Page 1: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

AGRA DIVISION

आगरा मंडल

ELECTRICAL OPERATION, AGRAELECTRICAL OPERATION, AGRAवि�दु्यत परिचालन, आगा

Page 2: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

1.0 INTRODUCTION/ (परिरचय)

1.1 FUNCTIONS/काय� -The Electrical Operation Branch of Agra division is managing the operation of Electric traction as well as Diesel traction, also responsible to maintain the lobbies, running rooms and trip sheds under the division. The main responsibility of this organization is management & optimum utilization of crew meeting the traffic requirement as well as

fulfilling the mandatory requirements of training, rest, hours of working etc. Management of AC locomotives on line is also done by this branch.

वि�द्युत परिचालन शाखा आगा का मुख्य काय� वि�द्युत लोको के साथ साथ डीजल लोको का परिचालन प्रबंधन देखना � मंडल में स्थि%त सभी लॉबी , निनंग रूम � ट्रि,प शैड की देखभाल शामिमल ह ै | इस शाखा की मुख्य जिजम्मेदाी कू्र की देखभाल � यातायात के अनुसा उसका अमिधकतम उपयोग कना उसके पू े प्रशिशक्षण की जिजम्मेदाी, उनके आ�मिधक वि�श्राम � काय� के घंटो इत्याट्रिद की विनगानी खना शामिमल है | विब जली शेड के बाह काय�त विब जली इंजनों के अनुक्षण औ परि चालन की व्य�%ा भी शामिमल है ।

2.0 ORGANIZATION /संगठन -2.1 GAZETTED / राजपत्रि�त -

Presently following Gazetted posts are in traction operation branch. �त�मान में वि�द्युत परिचालन शाखा में ाजपविCत पदों के विनम्न पद हैं -

Sr. DEE/OP/AGRA / �रि.मंडल विबजली इंजी./परि./आगा - 01DEE/OP/NDLS / मंडल विबजली इंजी./परि./नई ट्रिदल्ली -

01ADEE/OP/AGRA / सहा. मंडल विबजली इंजी./परि./आगा - 01

3.0 RUNNING STAFF POSITION रनिनंग स्टॉफ की स्थि�त्रित -

Designation पद नाम

S/S स्वीकृत पद

MOR काय�रत कम�चारी

Vac. खाली पद

LPM लोको पायलट मेल 121 92 29

LPP लोको पायलट पेसेंजर 59 57 2

Page 3: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

LPG लोको पायलट मॉल. 419 354 65

Drafted लोको पायलट ड्राफ्टेड 78 25 53

LPS लोको पायलट शंटिटंग 85 19 66

ALP सहायक लोको पायलट 589 547 42

CLI मुख्य लोको त्रिनरीक्षक 67 28 39

Total योग 1418 1122 296

Page 4: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

4.0 ASSETS/ परिरसंपत्ति1यां- CREW BOOKING LOBBY (DEPOTS)/ कू्र बुनिकंग लॉबी

(त्रिडपो) – - AGC /आगरा छावनी - MTJ /मथुरा जंक्शन - NDLS /नई दिदल्ली

RUNNING ROOM/ रनिनंग रूम –- AGC /आगरा छावनी- IDH /ईदगाह - MTJ /मथुरा जंक्शन- NDLS /नई दिदल्ली

TRIP SHEDS (NEW DELHI AREA) /दि=प शेड – (नई दिदल्ली क्ष�े)

- NZM/ त्रिनजामुद्दीन - NDLS /नई दिदल्ली

4.1 CREW BOOKING LOBBIES कू्र बुनिकंग लॉबी (त्रिडपो)

SN

Location / station

%ान / स्टेशन

Classification

�गHकण (A, B or C)

Category of staff booked

कम�चारियों की बुक की गई श्रेणी

Average Sign ON & OFF / dayऔसत साइन

ऑन /ऑफ प्रवित ट्रिदन

Supervi

sor

पय��ेक्षक 2016-17

2017-18 Upto

Dec,17

1 AGC/आगरा छावनी

A /‘ऐ’

All categories of loco pilots, assistant loco pilots & Guards. सभी लोको पायलट, सहा. लोको पायलट

889 926 Sri Nepal Singh श्री नेपाल

सिसंह

Page 5: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

व गाड�

2NDLS/

नई दिदल्ली

A/‘ऐ’

All categories of loco pilots & assistant loco pilots.सभी लोको पायलट व सहा. लोको पायलट

652* 628*

Sri M.L.Rewaria

श्री ए

म.एल.े�ाारिया

3MTJ/मथुरा

जंक्शनA/‘ऐ’

All categories of loco pilots, assistant loco pilots & Guards.सभी लोको पायलट, सहा. लोको पायलट व गाड�

360 381

Sri D.K.

Goyal श्री ड

ाी.के.गोयल

4.2 RUNNING ROOMS / रनिनंग रूमस -

SN

Location / station%ान / स्टेशन

Classification �गHक

ण (A, B or C)

No. of

roomsकमों की

संख्या

No. of

bedsविबस्तों

की संख्या

Average Daily occupancy औसत

दैविनक अमिधभोग Supervisor

पय��ेक्षक2016-17

2017-18

Upto Dec’17

1

Multi Story, NDLSबहुमंजिजला ईमारत, नई दिदल्ली

A‘ऐ’ 79 242 234.1 235.9

Sri Harish Arora श्री हीश अोा

2Agra Cantt. आगरा छावनी

A‘ऐ’ 37 102 103.2 96.6

Sri Ravindr Singh श्री वि�न्द्र सिसंह

3Mathura मथुरा जंक्शन

B‘बी’ 17* 53* 44.6 45.6

Sri D.K. Goyal

श्री ड

ाी.के.गोयल

4 Idgah ईदगाह

B‘बी’ 04 23 22.2 21.2

Sri Ravindr Singh श्री

Page 6: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

वि�न्द्र सिसंह

4.3 TRIP SHED) दि=प शेड -There are Two Trip Inspection Sheds under Electrical Operation Branch.

वि�द्युत परिचालन शाखा के तहत दो ट्रि,प विनीक्षण शेड हैं-1. Trip Shed/ New Delhi /ट्रि,प शैड, नई दिदल्ली2. Trip Shed/ HNZM /ट्रि,प शैड,त्रिनजामुद्दीन

4.3.1PERFORMANCE OF TRIP SHEDS दि=प शेड का प्रदश�न -

SN Trip sheds दि=प शेड

2016-17 2017-18 Up to Dec’17

Trip inspection दि=प त्रिनरीक्षण Avg/Day औसत/दिदन

Visual checking दृश्य जांच Avg/Day औसत/दिदन

Trip inspection दि=प त्रिनरीक्षण Avg/Day औसत/दिदन

Visual checking दृश्य जांच Avg/Day औसत/दिदन

Trip Shed/ New Delhi

दि=प शैड, नई दिदल्ली 7.2 7.3 8.6 4.5

Trip Shed/ HNZM

दि=प शैड,त्रिनजामुद्दीन21.3 2.9 22.2 1.9

(Figures in nos. of loco)

Page 7: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

5.0 ELECTRICAL OPERATION PERFORMANCE -त्रिवदु्यत परिरचालन शाखा का प्रदश�न -

SNक्रसं

Items मद 2015-16

2016-17

2016-17 up

to Dec.

2017-18 up

to Dec.

(-) Shortfall

विगा�ट / (+) Improv. सुधा wrt.

Pr.year गत �र्ष� की तुलना में in (%)

1

Numbers of Punctuality loss cases समय हाविन के केसों की संख्या

76 79 58 49 15.5

2Numbers of trains lost in punctuality समय हाविन में आयी गाविSयों की संख्या

142 129 98 74 24.5

3

Electric loco failure cases (Nos. of locos)वि�द्युत लोको फेशिलय (संख्या)

100 108 83 53 36.1

4Electric Loco Utilizationवि�द्युत लोको का उपयोग (EKM/Day/Loco)

474.46

471.34 486.20 522.18 7.40

5Pre-Departure detention प्र%ान पू�� विबलम्ब (hh:mm)

01:06

01:08 01:08 01:04 5.9

610Hrs. performance १० घंटे डू्यटी विनयम अनुपालन

85.1 85.9 86.4 88.7 2.7

7

Energy Re-generation by Agra div. crew on ABB loco ऐ.ऐ.बी. लोको प आगा मंडल के कू्र द्वाा वि�द्युत का पुन� उत्पादन (KWH)

6799566

9509865

6859015

7660694 11.7

8 Numbers of 23 18 12 10 16.7

Page 8: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

stalling cases (AC loco) वि�द्युत लोको के साथ गाविSयों के स्टॉल होने की घटनाए ँ

9PYTHEN Trains Ex BAD to JHS बाद स्टेशन से चलने �ाली पायथन गाविSयों की संख्या

35 45 35 163 365.7

6. OTHER MAIN ACHIEVEMENTS OF 2017-18 (2017-18 की अन्य मुख्य उपलब्धिNयां)-

1.0 Extension of Loco Pilot and Guard Running Room MTJ –Extension of Loco Pilot and Guard Running Room MTJ with 6 numbers of new rooms which enhanced the capacity of 14 beds, in the month of September’ 2017. लोको पायलट औ गाड� निनंग रूम मथुा जंक्शन का क्षमता वि�स्ता-लोको पायलट औ गाड� निनंग रूम मथुा जंक्शन में 6 नए कमे, 14 बेड की क्षमता वि�स्ता माह शिसतंब’ 2017 के दौान विकया गया ।

2.0 Running Rooms air-conditioned –All rooms of Loco Pilot and Guard Running Room IDH and Agra made air-conditioned in the month of December’ 2017 and in January’2018 respectively.. लोको पायलट औ गाड� निनंग रूम, ईदगाह औ आगा के सभी कमों को क्रमश: माह ट्रिदसंब 2017 औ जन�ी ‘2018 में �ातानुकूशिलत क ट्रिदया गया ।

3.0 ISO 9001:2015 certificates – Loco Pilot and Guard Running Room AGC, MTJ and NDLS are awarded with ISO 9001:2015 certificates in the month of Jan.’ 2018. लोको पायलट औ गाड� निनंग रूम आगा छा�नी, मथुा जंक्शन � नई ट्रिदल्ली को आई.एस.ओ. 9001: 2015 प्रमाणपC से माह जन�ी 2018 में सम्माविनत विकया गया ।

4.0 ISO 14001:2015 certificates- Loco Pilot and Guard Running Room AGC and NDLS are awarded with ISO 14001:2015 certificates in the month of Jan.’ 2018.

Page 9: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

लोको पायलट औ गाड� निनंग रूम आगा छा�नी � नई ट्रिदल्ली को आई.एस.ओ. 14001: 2015 प्रमाण पC से माह जन�ी 2018 में सम्माविनत विकया गया ।

5.0 Solar water heating plant –Installation of Solar water heating plant completed in Loco Pilot and Guard Running Room AGC and IDH in the month of December’ 2017. माह ट्रिदसम्ब 2017 में लोको पायलट औ गाड� निनंग रूम आगा छा�नी � ईदगाह में सौ �ॉट हीटिटंग संयंC की %ापना की गई।

6.0 Booking of crew through CMS Through /सी.एम.एस. के माध्यम से चालक दल की बुनिकंग “FETCH AS PER RULE”:Monitoring of crew booking through CMS (“FETCH AS PER RULE”) regularly since September’2016 thus Agra Division has been achieved booking as per rule is 99.66 percent till March’17. Also 99.79% in 2017-18 up to December.

सी.एम.एस. के माध्यम से चालक दल की बुनिकंग “FETCH AS PER RULE” माह शिसतंब 2016 से विनयमिमत रूप से कू्र की बुनिकंग की विनगानी की जा ही है, इस प्रका आगा मंडल की बुनिकंग विनयमानुसा माच� 17 तक 99.66% तथा �र्ष� 2017-18 में ट्रिदसंब तक 99.79% ही |

7.0 Long Haul Trains/लॉन्ग हॉल गात्रिQयाँ -Long haul trains have been introduced from 30.09.2015 between BAD-AGC –JHS section in which two trains was coupled and work as single trains. A total 45 trains run during 2016-17 and 163 trains in 2017-18 up to December.आगा मंडल म ें लॉन्ग हॉल गाविSया ँ का संचालन बाद –आगा-झाँसी खंड म ें ट्रिदनांक 30.09.2015 से प्रांभ हुआ, जिजसमें दो गाविSयों को जोSक एक गाSी के रूम में चलाया जाता ह ै | �र्ष� 2016-17 में कुल 45 तथा �र्ष� 2017-18 में माह ट्रिदसंब ’17 तक 163 गाविSयों का संचालन विकया गया |

8.0 Best Running Room Shield (बेस्ट रनिनंग रूम शील्ड) -Running Room Agra Cantt. awarded Shield for ‘best running room’ during 62nd Railway Week, organized at H.Q. on date 13.04.2017.निनंग रूम आगा छा�नी को मुख्यालय म ें आयोजिजत 62 � ें ेल� े सप्ताह के दौान 'स��श्रेष्ठ निनंग रूम' के शिलए शील्ड से ट्रिदनांक 13.04.2017 को सम्माविनत विकया गया।

9.0 Seminar on “Role of Family participation in safe and Secure Train Operation”

("सुरक्षिक्षत और संरक्षिक्षत =ेन ऑपरेशन में परिरवारीजनों की भागीदारी पर संगोष्ठीयाँ )-

Page 10: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

Seminar/ conversation with families of running staff organized at lobby AGC and MTJ regarding “Role of Family participation in safe and Secure Train Operation”. The families of running staff encouraged about the ‘importance of quality rest’ in the safe train operations. It was also told to the family that the work of Loco pilot is very sensitive in which excessive concentration is required. Any kind of physical or mental fatigue can distract him. Therefore, stay of 6-8 hours is very necessary before going to duty. The following family seminar organized in Agra Division- वि�द्युत परिचालन शाखा द्वाा "सुरक्षिक्षत और संरक्षिक्षत =ेन ऑपरेशन म ें पारिरवारीजनों की भागीदारी” वि�र्षय प मंडल की वि�भिभन्न लौविबयों प लोको ंनिनंग स्टाफ के फेमिमली मेंब के साथ परिचचा� / संगोष्ठी के आयोजन विकये गए । निनंग स्टाफ के परि�ाों को सुभिक्षत ,ेन परिचालन में 'गुण�त्ता पूण� वि�श्राम के महत्�' के बाे में समझाया गया । साथ ही परि�ाों को बताया गया विक लोको पायलट का काम बेहद सं�ेदनशील है जिजसमें अत्यमिधक एकाग्रता की आ�श्यकता होती है। कोई भी शाीरिक या मानशिसक थकान उन्हें वि�चशिलत क सकती है इसशिलए ड्यूटी प जाने से पहले 6-8 घंटे का वि�श्राम बहुत आ�श्यक है । मंडल द्वाा विनम्नशिलखिखत संगोमिष्ठयाँ आयोजिजत की गयीं -

SN

Place �ान

Date दिदनांक

Officers available उपस्थि�त अत्तिYकारीगण

Nos. of

Family

परिरवारी सदस्यों

की संख्या

Nos. of Staff

available उपस्थि�त

कम�चारिरयों की संख्या

Nos. of staff

awarded सम्मात्रिनत कम�चारिरयों की संख्या

1.

Lobby MTJलॉबी मथुा

07.01.17

Sr.DEE/OP �रि.मं. विबज. इंजी./परि. 10

LP लोपा -15, ALP

सहा.लोपा.-12, CLI मुख्य

लो.विनी.-5

--

2.

Lobby AGC लॉबी आगा

12.02.17

ADRM, Sr.DEE/OP, Sr.DME/O&F, &

ADME/O&F, AGC अ.मं.ेल.प्रब., �रि.मं. विबज. इंजी./परि., �रि.मं. यांविCक

इंजी./परि., सहा. मं. यांविCक इंजी./परि.,आगा

45

LP लोपा -50, ALP

सहा.लोपा.-25, CLI मुख्य लो.विनी.-15&

TRS-4

25 (Rs 500/ each)

3Lobby

MTJ लॉबी मथुा

25.03.17

Sr.DEE/OP, APO-II, ADEE/OP, AGC

�रि.मं. विबज. इंजी./परि., सहा. का.अमिध.-II, सहा. मं. विबज.

इंजी./परि., आगा

10LP लोपा -20, ALP-20, CLI मुख्य लो.विनी.-

4--

4 Lobby AGC

29.07.17

DEE/OP, Sr.DME/O&F, ADEE/OP & ADME/O&F, 25 LP लोपा -40,

ALP 14(Rs 500/

Page 11: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

लॉबी आगा

AGC मं. विबज. इंजी./परि., �रि.मं.

यांविCक इंजी./परि., सहा. मं. विबज. इंजी./परि., आगा

सहा.लोपा.-27, CLI मुख्य लो.विनी.-6 &

TRS-2each)

5

Lobby AGC लॉबी आगा

(Safety Seminar) संक्षा सेमिमना

09.09.17

ADRM, SRDEE/OP, SRDEE TRD, SRDME O&F, SRDEE Gen.,

ADEE OP, ADFM, AO, APO, AGC

अ.मं.ेल.प्रब., �रि.मं. विबज. इंजी./परि., �रि.मं. विबज.

इंजी./कवि�., �रि.मं. यांविCक इंजी./परि., �रि.मं. विबज.

इंजी./सामान्य , सहा. मं. विबज. इंजी./परि., सहा. मं. वि�त्त. प्रब.,

सहा. का.अमिध.-II, आगा

0

LP लोपा -35, ALP

सहा.लोपा.-40, CLI मुख्य लो.विनी.-23 & TRS-2

3(Rs 500/ each)

6

Running Room,

MTJ निनंग रूम , मथुा

24.11.17

SrDEE/OP,Agra �रि.मं. विबज. इंजी./परि. 21

LP लोपा -19, ALP

सहा.लोपा.-23 & CLI मुख्य लो.विनी.-2

--

10.0 Running Room Management System /(निनंग रूम मेनेजमेंट शिसस्टम )During December’2016 “Running Room Management System” has been developed in house for Agra Cantt. Running Room and in November’2017 installed and working in Mathura Junction Running Room with the under mentioned features: ट्रिदसंब 2016 के दौान "निनंग रूम मैनेजमेंट शिसस्टम" निनंग रूम आगा छा�नी � माह न�ंब -2017 म ें मथुा जंक्शन निनंग रूम म ें %ाविपत औ काम क ह े ह ैं यह सोफ्ट�ेअ घ में ही वि�कशिसत विकया गया है, जिजसमें विनम्नशिलखिखत मुख्य सुवि�धायें : The train and other details of incoming crew is fed in the

system and detail of crew is automatically displayed. System will show the list of vacant beds in each building and floor and allow to choose the bed accordingly.

आने �ाली चालक दल की ,ेन औ अन्य वि��ण प्रणाली में भे जाने प, चालक दल का वि��ण स्�चाशिलत रूप से प्रदर्शिशंत होता ह ै । शिसस्टम प्रत्येक भ�न औ फश� में खाली बेड की सूची ट्रिदखाएगा औ तदनुसा विबस्त चुनने की अनुमवित देगा।

A Digital Display Occupancy Board appears in the system which indicates several information’s such as vacant and occupied beds, Crew information with current rest hours in running room on moving mouse over the bed indicator, by the color code of the occupied bed whether the crew has

Page 12: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

completed his running room rest or not, numbers of bed occupied and vacant etc.

अमिधग्रहण बोड� एक विडजिजटल प्रदश�न प्रणाली में ट्रिदखाई देता है, जो कई सूचनाओं जैसे खाली औ व्यस्त बेड के रूप में दशा�ता है, चालक दल द्वाा शिलया गया वि�श्राम आट्रिद शिसफ� कस� को घुमाने प ही मिमल जाती ह ै | निनंग रूम में खाली � भे वि�स्तों की संख्या आट्रिद शिसस्टम प बैठ क ही मिमल जाती है |

It has eliminated the manual work for giving average rest, total occupancy, peak occupancy etc.

इसने औसत आाम, कुल अमिधभोग, पीक अमिध�ास आट्रिद के शिलए मैनुअल काम को समाप्त क ट्रिदया है।

11.0 Unusual Occurrence Monitoring System : “अनयुजल औकेंस मॉविनटरिंग शिसस्टम”

For eliminating the existing manual UOR system, a web based Unusual Occurrence Monitoring System has been launched in Agra division on 26th December’2016. Now unusual occurrence written by Loco Pilot is fed in the system and the complaint will reflect on the system of concern department with automatic SMS generation to concerned Branch Officer and Control. The concerned department is supposed to give feed back in the system regarding action taken about the complaint. When the department completes the feedback, the TLC is supposed to close the given complaint. System will generate SMS for Loco Pilot and concerned department head and control after closer of each complaint. मौजूदा मैनुअल यूओआ शिसस्टम को समाप्त कने के शिलए, 26 ट्रिदसंब, 2016 को आगा विड�ीजन में �ेब आधारित “अनयुजल औकेंस मॉविनटरिंग शिसस्टम” लॉन्च विकया गया ।अब लोको पायलट द्वाा शिलखी जाने �ाली असामान्य घटना को प्रणाली में भा जाता है औ शिशकायत संबंमिधत वि�भाग की प्रणाली में पहुँच जाती ह ै जिजसके संबंध में संबंमिधत शाखा अमिधकाी औ विनयंCण काया�लय, शिशकायत के बाे में संबंमिधत का��ाई के संबंध में संबंमिधत वि�भाग को शिसस्टम में फ़ीड क देता है । जब वि�भाग प्रवितविक्रया को पूा कता

Page 13: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

है, तो टीएलसी उस शिशकायत को बंद क देता है । प्रत्येक शिशकायत प काय��ाही होने के बाद शिसस्टम लोको पायलट औ संबंमिधत वि�भाग प्रमुख औ विनयंCण के शिलए एसएमएस उत्पन्न क भेज देता है ।

12.0 PROVISION OF CCTV CAMERAS IN RUNNING ROOM AND LOBBY AGRA- रनिनंग रूम और लॉबी आगरा में सीसीटीवी कैमरे का प्रावYान-Web based CCTV cameras provided (4-4 Cameras in each) in Running room and lobby Agra since 19th January’2017.�ेब बेसड सीसीटी�ी कैमे का प्रा�धान ट्रिदनांक 19 जन�ी 2017 को (4-4 प्रत्येक) निनंग रूम औ लॉबी आगा में विकया गया है |

13.0 “YOGA SHIVIR” for Stress removing & personality development of LP’s and ALP’s-8. तनाव हटाने और व्यत्ति\त्व त्रिवकास के त्तिलए, लोको पायलट और सहायक लोको पायलटों के त्तिलए "योग क्षिशत्रिवर" The Electrical Operation Branch, Agra conducted a “YOGA SHIVIR” in collaboration with “Patanjali yogpeeth, Haridwar” on 30.04.2017 at the premises of Loco Pilot & Guard Running Room, Agra Cantt. for Stress removing & personality development of Loco Pilot and assistant loco pilot. 05 Loco Inspectors & 25 Loco Pilots/Asstt. Loco Pilots along with Sr. DEE/OP/Agra & ADEE/OP/Agra, participated in this Yoga Shivir.

लोको पायलट औ गाड� निनंग रूम, आगा कैं ट के परिस में ट्रिदनांक 30.04.2017 को "पतंजशिल योगपीठ, हरिद्वा" के सहयोग स े वि�दु्यत ऑपेशन शाखा आगा न े लोको पायलट औ सहायक लोको पायलट के तना� को दू कने � व्यशिwत्� वि�कास के शिलए "योग शिशवि�"का आयोजन विकया । जिजसम ें 05 लोको विनीक्षक , 25 लोको पायलट/सहायक लोको पायलट तथा �रि.मंडल विबजली इंजी./परि तथा सहा. मंडल विबजली इंजी./परि, आगा अमिधकाी गण भी सम्मिम्मशिलत हुए |

Page 14: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

14.0 “YOGA SHIVIR” for Stress removing & personality development of LP’s and ALP’s- तनाव हटाने और व्यत्ति\त्व त्रिवकास के त्तिलए, लोको पायलट और सहायक लोको पायलटों के त्तिलए "योग क्षिशत्रिवर"The Electrical Operation Branch, Agra conducted a “YOGA SHIVIR” in collaboration with “Gayitri Yog Pith Mathura” on 05.10.2017 at the premises of Loco Pilot & Guard Running Room, Mathura for Stress removing & personality development of Loco Pilot and assistant loco pilot. 02 Loco Inspectors & 25 Loco Pilots/Asstt. Loco Pilots along with Chief Crew Controller/Mathura, participated in this Yoga Shivir. लोको पायलट औ गाड� निनंग रूम, मथुा के परिस म ें ट्रिदनांक 05.10.2017 को "गामियCी योग पीठ मथुा" के सहयोग से वि�द्युत ऑपेशन शाखा आगा ने लोको पायलट औ सहायक लोको पायलट के तना� को दू कने � व्यशिwत्� वि�कास के शिलए "योग शिशवि�"का आयोजन विकया । जिजसम ें 02 लोको विनीक्षक , 25 लोको पायलट/सहायक लोको पायलट तथा मुख्य कू्र विनयंCक /मथुा सम्मिम्मशिलत हुए |

14.0 Web based LI Footplate Monitoring System:- A web based Loco Inspector Monitoring System as well its android application. The portal and the app ensures overall performance of the Loco Inspectors, Loco Pilots and Assistant Loco Pilots online in a consolidated format that can be retrieved anytime for chalking out the

Page 15: ncr.indianrailways.gov.inncr.indianrailways.gov.in/uploads/files/1518086234775... · Web viewThe Electrical Operation Branch of Agra division is managing the operation of Electric

weak areas, efficacy and effectiveness of the counselling by the Loco Inspectors. Programme inaugurated by DRM/Agra on 12.01.2018.

वेब आYारिरत “लोको इंसे्पक्टर फुटप्लेट मॉत्रिनटरिरंग त्तिसस्टम”-एक �ेब आधारित “लोको इंसे्पक्ट फुटप्लेट मॉविनटरिंग शिसस्टम” � साथ ही साथ इसके एडं्रॉइड एप्लिप्लकेशन (FPM) सोफ्ट�ेअ का विनमा�ण वि�दु्यत परिचालन शाखा, आगा द्वाा विकया गया । पोट�ल औ ऐप के द्वाा लोको इंस्पेक्ट, लोको पायलट्स औ सहायक लोको पायलटों के समग्र विनष्पादन को एक समेविकत प्रारूप में ऑनलाइन सुविनभि�त कता है, जिजससे विकसी भी समय लोकोपायलटों के कमजो के्षCों, प्रभा�कारिता औ लोको विनीक्षकों द्वाा पामश� की प्रभा�शीलता की जाँच की जा सकती है | जिजसका उदघाटन मंडल ेल प्रबंधक महोदय /आगा के द्वाा ट्रिदनांक 12.01.2018 को विकया गया |

----------------------