Project Process Highway Subcommittees submit statements two weeks before AASHTO Annual and Spring Meetings NCHRP Project Panel selects topics for funding at the AASHTO Annual and Spring Meetings and submits for SCOH approval NCHRP staff set up project panels to develop RFPs, typically by phone and Contractors selected by the panel to conduct the research Contractor reports are sent back to the subcommittees that requested them

TRANSCRIPT

Page 1: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

NCHRP NationalCooperativeHighwayResearchProgram

Project 20-07: Research for AASHTO Standing Committee on

Highways

Page 2: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

Project 20-07 OverviewSince 1969, a means to conduct research needed by SCOH

and its subcommitteesCurrently funded at $1,200,000 annuallyProject tasks are typically less than $100,000 and about 12

monthsNCHRP Project 20-07 panel selects tasks for SCOH approval

Panel typically chaired by SCOH Vice ChairMembers include SCOH subcommittee Chairs

Sample Tasks include:Input to AASHTO Specifications and GuidesSCOH and Subcommittee strategic plansOther information desired by SCOH or its subcommittees

Page 3: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

Project 20-07 ProcessHighway Subcommittees submit statements two

weeks before AASHTO Annual and Spring MeetingsNCHRP Project 20-07 Panel selects topics for funding

at the AASHTO Annual and Spring Meetings and submits for SCOH approval

NCHRP staff set up project panels to develop RFPs, typically by phone and email

Contractors selected by the panel to conduct the research

Contractor reports are sent back to the subcommittees that requested them

Page 4: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

Recently Completed Tasks

Task 269, Feasibility of Using Incentives to Facilitate Utility RelocationsTask 277, Update to the AASHTO “Pavement Management GuideTask 285, Recalibration of LRFR Load Factors in AASHTO Manual for

Bridge EvaluationTask 288, National Recalibration of MEPDG Concrete Models Based on

CTE ValuesTask 289, Performance Evaluation of Pavement Marking MaterialsTask 290, Highway Safety Training Synthesis/RoadmapTask 297, Analysis of usRAPTask 299, Resolution of Comments on the Draft AASHTO Bike GuideTask 302, Pilot Value Analysis for Lead States Team for Linear

Referencing SystemsTask 303, Synthesis of Truck Size and Weight ResearchTask 309, A Strategic Plan for Equipment Management Research

Page 5: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

Currently Active Tasks34 Active tasksIncludes 3 that have been combined and 2 that are

pendingOf the remaining 29 active tasks,

3 are close to completion (scheduled to complete in October 2011),

4 are under contract negotiation, 9 are in development, and 13 are in various stages of completion. 

Updates shown at: ftp://crpuser:[email protected]/NCHRP/20-07/Status_Update_20-07.pdf

Page 6: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

List of Tasks Selected for FY 12Task# Committee Title Allocated

Task 324 SCOH

NCHRP’S Role in Maintaining AASHTO Guidelines and Specifications $10,000

Task 325Bridges and Structures

Updating the AASHTO LRFD Wind Loads Provisions $60,000

Task 326

Bridges and Structures

Review and Update of the AASHTO Movable Bridge Inspection, Evaluation and Maintenance Manual, 1st Edition - Scoping Study $50,000

Task 327Design

Developing Recalibrated Concrete Pavement Performance Models for the DARWin-ME Mechanistic-Empirical Pavement Design $100,000

Page 7: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

List of Tasks Selected for FY 12

Task# Committee Title Allocated

Task 328Design

Update of the 1995AASHTO/ AGC/ ARTBA ‘A Guide to Standardized Highway Barrier Hardware’ (1995 Guide) $55,000

Task 329 Maintenance Assessing Alternative Delivery Methods for Winter Operations $75,000

Task 330Maintenance

Investigating the Use of Pavement Preservation Products as Low Cost Waterproofing Treatments for Bridge Decks $80,000

Task 331 MaterialsReport on the Methods and Standards to Measure the Permeability of Concrete $50,000

Task 332

Committee on Highway Traffic Safety

User’s Guide to Develop Highway Safety Manual Safety Performance Function Calibration Factors $50,000

Page 8: NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways

For More Informationhttp://www.trb.org/NCHRP

Chris JenksDirector, Cooperative Research [email protected]