![Page 1: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/1.jpg)
Neil Zahradka Manager, Office of Land Application Programs
1
![Page 2: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/2.jpg)
Presentation Overview Amendments to Virginia Pollution Abatement Animal
Feeding Operations (VPA AFO) General Permit
Small Animal Feeding Operations Evaluation and Assessment Strategy
Biosolids and Industrial Residuals – 2015 Legislation
US EPA Waters of the United States Rule
DEQ Water Withdrawal Reporting
2
![Page 3: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/3.jpg)
Amendments to VPA Animal Feeding Operations Regulation
and General Permit
3
![Page 4: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/4.jpg)
VPA AFO Amendments The VPA General Permit (GP) Regulation for
AFOs governs the pollutant management activities of animal wastes at AFOs: having 300 or more animal units; and utilizing a liquid manure collection and storage
system
First ten year permit term began in 1994 Second permit term ended November 15, 2014 Third permit term now effective
4
![Page 5: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/5.jpg)
Definitions, Terms and Reissuance Add, amend and remove definitions to ensure
consistency with other regulations governing AFOs
Amend dates to reissue the GP for another 10 year term
Amended registration statement (application)
5
VPA AFO Amendments
![Page 6: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/6.jpg)
Significant changes made to the GP and Regulation upon adoption of amendments. The Permittee will be allowed to : Transfer Animal Waste Receive Off-Site Generated Waste (materials) Construct and Operate Alternative Manure
Treatment Technologies (digester)
6
VPA AFO Amendments
![Page 7: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/7.jpg)
Requirements for Proper Construction and Operation of Alternative Manure Treatment Technologies New storage/treatment facilities - constructed in
accordance with appropriate practice standard adopted by United States Department of Agriculture - Natural Resource Conservation Service
DEQ also approves construction
7
VPA AFO Amendments
![Page 8: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/8.jpg)
Requirements for the Receipt Off-Site Generated Waste (Materials) for the purpose of feeding an on-farm digester or other manure treatment technology Allow the permitted AFO owner to manage imported
waste materials in accordance with the conditions of the VPA GP including additional recordkeeping
DEQ will approve the treatment process
8
VPA AFO Amendments
![Page 9: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/9.jpg)
Requirements for the Transfer of Waste Allow the permitted AFO owner to transfer
waste off-site Establish a threshold to trigger requirements more than 10 tons of solid or semi-solid or more than 6,000 gallons of liquid
9
VPA AFO Amendments
![Page 10: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/10.jpg)
Requirements for the Transfer of Waste Establish end-user technical requirements Storage Utilization Recordkeeping
Developed an Animal Waste Fact Sheet summarizes technical requirements for End-
Users
10
VPA AFO Amendments
![Page 11: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/11.jpg)
Modeled after the VPA Regulation and GP for Poultry Waste Management (9VAC25-630-10 et seq.) established in 2009.
End-Users must comply Equally as enforceable as the permit
coverage
11
Requirements for End-Users
![Page 12: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/12.jpg)
End-User is not required to obtain a permit unless non-compliance with the technical regulations is identified
If permit coverage is necessary – additional requirements shall be met: soils and waste monitoring, nutrient
management plans, animal waste transfer recordkeeping, DEQ compliance inspections and training
12
Requirements for End-Users
![Page 13: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/13.jpg)
Four options to determine land application rate 1 – Phosphorus Crop Removal 2 – Apply once every 3 years no more than 80# P 3 – Soil Test Recommendations 4 - Nutrient Management Plan
Land application timing and buffer zones Identical to those in the General Permit
13
Requirements for End-Users
![Page 14: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/14.jpg)
Storage Identical to requirements in the General Permit
Recordkeeping Land application activities Animal waste transactions
14
Requirements for End-Users
![Page 15: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/15.jpg)
Small AFO Evaluation and Assessment Strategy
15
![Page 16: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/16.jpg)
Small AFOs are operations that fall below the animal number thresholds which require permit coverage.
16
Small AFO Strategy
![Page 17: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/17.jpg)
Chesapeake Bay Watershed Implementation Plan (WIP) Approx. 800 small dairy and small poultry AFOs were
identified does not account for other livestock, equine or exotic/non-
traditional agricultural animal operations
Collaborative effort between DEQ and Virginia Department of Agriculture and Consumer Services (VDACS) to develop a Strategy to evaluate and assess Small AFOs for site specific risks/impacts to surrounding water quality
17
Small AFO Strategy
![Page 18: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/18.jpg)
18
DEQ VDACS - Agricultural Stewardship Program
Specific pollutant management activities
Complaint based, issue specific
AFOs and CAFOs with a duty to apply for permits
Non-permitted agricultural operations including AFOs
Discharges or potential discharges to state waters
Water quality problems: nutrients, sediment, toxins from agricultural activities
DEQ and VDACS
![Page 19: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/19.jpg)
Voluntary Participation Work one-on-one with the
owner/operator Self-Assessment Tool
19
Small AFO Strategy
![Page 20: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/20.jpg)
Evaluations Is it an AFO? Is there potential for a discharge?
On-Site Assessments Scheduled with owner/operator Owner/operator present during assessment Are there issues related to discharges or
potential discharges that need to be addressed?
20
Small AFO Strategy
![Page 21: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/21.jpg)
Four options if issues need to be corrected Voluntary implementation of BMPs
DEQ or VDACS Identify local resources for Cost-Share and
Technical Assistance Memorialized with a letter
VDACS Agricultural Stewardship plan DEQ permit: VPA AFO DEQ permit: VPDES CAFO
21
Small AFO Strategy
![Page 22: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/22.jpg)
Goal: complete 800 evaluations of Dairy/Poultry farms by December 2015 As of June 2015: 73% of WIP Goal met Another 324 operations have been evaluated (not identified in WIP - beef, swine, etc.)
22
Small AFO Strategy
![Page 23: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/23.jpg)
On-Site Assessments : 167 completed Corrective Action Plans: required at 24 farms All corrective actions to date are being addressed
through voluntary implementation or Ag Stewardship actions (no DEQ permits)
23
Small AFO Strategy
![Page 24: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/24.jpg)
Biosolids and
Industrial Residuals 2015 Legislation
24
![Page 25: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/25.jpg)
2015 Budget Bill Land Application fee changes Class B: $7.50 per dry ton Exceptional Quality: $3.75 per dry ton Effective October 1, 2015
Blue Plains biosolids treatment converted to EQ thermal hydrolysis followed by anaerobic digestion ~50% volume reduction Historically ~60% of biosolids in VA
25
Biosolids
![Page 26: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/26.jpg)
House Bill 1364 / Senate Bill 1413 Authorizes monitoring by local governments and collection of fee by DEQ Fee: $5.00 per dry ton in counties with local monitoring ordinances Effective January 1, 2016
26
Industrial Residuals
![Page 27: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/27.jpg)
US EPA & Army Corps of Engineers
Clean Water Rule: Definition of Waters of the United States
27
![Page 28: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/28.jpg)
Defines scope of waters protected under the Clean Water Act Final rule reflects response to extensive public comments Does not establish any regulatory requirements Fewer waters will be defined as “waters of the United States” under the rule than under the existing regulations 8 categories of jurisdictional waters Maintains existing exclusions for certain categories of waters Adds additional categorical exclusions Case-specific analyses still an option Effective August 28, 2015
28
Waters of the US Rule
![Page 29: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/29.jpg)
DEQ Water Withdrawal Reporting
29
![Page 30: Neil Zahradka Manager, Office of Land Application Programs · 2015-09-19 · more than 10 tons of solid or semi -solid or ... Users 10 VPA AFO Amendments Modeled after the VPA Regulation](https://reader033.vdocuments.net/reader033/viewer/2022050116/5f4cc07f9a615964d2382262/html5/thumbnails/30.jpg)
The Virginia Water Withdrawal Regulation requires the reporting of any withdrawal (groundwater or surface water) for crop irrigation if: withdrawals for any single month meet or exceed one million
gallons. All other agricultural production withdrawals (e.g. livestock watering, cooling, and facility cleaning) require reporting of any withdrawal (groundwater or surface water) if: the daily average withdrawal during any single month exceeds
10,000 gallons per day.
30
Water Withdrawal Reporting