new cambie & marine · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010...

6
CAMBIE & MARINE REZONING SUBMISSION CAMBIE STREET SKYTRAIN - CANADA LINE SW MARINE DRIVE W 64TH AVE. PHASE 2 PHASE 1 PHASE 2 PHASE 1 NORTH CORNER PLAZA FOCAL POINT FOCAL POINT NORTH COURT SOUTH COURT PUBLIC ART WALKWAY PHASE 1 ENTRY COURT SOUTH CORNER PLAZA PHASE 2 ENTRY COURT VEHICLE ACCESS LANE / MEWS WATER/STORMWATER FEATURE WATER/STORMWATER FEATURE W 64TH AVE STREETSCAPE SW MARINE DR STREET SCAPE LANDSCAPE SCHEMATIC SITE PLAN CONCEPT DIAGRAM

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

CAMBIE & MARINE REZONING SUBMISSIONJuly 30, 2010

CAMBIE & MARINE

1LANDSCAPE SCHEMATIC SITE PLAN- CONCEPT DIAGRAM

CA

MB

IE S

TRE

ET

SK

YTR

AIN

- C

AN

AD

A LI

NE

SW MARINE DRIVE

W 64TH AVE.

PHASE 2PHASE 1

PHASE 2PHASE 1

NORTH CORNER PLAZA

FOCAL POINT

FOCAL POINT

NORTH COURT

SOUTH COURT

PUBLIC ART WALKWAY

PHASE 1 ENTRY COURT

SOUTH CORNER PLAZA

PHASE 2 ENTRY COURT

VEHICLE ACCESS LANE / MEWS

WATER/STORMWATER FEATURE

WATER/STORMWATER FEATURE

W 64TH AVE STREETSCAPE

SW MARINE DR STREET SCAPE

LANDSCAPE SCHEMATIC SITE PLAN CONCEPT DIAGRAM

Page 2: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

JAMES KM CHENG ARCHITECTSJuly 30, 2010

CAMBIE & MARINE

2

CA

MB

IE S

TRE

ET

SK

YTR

AIN

- C

AN

AD

A LI

NE

SW MARINE DRIVE

LANDSCAPE SCHEMATIC SITE PLAN

W 64TH AVE.

North Corner Plaza• pedestrian node• focal point with public art interpretation• separate public and private with planting

and hedging

North Court• stepped terraces• seating / gathering opportunities• stormwater channel with planting• green buffer between private patio

and public realm

South Court• stepped terraces and stormwater

channel links upper level and lower level Entry Courts

• lawn for recreation• stone “bridges” cross the channel• seating / gathering opportunities• green buffer between private patio

and public realm

Public Art walkway• public art interpretation• double row of trees• 5’ green buffer on both sides• 3.5% pathway• 10’ wide pedestrian pathway• 8’ wide bikeway

Phase 2 Entry Court• water feature surrounds the lobby• bridge to Main Entry• grand steps connect to the South

Court• seating areas• planting buffer as a backdrop• water channel connects to the

stormwater feature in the south court• special paving to enhance the east-

west connection

Phase 2 Drop-Off• services phase 2 lobby• steps/ ramps connect to the Entry

Court

Vehicle Access Lane / Mews• double row of street trees• 5’ green buffer on both sides• access to entry drop-off, parking

entries and loading areas

Phase 1 Drop-Off• services phase 1 lobby• steps/ ramps connect to the Entry

Court

Live / Work Private Patio (phase 2)• every 2-3 units at same FFE on

level 1• separate public and private with

grade change, planting and hedging

• landscape buffer / edge provides privacy

Live / Work Private Patio (phase 1)• every 2-3 units at same FFE on

level 1• separate public and private with

grade change, planting and hedging

• landscape buffer / edge provides privacy

W 64th Ave Street Scape• continuation of street trees and

sidewalk width from adjacent parcel• separate public and private with

grade change, planting and hedging

• entry court leads to the vehicle access lane / mews

• seating areas / informal gathering

Loading & Parking Entry (phase 2)• screen between live/work and

loading area• AcquaPave permeable paving

Phase 1 Entry Court• water feature surrounds the lobby• bridge to Main Entry• special paving to enhance the east-

west connection

Retail Frontage• stepped terraces• outdoor cafe/ seating• planters defi ne the edge and

provide seating opportunities

South Corner Plaza• pedestrian node• public art interpretation• informal trees• site furniture / seating areas

Phase 2 Phase 2Phase 1 Phase 1

Loading & Parking Entry (phase 1)• screen between Entry Court and

loading area• AcquaPave permeable paving

Potential Future Plaza• strong connection to Phase 1 Entry

Court• pedestrian node / focus point• site furniture / seating areas

SW Marine Drive Streetscape• street trees and planting provide

green buffer between traffi c and pedestrians

• patterned paving for retail storefronts

Scale 1:50

LANDSCAPE DRAWINGS

LANDSCAPE SCHEMATIC SITE PLAN

53

Page 3: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

CAMBIE & MARINE REZONING SUBMISSION

LANDSCAPE SCHEMATIC ROOF GARDEN PLAN

July 30, 2010

CAMBIE & MARINE

6LANDSCAPE SCHEMATIC ROOF GARDEN PLAN Scale 1:50

Urban Agriculture• seating areas• community agriculture plots• storage areas• rain barrels

Urban Agriculture• seating areas• community agriculture plots• storage areas• rain barrels

Roof Terrace• seating areas• focal point• roof garden

Roof Garden Precedent Image

Roof Garden Precedent Image

Roof Garden Precedent Image

Page 4: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

JAMES KM CHENG ARCHITECTSJuly 30, 2010

CAMBIE & MARINE

3LANDSCAPE SCHEMATIC - SECTIONS

Vehi

cle

Acc

ess

Lane

/ Mew

s

W 6

4th

Ave

Nor

th C

ourt

Sou

th C

ourt

Pha

se1

Ent

ry C

ourt

Pha

se2

Ent

ry C

ourt

Sou

th C

ourt

Ret

ails

Sou

th C

orne

r Pla

za /

SW

Mar

ine

Pla

ntin

g as

buf

fer

Pha

se 2

Ent

ry C

ourt

Pub

lic A

rt w

alkw

ayP

ublic

Art

wal

kway

Sky

train

Live

/ wor

kP

rivat

e P

atio

Sto

rmw

ater

Feat

ure

Sky

train

A B

C1

SE

CTI

ON

C1

SE

CTI

ON

AS

EC

TIO

N B

SE

CTI

ON

C2

Sou

th C

ourt

Ram

p to

Ent

ry C

ourt

LANDSCAPE DRAWINGS

LANDSCAPE SCHEMATIC SECTIONS

55

Page 5: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

CAMBIE & MARINE REZONING SUBMISSIONJuly 30, 2010

CAMBIE & MARINE

5

CA

MB

IE S

TRE

ET

SK

YTR

AIN

- C

AN

AD

A LI

NE

SW MARINE DRIVE

LANDSCAPE SCHEMATIC - PRECEDENT IMAGES

W 64TH AVE.

W 64th Ave Street Scape

Vehicle Access Lane / Mews

Live / Work Private Patio

Phase 1 Drop-Off / Entry Court

SW Marine Drive Streetscape

Phase 2 Drop-Off/ Entry Court

Phase 2Phase 1

LANDSCAPE SCHEMATIC PRECEDENT IMAGES

Page 6: New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -

JAMES KM CHENG ARCHITECTS

July 30, 2010

CAMBIE & MARINE

4

CA

MB

IE S

TRE

ET

SK

YTR

AIN

- C

AN

AD

A LI

NE

SW MARINE DRIVE

LANDSCAPE SCHEMATIC - PRECEDENT IMAGES

W 64TH AVE.

North Corner Plaza / Public Art Walkway

North Court

South Court

Phase 1 Entry Court

Public Art Walkway South Corner Plaza

Phase 2 Entry Court

Phase 2Phase 1

LANDSCAPE DRAWINGS

LANDSCAPE SCHEMATIC PRECEDENT IMAGES

57