ndia systems engineering division 1ndia sed 2013-02-13ndia se division – summary - 2012 status and...

9
NDIA Systems Engineering Division 1 NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual Planning Meeting 2012 Summary and 2013 Plans NDIA SE Division Meeting 13 Feb 2013

Upload: evan-atkins

Post on 13-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

1NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA Systems Engineering DivisionAnnual Planning Meeting

2012 Summary and 2013 Plans

NDIA SE Division Meeting

13 Feb 2013

Page 2: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

2NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

Introduction

• Status of 2012 NDIA SE Division activities– Relative to 2012 Plan

• Stakeholder Inputs– DASD (SE), Services

• Committee Reports– 2012 Accomplishments– 2013 Plans

NDIA Systems Engineering Division

1Annual Planning Meeting - December 12-13, 2012 Committee Reports – 2012 Status and 2013 Plans

NDIA Systems Engineering DivisionAnnual Planning Meeting

2012 Summary and 2013 Plans

Action Plan StatusCommittee Reports

December 12-13, 2012

With tasks added for actions assigned to committees by NDIA SE Division based on OSD/services briefings 12/12/12 - TBD

References: see NDIA SE Division web pages for briefings from Dec 2012 and Dec 2013 meetings

Page 3: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

3NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2013 Tasks- Derived from DoD/Services Initiatives (Voice of the Customer)

ASA (ALT)OCSE

• Dev Planning• SE Workforce• SE methods/

tools• Reliability• Security

protection• ExportabiIity• Soldier/Small

Unit Challenge

DASN RDT&E SE&P 2012

YSTEMSNGINEERING

OLICY

Questions NDIA can help answer

1. Identify the new skills required of an engineer to succeed on an Agile development team

2. Recognizing that we can’t always create the ideal team, what processes can be developed to assist engineers on an Agile development team

3. The System of Systems mission level requirements analysis process has been identifying requirements that satisfy a mission and allocating those requirements to systems. The relationship between those allocated requirements and the application of new R&D products to meet those requirements is not robust.

4. How can the Navy work with Industry to improve the assessment of the compendium of R&D products* for application to system requirements, to increase success of the Technology Demonstration acquisition phase?

5

DASN (RDT&E)SEP

• Agile in acquisition

• SoS mission reqts

• R&D assessment

DoD Sys Eng2012/12/12 | Page-12

Distribution Statement A – Approved for public release by OSR, SR Case # 12-S-3121 applies.

Summary of DASD(SE) Goals

• Continued excellence in SE support to programs and acquisition decisions

• Improved, consistent PPP engagement with programs resulting in successful protection strategies– New processes for Software Assurance, Trusted Microelectronics,

Exportability

• Advocacy and impact in ensuring SE workforce capacity and capability

• Provide depth to acquisition policy and processes with SE guidance, practices, and continuous learning opportunities

• Make progress on areas of DoD interest:– Quantitative Risk Management

– SE Tradespace Analysis

– Supply Chain Risk Management and Damage Assessment

– Anti-Counterfeit

– Advanced Modeling for Engineering Resiliency

DASD (SE)• ERS• Anti-Counterfeit• Risk Mgmt• Schedule risk• Supplier risks• Security design• SE models

(MBx)• SoSE

VerbalInputs

Provided

SAF AQRE• Policy (levels)• Process• Tradespace• Architecture• Cost

Assessment• Specialty Engrg• People /

Workforce (specialists vs. generalists)

Page 4: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

4NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2012 Action Plan Status

# NDIA SED 2012 Tasks Committee Results

1 Risk Management industry workshop (ref: DASD(SE), USAF)

SE Effectiveness Initial discussions held, workshop deferred to Feb ’13

2 Program Protection industry workshop – vulnerabilities, mitigation, etc. (DASD(SE))

System Assurance

Workshop completed, report submitted. Briefed at Aug NDIA SED meeting.

3 Workforce: how do we train, qualify, and identify SEs? (Navy) SE qualifications, capability? (AF)

E&T Complicated by inconsistent job codes; recommend standardization. INCOSE collaboration on competency; working survey plan

4 Is the use of authoritative DoDAF-like architectures critical for a successful systems integration effort? (Navy). Reusable architectures/environments, system hierarchies. (AF)

Architecture WG / SoS

NDIA SE Conference track, discussion with DoD CIO. Recommend DAG updates for architecture, Info Sys Plan. Report due mid-2013.

5 Development of better visualization tools that show all information exchanges that occur during a mission (Navy)

Mission Analysis / Architecture WG / SoS

Deferred due to prioritization on Development Planning.Discontinued? Coordinate with Lynn Peterson.

Page 5: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

5NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2012 Action Plan Status

# NDIA SED 2012 Tasks Committee Results

6 Define interfaces and information needs for mission-level engineering with platform engineering, with responsibilities. (Navy)

Mission Analysis

Briefed initial concept to Navy (Helene Anderson) Apr 2012. Re-validate need for further work in 2013. Potential support for BAA development.

7 Continue work on T&E SoS best practices

SoS / DT&E Presented at T&E Conference, final report submitted to SED

8 SE metrics: affordability, architecture. Benchmarking SE metrics.

SDPMWG(SEEC)

Conducted survey, briefed at NDIA SE Conference, held workshop. 2013: final report, policy, guidance, assets.

9 Manufacturing Readiness Assessment (MRA) RFP language (TBD)

JCSEM / NDIA Mfg Div

No activity. Coordinate with NDIA Mfg Div resources.

10 Standardization support (DASD(SE))Industry review and comment

NDIA SED review (all)

Supported meetings with standardization team. Other actions pending, as needed.

Page 6: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

6NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2012 Action Plan Status

# NDIA SED 2012 Tasks Committee Results

11 Expedited SE / rapid fielding. Lean SE. Resilient systems. (USAF)

SEEC Sponsored ERS track at SE Conference. MIT Lean enablers briefing at SED. SED to support SERC research activities as applicable. (Art Pyster POC)

12 State of the art in M&S, M&S across the life cycle. Reusable architectures. Physics-based modeling, supporting architectures with M&S

M&S Report due March, PBM conference. Still open.

Page 7: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

7NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2013 Action Plan Status

# NDIA SED 2013 Tasks Committee Plan

1 Quantitative risk management guidance. [DASD(SE)]

SEEC(Brown, Rassa)

Ongoing action. Feb workshop planned.

2 Support Engineered Resilient Systems (ERS) initiatives. Link ERS with M&S? [DASD(SE)]

SED (Rassa)M&S

IEEE/NDIA ERS workshop in planning. Other actions pending. Division organizational emphasis?

3 Anti-counterfeit – SE role, industry feedback for supply chain risk management, augment body of knowledge [DASD(SE)]

SED(Henry)

Issue SED request for 1:1 company inputs provided direct to DASD(SE). Potential follow-up workshop. Could be company proprietary? Coordinate with other NDIA, AIA, etc.

4 Design Patterns for Security – share SERC research findings (UVA)[DASD(SE)]

SED(Henry)

Schedule Dr. Horowitz (UVA) for NDIA SED briefing.

5 Advanced Modeling: Model Based for “X” (MBx) – how could acquisition strategies be enhanced to use models (RFPs, etc.) [DASD(SE)]

M&S(Coolahan)

M&S committee study or report. Collect industry input, examples.

6 SoSE: how to demand articulation and insertion of SoS context during life cycle acquisition? [DASD(SE)]

SoS (Dahmann)

SoS committee study or report and recommendations. International issues?

Page 8: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

8NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

NDIA SED 2013 Action Plan Status

# NDIA SED 2013 Tasks Committee Plan

7 Soldier / Small Unit Challenge[ASA(ALT)]

SED WG(Serna)

WG to consider soldier and small unit architecture.

8 Design for Reliability – need RFP language. [ASA(ALT)]

LCS(Cothran)

Consider input on RFP language.

9 Security / Protection for coalition operations [ASA(ALT)]

System Assurance (Croll)

SA committee to consider security issues for coalition – provide recommendations to SED for action

10 Design for Exportability – BBP 2.0, foreign military sales (FMS), direct commercial sales (DCS) [ASA(ALT)]

No SED action

11 Reconcile Agile development with DoD 5000.2 acquisition practices, requirements, IPT structure, cost, skills[DASN (RDT&E)]

SW(Draper)

Conduct workshop. Collect best practices (cross-committee, cross-discipline, SEI, DHS, AFEI, etc.)(Dahmann, Wilson, Elm, …). INCOSE systems agile.

12 Consider how to move tradespace for architecture early in the life cycle (pre-MDD)

Architecture (Sheeley)MA (Lohse)

Start initially with white paper vision on use of architecture to bound/expand the trade space (solution agnostic)

13 Collect industry best practices for growing and retaining specialists vs. generalists

E&T (Gelosh) How does industry keep its specialists?

Page 9: NDIA Systems Engineering Division 1NDIA SED 2013-02-13NDIA SE Division – Summary - 2012 Status and 2013 Plans NDIA Systems Engineering Division Annual

NDIA Systems Engineering Division

9NDIA SED 2013-02-13 NDIA SE Division – Summary - 2012 Status and 2013 Plans

Committee Inputs- 2012 Task Progress / 2013 Task Plans

•Architecture (Arch)•Automatic Test (ATC)•Development Test and Evaluation (DT&E)•Enterprise Health Mgmt (EHM)•Environment, Safety, and Occupational Health (ESOH)•Education and Training (E&T)•Human-System Integration (HSI)•Joint Committee on Systems Engrg in Manufacturing (JCSEM)•Life Cycle Support (LCS)•Modeling and Simulation (M&S)•Mission Analysis (MA)•Systems Engineering Effectiveness Committee (SEEC)•Software Experts Panel (SW) •System Assurance Committee (SA)•System of Systems (SoS)

For committee status, see:• Dec planning meeting briefs

(quad charts)• Feb SE Division meeting updates