ndia 11 annual expeditionary warfare conference€¦ · armed craft swarm defense clearance...

6
1 PEO Littoral and Mine Warfare 06 10 23 PEO LMW NDIA Brief Final NDIA 11 th Annual Expeditionary Warfare Conference Force Structure Uncertainty Panel Discussion 25 October 2006 Jim Thomsen Program Executive Officer Littoral & Mine Warfare “Sustain combat readiness … with the right combat capabilities - access, speed, agility, adaptability, persistence, awareness and lethality - for the right cost.” Admiral Mike Mullen, CNO Guidance, 2006

Upload: others

Post on 21-Apr-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

1

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

NDIA11th Annual

Expeditionary Warfare ConferenceForce Structure Uncertainty

Panel Discussion25 October 2006

Jim ThomsenProgram Executive Officer

Littoral & Mine Warfare

“Sustain combat readiness … with the right combat capabilities - access, speed, agility,adaptability, persistence, awareness and lethality - for the right cost.”

Admiral Mike Mullen, CNO Guidance, 2006

2

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

0 10 20

Time

Tailored3 LCS1 LCSToday

Adaptive Force Packages and Force Structure -- an LCS example

0 100 200

Range

3 LCS1 LCSToday

0 20 40

Time

3 LCS1 LCSToday

Area Clearance

Barrier Ops

0 50 100 150

RedKills

3 LCS1 LCSToday

Armed Craft Swarm Defense

Clearance Timeline

Mine Countermeasures

Surface Warfare

Anti-Submarine Warfare

“We will develop Adaptive Force Packages … in support of operations in blue, green, andbrown water environments …” Admiral Mike Mullen --- CNO Guidance, 2006

3

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

Sensor / System LevelSensor / System Level

Vehicle LevelVehicle Level

MissionMissionPackage LevelPackage Level

Containerization /Containerization /TransportationTransportation

LevelLevel

AQS-20AMine Hunting

Mine Identification

RTASBi-Static ASW

MRUUV RMSMIWASW

USVMIWASWSUW

VTUAVMIWASWSUW

MPCESoftware

ISO STDs

Published ICD

Adaptive Force Packages, Mission Packages, and ModularityAdaptive Force Packages, Mission Packages, and ModularityM

odul

arity

4

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

The First LCS Mission Package Realized

RMS AQS-20AAMNS /

ALMDS /RAMICS

OASIS & Helo Mod KitBPAUV

5

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

Mission PackageOpen Computing Environment

• Maximum use of existing S/W – Common S/W apps with Current Fleet platforms

• MPs interface with LCS Sea frame through documented ICD

• OA Level 3 COTS H/W allows Open System model for acquisition and development

System Applications C2 Applications Common Applications or Services

Ground Control Station

MPS

Mission Module n

Mission Module 2

Mission Module 3

Unmanned Surface Vehicle Control

Mission Module 1

Remote Minehuntin

g Functional Segment

Unmanned Vehicle Command & Control

Mission Package Computing Environment

Mission Package Computing Environment

GCCS-M

CMS

Core System n

Core System 2

Core System 3

Comms

Core System 1

Hotel Services

On-BoardNavigatio

n

Total Ship Computing Environment

Total Ship Computing Environment

• Common format• Specified in the Interface

Control Document• Common set of Tools and

Processes

Sea Frame - Mission Package INTERFACE

• Industry Refresh• Open Business Model• Via MPI

6

PEO Littoral and Mine Warfare

06 10 23 PEO LMW NDIA Brief Final

Mission Package Open Business Model Approach

HardwareHardware

InIn--Service Service SupportSupport

ToolsTools

C3C3

SoftwareSoftware

MissionMissionPackagePackage

ComputingComputingEnvironmentEnvironment

SUWSUWMPMP

MIWMIWMPMP

ASWASWMPMP

ProductsProducts

Defined Defined ArchitectureArchitecture

&&InterfacesInterfaces

TransportTransport--ableable DeployedDeployedStagedStaged

ShipShip

LCSLCS--11

LCSLCS--22

MPSupportFacility

RailRail

PlanePlane

TruckTruck

Mission Package IntegratorMission Package Integrator

Spiral DevelopmentSpiral Development