14-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 NC RIFSGanttChart RollUp 04-17-2013

    1/1

    Newtown Creek Project Schedule Upd

    Ne

    J J J JS S S SS M M M MM M M MN N N NN J J J JF F F FO O O OO

    2012 2013 2014 2015 2016

    J J J JA A A AD D D DD A A A ATaskItem Start End

    I:\Projects\Newtow

    n_

    Creek\Project_Management\ProjectSchedule\GANTTEPA\NCRollUp_

    04.17.2013.p

    df

    byanasak

    04/17/2013

    J JSM MM MNJF FO

    2017 20

    J JA ADA

    Phase 1 Field Work

    Phase 1 Data Interpretaon

    Phase 1 Data Summary Report

    Reference Area Data Analyses

    Baseline Ecological Risk Assessment (BERA) Process

    Human Health Risk Assessment (HHRA) Process

    Upland Sites Data Review

    Groundwater Evaluaon

    Point Sources Evaluaon

    Non-Point Sources Evaluaon

    Modeling Workshops

    Sources Sampling Approach Memo

    Monthly Updates to USEPA on Key Technical Issues

    Phase 2 Work Plan (and Revisions to Supporng Plans)

    Phase 2 Field Work

    Phase 2 Data Interpretaon

    Preliminary Modeling Results Memo

    Modeling Approach Memo (2)

    Dra Baseline Ecological Risk Assessment Report

    Dra Human Health Risk Assessment Report

    Remedial Invesgaon Report

    Preliminary Alternaves Memo

    Feasibility Study Work Plan

    Feasibility Study Field Program Work Plan

    Feasibility Study Field Program Iniaon

    Refined Alternaves Memo

    Feasibility Study Report

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    2/2012

    7/2012

    1/2012

    11/2012

    3/2013

    11/2012

    Ongoing

    Ongoing

    Ongoing

    Ongoing

    --

    4/2013

    Ongoing

    4/2013

    4/2014

    5/2014

    11/2013

    5/2014

    4/2015

    4/2015

    11/2015

    11/2015

    11/2015

    11/2015

    8/2016

    5/2017

    9/2017

    1/2013

    4/2015

    7/2012

    5/2013

    12/2013

    7/2015

    TBD

    9/2013

    9/2013

    7/2013

    --

    11/2013

    Ongoing

    3/2014

    3/2015

    6/2015

    8/2014

    1/2015

    3/2016

    3/2016

    4/2016

    7/2016

    7/2016

    7/2016

    8/2017

    12/2017

    11/2018

    12/7

    1/10

    2/21

    3/21

    4/18

    5/16

    6/13

    7/25

    8/2

    9/12

    10/17

    11/14

    12/12

    6/20 2/2014 5/2014 8/2014 10/2014 2/2015 5/201511/14

    Monthly update meengs will include overview update on all areas of the Phase 2 WP; and focuseddiscussions on individual topics based on schedule above. Monthly meengs will connue beyond 2013.

    Legend:Workshop with USEPA

    In-person monthly meengs with USEPA

    Approximatemeframe