ne 130th street infill station · 4/16/2020 · station ocs installation testing revenue service...
TRANSCRIPT
NE 130th Street Infill Station
April 16, 2020
Seattle Design Commission30% Concept Design Review
2
Agenda• NE130thStreetInfillStationOverview
• CommunityOutreach
• SiteCondition&UrbanAnalysis
• DesignConcept
• Questions/Comments
3
Goals and OverviewGoals• Stationaddedasinfillin2016ST3voterpackage• Providesaccesstolightrailingrowingcommunity• Providesaccessforallmodesoftransportation• Enhancestationidentitywithartandfinishes• MinimizeimpactstoLynnwoodLinkExtensionanditscustomers
Overview• Stationlocatedat5thAveNEandNE130thSt• Elevatedside-platformstation• Estimated3,400dailyboardings• Traveltime:Westlake,15min;SeaTac/Airport,53min
4
Overview Continued
3
Overview• NE 130th St Infill Station located at 5th Ave NE
and NE 130th St• Infill station on Lynnwood Link Extension• Timing in ST3 Plan - start 2024, open 2031• Estimated 3400 daily boardings• Travel time to:
• Westlake: 15 min• SeaTac/Airport: 53 min
• Challenges with building as infill• Sept. 2018 accelerated preliminary
engineering• Feb. 2020 accelerated final design
Board decision in Q2 2021 on construction
Infill Station• PreferredalternativeinLLEfinalEIS• InfillstationonLynnwoodLinkExtension• TiminginST3Plan-start2024,open 2031• $144MprojectEstimate•Challengeswithbuildingasinfill • Sept.2018acceleratedpreliminary engineering • Feb.2020acceleratedfinaldesign • Board decision in Q2 2021 on construction and opening
NE 130th Street Infill Station
5
Challenges of Infill ConstructionOver 60k daily riders affected, nearly 90% from Snohomish and North King subareas
• Potentialsystem-widedelayscouldaffect manymoreriders• Servicedelaysduetosingle-tracking• Restrictedconstructionwindow– nighttimeconstructionandhighercost• Repeatedneighborhoodimpacts• Mitigationexpenses
6
Environmental• NE130thStInfillstationalternativeevaluatedinLLE2015FinalEIS• CurrentdesigngenerallyconsistentwithFinalEIS • Addedvehicleturn-aroundloop • Selectedsideplatformstation• StationlocatedinEIS-analyzedarea;WSDOTandSDOTROW• Additionalenvironmentalreviewnotneeded
7
Partner Collaboration• Collaboratedonstationdesign throughout2019• 3Designworkshops• 3TrafficAnalysisworkshops• 2Valueengineeringsessions
- Stationaccesspoints - Paratransitstoplocation - Busstoplocations - Streetandaccessimprovements - Trafficanalyses
8
Community Outreach• Seattle/Shoreline Open House – Feb 26, 2019• Seattle Station area planning workshop – Mar 13, 2019• Seattle Station area planning workshop – Sept 28, 2019• ST Board briefing – January 9, 2020• ST System Expan. Committee – February 13, 2020• ST Board Meeting – February 27, 2020
“I would strongly urge you to vote for the speeded up NE 130th station plan!”
“Will pedestrians be able to access the station on foot?”
9
Community OutreachGoal:Consultandinformgeneralpublic• ProjectupdatesviatheLLEprojectlistserv,over9,000subscribers• ParticipateinCityofSeattleStationAreaPlanningevents• Attendcommunityfairs&eventstodistributeinformation&gatherinput• Solicitfeedbackviaonlineopenhouses,LLEFacebook,email,social media,postcards,andflyers• Hostopenhousefor60%and90%designinQ3andQ4*
Targetaudiences:Neighborhoodgroups;Bikeandpedestriancommunity;residentsadjacenttoNE130thstation
*MaybecanceledduetoCovid-19
10
Project Schedule• ObjectiveisalignmentofNE130thwithLLEschedule• Q22021,Boardtodecidewhenstationwillopen
9
Project Schedule
2019 2020 2021 2022 2023 2024 2025
Lynnwood Link Extension
NE 130th InfillStation
OCS installation
Testing Revenue Service
PE Final Design
Feb: Board
Decision for FD
NE 130th
opening or by 2031
Q2:Board
Decision
• Objective is alignment of NE 130th Station with LLE schedule• Q2 2021, Board to decide when station will open
LLE Construction
Sept: Board
Decision for PE
C2 C3 Testing
11
Project Phasing
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
D
PLATFORM ROOF448' - 10"
A G
PLAZA ROOF404' - 0"
C EB F
08' 4' 8'
5TH AVE
I-5
WSD
OT RO
W
94’ CO
MPA
TIBILITY LINE
NBSB
84’ CO
MPA
TIBILITY LINE
EXISTINGEDGE OF
PAVEMENT
PARATRANSIT(BEYOND)
10’ 11’ 11’BUFFER
3’ 10’
C1: Foundation for a Guideway Supported Station Shafts, Columns, Cap-Beam, Guideway Superstructure
C2: Reduce impacts to LLE service Platform girders, slab, and canopy
C3: Station Opening Stairs, escalators, elevators, MSE wall, Back of House structure, Utilities, MEP, landscape, and street and access improvements
SIDEWALK(VARIES)
COMPLETE IN 2031
12
Zoning Information & Neighborhood Context
5TH AVE NE
NE
130T
H S
T
NE
127
TH S
T
NE
125
TH S
T
NE
135
TH S
T
NE
123
TH S
T
NE
120
TH S
T
NE
117
TH S
T
12TH AVE NE
ROOSEVELT WAY NE
8TH AVE NE
3RD AVE NE
CORLISS AVE NE
MERIDIAN AVE N
NE
145
TH S
T
I-5 NBI-5 SB
Neighborhood SingleFamilyResidential SF-7200 Multi-FamilyResidential NC1-55(M) Mixed-Use: Residential/CommercialLR3(M)
Location & Access WSDOTRightofWay Parallelto1-5 LynnwoodLinkLightRail -SouthNorthgateStation -North145thStation RoutetoNearbyUrbanVillages LocalBusRoutes Relocationofbusstop242& 243adjacenttostation
Local Amenities K-12Schoolslocatedwith1mile radius IngrahamHighSchool LakesideSchool LakesideMiddleSchool SeattleJewishCommunity School PinehurstK-8School
ParksandRecreation
N
1/4MILE
1/2MILE
SF-7200
NC1-55 (M)LR3 (M)
HallerLake
NorthacresPark
JacksonParkGolfCourse
ThorntonCreekPark
To Bitter Lake Urban Village
To Lake City Urban Village
SF-7200
13
Site Analysis / Existing Conditions
N
Interstate 5Siteparallelto1-5Adjacentto1-5NBofframpAdjacentto1-5SBonrampExistingNE130thStbridge
Pedestrian ExperienceLimitedsidewalknetworkNE130thSt&5thAveNEintersectionsolecrosswalkwithin1/4mileradius
Adjacent UsesSingleFamilyResidentialJacksonParkTrailJacksonParkGolfCourseNorthSeattleNazareneChurch5thAveNE/NE133rdStPark&Ride
Grading29’longitudinalgradedifference12’-24’transversegradedifference
GuidewayLynnwoodLinkGuidewaycurrentlyunderconstructionwithpredeterminedelevation
WSDOT 94’ COMPATIBILITY LINE
WSDOT RIGHT OF WAY
WSDOT 84’ COMPATIBILITY LINE
NE
130
TH
ST
ROOSEVELT
WAY N
E
5TH AVE NE
14
Existing Site Photos
N
1
2
3
1.SouthofNE130thSt&5thAveNEintersection
3.IntersectionofNE131stPl&5thAveNEadjacenttoprojectsite
2.EastofNE130thSt&5thAveNEintersectionlookingtowardprojectsite
NE
130t
h St
RooseveltWayNE
5thAveNE
I-5
15
N
4
5
6
4. South site corner from NE 130th St Bridge
6. Single family residence near project site
5. West of NE 130th St & 5th Ave NE intersection looking toward site
Existing Site Photos
NE
130
th S
t
Roose
velt
Way
NE
5th Ave NE
I-5
16
Workshops & Early Design Options
DESIGN WORKSHOP 1
STRG100
SEC100
JAN100
RR100
ELV70
ELV70
ELV70
ELV70
31'-4" 9'-0" 72'-0" 93'-6" 91'-4" 72'-0" 9'-0" 31'-4"
380'-0"
804010 20
NHIGH RISK - SCHEME ASOUTH ENTRANCE W/ UP & DN ESCALATORS & ELEVATOR EGRESS STAIR AT END OF PLATFORMNORTH ENTRANCE W/ PUBLIC STAIR & ELEVATOR EGRESS STAIR AT END OF PLATFORM1 MAIN TVM/ KIOSK AT EACH ENTRANCE2 BUILDINGS
FCC/FR240
ESC120
ERE240
ELEC300
COM420
UPS150
ESC120
MECH450
SVR250
CENTER OF PLATFROM
CL
CENTER OF PLATFROM
CL
PUBLIC SPACE
LEGEND
VERTICAL CIRCULATION
ANCILLARY SPACE
EGRESS STAIRS
E 84”
E 94’
E 84”
E 94’
JAN SECRR
REAR YARD
YARD
69'-4
"
21'-4
"
STRG
5'-7
"6'
-3"
804010 20
NHIGH RISK - SCHEME BSOUTH AND NORTH LOBBIES W/ UP ESCALATOR & PUBLIC/EGRESS STAIR & ELEVATOR
1 MAIN TVM/ KIOSK @ EACH LOBBY
1 BUILDING
45'-0" 20'-0"125'-0"125'-0"20'-0"
380'-0"
45'-0"
ELV
ELV
ELV
ESC125ELV
FCC/FR
ERE
ESC125
COM
SVR
VESTIBULE
UPSELEC
PUBLIC SPACE
LEGEND
VERTICAL CIRCULATION
ANCILLARY SPACE
CENTER OF PLATFROM
CL
EGRESS STAIRS
ROW
COMPATIBILITY LINE 84”
COMPATIBILITY LINE 94’
ROW
COMPATIBILITY LINE 84”
COMPATIBILITY LINE 94’
6'-3
"5'
-7"
21'-4
"
69'-4
"
STRG95
RR80
SEC85
JAN100
380'-0"
45'-0" 125'-0" 125'-0" 20'-0"20'-0" 45'-0"
4010 20
HIGH RISK - SCHEME CMAIN CENTRAL LOBBY SOUTH SIDE W/ UP ESCALATOR & PUBLIC STAIR CENTRAL ELEVATORS NORTH SIDE W/ UP ESCALATOR & PUBLIC STAIR1 MAIN TVM/ KIOSK IN CENTER1 BUILDING
ELEC340
UPS160
ESC125
VESTIBULE355
ESC125
SVR265
COM490ERE
250
FCC/FR250
CENTER OF PLATFROM
CL
PUBLIC SPACE
LEGEND
VERTICAL CIRCULATION
ANCILLARY SPACE
EGRESS STAIRS
ROW
COMPATIBILITY LINE 84”
COMPATIBILITY LINE 94’
ROW
COMPATIBILITY LINE 84”
COMPATIBILITY LINE 94’
SCHEME A
2 BUILDINGS
SOUTH ENTRANCEUP / DOWN ESCALATOR
ELEVATOREGRESS STAIR
NORTH ENTRANCEPUBLIC STAIR
ELEVATOREGRESS STAIR
SCHEME B
1 BUILDING
SOUTH ENTRANCEUP ESCALATOR
ELEVATORPUBLIC / EGRESS STAIR
NORTH ENTRANCEUP ESCALATOR
ELEVATORPUBLIC / EGRESS STAIR
SCHEME C
1 BUILDINGS
CENTRAL ENTRANCEUP ESCALATORS
PUBLIC / EGRESS STAIRSELEVATORS
INTEGRATED STRUCTURE
PLATFORM
PLAZA
PLATFORM
PLAZA
PLATFORM
PLAZA
SCHEME A
2 BUILDINGS
SOUTH ENTRANCEUP / ENTRANCE
ELEVATOREGRESS STAIR
NORTH ENTRANCEPUBLIC STAIR
ELEVATOREGRESS STAIR
SCHEME B
1 BUILDINGS
SOUTH ENTRANCEUP / ENTRANCE
ELEVATORPUBLIC / EGRESS STAIR
NORTH ENTRANCEPUBLIC STAIR
ELEVATOREGRESS STAIR
SCHEME C
1 BUILDING
CENTRAL ENTRANCEUP ESCALATOR
PUBLIC / EGRESS STAIRSELEVATOR
N
17
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
D
PLATFORM ROOF448' - 10"
A G
PLAZA ROOF404' - 0"
C EB F
08' 4' 8'
NBSB
PARATRANSIT(BEYOND)
10’ 11’ 11’BUFFER
3’ 10’SIDEWALK(VARIES)
Workshop Summary & Constraints
S.Plaza394’-0”N.Plaza390’-0”
N.Platform425’-0”
S.Platform428-10”
Platform Roof448’ - 10”
ExistingEdgeofPavement
Interstate5
5th Ave NE
84’C
ompatibilityLine
94’C
ompatibilityLine
WSD
OTRightofW
ay
30’-0”
11’ 11’ 10’Sidewalk(Varies)
Paratransit(Beyond)
10’Buffer3’
18
Design Concept
19
Station Components
Highlight Station Components
SDC -CONCEPT DESIGN PRESENTATION | APRIL 16, 2020
LYNNWOOD LINK EXTENSIONNE 130TH STREET INFILL STATION
South Plaza LobbyPublicStairElevatorEscalatorTicketVendingKiosk
North Plaza LobbyPublicStairElevatorEscalatorTicketVendingKiosk
Center of PlazaAncillaryBuildingParatransitDrop-Off
Drop-Off LoopPassengerPick-up&Drop-offparkingSTPersonnel&ServiceParkingADARampEntranceStair
VerticalCirculationAncillarySpaceInformation&Ticketing
N
GuidewayOverheadExistingCurbProposedBusStop
20
Enlarged Lobby Plans
N
SDC -CONCEPT DESIGN PRESENTATION | APRIL 16, 2020
LYNNWOOD LINK EXTENSIONNE 130TH STREET INFILL STATION
SDC -CONCEPT DESIGN PRESENTATION | APRIL 16, 2020
LYNNWOOD LINK EXTENSIONNE 130TH STREET INFILL STATION
North Plaza LobbySouth Plaza LobbyStairElevatorEscalatorEntranceBusStop
21
NE 130th & 5th Ave NE Intersection
N
SDC -CONCEPT DESIGN PRESENTATION | APRIL 16, 2020
LYNNWOOD LINK EXTENSIONNE 130TH STREET INFILL STATION
Proposed Channelization5th Ave NE to be one-way northbound after drop-off loop
Existing Channelization
5th Ave NE5th Ave NE
NE
130
th S
t
NE
130
th S
t
22
Site Access - Public TransitN
E 1
30T
H S
T
5TH AVE NE
Public TransitPedestrianBicyclistVehicular
N
23
NE
130
TH
ST
5TH AVE NE
Public TransitPedestrianBicyclistVehicular
N
Site Access - Pedestrian
24
NE
130
TH
ST
5TH AVE NE
Public TransitPedestrianBicyclistVehicular
N
Site Access - Bicyclist
25
NE
130
TH
ST
5TH AVE NE
Public TransitPedestrianBicyclistVehicular
N
Site Access - Vehicular
26
Site AccessN
E 1
30T
H S
T
5TH AVE NE
Public TransitPedestrianBicyclistVehicular
N
80% of Patron Traffic projected to arrive at south-end of station
27
Platform Plan
N
Elevator
Public / Egress Stair
Guideway
Southbound Platform
Northbound Platform
Platform Seating
Escalator
Information KioskWindwall
28
Elevations
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
PLATFORM ROOF448' - 10"
PLAZA ROOF404' - 0"
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
PLATFORM ROOF448' - 10"
PLAZA ROOF404' - 0"
Jacobs trustedHNTB
designpartners
DRAWING NO.:
FACILITY ID:
SHEET No: REV:
SCALE:
FILENAME:
CONTRACT No.:
SUBMITTAL DATE:DATE:
LIN
E IS
1" A
T
FULL
SC
ALE
REVIEWED BY:DATE:SUBMITTED BY:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
No. DATE DSN CHK APP REVISION
801 SECOND AVENUE, SUITE 501SEATTLE, WA 98104
206.682.3460FAX
206.343.9388
C:\t
emp\
revi
t\201
8\L2
10-N
13-A
-v20
18_c
willi
ams8
BU.rv
t3/
30/2
020
5:03
:59
PM
N13
106
NE 130TH STREET INFILL STATION - ARCHITECTUREEXTERIOR ELEVATIONS
OVERALL ELEVATIONS -EAST AND WEST
1" = 20'-0"
L210-N13-A
RTA / CN 0079-15C
12/16/2019 12/16/2019
H. FITZPATRICK
C. WILLIAMS
J. JOHNSON
S. VAN DYCK
LYNNWOOD LINK EXTENSIONCONTRACT L210
NE 130TH STREET INFILL STATIONN13-AEE100
12/16/2019S. BURCH F. CHIHAB
30% SUBMITTAL
SCALE: 1" = 20'-0" N13-AEE100
N13-APP200
EAST ELEVATION - OVERALL A
SCALE: 1" = 20'-0" N13-AEE100
N13-APP200
WEST ELEVATION - OVERALL B
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
PLATFORM ROOF448' - 10"
PLAZA ROOF404' - 0"
SOUTH PLAZA394' - 0"
SOUTH PLATFORM428' - 10"
NORTH PLAZA390' - 0"
NORTH PLATFORM425' - 0"
PLATFORM ROOF448' - 10"
PLAZA ROOF404' - 0"
Jacobs trustedHNTB
designpartners
DRAWING NO.:
FACILITY ID:
SHEET No: REV:
SCALE:
FILENAME:
CONTRACT No.:
SUBMITTAL DATE:DATE:LI
NE
IS 1
" AT
FULL
SC
ALE
REVIEWED BY:DATE:SUBMITTED BY:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
No. DATE DSN CHK APP REVISION
801 SECOND AVENUE, SUITE 501SEATTLE, WA 98104
206.682.3460FAX
206.343.9388
C:\t
emp\
revi
t\201
8\L2
10-N
13-A
-v20
18_c
willi
ams8
BU.rv
t3/
30/2
020
5:03
:59
PM
N13
106
NE 130TH STREET INFILL STATION - ARCHITECTUREEXTERIOR ELEVATIONS
OVERALL ELEVATIONS -EAST AND WEST
1" = 20'-0"
L210-N13-A
RTA / CN 0079-15C
12/16/2019 12/16/2019
H. FITZPATRICK
C. WILLIAMS
J. JOHNSON
S. VAN DYCK
LYNNWOOD LINK EXTENSIONCONTRACT L210
NE 130TH STREET INFILL STATIONN13-AEE100
12/16/2019S. BURCH F. CHIHAB
30% SUBMITTAL
SCALE: 1" = 20'-0" N13-AEE100
N13-APP200
EAST ELEVATION - OVERALL A
SCALE: 1" = 20'-0" N13-AEE100
N13-APP200
WEST ELEVATION - OVERALL B
West
East
25’ MSERetaining Wall
Stair Enclosure
GuidewayElevator Enclosure
Platform Windwall
Platform Canopy Escalator EnclosureStation Column
Ancillary Building Bike Lockers
Stair Enclosure
Guideway
Station Column
Bike Lockers
Elevator Enclosure
Escalator Enclosure
Ancillary Building
Platform Windwall
Platform Canopy
29
SustainabilityLLEEEEDD vv44 ffoorr BBDD++CC:: TTrraannssiitt
Project Checklist
YY ?? NN
Credit 11
00 00 00 1188 00 00 00 1133Credit 1 Y Prereq Required
Credit 2 Y Prereq Required
Credit 6 Credit 4
Credit 4 Credit 2
Credit 1 Credit 2
Credit 1 Credit Building Product Disclosure and Optimization - Material Ingredients 2
Credit Green Vehicles 1 Credit Durability in Material Selection, Design & Operation 1
Credit Disaster Preparedness Planning 1 Credit 2
Credit Social Equity 1
00 00 00 IInnddoooorr EEnnvviirroonnmmeennttaall QQuuaalliittyy 1166
00 00 00 99 Y Prereq Required
Y Prereq Required Y Prereq Required
Credit 1 Credit 3
Credit 2 Credit 3
Credit Rainwater Management 2 Credit Construction Indoor Air Quality Management Plan 1
Credit 2 Credit 2
Credit 1 Credit 1
Credit Universal Accessibility 1 Credit 1
Credit 2
00 00 00 1100 Credit 1
Y Prereq Required Credit 2
Y Prereq Required
Y Prereq Building-Level Water Metering Required 00 00 00 IInnnnoovvaattiioonn 66Credit 1 Credit 5
Credit 6 Credit 1
Credit 2
Credit Water Metering 1 00 00 00 RReeggiioonnaall PPrriioorriittyy 44Credit Regional Priority: Specific Credit 1
00 00 00 3333 Credit Regional Priority: Specific Credit 1
Y Prereq Required Credit Regional Priority: Specific Credit 1
Y Prereq Required Credit Regional Priority: Specific Credit 1
Y Prereq Required
Y Prereq Required 00 00 00 TTOOTTAALLSS Possible Points: 111100Credit 5
Credit 19
Credit 1
Credit 2
Credit 3
Credit 1
Credit 2
Construction Demolition and Excavation Waste Management
Minimum Indoor Air Quality Performance
Building Product Disclosure and Optimization - Environmental Product
Declarations
Integrative Process
Construction Activity Pollution Prevention
Building Product Disclosure and Optimization - Sourcing of Raw Materials
Project Name:
Date:
LLooccaattiioonn aanndd TTrraannssppoorrttaattiioonn
Sensitive Land Protection
Bicycle Facilities
Construction Demolition Waste and Excavation Management Planning
MMaatteerriiaallss aanndd RReessoouurrcceess
Storage and Collection of Recyclables
High Priority Site
Surrounding Density and Diverse Uses
SSuussttaaiinnaabbllee SSiitteess
Station Life-Cycle Impact Reduction
Green Power and Carbon Offsets
Heat Island Reduction
Outdoor Water Use Reduction
Indoor Water Use Reduction
Outdoor Water Use Reduction
Indoor Water Use Reduction
Enhanced Commissioning
Energy Metering
WWaatteerr EEffffiicciieennccyy
Fundamental Commissioning and Verification
Demand Response
Renewable Energy Production
Enhanced Refrigerant Management
Optimize Energy Performance
Advanced Energy Metering
CCeerrttiiffiieedd:: 40 to 49 points,, SSiillvveerr:: 50 to 59 points, GGoolldd:: 60 to 79 points, PPllaattiinnuumm:: 80 to 110
Intermodal Connectivity and Placemaking
Reduced Parking Footprint
Site Assessment
Interior Lighting
Daylight
LEED Accredited Professional
Innovation
Light Pollution Reduction
Environmental Tobacco Smoke Control
EEnneerrggyy aanndd AAttmmoosspphheerree
Minimum Energy Performance
Fundamental Refrigerant Management
Cooling Tower Water Use
Acoustic Performance
Quality Views
Enhanced Indoor Air Quality Strategies
Low-Emitting Materials
Indoor Air Quality Assessment
Thermal Comfort
Site Development - Protect or Restore Habitat
Targeting LEED Transit Silver at minimum
30
View from 5th Avenue NE
31
Potential Artwork Location
Art mural at center of station facing 5th Ave NE
32
View from NE 130th Street Bridge
33
View from Plaza Lobby
34
Potential Artwork Location
Suspended artwork located at both south & north lobbies (Potentially internally lit)
35
View From Southbound Platform
36
Inspired by NatureForm inspiration• ThorntonCreekstream
meandering• Intersectingarcgeometry
STA
TIO
N L
OC
AT
ION
THORNTON CREEK
photo: thorntoncreekalliance.info
37
Site Improvements
ProposedWestboundBusStop
Guideway OverheadExisting Curb
ProposedEastboundBusStop
SouthStationBicycleFacilities28Lockers,8Racks
Mid-BlockCrossingtoserveJacksonParkTrail,localchurchandfuturedevelopmentSiteFurniture,DepressedPlanters&LightingFixturesserveasVehicularBarriers
NorthStationBicycleFacilities16Lockers&44FutureLockers6BikeRacks&14FutureRacks
WidenedSidewalkalong5thAveNE
PrecastConcreteBenches
Para-Transit
N
38
Site PaletteLI
GH
TIN
G
BIC
YCLE
LO
CK
ERS
SEAT
ING
& S
ITE
FURN
ITUR
EPA
VIN
G &
STE
PS
Bik
Lock
Stan M
m Hi Th 30
stpa
Ulsmcaw
M Tr On Bi Fr
Deta
Elect
Exter
keLink™
ker Types
ndard eLockModular design aintenance, loigh quality mathree year limite04 stainless steeel doors and attern. ltra‐low powermart card readard reader, maireless networ
Motor‐driven 30ranslucent bluen‐site post‐instkeLink™ softwree technical su
ails
tronic Contro
rior Frame &
Quad 4 spacMost peffect
™ G5 eL
ker Configuand replaceab
ower lifecycle cterials, design,ed Warranty. Seel exterior fraside panels wit
r electronic coners (ready for gnetic stripe caking upgrades)000 lb test latce FRP roof. tallation orient
ware license. upport for the
oller Housing
Doors
eLocker ces, 2 Controllepopular and coive.
Locker™
urations ble componentcosts, and upgr and attentionService & Operme and perforth bike graphic
ntrollers with IISO‐14443 conard reader, an). h system.
tation.
life of the prod
304 series 1¼” thick UV No exposed Removable fHousing heldHigh contrasnighttime op
Exterior Fram Interior Fram No externall ¼” on 3/8” p
contents for Door recesse Full length p Door braced Lockers desi Debris skirts FRP roofs m
and cutting, Roof sloped
ers ost
™ Techn
ts for ease of radability. to aesthetics.rations Plan oprated 304 stainc perforation
ISO‐7816 compntactless RFID/d LAN/WAN
duct.
6 gage stainlesand abrasion pedges to pry afor maintenand in place by rest, wide tempeperation.
me and doors: me Componently removable sperforation patr security monied and extra thpry guard / dood for additionagned to be inss & door flaps peet stringent Tyet let light into shed rain a
Wedg2 spaFor covisibi
nical Fea
ptions. nless
pliant NFC
ss steel. protected polyagainst. ce and batteryecessed high‐serature 128x64
Stainless steets: 16 and 18 gcrew fastenersttern provides itoring and renhick for pry resor handle. l security and ostalled plumb aprevent intrusiTransit Agency so locker contnd deter repos
ge eLocker ces, 1 Controllorners and to mlity and traffic
atures
ycarbonate win
y or latch assemsecurity mecha4 graphic LCD u
l with #4 finishgage G90 galvas. exceptional se
ntal rules enforsistance.
out‐of‐plane stand level for coion and entrapfire resistancetents remain vse.
ler maximize flow.
& Spec
ndows.
mbly replacemanical lock. user interface d
h (standard, otanized steel.
ecurity resistanrcement.
tiffness to ensuonsistent autompment of wind‐e requirementsvisible at a dista
Doub2 spaFor siCann
cificatio
ment.
display with ba
her finishes av
nce and for vis
ure consistent matic door ope‐blown debris.s, resist very hance.
ble eLocker aces, 2 Controllites with limiteot be grouped
ons
acklight for
vailable)
ibility of
latching. ening action. igh impact, UV
lers ed clearance. .
V
Bik
Lock
Stan M
m Hi Th 30
stpa
Ulsmcaw
M Tr On Bi Fr
Deta
Elect
Exter
keLink™
ker Types
ndard eLockModular design aintenance, loigh quality mathree year limite04 stainless steeel doors and attern. ltra‐low powermart card readard reader, maireless networ
Motor‐driven 30ranslucent bluen‐site post‐instkeLink™ softwree technical su
ails
tronic Contro
rior Frame &
Quad 4 spacMost peffect
™ G5 eL
ker Configuand replaceab
ower lifecycle cterials, design,ed Warranty. Seel exterior fraside panels wit
r electronic coners (ready for gnetic stripe caking upgrades)000 lb test latce FRP roof. tallation orient
ware license. upport for the
oller Housing
Doors
eLocker ces, 2 Controllepopular and coive.
Locker™
urations ble componentcosts, and upgr and attentionService & Operme and perforth bike graphic
ntrollers with IISO‐14443 conard reader, an). h system.
tation.
life of the prod
304 series 1¼” thick UV No exposed Removable fHousing heldHigh contrasnighttime op
Exterior Fram Interior Fram No externall ¼” on 3/8” p
contents for Door recesse Full length p Door braced Lockers desi Debris skirts FRP roofs m
and cutting, Roof sloped
ers ost
™ Techn
ts for ease of radability. to aesthetics.rations Plan oprated 304 stainc perforation
ISO‐7816 compntactless RFID/d LAN/WAN
duct.
6 gage stainlesand abrasion pedges to pry afor maintenand in place by rest, wide tempeperation.
me and doors: me Componently removable sperforation patr security monied and extra thpry guard / dood for additionagned to be inss & door flaps peet stringent Tyet let light into shed rain a
Wedg2 spaFor covisibi
nical Fea
ptions. nless
pliant NFC
ss steel. protected polyagainst. ce and batteryecessed high‐serature 128x64
Stainless steets: 16 and 18 gcrew fastenersttern provides itoring and renhick for pry resor handle. l security and ostalled plumb aprevent intrusiTransit Agency so locker contnd deter repos
ge eLocker ces, 1 Controllorners and to mlity and traffic
atures
ycarbonate win
y or latch assemsecurity mecha4 graphic LCD u
l with #4 finishgage G90 galvas. exceptional se
ntal rules enforsistance.
out‐of‐plane stand level for coion and entrapfire resistancetents remain vse.
ler maximize flow.
& Spec
ndows.
mbly replacemanical lock. user interface d
h (standard, otanized steel.
ecurity resistanrcement.
tiffness to ensuonsistent autompment of wind‐e requirementsvisible at a dista
Doub2 spaFor siCann
cificatio
ment.
display with ba
her finishes av
nce and for vis
ure consistent matic door ope‐blown debris.s, resist very hance.
ble eLocker aces, 2 Controllites with limiteot be grouped
ons
acklight for
vailable)
ibility of
latching. ening action. igh impact, UV
lers ed clearance. .
V
39
Plant PaletteTR
EES
STR
EETS
CA
PEM
IX B
5TH
AVE
STAT
ION
PLA
ZA
Sword Fern
Vanderwolf Pine Metro Gold Hedge Maple Pacific Sunset MapleWestern Redcedar
Sword Fern
Sword FernWhite SpireaSoft Rush
Snowberry
Snowberry
Salal Inside-Out FlowerPrivet Honeysuckle Epimedium Low Oregon Grape
Low Oregon GrapeBaldhip Rose Red Twig Dogwood Thimbleberry
Bowhall Maple
40
Site Drainage
Multi-functional planters• Vehicularbarrier• Bioretentionplanting
CVT
CV
TC
ITS
ST
A
T E O F W A S H I N G
TO
N
L ICENS ED L A N D S C A P E A R C HIT
EC
T
NO
. 6 6 3 E X P . 0 6 / 0 2 / 21
BR IA N M EL R OD
5TH AVE NE
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: REVIEWED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:
LIN
E IS
1" A
T
FULL
SC
ALE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
03/3
0/20
| 4
:45
PM |
ELH
ADD
OX
C:\U
SER
S\EL
HAD
DO
X\D
ESKT
OP\
NEW
FO
LDER
(2)\L
210-
N13
-LPP
112.
DW
G
L210-N13-LPP112 LOCATION ID:
100% SUBMITTAL HNTBJacobs
30% SUBMITTAL J. LOGAN
J.LOGAN
B. ELROD
B. ELROD S. BURCH 12/16/2019 F. CHIHAB 12/16/2019
1" = 20'
RTA / CN 0079-15C
12/16/2019
LYNNWOOD LINK EXTENSIONCONTRACT L210
NORTHGATE STATION TO NE 200TH STREET
LANDSCAPEHARDSCAPE AND LANDSCAPE PLAN
N13-LPP112
N13
124 0
CH
AR
AC
TER
IMA
GES
KEY
PLA
N
RECESSED PLANTER LOCATIONSNTS
REC
ESSE
D P
LAN
TER
SEC
TIO
N
41
Thank you.
soundtransit.org
Questions & Comments