new air stream helmets at aurubis‘ secondary smelter · new air stream helmets at aurubis‘...
TRANSCRIPT
111
New air stream helmets at
Aurubis‘ secondary smelter
and lead refinery
January 2015
Dr. Ino Bauer
Aurubis AG
Hamburg
Germany
www.aurubis.com
2
Agenda
1. Aurubis
2. Former air stream system
3. Advantages of new system
4. First experiences
5. Success in blood lead values
Flat rolled products
Aurubis, an integrated copper producer
RECYCLING MATERIALS
CONCENTRATES
BU Primary Copper
BU Recycling /
Precious Metals
SULFURIC
ACID
Iron silicate
Other
metals
PRECIOUS
METALS
BU Copper Products
WIRE ROD
SHAPES
Other semi-finished products
CATHODES
3
Copper productionMines and
recycling marketsCopper processing
Processors and end users
4
Aurubis’ fully integrated metal production
Areas of blood lead monitoring
Primary smelter(copper)
Hamburg, Pirdop
dorérichbullion
doréanodes
dorécoinsCu-PM bullion
Secondary smelter(copper)
PM materials(market)
Secondary smelter(lead)
Hamburg
Copper tankhouseHamburg, Olen,
Pirdop
Anode slimeTreatmentHamburg
E-furnace KRSHamburg Lünen
Copper tankhouseLünen
Anode slimesmelting
(E-furnace)
Lead refinery
Precious metalsrefinery
Cupellation
Copper line Lead line
cathodes cathodes
Precious metals line
Maintenance Sampling PM-Laboratory
In Hamburg
total 287 workers;
in Luenen approx.
200 workers
are monitored
1. Aurubis
2. Former Air stream system
3. Advantages of new system
4. First experiences
5. Success in blood lead values
5
Agenda
Disadvantages / problems with old system
7
• Weight of helmet (fan and filter included in helmet)• Size of helmet problems at works in narrow space
• Air stream in visor – can‘t be regulated
• Filterclass P2 (fan and filter inside helmet)• Dust deposits inside the helmet due to technical set up
(coarse filter fan fine filter) and the positioning inside the helmet
• Separate battery pack with cable plug
• Filterclass P3 (fan and filter as backpack) „ Jupiter system“• Uncomfortable design problem for forklift operators
• Heavy weight of backpack• Non optimized ergonomic design• Fan and filter in the helmet are replaced by a tube – same size of helmet
• Lifetime of rechargable batteries not sufficient (NiCd; NiMh)
• Spare parts are running out of supply
• Complicated disassembling and cleaning of parts
9
Agenda
1. Aurubis
2. Former air stream system
3. Advantages of new system
4. First experiences
5. Success in blood lead values
Backpack – system with battery, fan and tube
13
NiMh orLi-Ionbattery
fan
Filter pressurecontrol
Charge controlunit andaccusticwarning
Facts and figures
16
Costs: 800 – 900 € per unit (helmet plus filter unit)
Weight of battery pack: 2.5 kg for NiMhapprox. 1.5 kg for Li-Ion (new generation)
Runtime of battery pack: NiMh – after a while less than 1 shift!!!Li-Ion – no longtime experience
Air volume: Approx. 160 l/min
Advantages of new system
17
• Better design – smaller shape – suitable for work in narrow spaces
• Less weight
• Larger field of view (larger visor)
• Better sealing between visor and helmet shell
• Accustic warning for low battery status and high filter pressure
• Larger filter surface
• Pressure regulated air flow
• Separation of filter unit and helmet – no dust in helmet
• Better ergonomics of helmet and backpack
forklift operators can sit much more comfortable
• Higher filter class (P3) plus combination filter (A2B2E2K1HgP3)
protection against carcinogenic elements like As, Cd, Hg,…
• Accessories can be mounted easily
• Flexible air flow direction by adjustable lid
• Quick disassembling, easy cleaning
• Less noise – due to removal of fan away from the helmet
18
Agenda
1. Aurubis
2. Former air stream system
3. Advantages of new system
4. First experiences
5. Success in blood lead values
First practical experiences
19
+ High acceptance – high request at the beginning of implementation
+ Approx. 260 helmets in Hamburg
+ Fast and easy disassembling, cleaning and mounting
+ Ergonomic backpack
+ Gold coated visor and other accessories are welcome
+ Reduced usage of half masks
- High investment (equipment, charging stations, spare parts…)
- Lifetime of battery pack (NiMh)
- Worn sealing at the connector of tube and filter unit
- Worker often open the visor when talking to each other
- Cold air at winter – risk of comming down with a cold
20
Agenda
1. Aurubis
2. Former air stream system
3. Advantages of new system
4. First experiences
5. Success in blood lead values
Blood lead development site Hamburg
50 50 50 50 50 50 50 50 50 20
520
470
530
650 665 670
450
500520
400
8570 70 75 70 60 60 50 50 50
270
240
210 220 225205
180160
120140
440
400380 390
415380
340 340320
270
0
100
200
300
400
500
600
700
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Range
5% Perzentile
Median
95%Perzentile
n= 313 303 313 343 370 422 491 542 643 598
Blood lead level [μg/L]
year
Begin ofimplementation