nearby groundwater contamination. redwood market (superior) shallow wells – no pce no deep wells...

16
NEARBY GROUNDWATER CONTAMINATION

Upload: jade-gallagher

Post on 12-Jan-2016

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

NEARBYGROUNDWATERCONTAMINATION

Page 2: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;
Page 3: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

REDWOOD MARKET (Superior)Shallow wells – no PCE

No deep wells

HOMAN TIRESShallow well 100-200 ppb PCEMTbE; hydrocarbons; solvents

FIESTA CENTER (LaBlue)•Shallow well in back – 8,000 ppb PCE

•600 ft well – no results

Page 4: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

7.5 HPPump

sanitary

seal

Well #1 BACKUP

15 HPPump

Well #2 MAIN

tankgenerator

PCE

NOPCE

7.5 HPPump

sanitary

seal

Page 5: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

BELMONT TERRACE BACKUP WELL PCE CONTAMINATION

0

1

2

3

4

5

6

Sep-02 Dec-02 Mar-03 Jun-03 Oct-03 Jan-04 Apr-04 Aug-04 Nov-04 Feb-05

Pa

rts

pe

r B

illi

on

MEASURED

LIMIT

NOT IN

MAIN WELL

WATER QUALITY

Page 6: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

UPGRADE NEEDS(WATER & WASTEWATER)

Page 7: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

WATER UPGRADE NEEDS

WHY?• PCE in backup well

• Summer nitrate high in backup well

• Old equipment is failing

• Need larger generator for main well

• Unbalanced PG&E power

• Reduce electricity costs

• 50-year piping old system; need replacement plan

• Need to document our groundwater as an asset

Page 8: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

NEW SEPTIC/LEACH REGULATIONSwere supposed to start Jan 1, 2007; already started in Marin

• New design standards

• Mandatory monitoring

NEW COSTS

FOR EACH HOME

upgrades

certification

monitoring

Page 9: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

UPGRADECOSTS

Page 10: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

WATER QUALITY & WELL SYSTEM UPGRADE

ITEM COST

75 KW emergency generator $30,431Electrical upgrades $15,000

Efficient main well pump/motor $8,953Efficient booster pumps/motors/VSD $8,508

Improved pressure controls $3,530Abandon and seal backup well $15,875

Installation $20,750Inspections/Permits (5%) $5,152

Tax/shipping $4,479Contingency (15%) $16,902

TOTAL $130,000Average cost per lot $1,500

2007$140,000

Page 11: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

RESERVE FORWATER MAINS REPLACEMENT

(emergency repair only)

ITEM COST

Water Distribution (8") $628,943Repave streets $69,219

Curb/Gutter Repair $46,460Inspections $22,339

Contingency 15% $115,044TOTAL $880,000

Average cost per lot $10,400

2007$900,000

Page 12: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

RATES

$150/mo

+ 9%/yr

RATES$150/mo+ 5%/yr

2007

$80,000

increase

3%/yr

Page 13: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

RATES$150/month

+ 9%/yr increase

2007

(So.Cal)

$160,000

Page 14: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

RATES$200/month

+ 5%/yr increase

increase

3%/yr

Page 15: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

2006 COST vs REVENUE

Page 16: NEARBY GROUNDWATER CONTAMINATION. REDWOOD MARKET (Superior) Shallow wells – no PCE No deep wells HOMAN TIRES Shallow well 100-200 ppb PCE MTbE; hydrocarbons;

$90/hr$45/hr

ACTUAL COSTS$52,841

REVENUE$52,200

•No increase in

reserves