New Dundee Water Supply – Iron and Manganese Treatment Upgrades Schedule “C” Class Environmental Assessment Virtual Public Consultation Centre #1 File Uploaded on Thursday June 18, 2020 to the Region of Waterloo’s website and YouTube Page

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

New Dundee Water Supply – Iron and Manganese Treatment

UpgradesSchedule “C” Class Environmental Assessment

Virtual Public Consultation Centre #1

File Uploaded on Thursday June 18, 2020 to the Region of Waterloo’s website and YouTube Page

Page 2: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

2

Welcome!The Goals of this Virtual Public Consultation Centre:

Introduce the project and the reasons why it is being done

Provide background information on the New Dundee Water Supply System

Comments received during this study will be used to identify a recommended approach for the New Dundee Water Supply iron and manganese treatment

Provide an overview of the process that will be followed for the project

Answer any questions you may have and provide an opportunity to get involved in the project

Page 3: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

3

The New Dundee drinking water supply system

ALDERVIEW DRIVE

Community of New Dundee

New Dundee Water supply facility

The New Dundee water supply system supplies drinking water to the community of New Dundee and is one of the Region of Waterloo’s Rural Water Supply systems. The facility is operated by the Region, but the watermains are operated by the Township of Wilmot

Page 4: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

4

New Dundee water supply facility

The New Dundee Water Supply facility is located at 156 Alderview Drive in the Township of Wilmot, in the Community of New Dundee.

The facility consists of two well-heads, one wellhouse, two reservoirs, an electrical room, and a portable generator.

Page 5: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

5

New Dundee water supply system iron and manganese treatment upgrades project overview

What are we doing?

What does it mean to you?

Why are we doing it?

Planning upgrades to the New Dundee Water Supply System to provide treatment for iron and manganese. This study will look at the best way to complete these upgrades.

Lower aesthetic drinking water objectives for manganese are expected in the near future. The New Dundee Water Supply System has been identified as requiring upgrades to meet these future aesthetic objectives. We are taking steps now to ensure we are ready to meet these objectives.

These upgrades will require a new building for the treatment equipment. It is expected additional property at the Region’s existing water supply site or a new site will be required. There is no change in the amount of water being taken from the New Dundee Water Supply wells.

Aesthetic objectives are targets we meet when treating water for taste,

odour, and colour.

Page 6: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

6

Iron and manganese in drinking water

Iron and Manganese are naturally occurring metals commonly found in soil. They are often present in drinking water where groundwater is the source.

Iron and Manganese may have aesthetic impacts such as staining of laundry and fixtures, undesirable taste, and discolouration.

Iron

Manganese

Page 7: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

7

Changes in drinking water standards

The Province is considering a reduction to the manganese aesthetic objective in drinking water from 0.05 milligrams per litre (mg/L) to 0.02 mg/L based on guidance from Health Canada.

The Province of Ontario regulates standards for drinking water to protect health and provides aesthetic objectives to produce drinking water that is pleasant to consumers.

The New Dundee Water Supply System has been identified by the Region of Waterloo as requiring upgrades to meet future aesthetic objectives.

Aesthetic Objectives

address non-health related items

Expected change in aesthetic objective

Manganese

Page 8: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

8

Overview of the Municipal Class Environmental Assessment planning process

We Are Here

This study is being completed as a Schedule C Class Environmental Assessment. A Class Environmental Assessment is a decision making process that all municipalities in Ontario follow for building new infrastructure. The process will allow you to follow what is planned and provide opportunities for you to ask questions and provide input.

VirtualPublic

Consultation Centre #1

Public Consultation

Centre #2

Public Consultation

Centre #3

Phase 1Identify Problem

and/or Opportunity

Phase 2Develop and

Evaluate Solutions and

IdentifyPreferredSolution

Phase 3Develop and

Evaluate Design Concepts for

Preferred Solution and

Identify Preferred Design

Phase 4Environmental Study Report

(ESR)30 Day Public

Review

Phase 5Implementation

(Design and Construction)

Page 9: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

9

Project study area

Page 10: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

10

Additional background studiesAs part of the Class EA process natural, archaeological, and cultural heritage sensitivities in the Study Area need to be considered when identifying a recommended approach for the iron and manganese treatment. The Barn Swallow pictured below is an example of a natural sensitivity because of its classification as a threatened species. These studies will be undertaken as part of this Class EA.

A photo of a Barn Swallow, a type of threatened bird species found in Ontario.

Page 11: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

11

Next steps

Region of Waterloo Council

Region of Waterloo Council will provide approval to file the Environmental Study Report for a 30-day review period for public comment.

WE ARE HERE

Collect data, review existing conditions and identify project constraints and opportunities

Develop and evaluate alternatives to meet the New Dundee Water Supply System‘s needs including treatment approach and key site requirements

Develop and evaluate the design of the preferred alternative including the facility location and site considerations

Identify the preferred alternative based on the evaluation process (the preferred alternative is the option that is considered the best overall solution)

Prepare the Environmental Study Report to document project information and the decision-making process

Obtain input on the facility location and size

Obtain input on the preferred treatment approach

Introduce the project

Review Background Information

Public Consultation Centre #3

Develop and Evaluate Alternatives

Identify Preferred Alternative

Develop and Evaluate Alternative Design Concepts

Reporting

Public Consultation Centre #2

Public Consultation Centre #1

An opportunity for the public to provide input

Page 12: New Dundee Water Supply – Iron and Manganese Treatment ......Report for a 30-day review period for public comment. WE ARE HERE. Collect data, review existing conditions and identify

12

Thank you for your participation!

Get engaged!We are still at the beginning of the New Dundee Water Supply System Iron and

Manganese Treatment Upgrades Environmental Assessment. Do you have questions, comments, or want to stay up to date?

Please contact:

Kaoru Yajima, P.Eng.Sr. Engineer, Water ServicesRegion of Waterloo150 Frederick Street, 7th FloorKitchener, Ontario N2G 4J3Tel: 519-575-4757 ext. 3349Email: [email protected]

Kirk Worounig, P.Eng, PMP.Project ManagerR.V. Anderson Associates Limited2001 Sheppard Avenue East, Suite 300Toronto, Ontario M2J 4Z8Tel: 416-497-8600 ext. 1246Email: [email protected]

More information, including copies of project notices and Public Consultation Centre materials like a transcript of this virtual presentation can be found at: