ARCHITECTURAL:
A0.1 OBC MATRIX DRAWING LIST, KEY PLAN, TYPICAL ABBREVIATIONS, SYMBOL & LEGEND
A0.2 CONTEXT PLAN
A1.1 DEMOLITION FLOOR AND REFLECTED CEILING PLAN
A2.1 PROPOSED FLOOR AND REFLECTED CEILING PLAN, INTERIOR ELEVATIONS
A2.2 FFE FLOOR PLAN, DETAILS AND SCHEDULES
MECHANICAL:
M1.1 MECHANICAL DEMOLITION FLOOR PLAN AND MECHANCIAL LEGEND
M2.1 HVAC DEMOLITION CEILING PLAN AND PROPOSED HVAC CEILING PLAN
ELECTRICAL:
E0.0 ELECTRICAL LEGEND
E1..1 EXITING ELECTRICAL PLANS
E2.1 PROPOSED ELECTRICAL PLAN
E2.2 PROPOSED ELECTRICAL CEILING PLAN
AREA OF WORK
ACP ACOUSTIC PANEL
ACPL ACOUSTIC PLASTER
ACT ACOUSTIC CEILING TILE
AC AIR CONDITIONING
AD ACCESS DOOR
ADR AREA DRAIN
ADD ADDENDUM
ADJ ADJUSTABLE
ADO AUTOMATIC DOOR OPERATOR
AES ARCHITECTURAL EXPOSED STEEL
AGG AGGREGATE
AL ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE(LY)
ARA AREA OF RESCUE ASSISTANCE
ARCH ARCHITECTURE(AL)
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
A.T.A.A. AIR TERMINAL (LIGHTNING ROD)
AUTO AUTOMATIC
AUX AUXILIARY
A/V AIR & VAPOUR BARRIER
AVM AIR, VAPOUR, & MOISTURE BARRIER
@ AT
BD BOARD
BF BARRIER FREE
BH BORE HOLE
BLDG BUILDING
BLKG BLOCKING
BLKHD BULKHEAD
BM BEAM
B.M. BENCHMARK
BRK BRICK
BSMT BASEMENT
BTM BOTTOM
BUR BUILT-UP ROOFING
X BY (DIMENSION)
CA CARD ACCESS
CR CARD READER
CGSB CANADIAN GENERAL STANDARDS BOARD
CSA CANADIAN STANDARDS ASSOCIATION
CPT CARPET / CARPET TILE
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CEMBD CEMENT BOARD
CEMPL CEMENT PLASTER
CEMR CEMENT RENDERING
C/L CENTRE LINE
C/C CENTRE TO CENTRE
CT CERAMIC TILE / PORCELAIN TILE
CLF CHAIN LINK FENCING
CHBD CHALKBOARD
CO CLEAN OUT
CLR CLEAR FINISH
CLO CLOSET
CRS COLD-ROLLED STEEL
CW COLD WATER
CP CONTROL PANEL
CONV CONVECTOR
CORR CORRIDOR
CG CORNER GUARD
CU CUBIC
M3 CUBIC METER
CUPBD CUPBOARD
CURT CURTAIN TRACK
COL COLUMN
C/W COMPLETE WITH
CW-# CURTAIN WALL (#)
CONC CONCRETE
CBLK CONCRETE BLOCK
CONST CONSTRUCTION
CONT CONTINUOUS
CJ CONTROL JOINT
DPC DAMPROOF COURSE
DPM DAMPROOF MEMBRANE
DEG.C DEGREES CELSIUS
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETE
Ø DIAMETER
DIM DIMENSION
DIST DISTANCE
DIV DIVISION
DGL DOUBLE GLAZING (INSULATED) (SEE DGL TYPES)
DN DOWN
DWG DRAWING
DF DRINKING FOUNTAIN
DW DISHWASHER
E EAST
EA EACH
ELEC ELECTRIC(AL)
ELEV ELEVATION (DATUM)
ENCL ENCLOSURE
EQ EQUAL
EPC EPOXY COATING (INTERIOR WALLS & CEILINGS)
EPCX EPOXY COATING (EXTERIOR WALLS & SOFFITS)
EPFL EPOXY FLOORING
EXCAV EXCAVATE
EXCL EXCLUDING
EX EXISTING
EXIST EXISTING
EXP JT EXPANSION JOINT
EXP EXPOSED
EXP AGGR EXPOSED AGGREGATE
EXT EXTERIOR
EIFS EXTERIOR INSULATING FINISHING SYSTEM
EW EMERGENCY EYE WASH
EO ELECTRICAL OUTLET
EP EMERGENCY PHONE
EOS EDGE OF SLAB
EBF EXPOSED BUILDING FACE
FAB FABRIC (CLOTH, VINYL)
FM FACTORY MUTUAL
FIN FINISH(ED)
FIN FL FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FDR FIRE DOOR
FA FIRE ALARM PULL STATION
FAP FIRE ALARM ANUNCIATOR PANEL
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FR FIRE RATED
FRR FIRE RESISTANCE RATING
FXTR FIXTURE
FL FLOOR
FD FLOOR DRAIN
FS FLOOR SUMP
FTG FOOTING
FTGR FOOT GRILLE
FB FLOOR BOX
FDN FOUNDATION
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GA GAUGE
GL GLASS / GLAZING (SEE GLASS TYPES)
GL BLK GLASS BLOCK
GR GRADE
GRD GROUND
GYP GYPSUM
GYP BD GYPSUM BOARD
GWB GYPSUM BOARD
GYP LATH GYPSUM LATH
GB GRAB BAR
GFA GROSS FLOOR AREA
G/L GRID LINE
H.CONC HARDENED CONCRETE
HDNR HARDENER
HDW HARDWARE
HD HEAVY DUTY
HT HEIGHT
HO HOLD OPEN
HM HOLLOW METAL
HSS HOLLOW STRUCTURAL STEEL
HORZ HORIZONTAL
HB HOSE BIB
HW HOT WATER
HWH HOT WATER HEATER
HR HOUR
HS HAND SINK
HDPE HIGH-DENSITY POLYETHYLENE
HP HIGH POINT
INCL INCLUDING
INFO INFORMATION
ID INSIDE DIAMETER
INS INSULATION (SEE INSULATION TYPES)
INSUL INSULATION
INSULR INSULATION RENDERED
INT INTERIOR
IFC INTUMESCENT FIREPROOF COATING
INV INVERT
IC INTERCOM
JC JANITOR'S CLOSET
JT JOINT
JNR JOINER
JST JOIST
JR JUNIOR
JS JANITOR'S SINK
KO KNOCK-OUT (PANEL)
KP KEY PAD
LAB LABORATORY
LAV LAVATORY
LH LEFT-HAND(ED)
LHR LEFT-HAND REVERSE
LEV LEVEL
LS LIGHT STANDARD
LIN LINEAR
LIN MET LINEAR METAL
(SEE RFL) LINOLEUM
LSSJ LONG SPAN STEEL JOIST
LEC LECTERN
LVR LOUVRE
LB LIGHT BOLLARD
L.D. LIMITING DISTANCE
LP LOW POINT
MAINT MAINTENANCE
MH MANHOLE
MO MASONRY OPENING
MAT S MAT SINKAGE
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MEM MEMBRANE
MEM AS MEMBRANE AIR SEAL
MET METAL
MET AS METAL AIR SEAL
MET CLG METAL PANEL CEILING
M METRE
MEZZ MEZZANINE
MM MILLIMETER
MIN MINIMUM
MISC MISCELLANEOUS
MTG MOUNTING
MDF MEDIUM DENSITY FIBREBOARD
MIR MIRRORED
MS MOP STRIP
MANUF MANUFACTURE(R)
MW MILLWORK (#)
MOD-BIT MODIFIED BITUMEN
NBC NATIONAL BUILDING CODE
NFC NATIONAL FIRE CODE
NOM NOMINAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
# NUMBER
NFHB NON-FREEZE HOSE BIB
ND NAPKIN DISPOSAL (SANITARY)
O/C ON CENTRE
OBC ONTARIO BUILDING CODE
OP OPENING
OWSJ OPEN WEB STEEL JOIST
OD OUTSIDE DIAMETER
OH OVERHEAD
PT PAINT(ED)
PR PAIR
PTN PARTITION
PVG PAVING
% PERCENT(AGE)
PLAS PLASTER
P.LAM PLASTIC LAMINATE
(SEE EPC) PLASTIC PAINT
PL PLATE (STEEL)
PV PLUMBING VENT
PLWD PLYWOOD
POL POLISHED
PVC POLYVINYL CHLORIDE
PE PORCELAIN ENAMEL
PCC ARCHITECTURAL PRECAST CONCRETE
PC TERR PRECAST TERRAZZO
PREFAB PREFABRICATE(ED)
PREFIN PREFINISHED
PS PROJECTION SCREEN
PROT BD PROTECTION BOARD
PA PUBLIC ADDRESS
PP POWER PANEL
PB PUSH BUTTON (DOOR OPERATOR)
RAD RADIUS
RWL RAIN WATER LEADER
PCTP RECEPTACLE
REC RECESS(ED)
REINFD REINFORCED
RST REINFORCING STEEL
RB RESILIENT BASE
REQD REQUIRED
RFL RESILIENT FLOORING
RFG REFRIGERATOR
RN RESILIENT NOSING
RR RESILIENT RISER
RH RIGHT-HAND
RHR RIGHT-HAND REVERSE
R RISER
RSH ROLLING SHUTTER DOOR
RM ROOM
(SEE RFL) RUBBER TILE
RA ROOF ANCHOR
RD ROOF DRAIN
RCP REFLECTED CEILING PLAN
RJ REVEAL JOINT
RM ROOM
RO ROUGH OPENING
R/A RETURN AIR
RP RADIANT CEILING PANEL
RWS ROLLER WINDOW SHADE
SAN SANITARY
SLR SEALER
(SEE EPFL) SEAMLESS RESIN FLOOR
SECT SECTION
SA SECURITY ACCESS
S/A UPPLY AIR
SH SHEET
(SEE RFL) SHEET RESILIENT FLOORING
SIM SIMILAR
SLS SLOP SINK
SOFF SOFFIT
SP SOLID POLYMER
SSM SOLID SURFACING MATERIAL
S SOUTH
SPEC SPECIFICATION
SQ SQUARE
SIB STANDARD IRON BAR
SS STAINLESS STEEL
STL STEEL
STO STONE
STOR STORAGE
STR STRUCTURAL
SWBD SWITCHBOARD
SSG STRUCTURAL SILICONE GLAZING
SD SUB-DRAINAGE
SDI SUB-DRAINAGE INVERT
SN STAIR NOSING
SPF SPORTS FLOORING
SAFB SOUND ATTENUATION FIRE BLANKETS
TB TACK BOARD
TEL TELEPHONE
TEL P. TELEPHONE PANEL
TEMP TEMPERATURE
TERR TERRAZZO
(SEE EPC) TEXTURED COATING
(SEE EPCX) TEXTURED COATING EXTERIOR
(SEE EPFL) THIN SET TERRAZZO
TWF THROUGH WALL FLASHING
T&G TONGUE & GROOVE
T/O TOP OF
TCB TOP OF CATCH BASIN
TC TOP OF CURB
TR TREAD
TGL TRIPLE GLAZING
TYP TYPICAL
TT TRAFFIC TOPPING
TBHM THERMALLY BROKEN HOLLOW METAL
THK THICK
T TREAD(S)
TPD TOILET PAPER DISPENSER
TRANS TRANSITION
U/C UNDERCUT
ULC UNDERWRITERS' LABORATORIES CANADA
UL UNDERWRITERS' LABORATORIES USA
U/G UNDER GROUND
U/S UNDERSIDE
(SEE RFL) URETHANE RESILIENT FLOORING
UR URINAL
U/P UTILITY (HYDRO) POLE
VB VAPOUR BARRIER
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITE TILE
(SEE FAB) VINYL FABRIC
VWC VINYL WALL COVERING
(SEE RFL) VINYL TILE
V.I.F.A. VERIFY IN FIELD
W WINDOW
WR WASHROOM
WC WATER CLOSET
WPM WATERPROOF MEMBRANE
WS WEATHERSTRIP
WWM WELDED WIRE MESH
WB WHITE BOARD
WF WIDE FLANGE
WD WOOD
WD FL WOOD FLOORING
WI WROUGHT IRON
W/ WITH
WP WATERPROOFING
TYPICAL ABBREVIATIONS
SYMBOL & LEGEND
ROOF LINE 5.05M
15
A-0.11
REF
INDICATES SECTION /
DETAIL NUMBER
INDICATES REFERENCE
TO A SIMILAR DETAIL
DRAWING
INDICATES DRAWING
SHEET NUMBER
A-0.11
REF
BUILDING SECTION REFERENCE
A-0.11 REF
SECTION REFERENCE
A-0.11
REF
INTERIOR ELEVATION REFERENCE
BUILDING ELEVATION REFERENCE
A-0.11
REF
PROJECT ELEVATION
GEODETIC ELEVATION[150.00]+
ROOM TAG
NAMEZONE
SQM
SY370
WINDOW TAG
W105
M05 MATERIAL TAG
REVISION NUMBER12
KEYNOTE
D-56
INDICATES DOOR NUMBER
CONSTRUCTION
ASSEMBLY SPECIFICATION
ACT+2700
INDICATES MATERIAL TYPE
INDICATES CEILING HT
ASSEMBLY TYPE
DIMENSION
CENTRELINE MARK
1713
GRID LINE
2400 A.F.F.PLAN
ELEVATION DATUM
DRAWING LIST
P1
AxX
UNIVERSITY OF TORONTO SCARBOROUGH KEY PLAN
A0.1
DETAIL REFERENCE
INDICATES SECTION /
DETAIL NUMBER
INDICATES DRAWING
SHEET NUMBER
DETAIL DRAWING REFERENCE
A105EAST
INDICATES ELEVATION NAME
INDICATES DRAWING
SHEET NUMBER
INDICATES ROOM SIZE IN
SQUARE METERS
INDICATES ROOM NUMBER
INDICATES ROOM USE
DOOR TAG
℄
CEILING TAG
ELLESMERE RD
M
I
L
I
T
A
R
Y
T
L
T
O
P
L
A
Y
I
N
G
F
I
E
L
D
S
I
N
V
A
L
L
E
Y
M
I
L
I
T
A
R
Y
T
R
A
I
L
MO
RN
IN
GS
ID
E A
VE
NU
E
M
O
R
N
IN
G
S
ID
E
A
V
E
N
U
E
TORONTO SCARBOROUGH
UNIVERSITY OF
BUILDING INDEX
AA - ARTS & ADMINISTRATIONAC - ACADEMIC RESOURCE CENTREAQ - TORONTO PAN AM SPORTS CENTREBD - DAN LANG FIELD - BASEBALL DIAMONDBV - BLADEN WINGCC - N’SHEEMAEHN CHILD CARE CENTRECH - COACH HOUSEEV - ENVIRONMENTAL SCIENCE & CHEMISTRYHH - HARBUTT HOUSEHW - HUMANITIES WINGIC - INSTRUCTIONAL CENTREML - MILLER LASH HOUSEMW - SOCIAL SCIENCESPO - PORTABLESSL - STUDENT CENTRESY - SCIENCE RESEARCHSW - SCIENCE WINGSRC - STUDENT RESIDENCE CENTRETC - UTSC TENNIS CENTRE
WALKS AND DRIVES
PAN AM DRIVECENTENNIAL CIRCLESCARBOROUGH CIRCLEROCK WALKGALLERY WALKSCHOLARS WALKBEECHGROVE DRIVEOLD RING ROAD
RESIDENCES
JF - JOAN FOLEY HALLA - ASPEN HALLB - BIRCH HALLC - CEDAR HALLD - DOGWOOD HALLE - ELM HALLF - FIR HALLG - GREY PINE HALLH - HICKORY HALLI - IRONWOOD HALLJ - JUNIPER HALLK - KOA HALLL - LARCH HALLM - MAPLE HALL
OLD
RIN
G R
OA
D
CENTENNIAL C
IRCLE
SCARBORO
UGH CIRCLE
RO
CK
WAL
K
GALLERY W
ALK
SCHOLARS W
ALK
BEECHGROVE DRIVE
NORTH
TRUE
OVE
E
L
A
U T
R B O
V
R
A
P
P
EV
IV
J
L
K
M
SY
SW
HW
AC
BV
AA
SL
RC
P
P
MW
PO
JF
SRC
F
I
H
G
D
E B
A
C
P
P
PO
Firm Name : AMANDA MCLEOD AS AN EMPLOYEE OF UNIVERSITY OF TORONTO SCARBOROUGH
Address: 1265 MILITARY TRAIL TORONTO, ONTARIO M1C1A4 Phone: 416.287.7091
Name of Project:
CENTRE FOR FRENCH AND LINGUISTICS SW149 INTERIOR RENOVATION
Location:
UNIVERSITY OF TORONTO SCARBOROUGH
1265 MILITARY TRAIL, TORONTO, ON, M1C 1A4
Ontario Building Code
Data Matrix, Part 11 - Renovation of Existing Building
Building
Code
Reference
11.01
Project Type:
□ Addition □ Renovation □ Addition and Renovation
□ Change of Use
[A] 1.1.2.
Description: 3.2.1.(1)
11.02
Major Occupancy
Classification:
Occupancy
1. ___________
Use
1. __________
1.4.1.2. [A]
11.03
Superimposed Major
Occupancy:
□ Yes □ No
Description: _____________________________
3.2.2.7.
11.04
Building Area
Description
________
Existing
New
________
Total
________
1.4.1.2. [A]
11.05
Building Height
Storeys above grade ___ Storeys below grade ____
Meters above grade (m) ____
1.4.1.2. [A]
& 3.2.2.1.
11.06
Number of Streets/
Firefighting Access
__1__ Street (s)
3.2.2.10. &
3.2.5.
3.13
Sprinkler System
Proposed
□ required □ not required NO CHANGE
3.2.1.5. &
3.2.2.17.
□ selected compartments
□ selected floor areas
□ basement □ in lieu of roof rating
□ entire building
3.13
Standpipe System □ Required □ Not Required
3.2.9.
3.15
Fire Alarm System
□ Required □ Not Required
3.2.4.
Proposed: □ Single stage □ Two Stage □ N/A
3.18
Construction Type
Restriction: □ Combustible permitted
□ Non-combustible permitted
Actual: □ Combustible
□ Non-combustible □ Combination
Heavy Timber Construction: □ No □ Yes
3.2.2.20.-83
& 3.2.1.4.
11.07
Building Size □ Small □ Medium □ Large □ > Large
T.11.2.1.1.B.
-N.
11.08
Existing Building
Classification
3.2.2 Group/Div.: _______________________
Change in Major Occupancy: □ Yes □ Not Applicable
Construction Index: _______________________
Hazard Index: ___________________________
Importance Category: □ Low □ Normal □ High □ Post-Disaster
11.2.1.1.
T 11.2.1.1A
T11.2.1.1B
to N
4.2.1.(3)
5.2.2.1.(2)
11.09
Renovation Type:
□ Basic Renovation □ Extensive Renovation
11.3.3.1.
11.3.3.2.
11.10
Occupant Load
Floor Level/Area
______________
______________
______________
______________
Occupancy
Type
_________
_________
_________
_________
Based
On
______
______
______
______
Occupant Load
(Persons)
_________
_________
_________
_________
3.1.17.
11.11
Plumbing Fixture
Requirements:
Ratio: Male: Female = 50:50 Except as noted otherwise.
3.7.4.
Floor Level/ Area:
Occupant
Load:
OBC
Reference:
Fixtures Required:
Fixtures Provided:
11.12
Barrier Free Design:
□ Yes □ No
Explanation: 11.3.3.2.(2)
3.23 Hazardous Substances □ Yes □ No
Explanation:
3.3.1.2. &
3.3.1.19.
3.24
Required Fire
Resistance Ratings
Horizontal
Assembly:
Floors over basement
Floors
Mezzanine
Roof
Rating
(H):
____1___
____1____
___N/A__
___N/A___
Rating
(H):
_________
_________
_________
_________
Supporting
Assembly (H):
EXISTING_
EXISTING_
_________
_________
3.2.2.20.-83.
& 3.2.1.4.
11.13
Reduction in
Performance Level:
Structural:
By Increase in occupant load:
By change of major occupancy:
Plumbing:
Sewage-systems:
Extension of combustible
construction:
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
11.4.2.1.
11.4.2.2.
11.4.2.3.
11.4.2.4.
11.4.2.5.
11.4.2.6.
11.140
Compensating
Construction:
□ No □ Yes ___________________________________________________
11.4.3.1.
11.15
Compliance Alternatives
Proposed:
□ No □ Yes A-73: 3.8.3.3. Existing doorway acceptable, providing not less than 810 wide.
11.5.1.
____________(list numbers and describe)________________
11.16 Notes:
WORK INCLUDES INTERIOR ALTERATION OF ONE RESEARCH SPACE:
1. RM SW149 CENTRE FOR FRENCH AND LINGUISTICS RESEARCH SPACE (AREA OF
WORK= 27.5 m2 SQ.M.)
- NEW DOOR, FINISHES, MECHANICAL AND ELECTRICAL
- NO WORK TO EXTERIOR WALLS
- PROPOSED CONSTRUCTION IS NON-COMBUSTIBLE
11.5.1.
GROUP A, DIVISION 2, UP TO 6 STOREYS
A2 ASSEMBLY RESEARCH SUPPORT SPACE IN SCHOOL
NO CHANGE6 1
17.5 M
GROUP A, DIVISION 2, UP TO 6 STOREYS
RM SW149 A2 RESEARCHSUPPORT SPACEIN SCHOOL
DESIGN 7.0
NO CHANGE
CONFIRM
OBC MATRIX
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
CENTRE FOR FRENCH ANDLINGUISTICS SW149 INTERIORRENOVATIONSCIENCE WING, 1265 MILITARY TRAIL
TG AM
OBC MATRIX, DRAWING LISTKEY PLAN, TYPICAL ABBREVIATIONS, SYMBOL & LEGEND
2019-04-12
NTSA0.1
02 2019-04-12 ISSUED FOR TENDER TG/AM01 2019-04-05 ISSUED FOR PERMIT TG/AM
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
CENTRE FOR FRENCH ANDLINGUISTICS SW149 INTERIORRENOVATIONSCIENCE WING, 1265 MILITARY TRAIL
TG AM
CONTEXT PLANS
2019-04-12
NTSA0.2
01A0.2 1:500
EXISTING 1ST FLOOR PLAN
AREA OF WORK ROOM SW149
SCOPE AREA: 23.5sqm
EXISTING FIRE HOSE CABINET
EXISTING FIRE HOSE CABINET
EXISTING FIRE HOSE CABINET
EXISTING FIRE HOSE CABINET
02A0.2 1:500
EXISTING 2ND FLOOR PLAN
EXISTING IITS DATA CLOSET
02 2019-04-12 ISSUED FOR TENDER TG/AM01 2019-04-05 ISSUED FOR PERMIT TG/AM
01A1.1 1:50
EXISTING FLOOR PLAN 02A1.1 1:50
EXISTING REFLECTED CEILING PLAN
GENERAL NOTES APPLY TO ALL DRAWINGS:
1. THE DRAWINGS ARE NOT STANDALONE AND ARE TO BE READ IN CONJUNCTION WITH THE
COMPLETE SET OF CONTRACT DOCUMENTS.
2. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING ( PROVINCIAL &
MUNICIPAL) AUTHORITIES.
3. EXISTING CONSTRUCTION SHOWN HAS BEEN TAKEN FROM AVAILABLE INFORMATION,
WHEN SPECIFIC DETAILS ARE UNAVAILABLE, ASSUMPTIONS HAVE BEEN MADE REGARDING
PROBABLE CONSTRUCTION. ANY VARIANCE FROM CONSTRUCTION AS SHOWN ON THE
DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO ATTENTION OF ARCHITECT.
4. FILL ALL EXISTING HOLES LEFT FROM MECHANICAL AND ELECTRICAL SERVICES REMOVED
OR RELOCATED TO MAINTAIN REQUIRED FIRE SEPARATIONS.
5. PATCH AND MAKE GOOD ALL EXISTING FLOOR, WALL AND CEILING MATERIALS AND
FINISHES DESTRUCTED BY CONSTRUCTION TO MATCH EXISTING ADJACENT.
6. CLEAN UP DEBRIS ON A DAILY BASIS AND DISPOSE OF IN AN APPROVED DISPOSAL
FACILITY OFFSITE ON A REGULAR BASIS. BUILDING PREMISES ARE TO BE THOROUGHLY
CLEANED PRIOR TO TAKEOVER BY THE OWNER.
7. ALL WORK SHALL BE INSTALLED IN A NEAT AND TIDY MANNER.
8. ADEQUATELY PROTECT THE WORK AT ALL STAGES OF CONSTRUCTION AND MAINTAIN THE
PROTECTION UNTIL WORK IS COMPLETED. REMOVE AND REPLACE AT NO EXPENSE TO
THE OWNER ANY DAMAGED WORK AND MATERIALS THAT CANNOT BE REPAIRED OR
RESTORED TO OWNER'S SATISFACTION.
9. CONTRACTOR TO INCLUDE FOR REMOVAL, TEMPORARY STORAGE ON SITE OR HANDING
OVER TO OWNER AS DETERMINED BY OWNER AND REINSTALLATION WHERE NOTED OF
EXISTING EQUIPMENT, LIGHT FIXTURES, DOORS, HARDWARE, ETC. THAT ARE REQUIRED
TO BE REMOVED, RELOCATED AND/OR REINSTALLED TO COMPLETE THE WORKS. ALL
REMOVED MATERIALS REQUIRED TO BE REINSTALLED SHALL BE REINSTALLED IN UN
DAMAGED CONDITION.
10. ALL DOORS AND DOOR HARDWARE TO REMAIN AS EXISTING UNLESS OTHERWISE NOTED.
DEMOLITION DRAWING NOTES:
1. CONTRACTOR TO COORDINATE CAREFUL REMOVAL OF
ELECTRICAL, AUDIO VISUAL AND COMMUNICATION FIXTURES AND
STORE FOR REUSE OR RETURN TO UTSC WHERE REQUIRED.
REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
2. CONTRACTOR TO COORDINATE CAREFUL REMOVAL OF
MECHANICAL FIXTURES AND STORE FOR REUSE OR RETURN TO
UTSC WHERE REQUIRED. REFER TO MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
3. RETURN ANY UNUSED MEDECO CYLINDERS TO UOFT PROJECT
MANAGER.
4. REMOVE AND DISPOSE OF INDICATED FLOORING AND BASE,
INCLUDING ADHESIVE. EXPOSED CONCRETE TO BE FREE FROM
ALL DEBRIS, BARBS AND ANY OTHER OBSTRUCTION THAT WOULD
OTHERWISE COMPROMISE INSTALLATION OF NEW FLOOR FINISH.
5. REMOVE AND DISPOSE OF EXISTING CABINETRY, METAL BASE AND
UPPERS THROUGHOUT SW149. REMOVE AND DISPOSE OF ALL
EXISTING LAB COUNTERTOPS. REMOVE AND DISPOSE OF ALL
EXISTING LAB COUNTER FIXED BASE. MAJORITY OF PLUMBING
WILL REQUIRE PLUMBING AND ELECTRICAL DISCONNECTS. REFER
TO MECHANICAL AND ELECTRICAL DRAWINGS.
6. REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME. CAULKING
BETWEEN FRAME AND ADJACENT MATERIALS TO BE REMOVED AS
PER TYPE 1 ABATEMENT, REFER TO ABATEMENT NOTES.
7. REMOVE AND DISPOSE OF EXISTING T-BAR GRID, CEILING TILES
AND ALL HANGER AND SUSPENSION CABLES.
8. IN SW148 CONTRACTOR TO COORDINATE CAREFUL REMOVAL OF
T-BAR CEILING AND STORE FOR REUSE. COORDINATE WITH
MECHANICAL AND ELECTRICAL REFER TO MECHANICAL AND
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
9. REMOVE AND DISPOSE OF WALL ABOVE DOOR.
10. REMOVE EXISTING FLOOR SLAB AROUND DRAIN TO ALLOW FOR
MECH CAP. VERIFY FLOOR DRAIN LOCATION AND COORDINATE
WITH NOTE 20. ON A1.2 DRAWINGS
PSYCHOLOGYLAB
23.5 m2
SW149
AREA OF WORK
OUT OF SCOPE
DEMO
6934
3350
90
FD
VESTIBULE
4 m2
SW149V
BIOLOGYLAB
SW148
AREA OF WORK
RETURNGRATE 2x4 LIGHT
SUPPLYGRILLE
SUPPLYGRILLE
2x4 LIGHT
2x4 LIGHT
2x4 LIGHT
AREA OF WORK
OUT OF SCOPE
6934
HD
3350
1x4 LIGHT
PSYCHOLOGYLAB
23.5 m2
SW149
VESTIBULESW149V
BIOLOGYLAB
SW148
EXISTING 12" CONC.WALL 1 HR FRR
EXISTINGEXPANSIONJOINT TOREMAIN
ABATEMENT NOTES:
1.1. ALL MATERIALS WITHIN SCOPE OF WORK THAT ARE
IDENTIFIED AS ASBESTOS CONTAINING MATERIAL (ACM) ARE
TO BE REMOVED. REMOVAL OF ACM TO BE CARRIED OUT IN
CONFORMANCE WITH THE MINISTRY OF LABOUR’S
PROCEDURES AS DESCRIBED IN THE ONTARIO REGULATION
278/05 DESIGNATED SUBSTANCE — ASBESTOS ON
CONSTRUCTION PROJECTS AND IN BUILDINGS AND REPAIR
OPERATIONS, SERVING AS PART OF THE OCCUPATIONAL
HEALTH & SAFETY ACT & UNIVERSITY OF TORONTO
PROCEDURES.
1.2. ABATEMENT CONTRACTOR TO ENSURE ALL TYPE I REMOVAL
PROCEDURES ARE ADHERED TO INCLUDING BUT NOT
LIMITED TO THE FOLLOWING;
A. GENERAL CONTRACTOR, ABATEMENT SUBCONTRACTOR
TO COORDINATE ABATEMENT PLAN AND PROCEDURES
WITH UNIVERSITY OF TORONTO, DESIGN & CONSTRUCTION
MANAGEMENT PROJECT MANAGER AND UNIVERSITY OF
TORONTO ENVIRONMENTAL HEALTH & SAFETY OFFICER
MINIMUM 5 DAYS IN ADVANCE OF WORK TO OCCUR.
B. GENERAL CONTRACTOR , ABATEMENT SUBCONTRACTOR
TO COORDINATE HVAC SHUT DOWN WITH UNIVERSITY OF
TORONTO, DESIGN & CONSTRUCTION MANAGEMENT
PROJECT MANAGER MINIMUM 5 DAYS IN ADVANCE OF
WORK TO OCCUR.
C. GENERAL CONTRACTOR , ABATEMENT SUBCONTRACTOR
TO COORDINATE WITH EHS SITE PREPARATION CAN
OCCUR DURING REGULAR WORKING HOURS.
D. AREA OF REMOVAL TO BE FULLY TENTED AND UNDER
NEGATIVE PRESSURE BY MEANS OF EXHAUST FAN
COMPLETE WITH HEPA FILTER.
E. PROPER ABATEMENT NOTIFICATION TO BE POSTED IN
VISIBLE AREAS OF AREA OF WORK.
F. THE CONSTRUCTOR IS REQUIRED TO MEET WITH
UNIVERSITY OF TORONTO PROJECT MANAGER AND
ENVIRONMENTAL HEALTH & SAFETY OFFICER
PRE-ABATEMENT SITE MEETING TO COORDINATE SITE
SPECIFIC ABATEMENT CONTAINMENT STRATEGIES AND
PROCEDURE.
1.3 REFER TO: https://ehs.utoronto.ca/our-services/occupational-hygiene-
safety/asbestos-management-program/
ACT+2286
EXISTING 6" REDBLOCK WALL 1HR FRR
REFER TODEMOLITION
DRAWING NOTE 8
REFER TO DEMOLITIONDRAWING NOTE 2
REFER TO DEMOLITIONDRAWING NOTE 2
EXISTINGELECTRICAL
PANEL
REFER TO DEMOLITIONDRAWING NOTE 1
REFER TO DEMOLITIONDRAWING NOTE 1
REFER TO DEMOLITIONDRAWING NOTE 4
REFER TO DEMOLITIONDRAWING NOTE 7
REFER TODEMOLITION
DRAWING NOTE 9
REFER TO DEMOLITIONDRAWING NOTE 10
REFER TODEMOLITION
DRAWING NOTE 9
OUT OF SCOPE
AREA OF WORK
TO BE REMOVED
EXISTING 1 HR FRR
NEW 1HR FRR
EXISTING PARTITION
WALL TO REMAIN
EXISTING PARTITION
WALL TO BE
DEMOLISHED
NEW PARTITION
EXISTING DOOR TO
REMAIN
EXISTING DOOR TO BE
REMOVED
S315
DEM
O
LEGEND:
DEMO FLOOR PLAN
FD EXISTING FLOOR DRAIN
EXISTING 2'X4'
SUSPENDED CEILING
GRID AND ACOUSTIC TILE
TO BE DEMOLISHED
EXISTING GWB TO BE
DEMOLISHED
EXISTING 1' X 4'
LIGHTS TO BE REMOVED
REFER TO ELECTRICAL
EXISTING AIR DIFFUSER
TO BE REMOVED REFER
TO MECHANICAL
MECH DAMPER TO
REMOVE. REFER TO
MECHANICAL
EXISTING HEAT
DETECTOR TO REMOVE.
REFER TO ELECTRICAL
EXISTING SPRINKLER TO
REMOVE. REFER TO
MECHANICAL
SP
HD
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
CENTRE FOR FRENCH ANDLINGUISTICS SW149 INTERIORRENOVATIONSCIENCE WING, 1265 MILITARY TRAIL
TG AM
EXISTING FLOOR AND RCPPLAN
2019-04-12
NTSA1.1
02 2019-04-12 ISSUED FOR TENDER TG/AM01 2019-04-05 ISSUED FOR PERMIT TG/AM
03A1.2 1:50
PROPOSED INT ELEV
05A1.2 1:50
PROPOSED INTERIOR ELEVATION
06A1.2 1:50
PROPOSED INTERIOR ELEVATION
01A1.2 1:50
PROPOSED FLOOR PLAN
GENERAL NOTES APPLY TO ALL DRAWINGS:
1. THE DRAWINGS ARE NOT STANDALONE AND ARE TO BE READ IN CONJUNCTION WITH THE COMPLETE SET
OF CONTRACT DOCUMENTS.
2. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING ( PROVINCIAL & MUNICIPAL)
AUTHORITIES.
3. EXISTING CONSTRUCTION SHOWN HAS BEEN TAKEN FROM AVAILABLE INFORMATION, WHEN SPECIFIC
DETAILS ARE UNAVAILABLE, ASSUMPTIONS HAVE BEEN MADE REGARDING PROBABLE CONSTRUCTION.
ANY VARIANCE FROM CONSTRUCTION AS SHOWN ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT
TO ATTENTION OF ARCHITECT.
4. FILL ALL EXISTING HOLES LEFT FROM MECHANICAL AND ELECTRICAL SERVICES REMOVED OR
RELOCATED TO MAINTAIN REQUIRED FIRE SEPARATIONS.
5. PATCH AND MAKE GOOD ALL EXISTING FLOOR, WALL AND CEILING MATERIALS AND FINISHES
DESTRUCTED BY CONSTRUCTION TO MATCH EXISTING ADJACENT.
6. CLEAN UP DEBRIS ON A DAILY BASIS AND DISPOSE OF IN AN APPROVED DISPOSAL FACILITY OFFSITE ON A
REGULAR BASIS. BUILDING PREMISES ARE TO BE THOROUGHLY CLEANED PRIOR TO TAKEOVER BY THE
OWNER.
7. ALL WORK SHALL BE INSTALLED IN A NEAT AND TIDY MANNER.
8. ADEQUATELY PROTECT THE WORK AT ALL STAGES OF CONSTRUCTION AND MAINTAIN THE PROTECTION
UNTIL WORK IS COMPLETED. REMOVE AND REPLACE AT NO EXPENSE TO THE OWNER ANY DAMAGED
WORK AND MATERIALS THAT CANNOT BE REPAIRED OR RESTORED TO OWNER'S SATISFACTION.
9. CONTRACTOR TO INCLUDE FOR REMOVAL, TEMPORARY STORAGE ON SITE OR HANDING OVER TO OWNER
AS DETERMINED BY OWNER AND REINSTALLATION WHERE NOTED OF EXISTING EQUIPMENT, LIGHT
FIXTURES, DOORS, HARDWARE, ETC. THAT ARE REQUIRED TO BE REMOVED, RELOCATED AND/OR
REINSTALLED TO COMPLETE THE WORKS. ALL REMOVED MATERIALS REQUIRED TO BE REINSTALLED
SHALL BE REINSTALLED IN UN DAMAGED CONDITION.
10. ALL DOORS AND DOOR HARDWARE TO REMAIN AS EXISTING UNLESS OTHERWISE NOTED.
AREA OF WORK
OUT OF SCOPE
SW149
152
1219
1168 1013 RO 1168
7024
3350
FD
CFL RESEARCHSUPPORT
23.5 m2
SW149
VESTIBULESW149V
BIOLOGYLAB
SW148
AREA OF WORKAREA OF WORK
OUT OF SCOPE
7024
HD
3350
CFL RESEARCHSUPPORT
23.5 m2
SW149
VESTIBULESW149V
BIOLOGYLAB
SW148
02A1.2 1:50
PROPOSED REFLECTED CEILING PLAN
DRAWING NOTES:
1. ALL WALLS ARE TO EXTEND FROM FLOOR TO U/S OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
2. SUPPLY AND INSTALL NEW DOORS AND HARDWARE ACCORDING TO DOOR SCHEDULE.
3. SUPPLY AND INSTALL NEW FLOORING & BASE AS PER ROOM FINISH SCHEDULE AND PLAN.
4. ALL EXISTING WALLS TO BE MADE READY TO RECEIVE NEW FINISHES. PATCH REPAIR ALL SURFACES WHERE
DEMO SCOPE BEEN REMOVED.
5. PAINT ALL WALLS, HOLLOW METAL FRAMES. REFER TO PLAN 01/A2.1 AND MATERIAL AND FINISH SCHEDULE
03/A2.1. DO NOT PAINT ANY UNPAINTED WOOD OR UNPAINTED CONCRETE.
8. GENERAL CONTRACTOR TO ALLOW FOR RECEIVING OF ALL FURNISHINGS, FIXTURES AND EQUIPMENT AT
LOADING DOCK AND COORDINATING INSTALL WHERE APPLICABLE FOR ITEMS PURCHASED BY OWNER (UTSC).
COORDINATE WITH UTSC PM FOR ACCEPTABLE ROUTE AND WITH FFE PLAN ON DWG A1.2 FOR ADDITIONAL
INFORMATION.
9. MECHANICAL UNITS, DUCTS & ELECTRICAL DEVICES ARE SHOWN FOR INFORMATION ONLY. REFER TO
MECHANICAL & ELECTRICAL DRAWINGS AS REQUIRED.
10. ACT-NEW SUPPLY AND INSTALL NEW ACT GRID AND ACOUSTICAL CEILING TILES REFER TO FINISH SCHEDULE.
SUBMIT SAMPLES REFER TO 02/A1.3 FINISH SCHEDULE GENERAL FINISH NOTES.PROVIDE ADDITIONAL 20%
OVERAGE OF NEW CEILING TILES TO OWNERS FACILITIES MAINTENANCE DEPARTMENT.
11. ACT EX REMOVE AND STORE EXISTING CEILING TILES FOR REUSE, COORDINATE WITH MECHANICAL WORK.
SUPPLY AND INSTALL NEW CEILING TILES TO MATCH EXISTING WHERE DAMAGE TILES ARE PRESENT. APRX +/-
20 ACT UNITS TO MATCH EXISTING.
12. PATCH AND MAKE GOOD ALL EXISTING FLOOR, WALL AND CEILING MATERIALS AND FINISHES DESTRUCTED BY
CONSTRUCTION TO MATCH EXISTING ADJACENT.
13. ALL MATERIAL SUBSTITUTIONS MUST BE APPROVED BY THE OWNER.
14. ADEQUATELY PROTECT THE WORK AT ALL STAGES OF CONSTRUCTION AND MAINTAIN THE PROTECTION UNTIL
WORK IS COMPLETED. REMOVE AND REPLACE AT NO EXPENSE TO THE OWNER ANY DAMAGED WORK AND
MATERIALS THAT CANNOT BE REPAIRED OR RESTORED TO OWNER'S SATISFACTION.
15. INSTALL SEALANT AT ALL JOINTS SURFACE JOINTS INCLUDING THE PERIMETER OF NEW DOOR FRAMES.
16. PROVIDE STRUCTURAL SUPPLY AS REQUIRED FOR ALL FIXTURES AND ACCESSORIES, REFER TO 02/A2.3 FOR
REFERENCE.
17. WHEN PENETRATING FIRE RATED PARTITION REPLACE BATT INSULATION IN EXISTING PENETRATIONS WITH
LISTED FIRE STOPPING MATERIAL WHICH BEARS LABEL OF C.S.A AND U.L.C. WITH PAINTABLE FINISH AND
MAINTAIN SAME FIRE RATING AS THAT OF BUILDING COMPONENT PENETRATED.
18. SUPPLY AND INSTALL NEW FLOOR ACCORDING TO ROOM FINISH SCHEDULE. COMPLETE WITH TRANSITION
STRIP WHERE INDICATED ACCORDING TO DETAIL 3/A3.21
19. PAINT ACCORDING TO ROOM FINISH SCHEDULE. SUBMIT SAMPLES REFER TO 03/A1.2MATERIAL AND FINISH
SCHEDULE GENERAL NOTES. DO NOT PAINT EXPOSED CONCRETE
20. INFILL EXISTING FLOOR SLAB AROUND MECH CAP TO SUIT EX SLOPES
21. GC TO MEASURE EXISTING SITE LEVEL AFTER EXISTING FLOOR FINISH REMOVAL.
22. GC TO CARRY A CASH ALLOWANCE OF $9,500.00 FOR INSTALLING NEW SELF LEVELING FLOORING INCLUDING
EBA PRIMER AND M20 FLOORING IN CONSULTATION WITH ARMORROCK FLOORING IF REQUIRED. TOLERANCES
BASED ON THE MANUFACTURER REQUIREMENTS OF SOUND CABIN. GC TO WORK WITH SUB CONTRACTOR TO
PROVIDE SUITABLE DETAIL TO ACCOMMODATE BUILDING EXPANSION JOINT AND SUBMIT TO UTSC FOR
APPROVAL PRIOR TO WORK COMMENCING. GC TO ALLOW FOR WOOD BLOCKING OF FLOOR LEVELING
PRODUCT AT EXPANSION JOINT AND TRANSITIONS.
23. GC TO COORDINATE REMAINING MECHANICAL, ELECTRICAL AND CEILING INSTALLATION FOLLOWING THE
SOUND CABIN INSTALLATION. ESTIMATED DELIVERY DATE OF SOUND CABIN IS SEPTEMBER 2019.
24. SOUND CABIN INSTALLER IS RESPONSIBLE FOR DELIVERY OF CABIN INTO ROOM SW149.
A1.205
A1.206
A1.203
A1.204
04A1.2 1:50
PROPOSED INT ELEV
910
MONITOR
WHITEBOARD2430
1615
OUTLINEOF DOOR
SWING
OUTLINEOF DOORSWING
3
56
78
MOBILE TABLETWO UNITS
UNIVERSAL LAMINATE OVERHEADHINGED DOORS TWO UNITS 15.75" BY 48"
UNIVERSAL LAMINATEOVERHEAD HINGED
LOCKABLE 15.75" BY 36"
VERIFYCONDUIT
LOCATIONMODIFY
UPPERS IFREQUIRED
91011
12
1314 13
3
5 6
7 8
KEY PAD
W1
EXISTING BLDGEXPANSIONJOINT TOREMAIN
REFER TODRAWINGSNOTE 21 AND22
ACT-NEW+2430
CONCRETE+3353
EX
WB-1 DTM
M-01
EX EX
EX
WB-1 DTM
EX EX EXEX
WB-1WB-1
WB-1WB-1
WB-1WB-1 WB-1WB-1
EX PT-3PT-3
M-02
ACT-NEW±2286
ACT EX±2286
REFER TO DRAWINGNOTE 11.
REFER TODRAWINGNOTE 20
W1 W1
W2EX
EX
W2
SOUND CABINSEE NOTES 23 AND 24
SOUND CABINSEE NOTES 23 AND 24
OUT OF SCOPE
AREA OF WORK
TO BE REMOVED
EXISTING 1 HR FRR
NEW 1HR FRR
EXISTING PARTITION
WALL TO REMAIN
EXISTING PARTITION
WALL TO BE
DEMOLISHED
NEW PARTITION
EXISTING DOOR TO
REMAIN
NEW DOOR AND FRAME
AT LOCATION SHOWN
S315
S315
N
LEGEND:
PROPOSED FLOOR PLAN
+8'-0"ACT
EXPOSED STRUCTURE
AND SERVICES
NEW 2' X 4' SUSPENDED
CEILING GRID AND
ACOUSTIC TILE
NEW GWB
NEW 1'X4' LIGHT FIXTURE.
REFER TO ELECTRICAL
NEW SUPPLY DUCT
REFER TO MECHANICAL
NEW RETURN OR
EXHAUST DUCT REFER
TO MECHANICAL
HEIGHT OF CEILING
ABOVE FINISHED FLOOR
EXP
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
CENTRE FOR FRENCH ANDLINGUISTICS SW149 INTERIORRENOVATIONSCIENCE WING, 1265 MILITARY TRAIL
TG AM
PROPOSED FLOOR AND RCPPLAN, AND INTERIOR ELEVATIONS
2019-04-12
NTSA1.2
02 2019-04-12 ISSUED FOR TENDER TG/AM01 2019-04-05 ISSUED FOR PERMIT TG/AM
01A1.3 1:50
PROPOSED FFE FLOOR PLAN
3 5
6
7 8
910
11 12
13
14
16
15
1
13
2529
2135
915
1220
483
610
AREA OF WORK
OUT OF SCOPE
SW149
152
1219
1168 1013 RO 1168
7024
3350
FD
CFL RESEARCHSUPPORT
23.5 m2
SW149
VESTIBULESW149V
BIOLOGYLAB
SW148
LIGHT SWITCHES AND NEWTHERMOSTAT LOCATION
LIGHT SWITCHES
KEYPAD
BACK OF EXISTING PANEL
IAC OUTLET
DRAWING NOTES:
1. GENERAL CONTRACTOR TO SUPPLY AND INSTALL ALL EQUIPMENT AND
FURNISHINGS WHERE APPLICABLE ON FFE SCHEDULE, ON THIS DRAWING PAGE.
REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DETAILS.
2. GENERAL CONTRACTOR TO ALLOW FOR RECEIVING OF ALL EQUIPMENT AND
FURNITURE AT LOADING DOCK AND COORDINATING INSTALL INCLUDING FOR
ITEMS PURCHASED BY OWNER (UTSC). LOOSE FURNITURE IS TO BE PURCHASED
BY OWNER. REFER TO PROJECT DOCUMENTS FOR ACCEPTABLE ROUTES.
3. GENERAL CONTRACTOR TO PROVIDE ADEQUATE BLOCKING FOR AV EQUIPMENT
WHERE INDICATED.
4. GENERAL CONTRACTOR TO ALLOW FOR SUPERVISION OF THE INSTALLATION OF
THE OWNER SUPPLIED SOUND CABIN. SOUND CABIN INSTALLATION WILL BE
PERFORMED BY SUPPLIER (ELECTRO-MEDICAL INSTRUMENT COMPANY) SOUND
CABIN SUPPLIER IS RESPONSIBLE FOR DELIVERY OF SOUND CABIN INTO SW149.
EXPECTED DELIVERY DATE OF SOUND CABIN IS SEPTEMBER 2019. COMPLETION
OF T-BAR CEILNG – OR PORTION THERE OF TO FOLLOW AFTER SOUND CABIN
INSTALLATION.
5. GC TO COORDINATE REMAINING MECHANICAL, ELECTRICAL AND CEILING
INSTALLATION FOLLOWING INSTALLATION OF SOUND CABIN. ESTIMATED DELIVERY
DATE SEPTEMBER 2019.
EX
M-01
WB-1
PAINTING
SHEET FLOORING
CEILING TILE
PT-3
DTM
M-02
SW149
n
n
A B C D E F G H
RHR
n n n n nnD
n
SOUND CABINTRANS 1,
RUBBER TRANSITION.
HEIGHT TO SUIT
MATERIAL
NEW LEVELED
CONCRETE
VINYL FLOOR
DOOR FRAME WIDTH VARIES
DOOR SWING OUT
OF THE ROOM
TRANS 2,
RUBBER TRANSITION.
HEIGHT TO SUIT
MATERIAL
EX CONCRETE
SURFACE
VINYL FLOOR
W1
W2
OUT OF SCOPE
AREA OF WORK
TO BE REMOVED
EXISTING 1 HR FRR
NEW 1HR FRR
EXISTING PARTITION
WALL TO REMAIN
EXISTING PARTITION
WALL TO BE
DEMOLISHED
NEW PARTITION
EXISTING DOOR TO
REMAIN
NEW DOOR AND FRAME
AT LOCATION SHOWN
S315
S315
N
LEGEND:
PROPOSED FLOOR PLAN
+8'-0"ACT
EXPOSED STRUCTURE
AND SERVICES
NEW 2' X 4' SUSPENDED
CEILING GRID AND
ACOUSTIC TILE
NEW GWB
NEW 1'X4' LIGHT FIXTURE.
REFER TO ELECTRICAL
NEW SUPPLY DUCT
REFER TO MECHANICAL
NEW RETURN OR
EXHAUST DUCT REFER
TO MECHANICAL
HEIGHT OF CEILING
ABOVE FINISHED FLOOR
EXP
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
CENTRE FOR FRENCH ANDLINGUISTICS SW149 INTERIORRENOVATIONSCIENCE WING, 1265 MILITARY TRAIL
TG AM
FFE PLAN AND SCHEDULES
2019-04-12
NTSA1.3
02A1.3 NTS
FINISH SCHEDULE
05A1.3 NTS
DOOR SCHEDULE
06A1.3 NTS
EQUIPMENT LIST
04A1.3 NTS
PARTITION SCHEDULE
03A1.3 NTS
TRANSITION DETAIL
02 2019-04-12 ISSUED FOR TENDER TG/AM01 2019-04-05 ISSUED FOR PERMIT TG/AM
SCIENCE WING
SW149 INTERIOR RENOVATION
UNIVERSITY OF TORONTO SCARBOROUGH
01E0.0 NTS
ELECTRICAL LEGEND
02 2019-04-05 ISSUED FOR TENDER HY01 2019-04-05 ISSUED FOR PERMIT HY
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
SW149 INTERIOR RENOVATIONKANG SOUND CABINS
SCIENCE WING, 1265 MILITARY TRAIL
AR HY
ELECTRICAL LEGEND
2019-04-05
NTSE0.0
01E1.1 1:50
EXISTING ELECTRICAL PLAN 02E1.1 1:50
EXISTING ELECTRICAL CEILING PLAN
NOTES:
1. FOLLOW ALL HEALTH AND SAFETY PROCEDURES AS MANDATED BY UNIVERSITY OF TORONTO EHS DEPARTMENT WHILEWORKING ON SITE (I.E CONFINED SPACES, FALL PROTECTION, PORTABLE LADDERS, ETC) REFER TOhttp://www.ehs.utoronto.ca/resources/manindex.htm FOR ADDITIONAL INFORMATION.
2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, HEIGHTS,CONSTRUCTION DETAILS, FINISHES AND COLOURS.
3. AS PART OF THE DEMOLITION CONTRACT, THE ELECTRICAL CONTRACTOR SHALL REMOVE ALL FLOOR, COLUMN, CEILING, ISLANDAND WALL MOUNTED POWER, TELEPHONE/DATA OUTLETS, CABLING AND CONDUIT NOT REQUIRED, TO SUIT THE NEW LAYOUTAND MAKE SAFE. VISIT SITE TO DETERMINE EXACT REQUIREMENTS.
4. ELECTRICAL CONTRACTOR TO REUSE CIRCUITS OBTAINED THROUGH DEMOLITION, UNLESS OTHERWISE NOTED. MAXIMUM 6RECEPTACLES PER CIRCUIT FOR GENERAL USE RECEPTACLES, AND MAXIMUM 4 RECEPTACLES PER CIRCUIT FOR COMPUTERWORK STATION RECEPTACLES. EXACT LOCATION OF ALL NEW AND RELOCATED RECEPTACLES TO BE CONFIRMED ON SITE WITHARCHITECT.
5. ALL EXISTING ELECTRICAL DEVICES, EQUIPMENT AND LIGHTING WITHIN BASE BUILDING ROOMS, STAIRWELLS AND AREASDEEMED NOT IN SCOPE SHALL REMAIN LIVE AND OPERATIONAL. ELECTRICAL CONTRACTOR TO ENSURE SERVICES TO THESEAREAS ARE ISOLATED AND PROTECTED DURING THE COURSE OF DEMOLITION AND CONSTRUCTION.
6. ELECTRICAL CONTRACTOR SHALL MAINTAIN AND RELOCATE EXISTING SERVICES WHICH PASS THROUGH THE AREA OFRENOVATION OR DEMOLITION, BUT FEEDS ITEMS LOCATED OUTSIDE OF THESE AREAS. REWIRE DEVICES TO ORIGINAL CIRCUITS.
7. PROVIDE JUNCTION BOXES, OUTLET BOXES, WIRING, PLATES AND OTHER ITEMS NECESSARY FOR COMPLETE RELOCATION OFDEVICES, FIXTURES AND EQUIPMENT.
8. CONNECTIONS TO EXISTING SYSTEMS TO BE MADE AT APPROVED TIMES. OBTAIN WRITTEN APPROVAL RECORDING TIMES WHENCONNECTIONS CAN BE MADE. ARRANGE WORK SO THAT PHYSICAL ACCESS TO EXISTING BUILDINGS IS NOT UNDULYINTERRUPTED. REQUEST FOR SHUT-DOWNS TO BE SUBMITTED IN WRITING BE THE CONTRACTOR WITH A MINIMUM OF TWOWEEK NOTICE.
9. ALL ELECTRICAL CONDUITS THROUGH WALLS MUST BE COMPLETELY SEALED TO ELIMINATE THEIR POTENTIAL USE AS ROUTESFOR VERMIN OR AEROSOLS.
10. ELECTRICAL CONTRACTOR TO USE CIRCUITS FROM LIGHTING PANEL FOR ALL LIGHTING FIXTURES ON NORMAL POWER.ELECTRICAL CONTRACTOR TO USE CIRCUITS FROM EMERGENCY PANEL FOR ALL NEW LIGHTING FIXTURES ON EMERGENCYPOWER.
11. ALL BALLASTS ARE TO BE REMOVED FROM THE FIXTURE PRIOR TO DISPOSAL AND BE CHECKED FOR PCB CONTAININGMATERIALS.
12. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SEPARATION AND DISMANTLING OF ALL EXISTINGFLUORESCENT LIGHTING CONTAINING PCB BALLASTS. THE ELECTRICAL CONTRACTOR SHALL PUT THE PCB BALLASTS IN THEDESIGNATED BIN IN SW200P.
13. REMOVE ALL EXISTING LIGHTING FIXTURES, ELECTRICAL DEVICES, WIRING AND EQUIPMENT TO SUIT NEW CONSTRUCTION.CUT BACK AND CAP CONDUITS AND ELECTRICAL OUTLETS NOT BEING USED, SO THAT FINISHED WORK PRESENTS A NEAT ANDCLEAN APPEARANCE. DISCONNECT AT POINT OF ELECTRICAL SUPPLY, REMOVE OBSOLETE WIRING AND CONDUITS, AND MAKEEXISTING SYSTEM SAFE. BLANK OFF OPENINGS IN PANELS OR BOXES FROM REMOVED CONDUITS OR DUCTS.
14. THE LIGHTING FIXTURES IN THE ROOMS TO BE RECESSED VAPOR-PROOF LED WITH SMOOTH LENSES, DOUBLE SWITCHED HALFLAMPS TO TIMED WALL SWITCH, HALF LAMPS TO CENTRAL LIGHTING CONTROL SYSTEM.
15. AS PART OF THE DEMOLITION CONTRACT, THE ELECTRICAL CONTRACTOR SHALL REMOVE AND DISPOSE OF ALLCOMMUNICATIONS/FIRE ALARM AND SECURITY DEVICES, CABLING AND CONDUIT NOT REQUIRED AND MAKE SAFE. REMOVEASSOCIATED WIRING BACK TO THE ELECTRICAL PANEL OR IT RACK. VISIT SITE TO DETERMINE THE EXACT REQUIREMENTS.
16. AS PART OF DEMOLITION CONTRACT, THE ELECTRICAL CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL LIGHTING,SWITCHES AND ASSOCIATED WIRING BACK TO ELECTRICAL PANEL. VISIT SITE TO DETERMINE THE EXACT REQUIREMENTS ANDREFER TO DEMOLITION DRAWINGS.
BIOLOGY LAB
13.3 m2
SW149
AREA OF WORK
OUT OF SCOPE
SW149V
DEMO
SW149
FD
AREA OF WORK
RETURNGRATE 2x4 LIGHT
SUPPLYGRILLE
SUPPLYGRILLE
2x4 LIGHT
2x4 LIGHT
2x4 LIGHT
BIOLOGY LAB
13.3 m2
SW149
AREA OF WORK
OUT OF SCOPE
SW149V SW149
1x4 LIGHT
EXISTING
120/208 PANEL
SERVING S148
RP-1A8
EXISTING
120/208 PANEL
02 2019-04-05 ISSUED FOR TENDER HY01 2019-04-05 ISSUED FOR PERMIT HY
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
SW149 INTERIOR RENOVATIONKANG SOUND CABINS
SCIENCE WING, 1265 MILITARY TRAIL
AR HY
EXISTING ELECTRICAL PLANS
2019-04-05
AS NOTEDE1.1
03E2.1 1:50
PROPOSED INTERIOR ELEVATION
04E2.1 1:50
PROPOSED INTERIOR ELEVATION
01E2.1 1:50
PROPOSED ELECTRICAL PLAN
3 5
6
7 8
910
11 12
13
14
16
15
1
13
AREA OF WORK
OUT OF SCOPE
SW149V
SW149
CFL LAB
13.3 m2
SW149
SW149
FD
E2.103
E2.104
E2.102
02E2.1 1:50
PROPOSED INT ELEV
MONITOR
WHITEBOARD
1615
OUTLINEOF DOOR
SWING
OUTLINEOF DOORSWING
3
56
78
MOBILE TABLETWO UNITS
UNIVERSAL LAMINATE OVERHEADHINGED DOORS TWO UNITS 15.75" BY 48"
UNIVERSAL LAMINATEOVERHEAD HINGED
LOCKABLE 15.75" BY 36"
VERIFYCONDUIT
LOCATIONMODIFY
UPPERS IFREQUIRED
91011
12
1314 13
3
5 6
7 8
05E2.1 NTS
EQUIPMENT SCHEDULE
EXISTING
120/208 PANEL
SERVING S148
NEW DATA AND
RECEPTACLES
SURFACE
MOUNT WITH
CONDUIT
DEDICATED
CIRCUIT
FOR TV
NOTES:
1. FOLLOW ALL HEALTH AND SAFETY PROCEDURES AS MANDATED BY UNIVERSITY OF TORONTO EHS DEPARTMENT WHILEWORKING ON SITE (I.E CONFINED SPACES, FALL PROTECTION, PORTABLE LADDERS, ETC) REFER TOHTTP://WWW.EHS.UTORONTO.CA/RESOURCES/MANINDEX.HTM FOR ADDITIONAL INFORMATION.
2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, HEIGHTS,CONSTRUCTION DETAILS, FINISHES AND COLOURS.
3. ELECTRICAL CONTRACTOR TO REUSE CIRCUITS OBTAINED THROUGH DEMOLITION, UNLESS OTHERWISE NOTED. MAXIMUM 6RECEPTACLES PER CIRCUIT FOR GENERAL USE RECEPTACLES, AND MAXIMUM 4 RECEPTACLES PER CIRCUIT FOR COMPUTERWORK STATION RECEPTACLES. EXACT LOCATION OF ALL NEW AND RELOCATED RECEPTACLES TO BE CONFIRMED ON SITE WITHARCHITECT.
4. CONNECTIONS TO EXISTING SYSTEMS TO BE MADE AT APPROVED TIMES. OBTAIN WRITTEN APPROVAL RECORDING TIMES WHENCONNECTIONS CAN BE MADE. ARRANGE WORK SO THAT PHYSICAL ACCESS TO EXISTING BUILDINGS IS NOT UNDULYINTERRUPTED. REQUEST FOR SHUT-DOWNS TO BE SUBMITTED IN WRITING BE THE CONTRACTOR WITH A MINIMUM OF TWOWEEK NOTICE.
5. COORDINATE ELECTRICAL CONNECTION REQUIREMENTS FOR THE EQUIPMENT ON SITE WITH SHOP DRAWINGS, PRIOR TOINSTALLATION.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED TO EXISTING SYSTEMS WHEN MAKING CONNECTIONS.
7. ALL RECEPTACLES IN AREAS WHERE THEY MAY BE EXPOSED TO WATER MUST BE GROUND FAULT PROTECTED (GFCI) AND HAVEA WHILE-IN-USE ALL-WEATHER COVER. THIS INCLUDES ALL EXISTING RECEPTACLES WITHIN 2 METERS OF SINKS.
8. ALL ELECTRICAL CONDUITS THROUGH WALLS MUST BE COMPLETELY SEALED TO ELIMINATE THEIR POTENTIAL USE AS ROUTESFOR VERMIN OR AEROSOLS. MASONRY BACK BOXES TO BE USED.
9. THE POWER FOR SPECIALIZED EQUIPMENT MUST BE SIZED AND INSTALLED ACCORDING TO THE RECOMMENDATIONS OF THEMANUFACTURERS OF THE EQUIPMENT. VERIFY THE EXACT POWER REQUIREMENTS AND RECEPTACLE TYPES FOR SPECIALEQUIPMENT WITH MANUFACTURER PRIOR TO INSTALLATION.
10. ELECTRICAL CONTRACTOR SHALL SUPPLY AND INSTALL SUITABLE LABELS ON ALL RECEPTACLES. LABELS TO INCLUDE BOTHPANEL AND CIRCUIT DESIGNATION.
11. ELECTRICAL CONTRACTOR TO REVISE AND UPDATE PANELBOARD SCHEDULES AFFECTED BY WORK.
12. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND EXAMINING ALL CONDITIONS AFFECTINGTHE PROPOSED INSTALLATION. NO CONSIDERATION WILL BE GIVEN FOR EXTRA COSTS ARISING FROM FAILURE TO VISIT SITE.
13. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW FOR ALL ELECTRICAL COMPONENTS.
14. SUPPLY AND INSTALL NEW RECEPTACLES AS SHOWN. RECEPTACLE COVER PLATES TO BE STAINLESS STEEL. MOUNTING HEIGHTSTO BE CONFIRMED ON SITE. ELECTRICAL CONTRACTOR TO MARK UP OUTLET LOCATIONS AND OBTAIN APPROVAL PRIOR TOINSTALLATION.
15. RELOCATE EXISTING RACEWAYS ON CONCRETE WALLS AS SHOWN IN ELECTRICAL PLANS. ENSURE THERE ARE PHYSICALDIVIDERS TO ACCOMMODATE BOTH DATA AND POWER WIRING WHERE APPLICABLE. ENSURE RACEWAY IS COMPLETELY SEALED.
16. SUPPLY AND INSTALL PLENUM RATED FT6 (BELDEN 4813) CABLES FOR COMMUNICATIONS. CABLE TO RUN FROM DATA DROPS,IN CABLE TRAY, TO MAIN IT ROOM. CONDUIT TO BE INSTALLED FROM DEVICE TO CABLE TRAY.
17. ALL WIRING TO RUN IN CONDUITS AND ALL CONDUITS TO BE ELECTRICAL METALLIC TUBING (EMT) UNLESS OTHERWISESPECIFIED.
18. CONDUIT MUST BE INSTALLED SO THAT CONDUCTORS CAN BE DRAWN IN WITHOUT STRAIN OR DAMAGE TO THECONDUCTORS.
19. WHERE VERTICALLY RUN CONDUITS PASS THROUGH A SLAB, CONTRACTOR TO PROVIDE 100MM HIGH CONCRETE PAD WITHTHE PAD EXTENDING 100MM ON ALL SIDES OF THE CONDUIT.
20. FIRE DEPARTMENT SHALL BE NOTIFIED PRIOR TO SHUTTING DOWN ANY FIRE PROTECTION SYSTEM AND NOTIFIED AGAINWHEN THE SYSTEM IS RETURNED TO NORMAL OPERATION. TO BE COORDINATED WITH DCM PROJECT MANAGER 5 DAYS PRIORTO SHUT DOWN.
21. ELECTRICAL CONTRACTOR TO ALLOW FOR FIRE ALARM PANEL SUPERVISION DURING TIME OF FIRE ALARM BYPASS DURINGINSTALLATION.
22. ALL FIRE DETECTION DEVICES TO BE SUPPLIED AND VERIFIED BY SIEMENS CANADA LTD, BUILDING TECHNOLOGIES DIVISIONCONTACT GERRY THIBEAULT MOBILE: 416-617-3786 [email protected].
23. ALL NORMAL LOADS TO BE FED FROM NORMAL PANELS SERVING THE ROOM. ALL EMERGENCY LOADS TO BE FED FROM PANELEP-02 LOCATED ACROSS THE HALLWAY. CONFIRM PANEL AND CIRCUIT USE WITH SIGNING ENGINEER PRIOR TO INSTALLATION.
24. RACEWAY TO BE TRIMMED ACCORDING TO ARCHITECTURAL PLANS SO THAT IT DOES NOT OBSTRUCT THE SOUND BOOTH.
25. RELOCATE EXISTING RACEWAYS TO SUIT PROPOSED PLAN SHOWN. CONTRACTOR TO CONFIRM EXACT LOCATION WITHARCHITECT PRIOR TO RELOCATION.
26. NEW DATA DROP TO RUN BACK TO ROOM SW254. REFER TO ARCHITECTURE PLANS FOR ROOM LOCATION.
27. SEPARATE PRICE: INCLUDE FOR RELOCATION AND RE-WIRING OF EXISTING PANEL IN SW149 INTO VESTIBULE SW149V.
28. PROVIDE 120V 15A RECEPTACLE IN CEILING SPACE OF SW148 FOR MECHANICAL MIXING BOX. COORDINATE EXACT LOCATIONWITH MECHANICAL CONTRACTOR AND SHOP DRAWINGS PRIOR TO INSTALLATION.
ON LOWER
RACEWAY
20A DEDICATED
CIRCUIT
FOR SOUND BOOTH
NEW RECEPTACLE ON
DEDICATED
EMERGENCY CIRCUIT
NEW RECEPTACLE
NEW RECEPTACLE
RP-1A8
EXISTING
120/208 PANEL
02 2019-04-05 ISSUED FOR TENDER HY01 2019-04-05 ISSUED FOR PERMIT HY
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
SW149 INTERIOR RENOVATIONKANG SOUND CABINS
SCIENCE WING, 1265 MILITARY TRAIL
AR HY
PROPOSED ELECTRICAL PLAN
2019-04-05
AS NOTEDE2.1
AREA OF WORKAREA OF WORK
OUT OF SCOPE
SW149V SW149
01E2.2 1:50
PROPOSED REFLECTED CEILING PLAN
NOTES:
1. FOLLOW ALL HEALTH AND SAFETY PROCEDURES AS MANDATED BY UNIVERSITY OF TORONTO EHS DEPARTMENT WHILEWORKING ON SITE (I.E CONFINED SPACES, FALL PROTECTION, PORTABLE LADDERS, ETC) REFER TOHTTP://WWW.EHS.UTORONTO.CA/RESOURCES/MANINDEX.HTM FOR ADDITIONAL INFORMATION.
2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, HEIGHTS,CONSTRUCTION DETAILS, FINISHES AND COLOURS.
3. ELECTRICAL CONTRACTOR TO REUSE CIRCUITS OBTAINED THROUGH DEMOLITION, UNLESS OTHERWISE NOTED. MAXIMUM 6RECEPTACLES PER CIRCUIT FOR GENERAL USE RECEPTACLES, AND MAXIMUM 4 RECEPTACLES PER CIRCUIT FOR COMPUTERWORK STATION RECEPTACLES. EXACT LOCATION OF ALL NEW AND RELOCATED RECEPTACLES TO BE CONFIRMED ON SITE WITHARCHITECT.
4. CONNECTIONS TO EXISTING SYSTEMS TO BE MADE AT APPROVED TIMES. OBTAIN WRITTEN APPROVAL RECORDING TIMES WHENCONNECTIONS CAN BE MADE. ARRANGE WORK SO THAT PHYSICAL ACCESS TO EXISTING BUILDINGS IS NOT UNDULYINTERRUPTED. REQUEST FOR SHUT-DOWNS TO BE SUBMITTED IN WRITING BE THE CONTRACTOR WITH A MINIMUM OF TWOWEEK NOTICE.
5. COORDINATE ELECTRICAL CONNECTION REQUIREMENTS FOR THE EQUIPMENT ON SITE WITH SHOP DRAWINGS, PRIOR TOINSTALLATION.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED TO EXISTING SYSTEMS WHEN MAKING CONNECTIONS.
7. ALL RECEPTACLES IN AREAS WHERE THEY MAY BE EXPOSED TO WATER MUST BE GROUND FAULT PROTECTED (GFCI) AND HAVEA WHILE-IN-USE ALL-WEATHER COVER. THIS INCLUDES ALL EXISTING RECEPTACLES WITHIN 2 METERS OF SINKS.
8. ALL ELECTRICAL CONDUITS THROUGH WALLS MUST BE COMPLETELY SEALED TO ELIMINATE THEIR POTENTIAL USE AS ROUTESFOR VERMIN OR AEROSOLS. MASONRY BACK BOXES TO BE USED.
9. THE POWER FOR SPECIALIZED EQUIPMENT MUST BE SIZED AND INSTALLED ACCORDING TO THE RECOMMENDATIONS OF THEMANUFACTURERS OF THE EQUIPMENT. VERIFY THE EXACT POWER REQUIREMENTS AND RECEPTACLE TYPES FOR SPECIALEQUIPMENT WITH MANUFACTURER PRIOR TO INSTALLATION.
10. ELECTRICAL CONTRACTOR SHALL SUPPLY AND INSTALL SUITABLE LABELS ON ALL RECEPTACLES. LABELS TO INCLUDE BOTHPANEL AND CIRCUIT DESIGNATION.
11. ELECTRICAL CONTRACTOR TO REVISE AND UPDATE PANELBOARD SCHEDULES AFFECTED BY WORK.
12. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND EXAMINING ALL CONDITIONS AFFECTINGTHE PROPOSED INSTALLATION. NO CONSIDERATION WILL BE GIVEN FOR EXTRA COSTS ARISING FROM FAILURE TO VISIT SITE.
13. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW FOR ALL ELECTRICAL COMPONENTS.
14. SUPPLY AND INSTALL NEW RECEPTACLES AS SHOWN. RECEPTACLE COVER PLATES TO BE STAINLESS STEEL. MOUNTING HEIGHTSTO BE CONFIRMED ON SITE. ELECTRICAL CONTRACTOR TO MARK UP OUTLET LOCATIONS AND OBTAIN APPROVAL PRIOR TOINSTALLATION.
15. RELOCATE EXISTING RACEWAYS ON CONCRETE WALLS AS SHOWN IN ELECTRICAL PLANS. ENSURE THERE ARE PHYSICALDIVIDERS TO ACCOMMODATE BOTH DATA AND POWER WIRING WHERE APPLICABLE. ENSURE RACEWAY IS COMPLETELY SEALED.
16. SUPPLY AND INSTALL PLENUM RATED FT6 (BELDEN 4813) CABLES FOR COMMUNICATIONS. CABLE TO RUN FROM DATA DROPS,IN CABLE TRAY, TO MAIN IT ROOM. CONDUIT TO BE INSTALLED FROM DEVICE TO CABLE TRAY.
17. ALL WIRING TO RUN IN CONDUITS AND ALL CONDUITS TO BE ELECTRICAL METALLIC TUBING (EMT) UNLESS OTHERWISESPECIFIED.
18. CONDUIT MUST BE INSTALLED SO THAT CONDUCTORS CAN BE DRAWN IN WITHOUT STRAIN OR DAMAGE TO THECONDUCTORS.
19. WHERE VERTICALLY RUN CONDUITS PASS THROUGH A SLAB, CONTRACTOR TO PROVIDE 100MM HIGH CONCRETE PAD WITHTHE PAD EXTENDING 100MM ON ALL SIDES OF THE CONDUIT.
20. FIRE DEPARTMENT SHALL BE NOTIFIED PRIOR TO SHUTTING DOWN ANY FIRE PROTECTION SYSTEM AND NOTIFIED AGAINWHEN THE SYSTEM IS RETURNED TO NORMAL OPERATION. TO BE COORDINATED WITH DCM PROJECT MANAGER 5 DAYS PRIORTO SHUT DOWN.
21. ELECTRICAL CONTRACTOR TO ALLOW FOR FIRE ALARM PANEL SUPERVISION DURING TIME OF FIRE ALARM BYPASS DURINGINSTALLATION.
22. ALL FIRE DETECTION DEVICES TO BE SUPPLIED AND VERIFIED BY SIEMENS CANADA LTD, BUILDING TECHNOLOGIES DIVISIONCONTACT GERRY THIBEAULT MOBILE: 416-617-3786 [email protected].
23. SUPPLY AND INSTALL NEW LED LIGHTS COMPLETE WITH CABLE MOUNTING KITS AS PER UTSC SPECIFICATIONS AND ATTACHEDLIGHTING LEGEND WHERE INDICATED.
24. ELECTRICAL CONTRACTOR TO USE CIRCUITS FROM LIGHTING PANEL FOR ALL NEW LIGHTING FIXTURES ON NORMAL POWER.ELECTRICAL CONTRACTOR TO USE CIRCUITS FROM EMERGENCY PANEL FOR ALL NEW LIGHTING FIXTURES ON EMERGENCYPOWER.
25. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR LIGHT LOCATIONS IN REFERENCE TO THEPROPOSED DUCTING AS SHOWN ON MECHANICAL DRAWINGS.
02 2019-04-05 ISSUED FOR TENDER HY01 2019-04-05 ISSUED FOR PERMIT HY
SCALE:
DRAWING TITLE:
DRAWING No:DATE:
DRAWN BY: CHECKED BY:
Notes:
All dimensions and information shall be checked and verified on the site and anydiscrepancies must be reported to the UofT Project Manager or the UofT ProjectCoordinator before commencing the work. Drawings are not to be scaled.
This drawing and all aspects of its content are protected by copyright.Reproduction in whole or in part, by any means whatsoever, whether electronic,mechanical or otherwise, without the expresses written permission of theUniversity of Toronto Scarborough, is prohibited by law.
DESIGN & CONSTRUCTION MANAGEMENT
1265 Military TrailToronto Ontario
M1C 1A4
PROJECT TITLE:
PROJECT #:
CLIENT:
NO. DATE REVISION NO BY
UNIVERSITY OF TORONTO SCARBOROUGH1265 MILITARY TRAIL, TORONTO ONTARIO, M1C1A4
DCM2019-02
SW149 INTERIOR RENOVATIONKANG SOUND CABINS
SCIENCE WING, 1265 MILITARY TRAIL
AR HY
PROPOSED ELECTRICALCEILING PLAN
2019-04-05
AS NOTEDE2.2