new a05 building b plans, elevati · 2019. 9. 20. · title: a05 building b_ plans, elevati author:...

1
Drawing No.: Title: Drawn: Scale: Date: Status: Plot Date: Drawing: Amendments: Rev: Date: Legend: Detail: Bar Scale: Client: Project No: Project: North Point: 06:01 Project Name: Alterations & Additions: San Clemente Catholic High School CDJ DA 1:100 06:01 7/5/07 carste STUDIO PTY LTD All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction. ABN 16122394450 trading as ACN 122394450 p: (02) 4951 2578 m: 0427 432 720 f: (02) 4950 0591 e: [email protected] a: PO Box 149 Wallsend 2287 stephen booker architect Architects and Heritage Consultants 07.05.07 -DA-A05 CATHOLIC SCHOOLS OFFICE Diocese of Maitland - Newcastle Building B: Plans, Elevations & Section 78 Havelock Street Mayfield N Ground Floor RL + 18,500 Roof First Floor RL + 21,350 RL + 22,605 MC FB1 MR MR FB2 RL + 25,745 Roof CC Ground Floor DP RL + 18,500 DP DP DP Roof Roof FB1 AL AL AL FB1 AL MR First Floor RL + 21,350 RL + 22,605 RL + 25,745 CC CC CC CC MR Parapet RL + 26,505 FB2 MC MC GENERAL PURPOSE LEARNING AREA MUSIC ROOM Ground Floor RL + 18,500 COVERED WALKWAY FB1 MR MC First Floor CC CC CC AL AL AL RL + 24,050 Ceiling Roof RL + 26,175 RL + 21,350 Ceiling RL + 21,200 FB1 MR MC Ground Floor RL + 18,500 Roof First Floor RL + 21,350 RL + 22,605 Parapet RL + 26,505 Roof RL + 25,650 RL + 24,815 Parapet and Columns CC CC CC CC CC CC AL AL AL FB2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1,800 2,500 3,845 597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985 22,195 12,425 6,340 3,550 2,185 1,950 6,335 1,280 2,185 1,280 270 7,420 110 3,625 110 7,280 270 18,765 19,085 270 2,835 110 4,470 270 5,795 270 4,475 270 600 355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350 1,270 4,445 18,765 270 3,345 950 350 2,185 350 2,185 1,610 950 230 270 6,070 600 230 2,298 350 2,298 350 2,298 300 1,900 4,420 2,005 270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270 973 7 A05 7 A05 PRACTICE ROOM CPT 6.80m 2 DP DP DP PRACTICE ROOM CPT 6.80m 2 PRACTICE ROOM CPT 6.80m 2 MUSIC ROOM CPT 56.30m 2 GARDEN STORE CBR 21.00m 2 SPORTS STORE CBR 42.20m 2 MUSIC ROOM CPT 56.30m 2 MUSIC COMPUTER/ STORE ROOM CPT 17.40m 2 WINDOW DOOR DOOR OPENING WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW GROUND FLOOR WALKWAY CBR RL 18.50m DOOR DOOR WINDOW DP DP DP DP DP DP LINE OF EXISTING BUILDING LINE OF EXISTING BUILDING 7 A05 7 A05 19,085 270 6,210 270 5,675 270 5,800 270 355 2,185 350 2,185 350 2,185 18,765 6,750 5,675 6,340 230 2,298 350 2,298 350 1,223 4,495 950 230 6,340 270 85 2,185 350 2,185 350 2,185 350 2,185 45 270 270 6,210 110 3,495 110 8,300 270 1,015 2,185 350 2,185 7,295 2,185 350 2,185 1,015 600 10,460 640 270 7,215 6,735 4,545 18,765 2,500 1,645 1,655 600 270 7,420 270 10,855 270 19 o FALL 19 o FALL FIRST FLOOR WALKWAY CBR RL 21.35m GENERAL PURPOSE LEARNING AREA CPT 61.60m 2 GENERAL PURPOSE LEARNING AREA CPT 61.60m 2 GENERAL PURPOSE LEARNING AREA STORE CPT 25.90m 2 DP DP DP DP DP WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW DOOR LINE OF EXISTING BUILDING LINE OF EXISTING BUILDING LINE OF EXISTING BUILDING Ground Floor RL + 18,500 Roof Roof First Floor RL + 21,350 RL + 22,605 RL + 25,745 Parapet RL + 26,505 FB1 CC CC CC FB2 FB2 CC FB2 DP DP DP MC MR MC MR 0 1 2 3 4 5 AL ALUMINIUM LOUVRES CBR CONCRETE - BROOM FINISH CC OFFORM CONCRETE COLUMN - CLASS 2 FINISH CPT CARPET FLOOR FINISH DP COLORBOND DOWNPIPE - SHALE GREY FB1 FACE BRICK - TO MATCH EXISTING FB2 FACE BRICK - LIGHT CONTRAST TO EXISTING MC COLOROBOND METAL ROOF CAPPING - SHALE GREY MR COLORBOND METAL ROOF SHEETING - SHALE GREY SC STEEL COLUMN - GALVANISED SV SHEET VINYL FLOOR FINISH Building B: West Elevation 6 1:100 Building B: North Elevation 3 1:100 Building B: Section 01 7 1:100 Building B: South Elevation 5 1:100 Buiding B: Ground Floor Plan 1 1:100 Building B: First Floor Plan 2 1:100 Building B: East Elevation 4 1:100

Upload: others

Post on 15-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New A05 Building B Plans, Elevati · 2019. 9. 20. · Title: A05 Building B_ Plans, Elevati Author: Stephen Booker Created Date: 5/7/2007 12:09:03 PM

D r a w i n g N o . :

T i t l e :

D r a w n :

S c a l e :

D a t e :

S t a t u s :

P l o t D a t e :

D r a w i n g :

A m e n d m e n t s :R e v : D a t e :

L e g e n d :

D e t a i l :

B a r S c a l e :

C l i e n t :

P r o j e c t N o :

P r o j e c t :

N o r t h P o i n t :

06:01

P r o j e c t N a m e :

Alterations & Additions:San Clemente Catholic High School

CDJ

DA

1:100

06:01

7 / 5 / 0 7

c a r s t e S T U D I O P T Y L T D

Al l i n fo rma t ion , concep ts and i deas con ta ined he re in a rethe p rope r t y o f Ca rs te S tud io P ty L td and may no t bed i s t r i bu ted and / o r rep roduced w i thou t exp ress pe rm iss ionf rom Cars te S tud io P ty L td . I t i s t he respons ib i l i t y o f t hebu i l de r t o check and ve r i f y a l l d imens ions on -s i t e p r i o r t othe commencemen t o f wo rk and to no t i f y Ca rs te S tud ioP ty L td o f any e r ro rs and omiss ions . Do no t sca led raw ing . Do no t use d raw ing fo r cons r tuc t i on pu rposesun less i ssued by Cars te S tud io P ty L td fo r cons t ruc t i on .

A B N 1 6 1 2 2 3 9 4 4 5 0 t r a d i n g a s A C N 1 2 2 3 9 4 4 5 0

p : ( 0 2 ) 4 9 5 1 2 5 7 8 m : 0 4 2 7 4 3 2 7 2 0 f : ( 0 2 ) 4 9 5 0 0 5 9 1e : b o o k e r a r c h @ t p g . c o m . a u a : P O B o x 1 4 9 W a l l s e n d 2 2 8 7

s t e p h e n b o o k e r a r c h i t e c tA r c h i t e c t s a n d H e r i t a g e C o n s u l t a n t s

07.05.07

-DA-A05

CATHOLICSCHOOLSOFFICEDiocese ofMaitland - Newcastle

Building B: Plans, Elevations & Section

78 Havelock Street Mayfield

N

Ground FloorRL + 18,500

Roof

First FloorRL + 21,350

RL + 22,605MC

FB1

MR MR

FB2

RL + 25,745Roof

CC

Ground Floor

DP

RL + 18,500

DP

DP DP

Roof

Roof

FB1

ALAL

AL

FB1

AL

MR

First FloorRL + 21,350

RL + 22,605

RL + 25,745

CC CC CCCC

MR

ParapetRL + 26,505

FB2

MC

MC

GENERAL PURPOSE LEARNING AREA

MUSIC ROOMGround FloorRL + 18,500

COVEREDWALKWAY

FB1

MR

MC

First Floor

CC CC CC

AL ALAL

RL + 24,050Ceiling

RoofRL + 26,175

RL + 21,350

Ceiling RL + 21,200

FB1

MR

MC

Ground FloorRL + 18,500

Roof

First FloorRL + 21,350

RL + 22,605

ParapetRL + 26,505

RoofRL + 25,650

RL + 24,815Parapet and Columns

CC CC CC CC CC CC

AL ALAL

FB2

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

5A04

5A04

7A05

7A05

19,085

3,324 230 3,364 230 3,364 230 3,064 1,070 2,075 8,700 610 800

8,430 110 8,430 110 9,980

1,595 2,410 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 1,325 270

270 8,430 110 8,430 110 9,980 270 3,460

27,600

13,9

601,

664

470

270

6,21

027

05,

675

270

5,80

027

0

23,2

1528

0

13,895

355 2,185 350 2,185 350 2,185

18,7

65

300

8,99

030

03,

845

25,9

7528

0

150 13,225 150

6,75

05,

675

6,34

0

230

2,29

835

02,

298

350

1,22

34,

495

950

230

6,34

0

270 85 2,185 350 2,185 350 2,185 350 2,185 45 270

270

6,21

011

03,

495

110

8,30

027

0

1,01

52,

185

350

2,18

57,

295

2,18

535

02,

185

1,01

5

600 10,460 640

270

7,21

56,

735

4,54

5

18,7

65

1,325 2,410 350 2,410 350 950 2,070 2,410 350 2,410 350 950 1,470 2,410 350 2,410 1,810 950 1,325

2,50

01,

645

1,655

600 270 7,420 270 10,855 270

600

270

9,07

527

060

036

51,

710

470

600

D6

DP

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

DP

WINDOWWINDOWWINDOW WINDOW WINDOW WINDOW WINDOW

OPENING

WINDOW

OP

EN

ING

WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW

OPENING

DOOR DOOR DOOR

DPDPDPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

LINE OF EXISTING BUILDING

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

19o FA

LL

19o FA

LL

FIRST FLOOR WALKWAYCBR

RL 19.00m

19o FALL

19o FALL

19o FALL

19o FALL

19o FALL

19o FALL

19o FA

LL

BO

UN

DA

RY

GENERAL PURPOSE LEARNING AREACPT

90.55m2

TECHNICAL AND APPLIED SCIENCECPT

76.50m2

TECHNICAL AND APPLIED SCIENCECPT

76.50m2

19o FA

LL19

o FA

LL

FIRST FLOOR WALKWAYCBR

RL 21.35m

GENERAL PURPOSE LEARNING AREACPT

61.60m2

GENERAL PURPOSE LEARNING AREACPT

61.60m2

GENERAL PURPOSE LEARNING AREA STORECPT

25.90m2

DP DP

DP

DP

DP

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WINDOW WINDOW WINDOW

WINDOW WINDOW WINDOW WINDOW

DO

OR

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LINE OF EXISTING BUILDING

BO

UN

DA

RY

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

Ground FloorRL + 18,500

Roof

Roof

First FloorRL + 21,350

RL + 22,605

RL + 25,745

ParapetRL + 26,505

FB1

CC CC

CC

FB2

FB2

CC

FB2

DP DP DP

MC

MR

MC

MR

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

Building B: West Elevation6 1:100

Building B: North Elevation3 1:100

Building B: Section 017 1:100

Building B: South Elevation5 1:100

Buiding B: Ground Floor Plan1 1:100

Building B: First Floor Plan2 1:100

Building B: East Elevation4 1:100