Page 1: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

CAMDEN AIRPORTMASTER PLAN 2020 | PRELIMINARY DRAFTQUICK REFERENCE GUIDE

Page 2: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

Camden Airport | Master Plan 20202

OVERVIEW

Bankstown Airport have common operational ownership, together trading as Sydney Metro Airports.

Camden Airport will continue to support both current and future airport users, including flying schools, emergency service operators, flying clubs, air charter operators, community and youth aviation groups, as well as sporting and recreational aviation operators.

This quick reference guide presents key features of the Preliminary Draft Master Plan 2020 for Camden Airport.

The Airports Act 1996 requires that a Master Plan be prepared every eight years for Commonwealth leased airports such as Camden Airport.

Master Plan 2020 outlines the Airport’s development over the next eight years and provides a strategic vision for the next 20 years. It also includes the Airport Environment Strategy and Ground Transport Plan which present targets and actions for the next eight years.

Master Plan 2020, when approved by the Minister for Transport, Infrastructure and Regional Development, will replace the existing 2015 Master Plan.

This quick reference guide presents a summary of three key areas addressed in Master Plan 2020 which are important to the community and the aviation industry:

• Aircraft activity forecasts

• Economics and employment growth

• Management of aircraft noise.

Master Plan 2020 can be viewed and downloaded online.Visit www.sydneymetroairports.com.au

CAMDEN AIRPORT WILL CONTINUE TO BE THE GENERAL AVIATION, EMERGENCY SERVICES, SPORT AND RECREATIONAL AIRPORT SERVICING THE SOUTH WEST GROWTH CENTRE OF SYDNEY, AND A BESPOKE COMMERCIAL AND EMPLOYMENT HUB FOR THE CAMDEN REGION.

Camden Airport is a general aviation, emergency services, sport and recreational aviation airport located approximately 50 kilometres south-west of the Sydney CBD.

Camden Airport is operated by Camden Airport Limited under a Head Lease from the Commonwealth Government, the owner of the Airport. Both Camden and

PRELIMINARY DRAFT MASTER PLAN 2020

PUBLIC CONSULTATION

EARLY ENGAGEMENT WITH STATE AND LOCAL GOVERNMENT

DRAFT MASTER PLAN

MINISTER’S DECISION

FINAL MASTER PLAN

PUBLIC CONSULTATION

Page 3: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

3Quick Reference Guide

STRATEGIC OBJECTIVES

Strategic Objectives for Master Plan 2020 are:

• To provide a regional general and recreational aviation hub for the South West Growth Centre of Sydney

• To provide an efficient Airport supporting all forms of general and recreational aviation including flight training, emergency services and aircraft maintenance

• To develop the land assets of the Airport to provide high quality employment and commercial development opportunities.

We will achieve these Strategic Objectives through:

AVIATION: Supporting all forms of general, sport and recreational aviation

ECONOMY: Creating more jobs and contributing to the Camden region

ENVIRONMENT: Continuing to build a culture of responsibility in every aspect of our business

COMMUNITY: Be a good neighbour

MASTER PLAN 2020 FOR CAMDEN AIRPORT IS THE PRINCIPAL PLANNING DOCUMENT FOR THE AIRPORT. IT DESCRIBES FUTURE AVIATION OPERATIONS, LAND USE, FACILITIES AND INFRASTRUCTURE, AND THE MANAGEMENT OF ENVIRONMENTAL AND NOISE IMPACTS.

The Master Plan:

• Provides stakeholders with a clear statement of Camden Airport’s vision and objectives for the Airport

• Presents a land use plan which balances long-term aviation requirements with new non-aviation developments

• Provides sufficient flexibility for Camden Airport to adjust its plans to accommodate a changing commercial and operating environment

• Reflects local Camden Council and NSW planning frameworks.

Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies and procedures. It has also directed its energies to empower the new management team to deliver its statutory, community and development roles for the long-term future of Camden Airport.

ABOUT MASTER PLAN 2020

Page 4: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

Camden Airport | Master Plan 20204

!P

!H

Ellis L

ane

Whiteman Lane

Edward StreetMo

oresfi

eld La

ne

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth Street

Rossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

06/24

10/28

LEGEND

Site Boundary!P Control Tower!H Helipad

Internal Road NetworkBuildingExisting SealedRunwayExisting Grass RunwayExisting Gliding StripsExisting Sealed ApronExisting Grass ApronExisting TaxiwaysExisting Run Up Bays

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH03_Aerial_CamdenAirportToday_A4L_RHS_03_200108.mxd Date Saved: 22/04/20200 125 250 m

!P

!H

Ellis L

ane

Whiteman Lane

Edward Street

Moore

sfield

Lane

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth StreetRossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

06/24

10/28

LEGEND

Site Boundary!P Control Tower!H Helipad

Internal Road NetworkBuildingExisting SealedRunwayExisting Grass RunwayExisting Gliding StripsExisting Sealed ApronExisting Grass ApronExisting TaxiwaysExisting Run Up Bays

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH03_Aerial_CamdenAirportToday_A4L_RHS_03_200108.mxd Date Saved: 22/04/20200 125 250 m

!P

!H

Ellis L

ane

Whiteman Lane

Edward Street

Moore

sfield

Lane

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth Street

Rossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

06/24

10/28

LEGEND

Site Boundary!P Control Tower!H Helipad

Internal Road NetworkBuildingExisting SealedRunwayExisting Grass RunwayExisting Gliding StripsExisting Sealed ApronExisting Grass ApronExisting TaxiwaysExisting Run Up Bays

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH03_Aerial_CamdenAirportToday_A4L_RHS_03_200108.mxd Date Saved: 22/04/20200 125 250 m

CAMDEN AIRPORT TODAY

Page 5: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

5Quick Reference Guide

AVIATION FORECASTS AND INFRASTRUCTURE

CAMDEN AIRPORT IS CURRENTLY ONE OF THE BUSIEST GENERAL AVIATION AIRPORTS IN AUSTRALIA. LIMITED GROWTH IS FORECAST IN THE PLANNING PERIOD FOR THIS MASTER PLAN

Camden Airport is one of the busiest general aviation airports in Australia with over 104,000 aircraft movements in the 2018/19 financial year. Aviation activity at the Airport primarily consists of single-engine and twin-engine piston aircraft, with helicopters accounting for around 7% of movements. In addition, there were more than 7,400 glider movements in 2018.

General aviation will continue to be the predominant form of aviation activity at Camden Airport in the next eight years. Limited growth (of approximately 1.0% per annum) is forecast in the next eight years.

Camden Airport consists of four runways, two fixed wing and two glider strips, along with a Helicopter Landing Site. The Airport has one asphalt sealed runway with a length of 1,464 metres and a maximum aircraft take-off weight limiting the type of aircraft that can use Camden Airport.

There are no planned runway extensions or improvements in the planning period of this Master Plan. Any expansion of aviation facilities at Camden Airport can be accommodated on the vacant land to the north-east of the existing hangar facilities.

The development program for Camden Airport over the next eight years will focus on supporting and growing aviation operations (including new hangars) and low traffic generating warehouse and commercial development. Such development will be primarily on the vacant land within the Airport Business Zone.

Potential Development Area (Airport Business Zone) - Development Concept

Over104,000Movements in FY2019

Aviation OperationsGeneral AviationFixed Wing HelicoptersGlidingBallooning

3x Grass1x Sealed

Main RunwayRWY 06/24 Sealed Runway Lights

!PNepean River

LEGEND

!P Control Tower

Site Boundary

Development AreaBoundary

Existing Road AccessPotential Road Access

Existing TaxiwayPotential TaxiwayPotential ApronPotential Hangar (WithAssociated Offices)Stage 2 Potential forAviation or Warehouse/Comercial Development

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH09_PrecinctConceptPlan_A4L_RHS_01_200514.mxd Date Saved: 14/05/20200 50 100 m

Runway 06/24

Taxiway E

Taxi

way

D

Page 6: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

Camden Airport | Master Plan 20206

AIRCRAFT NOISE

THE AIRPORT WORKS ACTIVELY WITH AIRPORT USERS, GOVERNMENT AGENCIES AND COMMUNITY REPRESENTATIVES ON A RANGE OF INITIATIVES TO MANAGE NOISE IMPACTS FROM AIRCRAFT OPERATIONS.

MASTER PLAN 2020 SHOWS A REDUCTION IN THE NUMBER OF RESIDENTIAL PROPERTIES LIKELY TO BE AFFECTED BY AIRCRAFT NOISE OVER THE 20-YEAR PLANNING PERIOD. THIS IS DUE TO QUIETER AIRCRAFT LIKELY TO BE USING THE AIRPORT IN THE FUTURE.

The Airports Act requires the Master Plan to forecast noise levels resulting from the operation of the Airport. Master Plan 2020 contains information about:

• Aircraft and helicopter flight paths to and from the Airport

• The 2018 Australian Noise Exposure Index (ANEI) for Camden Airport

• Estimated noise exposure based on a forecast of aircraft movements and fleet mix to provide the 2040 Australian Noise Exposure Forecast (ANEF) for Camden Airport.

Master Plan 2020 also contains a comparison between the 2034/35 ANEF (contained in the 2015 Master Plan) and the 2040 ANEF.

Camden Airport has prepared forecasts which indicate minor changes in the level of noise generated by aircraft activity compared with the 2015 Master Plan. With limited growth and changes to aircraft mix, resulting in quieter aircraft from Camden Airport, less residential properties are likely to be affected by aircraft noise over the 20-year planning period.

The Airport has established a voluntary Fly Neighbourly Procedures program to assist with reducing the impacts of aircraft noise on the surrounding community.

!P

!H

CAMDEN

ELDERSLIE

KIRKHAM

BROWNLOW HILLELLIS LANE

GRASMERE

GRASMERE

COBBITTY

COBBITTY

NarellanCreek

Narellan Creek

Nepean River

Sickles Creek

Nepean River

Nepean River

Sickle

sDrive

Hollyhock Aven

ue

Kirkham Lane

Ritchie Street

Ellis Lane

Exeter Street

Lilac Stree

t

Whiteman Lane

Tarco

olaPlace

Moore

sfield

Lane

Macquarie Grove Road

JamaicaPark Road

Caernarvon Close

GrasmereCircuit

Werombi Road

Camelot Close

Mckellar Street

The Meadows

Cran

a Roa

d

Sunnyside Drive

Baldwin Close

PepperfieldsPlace Centennial Lane

Willoug

hby

Circu

it

Aerodrome RoadMilford Road

25

30

25

20

3535

35

35

35

30

20

3530

20

3535

25

LEGEND

Site Boundary!P Control Tower!H Helipad

2040 ANEF2034/2035 ANEF

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH05_ANEFComparison_2040_2035_A4L_RHS_01_191129.mxd Date Saved: 14/01/20200 200 400 m

!P

!H

CAMDEN

ELDERSLIE

KIRKHAM

BROWNLOW HILLELLIS LANE

GRASMERE

GRASMERE

COBBITTY

COBBITTY

NarellanCreek

Narellan Creek

Nepean River

Sickles Creek

Nepean River

Nepean River

Sickle

sDrive

Hollyhock Aven

ue

Kirkham Lane

Ritchie Street

Ellis Lane

Exeter Street

Lilac Stree

t

Whiteman Lane

Tarco

olaPlace

Moore

sfield

Lane

Macquarie Grove Road

JamaicaPark Road

Caernarvon Close

GrasmereCircuit

Werombi Road

Camelot Close

Mckellar Street

The Meadows

Cran

a Roa

d

Sunnyside Drive

Baldwin Close

PepperfieldsPlace Centennial Lane

Willoug

hby

Circu

it

Aerodrome RoadMilford Road

25

30

25

20

3535

35

35

35

30

20

3530

20

3535

25

LEGEND

Site Boundary!P Control Tower!H Helipad

2040 ANEF2034/2035 ANEF

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH05_ANEFComparison_2040_2035_A4L_RHS_01_191129.mxd Date Saved: 14/01/20200 200 400 m

Comparison between 2040 ANEF and 2034/35 ANEF

Page 7: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

7Quick Reference Guide

ENVIRONMENTAL MANAGEMENTElli

s Lan

e

Whiteman Lane

Edward Street

Moore

sfield

Lane

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth Street

Rossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

LEGEND

Site Boundary

Buildings

Area of moderateheritage value(Administration andOperations Area)Ecologically SensitiveRiparian Area

Historic RoadAlignments

Aerodrome RoadParade Ground

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH12_Heritage_A4L_RHS_03_200331.mxd Date Saved: 31/03/20200 125 250 m

AIR QUALITY

MANAGEMENT OF ENVIRONMENTAL ASPECTS

BIODIVERSITY

GROUND BASED NOISE

HERITAGE

HAZARDOUS SUBSTANCE

SOIL AND WATER

CAMDEN AIRPORT IS COMMITTED TO CONTINUALLY IMPROVING ENVIRONMENTAL MANAGEMENT BY FOSTERING A CULTURE OF SHARED RESPONSIBILITY IN ALL AREAS OF AIRPORT OPERATIONS.

Most of Camden Airport has been significantly modified since it was first acquired as an airfield in 1939. However, it contains areas of environmental and historic value which needs to be carefully managed.

The Airport is responsible for ensuring that environmental impacts are minimised wherever possible. Master Plan 2020 focuses on managing the following aspects of the environment:

Ellis L

ane

Whiteman Lane

Edward Street

Moore

sfield

Lane

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth Street

Rossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

LEGEND

Site Boundary

Buildings

Area of moderateheritage value(Administration andOperations Area)Ecologically SensitiveRiparian Area

Historic RoadAlignments

Aerodrome RoadParade Ground

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH12_Heritage_A4L_RHS_03_200331.mxd Date Saved: 31/03/20200 125 250 m

Ellis L

ane

Whiteman Lane

Edward Street

Moore

sfield

Lane

Exeter StreetGras

mere

Circu

it

Macquar

ie Grove Ro

ad

Elizabeth Street

Rossmoyne Lane Caernarvon Close

Baldwin Close

Aerodrome Road

Matahil CreekNepean River

LEGEND

Site Boundary

Buildings

Area of moderateheritage value(Administration andOperations Area)Ecologically SensitiveRiparian Area

Historic RoadAlignments

Aerodrome RoadParade Ground

\\ausyd1fp001\Projects\606X\60609242\900_CAD_GIS\920_GIS\02_Maps\_MASTERPLAN\CH12_Heritage_A4L_RHS_03_200331.mxd Date Saved: 31/03/20200 125 250 m

Areas of Heritage and Environmental Significance

The Airport also continues to consider ways to improve sustainability through minimising its use of energy and reducing greenhouse gas emissions.

Page 8: New CAMDEN AIRPORT · 2020. 8. 4. · Over the past five years since preparing the 2015 Master Plan, Camden Airport has focused on reviewing and implementing new management policies

COMMUNITY FEEDBACK IS AN IMPORTANT PART OF THE MASTER PLAN PREPARATION PROCESS.Master Plan 2020 is available to view online at www.sydneymetroairports.com.au as well as numerous locations around Camden:

• Downloaded from www.sydneymetroairports.com.au

• Viewed as a hard copy at the following location during business hours:

• Camden Airport Management Office, Aerodrome Road, Camden Airport

• Purchased as a hard copy from the Sydney Metro Airports Management Centre, 3 Avro Street, Bankstown ($80 per copy, inc. GST)

For any further information, please visit www.sydneymetroairports.com.au or call 1800 517 205 (during business hours).

SUBMISSIONS:Public submissions close on Tuesday 18 August 2020.

Email submissions to:

[email protected]

Or post submissions to:

Camden Airport, PO Box 6450, Wetherill Park NSW 1851

All submissions will be considered in the Draft Master Plan submitted to the Minister for Infrastructure, Transport, Regional Development and Communications for consideration.