network managed services vendor questions · 17.09.2020 · network managed services vendor...
TRANSCRIPT
Addendum No. 1 - Page 1 of 4
ROCK RIVER WATER RECLAMATION DISTRICT ADDENDUM NO. 1
REQUEST for PROPOSALS #20-215 NETWORK MANAGED SERVICES
September 17, 2020 AD1-1 Notice
This Addendum No. 1, dated September 17, 2020, to the Request for Proposals: Network Managed Services, supersedes all contrary and conflicting information in the above-mentioned instructions, specifications, and contract documents which are hereby supplemented or revised in certain particulars as follows: AD1-2 General Information
The District submits Addendum #1 to answer questions, and provide clarification. AD1-3 Instructions Please see the answers to questions from vendors below, and the following attachments: server list, networking equipment list, network diagram, and the revised proposal form. A copy of this addendum initialed at the bottom shall be included in the proposal as acknowledgment of receipt.
Network Managed Services Vendor Questions 1. Roughly how many end users and network devices (switches and firewalls) would be in‐scope for these services? Approximately 110 end users. We have 21 managed network switches. Core network switches also function as routers. Before this contract begins, there will be four (4) firewalls on the network. 2. How many firewalls do you currently have? If possible, are you able to share the brand, make and serial number for each device? Two (2) Sophos Model: SG230 and two (2) Sophos Model: XG230 3. To estimate penetration testing, we need a scope. How many IP’s internal/external, and frequency of testing? Approximately 725 internal and 13 external IP addresses. 4. Will you consider replacement of all firewall devices NGFW devices to support Firewall Monitoring and Security? There are no current plans to replace the District firewalls. The two (2) Sophos Model XG230s are new. We are just finishing deployment of them. 5. What is the length of term for the opportunity once awarded? Will this be a 12 months, 24, 36? Or negotiated with the chosen vendor?
Addendum No. 1 - Page 2 of 4
The Contractor shall provide the Network Managed Services for a period of two (2) years. If the District and the successful proposer agree in writing, the contract shall have three (3), one-year options to renew (Section VII, Contract, 1. Scope). 6. How many users will this RFP support? Approximately 110 users. 7. Regarding SCADA support, can there be an FTE Supplied by the vendor or is this more remote/virtual/cloud support? Do you currently have a solution in place for SCADA operations? The scope of support for the SCADA network is limited to the network equipment that serves the plant area and SCADA controllers. The actual SCADA controllers are managed by the District. Vendors shall choose their method of support for their proposals. 8. What is the End Point Count and Type 125 virtual desktops accessed through Windows thin clients or 10ZiGs. 20-25 Dell physical workstations. 25-35 Dell laptops and Surface Pros. 9. What needs to be replaced within the organization: Equipment type and count? The District has identified existing HP edge switches as ready for replacement. These switches are listed in the Switch & Network Documentation. 10.What are we pen testing? Internal/External IP's? The proposal form lists projects that are not included in on-site support services. There is an External Penetration Test project and one for an Internet Penetration Test from the Administrative Network to the SCADA Network. See responses to questions 13 and 14 for quantities of IP addresses. 11.Number of users? Approximately 110 users. 12.Number of physical locations? There are 15 different buildings with network switches in them. 13.Number of internal IP addresses? Approximately 725 14.Number of external IP addresses? 13
15.Please provide an exact count of Servers, including physical or virtual, and the OS on those servers. See Attached Server List.xlsx.
16. Please provide an exact count of network equipment: switches, routers, firewalls, and access points. Make and model would be appreciated. See Attached Switch & Network Documentation.docx. 17. How do you currently support your network:
Do you have an in-house IT person?
Addendum No. 1 - Page 3 of 4
The staff member who managed the network will be retired by the time this contract takes effect. Do you currently outsource? We do not currently outsource network management.
18.What Line of business apps do you use? Are there any additional critical applications you rely on? Microsoft Office, AssetWorks, AutoCAD, ESRI (GIS), CUES GraniteNet (inspections), Infor, Horizon Laboratory Information Management System (LIMS), and STREAMS (custom application for utility billing, permitting and other District functions). 19. Is your email through 0365 or another service?
Exchange Online
20. Onsite intervention managed by… This contract will be administered by the Manager of Internal Services or a designee. 21. Monitoring system – provide server to monitoring system If equipment is needed, please include in proposal. 22. Elaborate on what is expected in proposal for alternate. See revised proposal form for a Table to enter the Alternate Cost information. Refer to Section 3.4.C – Firewall Monitoring and Security – Alternate for scope of services. 23. Monitoring of fiber? The RFP contains no specific requirements for monitoring or maintaining fiber structured cabling, just the networking equipment. Maintenance of structured cabling is handled by a separate vendor or vendors. CLARIFICATION ON # SECTION 5 (REQUEST FOR FINANCIAL INFORMATION) The District has amended this request as follows: Section 5 – Financial Litigation Information 1. Include an audited financial statement for the most current quarter and last year-end including Balance Sheet, Income Statement, and Statement of Cash Flows for your company. This is not required. 2. Include a description of any litigation in which Proposer is currently involved. Indicate any potential conflict of interest with vendors that could affect RRWRD’s interests and plans for avoiding the conflict. See note* Place this information in a separate, single sealed envelope, labeled Section 5 (with your company name) in the original proposal copy. This information will be used to determine overall financial strength and maintained as confidential by RRWRD, to the extent permitted by law. This is not required. Note: The District requests financial information to ensure that a respondent is financially stable and will be in business for the duration of the agreement. While this language is conducive for our operational RFP’s we recognize that web developers do not operate in this arena. Therefore, we simply ask that you provide a notarized statement that identifies you are financially stable. We do
Addendum No. 1 - Page 4 of 4
request that you identify any litigation or conflicts of interest that should be considered. If you are free of either issue, simply include this statement in your notarized letter. ________Proposer’s Initials
Node IP Address Description/Node Node IP Address Description/Node
NetWare 6.5 OES Red Hat Enterprise Linux 6Volumes Netmail Indexer
Service Windows 2012R2 (64)Service Netmail Master 0365
Windows 2003 Windows 2012R2 (64)Services Netmail Master Groupwise
Services Windows 2012R2 (64)
Windows 2003 Netmail Search
Avaya BCMS Windows 2016
ESX Host 1 Horizon LIMS Reporting/Actuate
ESX Host 2 Windows 2016
ESX Host 3 Horizon LIMS Application Server
Windows 2016
VDI ESX 6 Host Horizon LIMS Web Server
VDI ESX 6 Host Windows 2019 Standard
VDI ESX 6 Host Print Server 1
Windows 2019 StandardPrint Server 2
Suse Linux Enterprise 11 (64)vRealize Operations
PCS ESX 6 Host
PCS ESX 6 Host Windows 7 (VM)
PCS ESX 6 Host Smart Mailer, Printing, Avaya Site Administrator
IBM z13 VLANFirst Level Hypervisor
Windows 2016 HMC
SQL Server 2016 / Milestone 2018 R3 TCPIP00/LINKO404 TN3270 – VSEA
NetWare 6.5 OES TCPIP01/LINKO414 FTPSERVR – VSEA
Volumes BSI
Services TCPIP00/LINKO404 TN3270 – VSEB
Windows 2008R2 SP1 (64) TCPIP01/LINKO414 FTPSERVR – VSEB
Lieca Spider/CORS - DNAT Second Level Hypervisor
Windows 2003 SP2 zVMHP ProCurve Manager Plus First Level Hypervisor
RPS – SQL Server Express 2005 Velocity
NetWare 6.5 OES SUSE Linux Enterprise 11 SP4 Volumes Linux Installation/Maintenance
SUSE Linux Enterprise 11 SP4
SLES 12 SP2 Central Log Server
Apache - www.rrwrd.dst.il.us SUSE Linux Enterprise 11 SP4
CentOS 5.9 Central Terminal Server
Avaya - SAL_Gateway_2.0.0.6 SUSE Linux Enterprise 12 SP2
Windows 2012R2 (64) Rocket Software LegaSuite - PROD
ArcGIS License Server SUSE Linux Enterprise 11 SP4
Windows 2008R2 SP1 (64) Oracle/Infor
Avaya - ECAS SUSE Linux Enterprise 12 SP3
Windows 2019 Standard (64) Oracle/GIS
Sophos SafeGuard Management SUSE Linux Enterprise 11 SP4
Linux (64) z/VSE V6 Server
Extreme VX9000 Wireless Controller Pri.
Windows 2012R2 (64) SUSE Linux Enterprise 11 SP4 C: OS Oracle Server Hanprod (V7000)
D:Temp Data SUSE Linux Enterprise 11 SP4 E: Temp Media Oracle Server Hantest (V7000)
F: Misc Storage SUSE Linux Enterprise 11 SP4 G: Sql Database VTAPE
H: Media Storage SUSE Linux Enterprise 11 SP4
Windows 2008R2 SP1 (64) Oracle/Cues GraniteNet
IIS Server - ArcIMS SUSE Linux Enterprise 11 SP4
Windows 2012R2 (64) Rocket Software LegaSuite - TEST
Hansen/Infor/IIS – TEST SUSE Linux Enterprise 11 SP4
OES Netware 11 (64) Oracle Server - Granite Net New
GroupWise 2012 POA - MAINPOST SUSE Linux Enterprise 12 SP3
SUSE Linux Enterprise 11 (64) Oracle Backup Server
Service 10.104.0.17:25 SUSE Linux Enterprise 11 SP4 10.104.0.17:9850 Oracle Server
Windows 2016 SUSE Linux Enterprise 12 SP3SQK Server 2016 / Maxxess Oracle Server
Linux (64) SUSE Linux Enterprise 12 SP2vCenter 6.5 Appliance Second Level Hypervisor/Level2VM
Red Hat Linux 5 (32)
AES/Avaya/TSG
Windows 2008R2 SP1 (64)Milestone IP Camera Server
Volume
CentOS Linux (64 bit)Avaya WebLM
Windows 2012R2 Standard (64)Autodesk - License Manager
Windows 2008R2 SP1 (64)Sophos Enterprise Console
Windows 2008R2 SP1 (64)Attendance Enterprise
Windows 2012R2 (64)Test Identity Mgr Server
Windows 2008R2 SP1 (64)Automatic Email Printing
Windows 2008R2 SP1 (64)VDI POC – Active Directory PDC
Extrme VX9000 Wireless Controller Second
Windows 2012R2 (64)Azure Active Directory Connection Server
Novell OES 2015/SUSE 11 (64)Test OES Server
Windows 2012R2 (64)Hansen/Infor/IIS
Windows 2019 Standard (64) File Server
Windows 2008R2 SP1 (64)Fundware/Blackbaud/RDS
Windows 2012R2 (64)Cues GraniteNet
Windows 2012R2 (64)VDI vCenter
Windows 2012R2 (64)VDI View Connection Server
Windows 2012R2 (64)VDI View Connection Server – Redundant
Windows 2012R2 (64)VDI AD Domain Controller – Redundant
Windows 2012R2 (64)
VDI – Security Server
CentOS Linux (32 bit)
VDI Unidesk Management Appliance
CentOS Linux (32 bit)
VDI Unidesk Master CachePoint Appliance
CentOS Linux (32 bit)
VDI Unidesk Secondary CachePoint Appliance
Windows 2012R2 (64) Astaro REDS1 RED_PCS_VLAN
PSC (Platform Services Controller) Astaro REDS2 RED_N_Facility
Windows 2012R2 (64) Astaro REDS3 RED_WinnebagoGate
vCenter Primary Astaro REDS4 RED_AirportGate
Windows 2012R2 (64) Astaro REDS5 Fuller Creek
vCenter Secondary (Future)
Windows 2012R2 (64)
Virtual SCADA1
Windows 2012R2 (64)
Virtual SCADA2
Windows 2012R2 (64)
Virtual Win911
Windows 2012R2 (64)
Virtual Historian
Windows 2012R2 (64)
WebSpace
Windows 7
PCS License Server
Windows 7 SP1
Sytech XLReporter
Unitrends 8060S - Backup Appliance
ETH1 & ETH2 - Bonded
Updated 09/15/2020 - DF
Rock River Water Reclamation District
Switch & Network Documentation
Note: Highlighted equipment is targeted for replacement. See the project item in the Proposal Form for Replace obsolete equipment with current models.
Core switch 1 Core switch 2
Aruba 5406R Aruba 5406R
J9990A J9990A
J9990A J9990A
J9990A J9990A
J9990A J9990A
J9986A J9986A
J9995A J9995A
Admin 1 Admin 2
Aruba 5406R Aruba 5406R
J9990A J9990A
J9986A J9986A
J9986A J9986A
J9986A J9986A
J9986A J9986A
J9986A J9986A
Aeration Digester Control
J9624A – 2620‐PWR J8762A ‐ 2600‐PWR
Dewatering Old Admin
J8165A ‐ 2650‐PWR J9624A ‐ 2620‐PWR
FEMS Garage
J8762A ‐ 2600‐PWR J8762A ‐ 2600‐PWR
Guard Shack 1 Guard Shack 2
J8762A ‐ 2600‐PWR J8762A ‐ 2600‐PWR
Maintenance Maintenance 2
J8165A ‐ 2650‐PWR HP 5500‐48G‐PoE
Maintenance Training Room Sludge Transfer
J8164A ‐ 2626‐PWR J8762A ‐ 2600‐PWR
Screening Main Pump
J9624A ‐ 2620‐PWR J4903A ‐ 2824
Laboratory 2 GBT
HP 5500‐48G‐PoE J9624A ‐ 2620‐PWR
Aqua Aerobics J9565A ‐ 2615‐8‐PWR Laboratory 1 J8165A – 2650‐PWR
Network Documentation:
Firewalls:
Sophos UTM 9 SG230 (2) Sophos XG230 (2)
Wireless:
Extreme VX‐9000 Wireless Controller (2)
Extreme WiNG AP 8432 (14)
Extreme WiNG AP 7632 (1)
Internet Bandwidth: 500 Mbps
ISP: Illinois Century Network / iFiber
AT
&T
Inte
rnet
Co
mca
st
Inte
rnet
iFib
er
Scr
een
ing
(262
0-P
WR
)
J876
2A
Dew
ater
ing
(265
0-P
WR
)
Dis
infe
cti
on
CL
2 P
LC
FE
MS
RA
SP
LC
RR
WR
D N
etw
ork
Dia
gra
mLa
st U
pdat
e09
/17/
2020
DF
Mai
n P
um
p(2
824)
Gar
age
(260
0-8
PW
R)
Wel
l H
ou
se #
2P
LC
Ad
min
_1A
rub
a 54
06R
Ad
min
_2A
rub
a 54
06R
Mai
nte
nan
ce
(HP
E 5
500
& 2
650-
PW
R)
Old
Ad
min
(262
0-P
WR
)
Tra
inin
g R
oo
m (
2nd
Flo
or)
(262
6-P
WR
)
HP
141
0-16
G
Aer
atio
n(2
620-
PW
R)
J96
24A
J962
4A
J96
24A
GB
T(2
620-
PW
R)
10G
bD
AC
Hea
rtbe
at
DM
Z
391
61
00-2
40V
AC
3A
50
/60
Hz
12
34
56
CO
NS
OL
EL
NK
/ACT
SP
DL
NK
/ACT
SP
DL
NK
/AC
TS
PD
LN
K/A
CT
SPD
LN
K/A
CTS
PD
LNK/
AC
TS
PD
STAT
ALM
LN
K/A
CT
SP
DLN
K/A
CT
SPD
iFib
er -
Win
GIS
–50
0Mb
iFib
er –
Win
GIS
–50
0Mb
iFib
er -
Inte
rnet
-50
0Mb
iFib
er -
Inte
rnet
-50
0Mb
PC
S E
SX
Clu
ster
2-N
od
e
ET
RC
CA
ET
H L
AN
CO
NS
OLE
V6
V2
V1
V5
V4V3
G4
50
V7
MD M A
LM
CP
UP
WR
SYSTEM
RS
TA
SB
US
BE
TH
WA
NS
ER
VIC
ES
V8
ET
RC
CA
ET
H L
AN
CO
NS
OLE
V6
V2
V1
V5
V4V3
G4
50
V7
MD M A
LM
CP
UP
WR
SYSTEM
RS
TA
SB
US
BE
TH
WA
NS
ER
VIC
ES
V8
Ava
ya G
450'
s
VD
I ES
X C
lust
er3-
No
de
Ser
ver
ES
X C
lust
er3-
No
de
10G
b
10G
b10
Gb
10G
b
2x1G
B
10G
b10
Gb
10G
b2x
1GB
2x1G
B
10G
bT
otal
Acc
ess
900e
Lab
ora
tory
(HP
E 5
500
& 2
650-
PW
R)
Riv
er S
tati
on
PL
C
J49
03A
J81
64A
10G
b
10G
b
8Gb
8Gb
8Gb
8Gb
8Gb
8Gb
16G
b
16 G
b
GB
T2
AP
7632
(1)
hp
pro
cu
rve
sw
itch
26
50
Pow
er
Fau
lt
J48
99
A
Act
FDx
Max
J81
65A
J81
65A
Dig
este
r C
on
tro
l(2
600-
8 P
WR
)
J876
2A
J876
2A
FE
MS
(260
0-8
PW
R)
100M
b
8Gb
8Gb
8Gb8G
b
1Gb
100M
b10
0Mb
100M
b
J87
62A
Gu
ard
Sh
ack
(260
0-8
PW
R)
2x1G
B
J81
65A
Wel
l Ho
us
e #1
PL
CG
rit
PL
CS
wit
ch G
ear
PW
R M
eter
Sw
itch
Gea
rM
ain
sS
wit
ch
Gea
rP
LC
Exc
ess
Flo
wG
rit
S2
hp
pro
cu
rve
sw
itch
26
50
Pow
er
Fau
lt
J48
99
A
Act
FDx
Max
Slu
dg
e T
ran
sfer
(260
0-8
PW
R)
J876
2A
Ser
vic
eG
arag
eS
ervi
ceG
ara
ge
Dig
est
er
Co
ntr
ol
Dig
est
er
Co
ntr
ol
Slu
dg
eT
ran
sfer
Blo
wer
PL
CF
EM
S
1Gb
10G
b10
Gb
1Gb
10G
b
1Gb
1Gb
1Gb
1Gb
J96
24A
1Gb
1Gb
Scr
een
ing
De
wat
erin
gD
ew
ater
ing
Aq
ua
Aer
ob
ics
(261
6-8-
PO
E)
Slu
dg
eT
ran
sfe
rS
cre
enin
gS
cree
nin
gF
reed
om
Fie
ld (
*)
hp
pro
cu
rve
sw
itch
26
50
Pow
er
Fau
lt
J48
99
A
Act
FDx
Max
De
wa
teri
ng
De
wat
eri
ng
GB
T
1Gb
1Gb
1Gb
1Gb
Un
itre
nd
sR
eco
very
-806
0S
Cab
le M
od
em –
Aq
ua
Aer
ob
ics
Cis
co IP
Fle
x R
ou
ter
Ad
tran
908
3
Arr
is C
M82
0
Op
tim
ux-
106
Cab
le M
od
em -
ITS
CS
2A
rub
a 54
06R
CS
1A
rub
a 54
06R
AP
8432
(5)
Ext
rem
e
AP
8432
(8)
Ext
rem
e
AP
8432
(1)
Ex
trem
e
Ex
trem
e
100M
b100M
b
Fib
er -
SM
–1G
b -
Aq
ua
Aer
ob
ics
Fib
er -
SM
–10
Gb
Fib
er -
SM
–1G
bF
iber
–H
ybri
d –
1Gb
Fib
er –
MM
–1G
bF
iber
–M
M –
100M
bF
iber
–M
M –
10M
b
CA
T6
-10
Gb
CA
T 5
/6 -
1Gb
CA
T 5
/6 –
100M
bC
AT
-5/6
–10
Mb
Fib
er C
han
nel
–S
M –
8/16
Gb
Pro
po
sed
Inte
rnal
Fir
ewal
l
Pro
pose
d R
edun
dant
ISP
Ae
rati
on
Aer
atio
n
Mai
nte
nan
ceM
ain
ten
ance
Mai
nte
na
nce
Mai
nte
nan
ce
IBM
z13
RR
WR
DV
7K1
IBM
Sto
rew
ise
V70
00(8
0TiB
)
Ad
min
_IB
M_F
C2
Ad
min
_IB
M_F
C1
RR
WR
DV
7K2
IBM
Sto
rew
ise
V70
00(8
0TiB
)
LA
B_I
BM
_FC
2
LA
B_I
BM
_FC
1
1Gb
100M
b100M
b
GB
T
100M
b10
0Mb
100M
b
Scr
een
ing
100M
b
Dis
ch
arg
eS
tati
on
IP P
ho
ne
Dis
char
ge
Sta
tio
nIP
Cam
era
Dis
char
ge
Sta
tio
nP
LC
` `
10G
bD
AC 10
Gb
DA
C10G
bD
AC
`
Ph
ase
III –
Sw
itch
Ref
resh
Pro
po
sed
`
Ph
ase
III –
Sw
itch
Ref
resh
Pro
po
sed
10G
b
DA
Cs
1Gb
1Gb
J956
5A
IV PROPOSAL FORM
REQUEST FOR PROPOSALS #20-215 NETWORK MANAGED SERVICES
To: BOARD OF TRUSTEES From: ROCK RIVER WATER (Individual, Partnership or Corporation) RECLAMATION DISTRICT P. O. Box 7480 ROCKFORD, IL 61126-7480 (Address of Individual, Partnership or Corporation) Trustees: I (We) the undersigned hereby propose to furnish Network Managed Services in compliance with the attached Notice, General Specifications, Detailed Specifications, Proposal Form, Fair Employment Practices Affidavit of Compliance Form, Forms of Affidavit, and Contract Form. The Undersigned also affirms and declares: A. That he (they) has (have) examined and is (are) familiar with all the related contract documents and found that they are accurate and complete and are approved by the undersigned. B. That he (they) has (have) carefully examined the scope of the required service, and that, from his (their) own investigation, has (have) satisfied himself (themselves) as to the nature and location of the delivery point, the character, quality and quantity of materials, and the kind and extent of equipment and other facilities needed for the performance of the service and provision of the materials, the general and local conditions and all difficulties to be encountered, and all other items which may, in any way, affect the materials or services or their performance. C. That this proposal is made without any understanding, agreement or connection with any other person, partnership, or corporation making a proposal for the same purposes, and is in all respects fair and without collusion or fraud; and that he (they) is (are) not barred from proposing as a result of a bid-rigging or bid-rotating conviction. D. All goods and services provided in response to this request will be produced in compliance with all applicable requirements of Sections 6, 7 and 12 of the Fair Labor Standards Act, as amended, and of regulations and orders of the United States Department of Labor issued under Section 14 thereof. E. The firm which I (we) represent complies with all applicable requirements of the Americans with Disabilities Act (ADA), the Occupational Safety and Health Act (OSHA), rules and regulations of the US Department of Transportation (DOT), and the Federal Drug Free Work Place Act. If said firm is awarded a contract to provide the District’s Network Managed Services, it will: 1. complete all OSHA, ADA, and DOT required supervisory, employee and customer training, 2. document compliance as required, 3. ensure that persons in safety-sensitive positions associated with loading, transportation,
and delivery of the merchandise or service detailed in these specifications are subject to all required drug and alcohol testing and are properly licensed,
4. prepare and make available all required information and documentation, and 5. hold harmless and indemnify the District and the District’s representatives as defined in
Section III, 3.11 from all: a. Suits, claims, or actions; b. Costs, either for defense (including but not limited to reasonable attorney’s fees and
expert witness fees) or for settlements, and;
(PROPOSAL FORM CONTINUED)
c. Damages of any kind (including but not limited to fines, actual, punitive, and compensatory damages) relating in any way to or arising out of the ADA or the OSHA, to which said firm is exposed or which it incurs in the execution of the contract.
F. The firm which I (we) represent has adopted and promulgated written sexual harassment policies that include, at a minimum, the following information: 1. the illegality of sexual harassment; 2. the definition of sexual harassment under Illinois State law; 3. a description of sexual harassment, utilizing examples; 4. my (our) organization’s internal complaint process including penalties; 5. the legal recourse, investigative and complaint process available through the Illinois
Department of Human Rights and the Illinois Human Rights Commission; 6. directions on how to contact the Department and the Commission; and 7. protection against retaliation as provided by Section 6-101 of Illinois Human Rights Act.
Upon request, my (our) organization will provide the Illinois Department of Human Rights with the information described in F1 through F7 above. I (we) agree that I (we) shall not withdraw this proposal for a period of 60 calendar-days following the scheduled proposal due date. I (we) have carefully examined the nature of the service and materials. The cost of all the materials, equipment, and service necessary to complete this contract is given in this Proposal. The undersigned acknowledges that he has received Addendum numbers , , , and realizes that all Addenda are considered part of the Contract. Managed Services - Using the table below, please provide monthly costs for support services.
Managed Services Quantity Monthly Cost
Switches
Routers
Firewalls
Access Points
Total Monthly Cost
Alternate Quantity Monthly Cost
Firewall Monitoring and Security Projects and project-related work are not included in on-site support services. Using the table below, please provide proposed costs for the following projects:
Project Cost of Services
External Penetration Test
Internal Penetration Test – Administration Network to SCADA Network
Firewall rule audit, validation and documentation
Replace obsolete equipment with current models
Facilities wireless walk-through and recommendations for improved service
Network VLAN redesign to current standards. Consistency throughout network.
(PROPOSAL FORM CONTINUED)
Special projects that are outside of normal support and planned projects may be requested by the organization from time to time. In the table below, please provide an hourly rate schedule for additional services and special projects.
Title Skill Set Description Hourly Rate
Invoicing shall be monthly for services rendered. Detailed invoicing for all time and expense charges shall include: date of service, who performed service, description of service performed, duration of chargeable time. Alternate Proposals: Any potential work not included within the proposed scope of services, or which has not been mentioned in this RFP, must be clearly identified, along with a suggested basis for payment, should those services be necessary or elected by the organization. Respondent: Date: By: Name of Firm Authorized Rep’s Signature Street Address Rep’s Name City, State, Zip Rep’s Title Phone Number Facsimile Number
NOTE: The Rock River Water Reclamation District, a Governmental Unit, pays neither Federal Excise Tax nor Illinois Retailers’ Occupational Tax. The respondent shall exclude those taxes from his proposal.