Page 1: NCM S7 for Industrial Ethernet j

Preface

Overview of the Steps1

“PROJECT ETHERNET”The S7 Sample Project

2

Communication on the SEND/RECEIVE Interface...

...Between S7 Stations3

...Between S7 and S5 Stations4

ReferencesA

NCM S7 for Industrial Ethernet

Primer

SIMATIC NET

11/2002C79000–G8976–C116Release 03

Page 2: NCM S7 for Industrial Ethernet j

2SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Classification of Safety-Related NoticesThis manual contains notices which you should observe to ensure your own perso-nal safety, as well as to protect the product and connected equipment. These noti-ces are highlighted in the manual by a warning triangle and are marked as followsaccording to the level of danger:

!Danger

indicates that death or severe personal injury will result if proper precautions arenot taken.

!Warning

indicates that death or severe personal injury can result if proper precautions arenot taken.

!Caution

with warning triangle indicates that minor personal injury can result if properprecautions are not taken.

Caution

without warning triangle indicates that damage to property can result if properprecautions are not taken.

Notice

indicates that an undesirable result or status can result if the relevant notice isignored.

Note

highlights important information on the product, using the product, or part of thedocumentation that is of particular importance and that will be of benefit to theuser.

Page 3: NCM S7 for Industrial Ethernet j

3SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Trademarks

SIMATIC�, SIMATIC HMI� and SIMATIC NET� are registered trademarks ofSIEMENS AG.

Third parties using for their own purposes any other names in this document whichrefer to trademarks might infringe upon the rights of the trademark owners.

Safety Instructions Regarding your Product:

Before you use the product described here, read the safety instructions below tho-roughly.

Qualified Personnel

Only qualified personnel should be allowed to install and work on this equipment.Qualified persons are defined as persons who are authorized to commission, toground, and to tag circuits, equipment, and systems in accordance with establis-hed safety practices and standards.

Correct Usage of Hardware Products

Note the following:

!Warning

This device and its components may only be used for the applications described inthe catalog or the technical description, and only in connection with devices orcomponents from other manufacturers which have been approved orrecommended by Siemens.

This product can only function correctly and safely if it is transported, stored, setup, and installed correctly, and operated and maintained as recommended.

Before you use the supplied sample programs or programs you have writtenyourself, make certain that no injury to persons nor damage to equipment canresult in your plant or process.

EU Directive: Do not start up until you have established that the machine on whichyou intend to run this component complies with the directive 89/392/EEC.

Correct Usage of Software Products

Note the following:

!Warning

This software may only be used for the applications described in the catalog or thetechnical description, and only in connection with software products, devices, orcomponents from other manufacturers which have been approved orrecommended by Siemens.

Before you use the supplied sample programs or programs you have writtenyourself, make certain that no injury to persons nor damage to equipment canresult in your plant or process.

Page 4: NCM S7 for Industrial Ethernet j

4SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Prior to Startup

Prior to startup, note the following:

Caution

Prior to startup, note the information and follow the instructions in the latestdocumentation. You will find the ordering data for this documentation in therelevant catalogs or contact your local Siemens office.

We have checked the contents of this manual for agreement with the hard-ware and software described. Since deviations cannot be precluded entirely,we cannot guarantee full agreement. However, the data in this manual arereviewed regularly and any necessary corrections included in subsequenteditions. Suggestions for improvement are welcomed.

Disclaimer of LiabilityCopyright � Siemens AG 2001 – 2002 All rights reserved

The reproduction, transmission or use of this document or its contents is notpermitted without express written authority. Offenders will be liable fordamages. All rights, including rights created by patent grant or registration ofa utility model or design, are reserved.

Siemens AGAutomation and Drives

Postfach 4848, D-90327 Nuernberg Technical data subject to change.

Siemens Aktiengesellschaft G79000–G8976–C116–03

Page 5: NCM S7 for Industrial Ethernet j

5SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Preface

You want to install our SIMATIC S7 CPs in your system and makeoptimum use of them.

This primer will help you to become familiar with handling NCM S7 forIndustrial Ethernet, the configuration tool for S7 CPs. Based on theconfiguration and program examples supplied with NCM, we introduceyou to the typical steps required to make optimum use of NCM S7 forIndustrial Ethernet with your SIMATIC S7 CPs.

Aims of the Primer... ...how to achieve the aims

You can learn how to use theproduct effectively in a shorttime...

...by working through the stepsdescribed and using the suppliedexample on a suitable systemconfiguration.

You can learn how to use theproduct extremely effectivelytaking somewhat more time...

...by using the description tosupport you when you firstconfigure and program anapplication of your own.

You should be familiar with the basics of STEP 7, in other words youshould know the following:

� How to work with STEP 7

� Which functions STEP 7 provides for managing hardware and software

� How to handle projects

This primer is intended for installation personnel and STEP 7programmers as well as for service personnel.

This primer applies to Version V5.2 and higher of the NCM S7configuration software and to Version 5.0 and higher of the STEP 7software.

For further information about STEP 7 documentation and the product,please refer to the accompanying manual “NCM S7 for IndustrialEthernet”.

For further information about installing the NCM S7 for IndustrialEthernet software, please refer to the readme file.

Aims

How to AchieveYour Aims

Requirements

Audience

Scope of theManual

FurtherInformation...

Page 6: NCM S7 for Industrial Ethernet j

Preface

6SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Note

Please note that the NCM S7 for Industrial Ethernet product information bulletinmay contain further information about the sample programs described in thisprimer.

The following conventions are used in the primer:

� References to other manuals and documentation are indicated bynumbers is slashes /.../. These numbers refer to the titles of manualslisted in the Appendix.

� Actions you are required to perform are indicated by the symbol ” � ”

Conventions

Page 7: NCM S7 for Industrial Ethernet j

7SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Overview of the Steps

Based on the sample configuration and the sample program “PROJECT ETHERNET”, thePrimer will guide you through the following steps in the next chapters:

Chapter 3ISO S7<–>S7

1. Create/open your project

2. Configure and network your hardware

3. Configure communications service

4. Write your user program

You specify the components of your system.Base your selection on the configurationexplained Chapters. 3 and 4.

5. Startup/diagnosticsIf you encounter problems, you caninvestigate the S7 stations with theonline tools of STEP 7/STL andNCM diagnostics.

Chapter 2“PROJECT ETHERNET”

Chapter 4ISO S7<–>S5

You convert your control task to an S7 userprogram. You can use, for example, the STLnotation.

It is advisable to create all the system data “offline”.The data can then be changed, saved anddownloaded at any time. The basis for this is theSTEP 7 project PROJECT ETHERNET.

You set up ISO transportconnections.

To achieve success quickly...

If your system configuration corresponds to the configuration selected for the sample, you candownload the sample data directly to the S7 stations in steps 2, 3 and 4!

You will, however, learn more by working throughthe steps as outlined in this primer.

1

T I PSkip the functions you alredyknow.

Page 8: NCM S7 for Industrial Ethernet j

8SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

“PROJECT ETHERNET”STEP 7 Samples for Ethernet CPs

This chapter explains how you can use the “PROJECT ETHERNET”with the configurations and programs for the communications samples.

How the chapter will help you:

� You will get to know how to create a project with CPs

� You will get to know all the steps involved in configuration

Requirements:

A working knowledge of STEP 7, experience with STL, abasic knowledge of PLCs.

If you require detailed information about the otherfunctions of the configuration software, please refer tothe corresponding manuals. This chapter also containsreferences to specific manuals.

Contents:

– Create/open your project 9– Configure and network your hardware 12

2

Page 9: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

9SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

1. Create/open your project

2. Configure and network your hardware User programs and an image of theS7 stations are managed in theSTEP 7 project.

After installation of the NCM S7 optional software, the sample project is located in the projectfolder of STEP 7, for example in the folder C:\SIEMENS\STEP7\EXAMPLES\EXIE.

If you want to use the project in the S7 folder, follow the steps outlined below:

� Start the SIMATIC Manager.

� Open the supplied sample project PROJECT ETHERNET with File � Open � Project....

From the sample programdisplayed here, you moveon to the steps describedin the following sections.

The sample project contains an Ethernet subnet. If you want tocreate a new or further Ethernet subnet or a different object,

� Select the function Insert � ... � ...Manual/3/

Chapter 2

For more infor-mation...

Page 10: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

10SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

If you want to create a working version of the ETHERNET sample project...

� ...Use the menu command File � Save As to create a copy of the sample project in anyfolder you wish.

Device configuration

The following table shows the configurations in the individual stations. This will also indicatehow much of the sample you can use directly and the extent to which you will have to adapt thesample.

Station CP Type MAC Address Communicates with Station

Description

SIMATIC 400station(1)

CP 443–1 08.00.06.01.00.00 SIMATIC 400station(2)

Communication via theSEND/RECEIVE interface with theCP 443–1.

Data are transmitted in both direc-tions. The FCs AG_SEND andAG_RECV are used.

SIMATIC 400station(2)

CP 443–1 08.00.06.01.00.01 SIMATIC 400station(1)

SIMATIC 400station(3)

CP 443–1 08.00.06.01.00.03 SIMATIC S5station(1)

Communication via theSEND/RECEIVE interface with theCP 443–1.

The user program is adapted to theprogram sample of the CP 1430 TF(see /14/).

Data are sent from the SIMATIC 400station(3) to the SIMATIC S5 station.

SIMATICS5(1)

CP 1430TF

08.00.06.01.00.02 SIMATIC 400station(3)

Page 11: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

11SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

You have already created a configuration

If you have already created a configuration and simply want to use the sample programs foryour CPU, follow the steps outlined below:

� Copy the sample programs (container with S7 programs) of the station from the sampleproject to the CPU of your existing project. Make sure that blocks do not overlap.

� Make sure that the hardware configuration and networking and the configured connectionsare adapted according to the descriptions below.

Summary of step 1 “Creating the Project”:

You have created a STEP 7 project

– in which you can configure your system

– and in which you can create and save your user programs.

Page 12: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

12SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

1. Create /open your project

2. Configure and network your hardware� Which components does the system

include?

� How are the components attached tothe network?

When completed, you will have downloadedthe hardware configuration to the stations.

If you start with the existing sample configuration, youshould get an overview of it before you download theconfiguration to the PLC. STEP 7 provides you withconvenient methods of obtaining an overview. You cando the following:

� Display the configuration in HW Config

� Display a station overview

� Display the networking of the stations graphically withNetPro.

� Double-click the object “Ethernet(1)” in your project in the SIMATIC Manager. This opens theNetPro view for your project.

From this display, you can start all the steps required for hardware and connectionconfiguration.

As shown in the illustration,

� the connection table for the selected CPU is displayed in the lower part of the screen;

� information about the network attachment is displayed if you point to the symbol for theinterface of the node with the mouse pointer.

T I PPage 2–8 deals with the topic“Downloading”

Manual/3/

Chapter 2

For more infor-mation...

Page 13: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

13SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

From the information relating to the network attachments, you can recognize the followingsituation:

The CP 443-1 has the configured MAC address (node). The CPU is shown with an MPIaddress. You require this MPI addresse, for example, when you want to run diagnostic functionson the CP via the MPI attachment of the CPU with NCM Ethernet Diagnostics.

If you want to modify the network address...

... you can do this in the Properties dialog of the Ethernetnode. You can display this dialog by double-clicking thenetwork node in the NetPro view. An addressmodification may, for example, be necessary when theconfigured Ethernet address is already being used inyour network by another station.

Checking the configuration in HW Config – here based on the example of theSIMATIC 400 station(1)

� Select the station or the CPU in the SIMATIC 400 station(1) in the NetPro view; then selectEdit � Open Object. You will see the hardware configuration with an overview and adetailed view.

If you want to see the configuration of one of the displayed modules in detail,

� position the cursor on the module, for example the CP 443-1 and select Edit � ObjectProperties.

For more information...

Manual/2/

Chapter2.2.4

Page 14: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

14SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Adapting the configuration in HW Config

If your hardware configuration does not match the configuration required for the sample, youcan now change the entries. You could, for example, make the following changes:

� Move modules to different slots.

– The configuration of the connections is retained.

– User programs may have to be adapted to a new module address.

� Work without a simulation module

To do this, delete the simulation module in slot 5.

� Use a different CP type

– The configuration of the connections is retained.

Outputting a station overview

Use the print functions of STEP 7 to create your system documentation. You can print out thefollowing:

� Entire station

� Selected module(s)

The printout for the CP you are using then appears as shown below:

Page 15: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

15SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Further information about networking the station

It is easy to obtain an overview of the existing network attachment configurations using the printfunctions in NetPro.

The printout for a configured network appears as shown in the example below:

Page 16: NCM S7 for Industrial Ethernet j

“PROJECT ETHERNET”

16SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

To download the hardware configuration to the PLC...

...follow the steps outlined below:

� Connect the PG to the MPI interface of the CPU using the MPI cable.

� Set the interface on your PG/PC for the required type of attachment. Select the PG/PCinterface in the Windows control panel to match the CPs available on your PG and to matchthe bus attachment.

� Select the menu option PLC �Download...

STEP 7 then guides you through further dialog boxes to therequired result.

Summary of Step 2 “Configuring and Networking Your Hardware”:

You have now done the following:

1. Configured the S7 stations in the STEP 7 project

2. Assigned the S7 stations to the Ethernet subnet and assigned addresses

3. Downloaded the configuration to both S7 stations.

The stations are now ready for you to configure the communication connections and download the user programs.

T I PTo check which nodes areaccessible over Ethernet, use the“Accessible Nodes” function.

STEP 7 Help System

For more informa-tion...

Manual/3/

Section2.2.9

Page 17: NCM S7 for Industrial Ethernet j

17SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Communication on the SEND/RECEIVEInterface between S7 Stations

The SEND/RECEIVE interface allows data exchange on configuredISO transport connections, TCP connections, and ISO-on-TCPconnections.

This chapter explains the steps required during configuration andprogramming to implement a simple communication task on ISOtransport connections.

How the chapter will help you:

� You will get to know the steps involved in configuration.

� You will learn about downloading and starting up.

� You will become familiar with the SEND/RECEIVE call interface.

� You can use the sample program as a basis for creating PLCprograms.

Requirements

A working knowledge of STEP 7, experience with STL, aworking knowledge of PLCs.

If you require detailed information about the properties ofthe type of communication introduced here or about otherfunctions provided by the configuration software, pleaserefer to the corresponding manuals. The preface of themanuals provides you with an overview of the availabledocumentation. This chapter also contains references tospecific manuals.

Contents

3.1 The task 18

3.2 System configuration 19

3.3 The example step by step 21

– Configuring ISO transport connections 23– Creating a user program 29– Startup/diagnostics 36

3

Page 18: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

18SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

3.1 The Task

Sending and Receiving Data

The communication task illustrated by the sample program has deliberately been kept simple.

� A controller (SIMATIC 400 station 1) processes process data.

� It communicates with a further device (SIMATIC 400 station 2), for example to delegate acontrol job. The SIMATIC 400 station 2 returns data to station 1.

The following schematic illustrates how the program functions:

SIMATIC 400 station 1

Send job data (4 bytes)

Evaluate received data

Time Time

Process data

Accept job and executeit

SIMATIC 400 station 2

Send response data (4 bytes)

The jobs and responses in the example contain 4 bytes of user data.

Page 19: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

19SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

3.2 System Configuration

Structure

The following system configuration is required for the supplied sample project (modifications /alternatives are possible –> see following page):

SIMATIC 400 station 1

Ethernet

PG/PC with STEP 7

MPI interface

SIMATIC 400 station 2

as400

MPI interface

Page 20: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

20SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Required Devices/Resources

You require the following components if you want to use the supplied example unmodified.

No.Required

Type Order Number

2 S7-400 programmable controllers with CPU 414–1 see Catalog ST 70

2 CP 443–1 6 GK 7443-1EX11-0XE0 1)

2 Simulation modules DI/DO

Can be replaced byDigital output module DO16xDC24V/2A

or byDigital output module DO32xDC24V/0.5A

6ES7422-1BH10-0AA0

6ES7422-1BL10-0AA0

1 Transmision path see /11/ /12/

1 Programming device (PG/PC) with

� STEP 7 software version V5.2 or higher installed

� Optional software NCM S7 for Ethernet version V5.2or higher installed.

� MPI attachment

� As an option for the PG/PC mode on Ethernet: CP forEthernet attachment –>diagnostics/installation/service

see Catalog ST 70

1) Newer versions of the module are normally compatible in terms of functionality; You can loadthe configuration data of the sample project on your module without needing to make changes.Please read the information in the manual of the CPs on the topic of compatibility and replacingdevices!

Alternatives:

You can adapt the sample configuration to suit your own situation. Possible modifications areoutlined below:

� S7-300 instead of S7-400

Instead of S7-400 stations, you can also use S7-300 stations (for example with theCP 343-1).

The appropriate adaptations must be made in HW Config and in the user program. You mustalso use different FC types with an S7-300.

� Using a different CPU type

� Doing without simulation modules

This only requires slight modification in the user programs (no output to the simulationmodule). It is then possible to monitor communication by displaying data blocks on the PG.

� Using other input/output modules

This may mean that module addresses are changed.

� Changing the order of the modules in the rack

This may mean that module addresses are changed with certain CPU types.

Page 21: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

21SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Notice

If you change the module address in the configuration, you must also adapt theuser program and the configured connection.

3.3 The Example Step by Step

This description is based on the created project and on the configured stations. The steps“Create Project” and “Configuring and Networking Hardware” were explained in Chapter 2.

1. Create/open your project

2. Configure and network your hardware

3. Configure ISO transport connections

4. Write your user program

5. Startup

�� Chapter 2

Chapter 3.3 / and pages following

To achieve success quickly...

If your system configuration corresponds to the configuration selected for the example, you candownload the sample data directly to the S7 stations in steps 3 and 4.

You will, however, learn more by working throughthe steps as outlined in this primer.

T I PSkip the functions that youalready know.

Chapter 2 deals with the topic of“Downloading”.

Page 22: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

22SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

1. Create/open your project

2. Configure and network your hardware

3. Configure ISO transport connections

4. Write your user program

5. Startup

Set up communicationconnections for the CPUs.

When completed, you will havedownloaded the connectionconfiguration to the stations.

��

Communication on the SEND/RECEIVE interface usesconfigured ISO connections . The next step is thereforeto download the connection list to the station.

First, however, you should get an overview of the sample configuration by:

Checking the connections in the connection table in NetPro

� Change back to the SIMATIC Manager and select the CPU in the required station.

T I PPage 27 contains more detailedinformation about “Downloading”.

For moreinformation...

Manual/3/

Chapter 3

Page 23: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

23SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

� Select the object “Connection” and then select Edit�Open Object. The connection table is then displayedwith the entries for the selected station.

or

� Change directly to the NetPro view by selecting the network.

Here, you can select theconnection properties with adouble-click

Here, you can select“Change Partners“with a double-click.

From the display, the following situation is clear:

� One ISO transport connection is currently configuredto the partner station SIMATIC 400 Station(2).

� Connection establishment is activated bySIMATIC 400 Station(1).

Further connections...

...You can configure further configurations to this or other partner stations in this overview.

� To insert a new connection in the connection list, select the function Insert � Connection.

Connection

Note......By selecting the stations, youcan obtain an overview of all thestations in the project and theconfigured connections.

Page 24: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

24SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

To check important connection parameters...

� Select the connection properties by double-clicking the connection in the connection table.

0001 is the ID that youuse in the user program on theSEND/RECEIVE interface

A020 is the ID for ISOtransport connections.

Note on the block parameters:The module start address and theconnection ID are required later when youprogram the SEND/RECEIVE interface.

Page 31 has a similar sample call.

You can assign a name tothe connection reflecting itspurpose in your system.

“Addresses” Tab

The information in the “Addresses” tab page for a connection between S7 stations within aproject does not normally need to be modified.

Page 25: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

25SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

For further information about the status of the connection or the connectionconfiguration, open the “Overview” tab.

If the character “!” appears in the “Local ID” field, this indicates further relevant information inthe “Status” field. Depending on the setting of the table header, this field may be hidden. Youcan readjust the display with the horizontal arrow key.

In the situation shown here, the status is when the connection configuration is completed.

Page 26: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

26SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

If you want to address another communication partner...

� ...select the “Change Partners” dialog with the Edit� Change Partners menu command orby double-clickng the connection in the “Partner” column of the connection table.

� If required, select a different connection partner in the “Station” field.

Page 27: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

27SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

To download the connection configuration to the PLC...

...follow the steps outlined below:

� If you have made changes in the connection configuration, save your changes with Connection Table � Save.

� Select the station in the connection table for which the Ethernet attachment exists.

� Select the menu command PLC � Download.

� Attach the MPI to the SIMATIC 400 station (2).

� Repeat step 2 “Configuring/networking your hardware” and step 3 “Configuring ISO transportconnections” for the SIMATIC 400 station(2) if you want to make changes to the existingconfiguration of the second station.

Summary of step 3 “Configuring ISO transport connections”:

You have now done the following:

– Configured an ISO transport connection between the two SIMATIC 400 stations

– Downloaded the connection configuration to the two SIMATIC 400 stations

The stations are now ready for data exchange on the SEND/RECEIVE interface.

Note:During the download, you are as-ked whether you want to copyfrom RAM to ROM on the CP. Ifyou want to save the data in non-volatile memory, answer with“Yes”.

STEP 7 Help System

For more informa-tion...

Manual/4/

Page 28: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

28SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

1. Create/open your project

2. Configure and network your hardware

3. Configure ISO transport connections

4. Write your user program

5. Startup

– How is the SEND/RECEIVE interfacesupplied with data?– How are the status bits evaluated? When completed, you will havedownloaded the user programs to thestations.

���

The tasks in the user program

The task described in Section 3.1 must now be converted to suitable programmable controllerprograms.

To execute the programs or to download them to the S7 stations...

� ...select the container with the program blocks in therequired SIMATIC 400 station in thePROJECT-ETHERNET.

The functions of theblocks are explained inthe following table.

For a better overview...

� ...you should print out the program blocks and check them. The following page contains anoverview of the FCs required for communication.

T I PPage 34 contains more detailedinformation about the topic“Downloading”.

Page 29: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

29SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

The table shows which blocks of the types OB and FC handle which tasks.

Task in SIMATIC400 Station 1

Task in SIMATIC400 Station 2

Description of the Task in the Program Blocks

Processing processdata

Simulation of a changing process value:

OB100Creation of data blocks DB30 and DB31. The processvalues are saved in these data blocks.

OB1Coordination of the program sequence.

FC29A data word is incremented and decremented cyclically.The time interval for botj incrementing and decrementingis 3 seconds.

FC30/FC5 (AG_SEND)This data word is transferred to Station 2 as the currentprocess value (job).

Accept and processjob

Accepting and further processing the job data:

OB100Creation of data blocks DB30 and DB31. The processvalues are saved in these data blocks.

OB1Coordination of the program sequence.

FC31/FC6 (AG_RECV)Save the received data in the data block and output thedata to the process simulation.

FC30/FC5 (AG_SEND)Return the data to Station 1 as job confirmation.

Evaluate thereceived data

FC31/FC6 (AG_RECV)Accept and evaluate job confirmation.

Output process data to the simulation module.

Notice

You can take and use the latest versions of the communications blocks (FC5/FC6) for your module from the SIMATIC NET block library of STEP 7.

If you are using an older module type, this is only possible if you use the latestfirmware version for this module type.

Page 30: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

30SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

The Program Sequence

The organization blocks in the example produce the following program sequence in the two S7stations:

AG_SEND

OB1

Legend: Sequence of the CPU cycle

AG_RECV

ISO transportconnection

FC30

FC31

FC29

OB100

– Increment / decrement / data word

Startup

Cyclic processing

– Create data blocks DB30 and 31

AG_RECV

FC31

AG_SEND

FC30

OB1

OB100

SIMATIC 400 station 1 SIMATIC 400 station 2

– Create data blocks DB30 and 31

Page 31: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

31SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Programming Functions (FCs) for Communication

Two functions (FCs) are available for handling communication on theISO transport connections, as follows:

� AG_SEND (FC5) This block transfers the user data from the specifieduser data area to the Ethernet CP for transmission.

� AG_RECV (FC6)This block enters the received user data in the userdata area specified in the call.

The user program in our example was written in STL notation. As an example, the parameter assignment for calling AG_SEND and AG_RECV in S7 station 1 is shown below.

STL Explanation

call fc 5ACT := M 50.0ID := 1LADDR := W#16#0110SEND := P#db30.dbx1.0 byte 240,LEN := 4DONE := M 1.2ERROR := M 1.3STATUS := MW 200

//AG_SEND block call//Bit for triggering job//Connection ID//Module address 272Dec. in hardware conf.//Data area to be transferred// Length of the data area to be sent (4 bytes// Memory bit for return parameter DONE// Memory bit for return parameter ERROR// Memory word for return parameter STATUS

STL Explanation

call fc 6

ID := 1LADDR := W#16#0110RECV := P#DB31.DBX 1.0 BYTE 240NDR := M1.0ERROR := M1.1STATUS := MW202LEN := MW10

//AG_RECV block call////Connection ID//Module address 512Dec. in hardware conf.//Data area for receive data// Memory bit for return parameter NDR// Memory bit for return parameter ERROR// Memory word for return parameter STATUS// Area for length of received data

To see the complete code contained in these FCs, and the other OBs and FCs, please refer tothe printouts of the sample project.

For more informa-tion...

Manual/3/

Chapter 4

Page 32: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

32SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Setting Block Parameters Automatically

To ensure correct parameter settings for the block calls, The LAD/STL/FBD editor in STEP 7provides you with the option of accepting all the relevant parameters from the hardwareconfiguration (HW Config) and from the connection configuration automatically. When assigningthe parameter values for the block in the user program, follow the steps outlined below:

� Select the block call and its block parameters;

� Select the menu command “Connections...” with the right mouse button.

� Depending on the block type, you can now select the connection intended for the block ormodule from a list.

� Confirm your selection; as far as possible, the available parameter values are entered in theblock call.

FCs AG_LSEND/ AG_LRECV for longer data areas (CP 443–1)

The newer versions of the Ethernet CPs with the FCs AG_LSEND (FC50) and AG_LRECV cantransfer larger data areas (up to 8192 bytes). Please check the manual of your CP for thesupported data area and, if applicable, use the appropriate FCs.

Working with the FCs is explained in the manual.

For moreinformation...

Manual/3/

Chapter 5

Page 33: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

33SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Extending the Sample Program

You can also extend the sample program or later your own applications. Some possibilities areshown below:

� Evaluation of the result codes of the FCs AG_SEND and AG_RECV to allow you to react tospecific statuses in your system.

� Conditional initiation of communication calls depending on result codes, so that, for example,the send call on the client is only triggered again after the job confirmation has beenreceived with the receive call.

� Evaluate the parameters DONE, ERROR andSTATUS for AG_SEND and NDR, ERROR andSTATUS for AG_RECV. You evaluate theseparameters as shown below:

Job

Completed without error Active Terminated with error

Typical error codes that must behandled by the user program:

8302H Lack of resources on partner8311H Destination station not (yet)

obtainable (e.g. due to startup)80C3H Resources occupied (due to

maximum load on S7-400)80D2H Module start address wrong (e.g.

you forgot to change the address after moving a module)8304H Connection not yet established

DONE/NDR = 1ERROR = 0STATUS = 0

DONE/NDR = 0ERROR = 0STATUS = 8180/8181

DONE/NDR = 0ERROR = 1STATUS = x

Example without simulation module

If you do not want to use simulation modules, simply deactivate the output “T QW ...” in theFC31 blocks on Simatic 400 station 1 and 2.

You can then follow the execution of the program by displaying the data blocks online in STEP7/STL.

For more informa-tion about statusbits Manual

/3/

Section 4.2

Page 34: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

34SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

To download the user program to the PLC...

...follow the steps outlined below:

� Change the CPU to STOP or RUN-P.

� Select the Blocks container in the appropriate station in the SIMATIC Manager.

� Download the entire program (except for the system data) to the S7 station using the PLC�

Download menu command.

� Change the CPU to RUN-P or RUN.

� Repeat the download procedure for the other station.

Summary of Step 4 “Creating the user program”:

You have now done the following:

– Created user programs according to the task description for both SIMATIC 400 stations

– Extended the sample programs, for example by evaluating the status codes

– Downloaded the user programs to the CPUs of both SIMATIC 400 stations

Result:

If you are working with simulation modules, you should now see the active LED displays onthe simulation modules or output modules indicating that communication is taking place.

If you cannot detect any communication, do one of the following:

� Check the program sequence online in STEP 7/STL (monitor blocks). Check whether achanging data word is being output to the simulation module.

� Go on to the next step and check communication with NCM Ethernet diagnostics.

Note:In the RUN-P mode, the block or-der is important since the CPU cy-cle is active. Make sure thatOB100 is only executed duringstartup.

STEP 7 Help System

File Edit Insert PLC

For more informa-tion...

Manual/4/

Page 35: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface between S7 Stations

35SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

1. Create your project

2. Configure / network your hardware

3. Configure ISO transport connections

4. Create the user program

5. Startup / diagnostics

Using Ethernet diagnostics,you can detectcommunication problems.

����

� Use, for example, the following diagnostic functionsto, check the status of stations and ISO transportconnections.

� Operating Mode

What is the status of the stations?

� ISO Transport

What is the status of the ISO transport connections?Were frames sent?How many successful?How many with errors?

� Diagnostic Buffer

What do the diagnostic buffer entries say?

For more informa-tion...

Manual/3/

Chapter 5

Page 36: NCM S7 for Industrial Ethernet j

36SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Communication on the SEND/RECEIVEInterface Between S7 and S5 Stations

In the first example, we showed you the steps involved in configuringand programming to implement a simple communication task with ISOtransport connections.

In this chapter, we will now show you the (slight) differences that arise ifyou want to communicate with a “Non-S7” station. These stations aregenerally known as “Other Stations” in STEP 7.

Based on Chapter 1, you will learn the following:

� How to handle SIMATIC S5 or “Non-S7 Stations” in the STEP 7project

� How to handle ISO transport connections to SIMATIC S5 or“Non-S7 Stations”

Requirements:

Working knowledge of STEP 7, knowledge of STL,experience of working with a PLC, a working knowledgeof SIMATIC S5

Contents:

4.1 Changed system configuration 37

4.2 The example step-by-step 39

– Creating your project 41– Configuring / networking your hardware 42– Configuring ISO transport connections 46– Creating the user program 49

4

Page 37: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

37SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

4.1 Changed System Configuration

In the system configuration shown in Section 3.2, the S7 station 2 must be replaced by aSIMATIC S5 station (modifications / alternatives are possible –> see Section 3.2).

Ethernet

PG/PC with STEP 7 and STEP 5

MPI interface

as400

SIMATIC S5 with CP 1430 TF

SIMATIC 400 station (3)

AS511 interface

Page 38: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

38SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Required Devices/Resources

You require the following components if you want to use the supplied example unmodified.

No.Required

Type Order Number

1 SIMATIC S7-400 programmable logic controllers see Catalog ST 70

1 CP 443-1 6 GK 7443-1EX11-0XE0 1)

1 SIMATIC S5 programmable logic controllers see catalogs ST52.3, ST54.1

1 CP 1430 TF 6 GK1 430–0TA0x6 GK1 430–0TB0x

1) Newer versions of the module are normally compatible in terms of functionality; You can loadthe configuration data of the sample project on your module without needing to make changes.Please read the information in the manual of the CPs on the topic of compatibility and replacingdevices!

1 Transmission path see /7/, /11/, /12/

1 Programming device (PG/PC) with

� STEP 7 V5.2 and STEP 5 V6.x software or higherinstalled

� NCM S7 for Ethernet optional software installed

� NCM COM 1430 TF software installed

� MPI connection

� As an option for the PG/PC mode on Ethernet: CPfor Ethernet connection –>diagnostics/installation/service

On the S5 station, you can use the example programs supplied with the NCM COM 1430configuration tool. Depending on the hardware configuration (CPU type etc.), you must selectthe suitable sample programs. For more detailed information refer to

Manual /14/Volume 1Chapter 7AppendixA.4

Page 39: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

39SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

4.2 The Example Step-by-Step

The following example is based on the project that was created and the stations that have beenconfigured. The steps “Creating your project” and “Configuring/networking your hardware” wereexplained in Chapter 2.

1. Create your project

2. Configure and network your hardware

3. Configure FDL connections

4. Create your user program

5. Startup

�� Chapter 2

Section 4.2 / and pages following

To achieve success quickly...

If you system configuration corresponds to the configuration selected for the example, you candownload the sample data directly to the SIMATIC stations in steps 3 and 4.

You will, however, learn more by working throughthe steps as outlined in this primer. T I P

Skip the functions that youalready know.

Chapter 2 deals with the topic of“Downloading”.

Page 40: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

40SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

1. Create your project

2. Configure and network your hardware

3. Configure FDL connections

4. Create the user program

5. Startup – Diagnostics

– Extra:

The S5 station is managed with NCM COM 1430 TF.

Managing station 2 (S5):

Use the familiar STEP 5 tools STEP 5 V6.x and NCM COM 1430 TF to edit the programs andthe database file for the sample program for the CP 1430 TF.

Manual /14/Volume 1

Chapter 7.Appendix A.4

COM 1430 TF

Configuration Environment for SIMA-TIC S5 with CP 1430 TF

Database file:ABU1AG2.CP2

Basic Set-tings

For more information, read:

Summary of Step 1 ”Creating your Project”:

You have created a project in STEP 7 in which you can configure your SIMATIC400 station and save the corresponding user programs.

You have created a database file for the S5 station in which the CP configuration data can be saved.

Page 41: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

41SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

1. Create your project

2. Configure / network your hardware

3. Configure ISO transport connections

4. Create the user program

5. Startup

Extra:– The SIMATIC S5 station must be made known in the STEP 7 project and networked.

To configure the SIMATIC 400 station in the STEP 7 project...

...follow the procedure described in Chapter 2.

Managing the S5 Station

For information about managing the configuration data and the(sample) programs, please refer to ......This provides you with information about handling the S5 tools.

To network the SIMATIC 400 station with the SIMATIC S5 station and to be able to obtain the station on ISO transport connections...

...this “S5 station” must be included in the STEP 7 project. In the sample project, a station ofthe type “SIMATIC S5” has been created.

If you want to continue working in a different project, you must now create a “SIMATIC S5station”.

� Select your project.

� Select the Insert � Hardware �SIMATIC S5 menu command.

Manual /14/Volume 1Chapter 5AppendixA.4

Page 42: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

42SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

...Now network the station

Networking the SIMATIC 400 station is also the same as in the first example. The main point ofinterest here is how to network the SIMATIC S5 station:

4. Select the SIMATIC S5 station that you want tocheck in your project using the SIMATIC Manageror the NetPro view.

5. Select the Object Properties dialog with the menu Edit �Object Properties or bydouble-clicking the icon.

� To check which MACaddress is used toaccess the SIMATICS5 station, select the“Ethernet node (1)” andclick the “Properties”button.

Page 43: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

43SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Downloading the hardware configuration to the PLC

To download the configuration data to the SIMATIC 400 station, follow the steps outlined below

� For the SIMATIC 400 station, as described in Chapter 2.

� For the SIMATIC S5 station, as described in...

Summary of Step 2 ”Configuring and Networking Your Hardware”:

You have now done the following:

1. Configured the SIMATIC 400 station in the STEP 7 project

2. Assigned the SIMATIC 400 station to the Ethernet and assigned addresses

3. Downloaded the configuration to the SIMATIC 400 station

4. Adapted the network configuration of the SIMATIC S5 station with NCM COM 1430 TF.

The SIMATIC 400 station is now ready for you to configure communication connectionsand download user programs.

Manual /14/

Chapter 6

Page 44: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

44SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

1. Create your project

2. Configure / network your hardware

3. Configure ISO transport connections

4. Create the user program

5. Startup

Extra:

– The connection parametersfor the S5 and S7 PLCs mustbe matched.

��

To create the ISO transport connections for S7–Station(3) in the STEP 7 project...

...follow the steps as described in Chapter 1:

� Display and check the configured connections in the connection table.

� Download the configured connections to the PLC.

Checking/configuring connection parameters

In the Addresses tab page, adapt the TSAP setting so that it matches the configuration inS5–Station. Only then can the local endpoints of the connection be correctly identified so that aconnection can be established successfully.

Follow the steps below:

� Open the connection table for the CPU in the SIMATIC 400 station.

� Select the connection properties by double-clicking the connection in the connection table.

� Check the “Active Connection Establishment” box. This must be selected.

Page 45: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

45SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

� Change to the “Addresses” tab page.

� Check the TSAP entries and if necessary adapt them to the configuration for the S5 station.

To check and adapt the ISO transport connections for the SIMATIC S5 station,

� Use the function “Edit �Connections�Transport Connections” in COM 1420 TF:

� Check the following assignment:

TSAP local (S5) = TSAP remote (S7)TSAP remote (S5) = TSAP local (S7)

COM 1430 TFTransport Connection

Local Parameters: Remote Parame-ters:

TSAP (ASC): 0 1 TSAP (ASC): 0 2

TSAP (Hex): 20.20.20.20.30.20.20.32. TSAP (Hex): 20.20.20.20.30.20.20.31.

MAC Address: 08.00.06.01.00.01

Properties – ISO Transport Connection

Manual /14/Volume 1

Chapter 7

Page 46: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

46SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

Downloading the connection configuration to the PLC

To download the configuration data to the stations, follow the steps outlined below:

� For the SIMATIC 400 station, as described in Section 1.3.

� For the SIMATIC S5 station, as described in...

Summary of Step 3 – “Configuring ISO transport connections”:

You have now done the following:

1. Configured an ISO transport connection between the SIMATIC 400 station and the SIMATIC S5 station

2. Downloaded the connection configuration to both stations

The stations are now ready for data exchange on the SEND/RECEIVE interface.

Manual /14/Volume 1

Section 6.4

Page 47: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

47SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

1. Create your project

2. Configure / network your hardware

3. Configure ISO transport connections

4. Create the user program

5. Startup

Extra:

– OBs, FBs and HDBs are usedon the SIMATIC S5 side.

���

The tasks in the user program

Compared with the description of the task in Chapter 1, the sample must be adapted for the CP1430 TF according the description in /14/, as follows:

Data are only sent by the SIMATIC 400 station to the SIMATIC S5 station, they are notreturned so that the send call in the SIMATIC S5 station and the receive call in the SIMATIC400 station are omitted.

The table shows you which blocks of the type OB and FB in the SIMATIC S5 station areresponsible for receiving the job data from the SIMATIC 400 station and processing it.

Task in the SIMATIC400 Station

Task in the SIMATICS5 Station

Description of the task in program blocks

Processing processdata

Simulation of a changing process value:

OB100Creation of data blocks DB30 and DB31. The processvalues are saved in these data blocks.

OB1Co-ordination of the program sequence.

FC29A data word is incremented and decremented cyclically.The time interval for both incrementing and decrementingis 3 seconds.

FC30 / FC5 (AG_SEND)This data word is transferred to Station 2 as the currentprocess value (job).

Receive and processjob

Receiving and processing job data:

OB1Coordination of the program sequence.

FB101 (HDB RECEIVE)Saves received data in the data block and outputs themto the process simulation.

Notice

You can take and use the latest versions of the communications blocks (FC5/FC6) for your module from the SIMATIC NET block library of STEP 7.

If you are using an older module type, this is only possible if you use the latestfirmware version for this module type.

Page 48: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

48SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

The Program Sequence

In the example, the OB blocks organize the following program sequence in the two stations:

AG_SEND

OB 1

Legend: Sequence of the CPU cycle

ISOtransportconnection

FC 30

FC 29

OB 100

– Increment / decrement data word

Startup

Cyclicprocessing

– Create data blocks DB30 and 31

HDB–RECEIVE

FB 101

SIMATIC 400station

SIMATIC S5 station

OB 20 / 21 / 22

FB 111

HDB–SYNC

OB 1

HDB–CTRL

To process or download the programs of the SIMATIC 400 station...

...follow the steps described in Chapter 1. The information in Chapter 1 about the programextensions, for example to evaluate the call status codes, also applies here.

For the SIMATIC S5 station ...

...you should adapt the program to obtain the required sequence, as follows:

� If the CP 1430 TF is not synchronized during startup, this may be caused by an incorrectOB20. Copy the content of OB21 to OB20 so that the HDB SYNC is correctly called.

Page 49: NCM S7 for Industrial Ethernet j

Communication on the SEND/RECEIVE Interface Between S7 and S5 Stations

49SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

Notice

Make sure that you use the correct HDBs for the specific CPU in the S5 station.In the example, you require the following:HDB-SYNCHDB-CTRLHDB-RECEIVE

Summary of step 4 “Creating the user program”:

You have now done the following:

1. Created user programs according to the task for both stations

2. Extended the sample programs, for example to include evaluation of status codes

3. Downloaded the user programs to the CPUs of both stations.

Result:

To monitor the data transfer, follow the instructions in the manual of the CP 1430 TF. Youmonitor the updating of the data in the receive data block on the SIMATIC S5 station.

If you cannot detect any communication, do one of the following:

� Check the program sequence online in STEP 7/STL (monitor blocks). Follow the sameprocedure with the programs on the SIMATIC S5 PLC in STEP 5.

� Check communication with Ethernet diagnostics, as shown in Chapter 1.

Manual /14/Volume 1

Appendix A

Page 50: NCM S7 for Industrial Ethernet j

50SIMATIC NET NCM S7 for Industrial Ethernet

C79000–G8976–C116–03

References

Manual/ Product Information SIMATIC NET CPSupplied with each CPSIEMENS AG

NCM S7 for PROFIBUS ManualSupplied with the documentation package NCM S7 for PROFIBUSSIEMENS AG

NCM S7 for Industrial Ethernet ManualSupplied with the documentation package NCM S7 for IndustrialEthernetSIEMENS AG

SIMATIC STEP 7 User ManualPart of the standard STEP 7 Documentation PackageSIEMENS AG

SIMATIC STEP 7 Programming ManualPart of the standard STEP 7 Documentation PackageSIEMENS AG

SIMATIC STEP 7 Reference ManualSIEMENS AG

Industrial Twisted Pair NetworksSIEMENS AG

Ethernet, IEEE 802.3(ISO 8802–3)

SINEC CP 1413Manuals for MS–DOS, WindowsSIEMENS AG

SIMATIC S7S7-300 Programmable ControllerHardware and InstallationManualSIEMENS AG

/1/

/2/

/3/

/4/

/5/

/6/

/7/

/8/

/9/

/10/

A

Page 51: NCM S7 for Industrial Ethernet j

References

51SIMATIC NET NCM S7 for Industrial EthernetC79000–G8976–C116–03

SINEC H1 Manual for Triaxial Networks SINEC H1SIEMENS AG

SINEC H1FO Ethernet ManualSIEMENS AG

SIMATIC SoftwareNetProGraphic Network ConfigurationSIEMENS AG

SINECCP 1430 TF with NCM COM 1430 TFManualSIEMENS AG6 GK 1970–1TA43–0AA0

The order numbers for the SIEMENS documentation listed above canbe found in the catalogs “SIMATIC NET Industrial Communication,Catalog IK10” and “SIMATIC Programmable Controllers SIMATIC S7 /M7 / C7”.

You can obtain these catalogs and any further information you requirefrom your local SIEMENS office or national head office.

/11/

/12/

/13/

/14/

Order Numbers