Nepal Trade Union congress
SUMMAY PROJECT OUTLINE (SPROUT)
Project Title Youth Organizing Campaign through study circle
Tentative Duration One year
Starting Date Sept. 2007
Geographical Coverage Six Region
Project Language Nepali/ English
Executing Organization/ Unit
Management Committee of NTUC
Implementing
Unit
Organizing Departments of NTUC
Preparation Date 20 July, 2007
Author Mahendra Prasad Yadav(National Executive Member)
Nepal Trade Union Congress
Background
This training course “ Youth organizing campaign through study circle “ aims to develop study circle organizers and leaders on the issues of organizational ,economic and social policies for promotion of decent work, in particular for young women and men.Each year, massive number of young workers join the labour force but often forced to be unemployed or under-employed, working in insecure and underpaid jobs under exploitative conditions.
Background and Justification
Nepal is land lock country. Land is still the major form of wealth and main source of
income with $220 GNP per capita. Literacy is rate is low as 45% and 62% are males and 28%
are females. The total population is 23.1 millions and size of labour force is as high 11.2 millions and growing annually at a rate of 2.3%.
Unemployment rate is 4.89% .but underemployment is as high as 45% of the total
labour force and further increasing because of the political turmoil and uncertainty in recent years has hindered economic development process and crucially affected employment
situation. .Formal sector employment is declining and livelihood reliability on informal
sector employment is increasing at a very fast rate . Organising rate is still not more than 9%
because organising wide spread informal sector workforce is not going to be easy.
NTUC has already completed the study circle campaign in Brick kiln (Construction sector)
with the support of ILO. From this programme, NTUC has been able to increase the number of
membership to a great extent.
Background and Justification
NTUC would like to expand its network much bigger and well-equipped, skilful and result –
oriented trade union activist can meet the globalization challenges. In this context, study circle within its affiliates and regional level will make a concrete trade union awareness and
massive campaigning in the affiliates, regions and district levels.
NTUC through the training programme would like to organize the youth workers through the study
circle in promoting membership. In the trade union sense, a study is a group of
fellow trade unionists, which meets on a regular basis to discuss on trade union policies and
decent work. Study circle will be the great methodology in promotion of decent work for the
youth. Detail of the study circle will find in annex 1
Target Group & Parties involved
Target group of this campaign are:Young workers of the labour force of which 8 affiliates of Informal sector .
six regional committees of NTUC,
Potential Leader of the Affiliates, regions and district level organizer / leader of Affiliates and Enterprises.
Implementers : organizing departments of NTUC
Federations and regional committeesTechnical and financial support from ILO
Decision-makers :Management Committee of NTUC
Development Objectives
Strengthening of Nepal Trade Union Congress capacity for the development of policies and strategies in the area of organizing.
This project will contribute to :
Immediate Objectives
At the end of the project :
1. Participants will be able to study in depth the operation of “study circle”
2. Participants will be able to conduct,coordinate,organize and facilitates the potential leaders or members in study circle sessions.
Key Outputs/Direct Results
1) For immediate objectives 125 (At least 33% women) Study circle organizers are trained and set up as main study group .
2) For immediate objectives 2
(i) Minimum 60 (At least 33% women) Study circle Leaders are trained by the main study group .
(ii) A total of 500 (At least 33%women) new members are trained within 6 months of project start up.
Region Bagmati East & Mid Western, Mid and far Western
Six region
Leader 20 20 20 60
Activities
Output 1.1: 25 organizers trained and set up as main study group
Activities1.1.1:NTUC is to prepare the following document;
study circle guide lines
youth Employment document
Right at work
Activity 1.1.2 : NTUC is to hold the first meeting with study circle organizers
Activity 1.1.3 : (10 days) Training for study circle organizer
Immediate objective 1 :developing the study circle organizer at national level (first training).
Activities
Immediate Objective 2Immediate Objective 2(i) Developing the study circle leaders at regional level (second training).
Output 1.2: Minimum 60 study circle leader trained by main study group.
Activity 1.2.1 NTUC is to hold the meeting with ILO in Nepal and
exchange experiences with each others to improve the areas.
Activity 1.2.2 NTUC is to get the material to distribute in training for study circle leader .
Activity 1.2.3 NTUC is to finalize
the date of programme (7 days).
Activities
Output 2.1 : study circle leaders will
develop a programme Activity 2.1.1 : Regional committees
of NTUC are to hold the meeting with study circle leaders about further programmes.
Activity 2.1.2: Regional committees of NTUC are to finalize the programmes in region.
Output 2.2 : 50 study circle will start.
Activity 2.2.1 : Regional committees of NTUC are to manage and coordinate all activities .
Activity 2.2.2 : Study circle leader is to start the study circle session (one to five )
Immediate objective 2(ii) Developing the 500 members/cadres (Approx. 50 study circle).
Main Inputs
Necessary resources required to implement the proposed activities :Human resources :
ILONTUCITUC
Financial resources : ILOAffiliatesNTUC
Equipment:Computer , Laptops and LCD Projector
ILO literature on Employment and ILS
Indicators of Achievement
For immediate objective 1Trained the study circle Organizer in national level
For immediate objective 260 study circle Leaders will be trained from the six regions of 3 training .
At least 500 youth workers will be organized through study circle.
Management of Risks
Risk Potential Risk Possible Response
1 ILO may not agree on this proposal due to lack of specified budget
Try to convince timely about importance of activities and long term and short term effects
2 Resource person from other institutions ( Study Circle Specialist ) may not get at time
Make timely consultations with concerned institutions or Specialists
3 Few affiliates and region may not send required participants
Prior make the term and condition for participants and send it timely to Concerning sectors.
4 Participants may not carry out work after training .
10 – 15% of the study circle groups may drop- out
Monitoring / Reporting / Evaluation Procedures
A (1). The first report of the training for study circle organizer for national level is to be submitted soon after the result of training by the NTUC
(2). The second report of training for study circle Leader for regional level is to be submitted after the completion of the all six training.
• The third report of training for study circle leader is to be submitted within one year.
B. NTUC (national body) monitors training progress.
C. Joint meeting of NTUC with the Donor on the Completion of the Training Program.
Preliminary Budget Proposal
Main Item Local Currency (NRs.) US Dollar
Activity 1 :
1.Expenses for Participants
2.Expennses of Lecturers and staff ( Lecturer from Abroad)
NRS 4,76,000.00
Activity 2
1.Expenses for participants
2. Expenses of lecturers and staff
NRS 4,23,000.00
Activity 3
1.Expenses for participantsNRS 6,25,000.00
Total NRS 15,24,000.00