Corporate Communication Copyright © Transparent Technologies Pvt. Ltd. All rights reserved New Generation Super Efficient, Energy Conserving & Eco-sustainable Solutions for WHR in Cement Plants 1 www.tespl.com 13/6/2016 Corporate Communication Copyright © Transparent Technologies Pvt. Ltd. All rights reserved Group companies Company Name Business Transparent Energy Systems Pvt. Ltd. www.tespl.com Waste Heat Recovery Systems Transparent Technologies Pvt. Ltd. www.ttpl.co.in Industrial Dryers, Flue Gas Desulphurization Systems etc Transparent Pollution Control Pvt. Ltd. www.transpol.co.in Air Pollution Control Decimin Control Systems Pvt Ltd www.decimin.com Noise Abatement 13/6/2016 Corporate Communication Copyright © Transparent Technologies Pvt. Ltd. All rights reserved Innovative Solutions for Cement Industries. Waste Heat Recovery Systems FGD Plants for SOx removal and Gypsum making Wet Fly Ash Drying Plants Waste Water Recycling Plants Bag Filter Coal Dryer New Generation Captive Power Plants 13/6/2016 Corporate Communication Copyright © Transparent Technologies Pvt. Ltd. All rights reserved Pioneers in WHRS in cement plants. 11 WHRS Projects completed within 10 years – 2006-2016. More than 30 WHR Boilers installed in 11 projects Total installed capacity – 80 MW In-house R&D center with IP base of more than 40 patents Manufacturing facility with IBR, ASME and EN certifications 13/6/2016

Upload: others

Post on 24-Oct-2020

10 views

Category:

Documents


1 download

TRANSCRIPT

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    New Generation

    Super Efficient, Energy Conserving &

    Eco-sustainable Solutions for WHR in

    Cement Plants

    1

    www.tespl.com

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Group companies

    Company Name Business

    Transparent Energy Systems Pvt. Ltd.

    www.tespl.com

    Waste Heat Recovery

    Systems

    Transparent Technologies Pvt. Ltd.

    www.ttpl.co.in

    Industrial Dryers, Flue

    Gas Desulphurization

    Systems etc

    Transparent Pollution Control Pvt. Ltd.

    www.transpol.co.inAir Pollution Control

    Decimin Control Systems Pvt Ltd

    www.decimin.comNoise Abatement

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Innovative Solutions for Cement

    Industries.

    • Waste Heat Recovery Systems

    • FGD Plants for SOx removal and Gypsum making

    • Wet Fly Ash Drying Plants

    • Waste Water Recycling Plants

    • Bag Filter

    • Coal Dryer

    • New Generation Captive Power Plants

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    • Pioneers in WHRS in cement plants.

    • 11 WHRS Projects completed within 10 years – 2006-2016.

    • More than 30 WHR Boilers installed in 11 projects

    • Total installed capacity – 80 MW

    • In-house R&D center with IP base of more than 40 patents

    • Manufacturing facility with IBR, ASME and EN certifications

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Award from DSIR

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Award from SIEMENS

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    WHR Schemes Implemented

    • Steam Rankine Cycle Power Plant

    • Organic Rankine Cycle Power Plant (ORC)

    • Steam Rankine Cycle with Co-firing

    • Heat Injection into Captive Power Plant

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Ultratech Cement Ltd., Tadipatri,

    �Organic Rankine Cycle Power Plant

    �Clinker Production – 2.5 Million TPA

    �Source – Clinker Cooler

    �Gross Power Generation – 4 MW

    �Air cooled condensing

    �Commissioned – March 2007

    Note – WHR system supplied by TESPL to client & Organic Power Generator

    sourced by client directly from ORC supplier

    TESPL’s Experiences (cement WHR)

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    The KCP Ltd., Macherla, AP

    �Steam Rankine Cycle Power Plant

    �Clinker Production – 0.5 Million TPA

    �Source – Preheater and

    Clinker

    Cooler

    �Gross Power Generation – 2.3 MW

    �Water cooled condensing

    �Commissioned – April 2007

    TESPL’s Experiences (cement WHR)

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Shree Cement Ltd., Beawar, Rajastan

    Project - I

    � Steam Rankine Cycle Power Plant

    � Clinker Production – 1 Million TPA

    � Source – Preheater

    � Gross power generation – 5 MW

    � Water cooled condensing

    � Commissioned – March 2008

    TESPL’s Experiences (cement WHR)

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Shree Cement Ltd., Beawar, Rajastan

    Project – II

    �Steam Rankine Cycle Power Plant

    � Clinker Production – Kiln – 1 : 1 Million TPA

    Kiln – 2 : 1.5 Million TPA

    � Source – Preheaters & Clinker Coolers

    � Gross power

    generation – 13.2 MW on waste heat from

    cement plant

    & 3.0 MW on heat from other

    sources

    Total 16.2 MW

    � Air cooled condensing

    � Status : Commissioned June 2010

    TESPL’s Experiences (cement WHR)

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Ultratech Cement Ltd. Awarpur, MH

    �Steam Rankine Cycle Power Plant

    � Clinker Production – Kiln 1 – 1.30 Million TPA

    Kiln 2 – 1.53 Million TPA

    � Source – Preheaters and Clinker Coolers

    � Gross power generation – 13.22 MW

    � Air cooled condensing

    � Status : commissioned on April 2014

    TESPL’s Experiences (cement WHR)

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    HOLCIM Rozonik – Slovakia

    �Organic Rankine Cycle Power Plant

    �Clinker Production – 1 Million TPA

    �Source – Preheater and Clinker Cooler

    �Gross Power Generation – 5 MW

    �Water cooled condensing

    �Status : commissioned on Sept 2013

    TESPL’s Experiences (cement WHR)

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Aditya Cement (Line III) – 6.5 MW

    TESPL’s Experiences (cement WHR)

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of Waste Heat

    Recovery Projects

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Need for Review –

    1. Unsustainable Prices

    2. Cost overruns and delays in execution

    3. Performance Variations

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • Most of the BUYERS in past had procured

    Captive Power Plant under EPC contracts.

    • There was natural preference to order the

    WHR Power plant on the same EPC basis.

    • However the WHR power plants were much

    more complex as compared to a CPP.

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • Each WHR Power plant is tailor made and

    has complexities –

    � Integration with process

    � Execution is a running plant

    � Layouts undergo change during execution

    � Uncertainties on various cost heads

    � Unanticipated delays in execution

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • Most of the over-eager bidders either

    overlooked these complexities or were

    too inexperienced to anticipate the

    complexities.

    • Such bidders offered the prices that did

    not provide for any of these

    complexities and uncertainties.

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • The BUYER had a compulsive

    preference for L1 bidder, with a belief

    that –

    “Once locked in legally enforceable fixed

    price contract, the vendor has no

    escape but to complete the project

    whether affordable or not.”

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • The BUYER’s compulsive preference for

    L1 bidder, forced even experienced

    bidders to make unsustainable

    compromise on price to at least stay in

    business.

    • The BUYER could thus draw a

    satisfaction of having made a

    competitive procurement contract.

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • The experienced players having long term

    interest patiently tolerated cost over runs,

    but completed the projects.

    • The inexperienced players with no long term

    vision abandoned the projects half way,

    forcing BUYERS to complete the project by

    themselves with heavy cost over run and

    inordinate delays.

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    • The loss of projected savings due to

    delayed projects proved to be much

    higher than the satisfaction of

    competitive procurement.

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    Performance Variations –

    1. Variance in actual exhaust gas parameters

    2. Absence of online measurement performance

    monitoring instrumentation.

    3. Absence of a Standardized Performance Test

    Procedure

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Critical Review of WHR Power Projects

    Fundamental decisions for next WHR

    Power Projects for each BUYER –

    • Is EPC Model of Procurement really most

    beneficial?

    • Does the policy of compulsive preference for

    L1 Bidder needs a review?

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    New Generation WHR Plants

    • Improve the accuracy of cost estimation before entering into firm price contract

    • Thorough planning for imely project completion.

    • Provide facility for online measurement of all vital parameters.

    •Evolve a Performance Test Procedure based on a universally accepted standard.

    26

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    New Generation WHR Projects in Cement Plants

    27

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Prominent Features of New Generation WHR Projects in Cement Plants

    28

    13/6/2016

    •Three Phase Execution Methodology

    •Online Real time measurement & logging of Vital process parameters

    •Innovative Mid Tap Control System.

    •Steam Dryness improvement at Super-heater Inlet

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    EPC Business Methodology for Successful Projects

    Project is divided in Critical Phases of the project with milestones for both EPC / Managed EPC Contract

    ▪Phase -1 : System Optimization, Detailed Engineering, Accurate Project Cost Estimation,

    ▪Phase -2 : Actual Procurement

    ▪Phase -3 : Site Activities, Erection & Commissioning, Performance Trials

    29

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Phase -1 Activities

    •Work jointly with End User

    •Conceptual Engineering & System Optimization

    •Facility planning

    •Performance test procedure

    •Real time on line recording of all vital input-output

    parameters at different locations in the system

    3013/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Phase -1 Activities

    •G.A. Drawings / Layouts, P+I diagrams.

    •Engineering Specifications / BOM / BOQ.

    •Detailed engineering.

    •BOM / BOQ / Material costs / Fabrication costs.

    •Packing & forwarding transport.

    •Unloading / shifting to foundation / site work / cabling /

    insulation, piping, structural etc.

    31

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Advantages of Phase-1

    •Finally reach a stage in Phase-I where in Accurate Cost Estimation is possible for procurement process to be initiated.

    •This eliminates surprises with reference to quantity & specifications of materials, their costs, project schedules etc.

    •Performance Test Procedures are also prescribed. – No Disputes related to Input & Output parameters.

    32

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Phase – 2 Procurement Activities

    1. Waste Heat Recovery Boiler

    2. Steam Turbine Generator Module

    3. Air Cooled Condenser

    4. Balance of Plant

    5. Site Work (including Civil Work)

    33

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Phase – 3 Activities

    •Site Work Management

    • Commissioning

    • Performance trials

    •Trouble shooting & Warrantee Services

    • Post warrantee services

    34

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Performance –Assurance and Monitoring

    •Online Real-time Flue Gas Flow Measurement

    •Online Real Time Dust Measurement System

    •Dual Mid Tap Control System

    •Steam Dryness improvement at Super-heater Inlet

    35

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Measurement of Vital Parameters

    •Online Real-time Flue Gas Flow Measurement

    ▪One of the most important parameter in Validation of WHR Project Performance.

    ▪Indirect method for Flue Gas Flow measurement is recommended by ASME-PTC-4.4 and it is universally accepted

    ▪The new generation WHR from TESPL will include a separate elaborate system to measure the online and real-time flue gas flow rates by indirect method.

    36

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Measurement of Vital Parameters

    • Online Real Time Dust Measurement System

    ▪One of the most important parameter in Validation of WHR ProjectPerformance.

    ▪The Dust Content in Flue gas may affect WHR System Performance.

    ▪New generation WHR Project from TESPL will include online dust measurement system.

    ▪TESPL has applied for the Patent for online dust measurement system.

    37

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Innovative Mid Tap Control System

    •Dual Mid Tap Control System▪Without Booster Fan▪With Booster Fan

    •Using this control system consistency in Flue gas temperature at Boiler inlet can be achieved.

    •TESPL has applied for the Patent for innovative Mid Tap Control System

    38

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Steam Dryness improvement at Super-heater Inlet

    •Super efficient, Cyclonic type Drum Internals are provided to minimize droplets carried over in the saturated steam.

    •Additional external cyclonic separator is provided at super-heater inlet to remove carried moisture / condensate at the super heater inlet.

    •This reduces moisture load on super-heater, reduces scale formation in super-heater and also maintains the designed gas temperature profile in the WHRS.

    39

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    New Generation WHR Projects

    •Cost effective project implementation.

    •Timely bound completion of project

    • No variance in performance

    • Online performance monitoring

    NEXT

    40

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Flue Gas Desulfurization (FGD)

    Plant for Captive Power Plants

    CII - WEbinar

    byMr. Ajit Apte

    Next

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Flue Gas Desulfurization (FGD)

    •Removal of Sulfur Emissions

    from Exhaust Gases

    •Source of Sulfur Emissions –

    Sulfur in fuel burns with coal

    to form sulfur dioxide (SO2)

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Need of FGD Plants

    • Use of Low Cost Fuels – Pet Coke, Imported Coal,

    Lignite

    • These fuels have high sulfur content (3 to 8%)

    • High sulfur pyrites in limestone

    • SO2 emissions from combustion of these fuel and

    pyrites in the kiln

    • Recent SO2 norms published by MOEF -

    • FGD process – absorption of SO2 and generation of

    bi products

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    What is FGD?

    • Exhaust gas is scrubbed with wet reagent

    • SO2 reacts with the reagent to form by-

    product

    • By-product is separated and un-reacted

    reagent is recycled.

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    FGD Processes

    13/6/2016

    Processes Reagent used By-Product Formed

    I. Wet FGD Processes

    Limestone Gypsum Process Limestone Gypsum

    Soda ash / Caustic Soda ProcessSoda Ash or Caustic

    SodaSodium Bisulfite

    Ammonia Process Ammonia Ammonium Sulfate

    Seawater Process Seawater None

    II. Semi-dry FGD Processes

    Flash Absorption Process (FAP) Lime or Hydrated LimeCalcium Sulfite and

    Sulfate

    Spray Dryer Absorber (SDA)

    ProcessLime or Hydrated Lime

    Calcium Sulfite and

    Sulfate

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Selection Criteria

    •Cost and availability of reagent

    •Revenue / Disposal of by-Product

    •SO2 content in exhaust gas

    •SO2 emissions regulations

    •Utility consumption – Power and Water

    •Type of user Industry

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Choice of FGD for Cement Plants

    Wet Limestone Gypsum Process

    • Limestone - Low cost & Easy Availability

    • By-product – Gypsum for Captive Use

    • Most effective for high sulfur fuels

    including pet coke

    • Output Emissions < 600 mg

    • No solid waste generation & disposal

    • Negligible Effluent Generation

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    WET LIMESTONE GYPSUM PROCESS

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Chemical Reactions

    13/6/2016

    Wet FGD - Limestone Gypsum Process

    1 CaCO3 (s) + SO2 (g) + ½ H2O (l) CaSO3. ½ H2O (s) + CO2 (g)

    Limeston

    e

    Sulphur

    Dioxide

    Water Calcium Sulphite

    Hemihydrate

    Carbon

    Dioxide

    2 CaSO3. ½ H2O (s) + 3/2 H2O (l) + ½ O2 (g) CaSO4.2H2O (s)

    Calcium Sulphite

    Hemihydrate+ Water + Oxygen Gypsum

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 13/6/2016

    Schematic Diagram

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    FGD PLANT - LIVE CASE STUDY

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Key parameters

    • Power Plant Capacity: 44 MW (22 MW x 2 nos)

    • Fuel: Petroleum Coke with 7-8 % Sulphur

    • Reagent Used: Low Purity Limestone (78%)

    • By-product: Gypsum (Purity – 73%, 15%

    Moisture)

    • Status: Commissioned in Feb 2012

    • Exhaust Gas Flow: 280000 m3 / hr

    • Temperature: 140 Deg C

    • Inlet SO2: 11420 mg / Nm3

    • SO2 removal Efficiency: 92 %

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Key parameters

    • Electricity Consumption: 950kW

    • Lime Stone (78% purity) Consumption: 4300 kg / hr

    • Water Consumption: 18 m3 / hr

    • Gypsum Generation (73% purity on dry basis):

    � On Wet Basis (12-15% moisture) : 7500 kg/hr

    � On Dry Basis (approx) : 6500 kg/hr

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Installation Photographs

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Installation Photographs

    13/6/2016Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Installation Photographs

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    FGD Economics for typical CPP

    13/6/2016

    Power Plant Capacity MW 27

    Total Fuel Consumption TPH 15

    Sulphur Content in Pet Coke (75 %) Wt% 7

    Sulphur Content in Lignite (25 %) Wt% 3.0

    SO2 in exhaust gas

    kg / hr 1800

    mg / Nm3 12077

    ppm 4227

    SO2 Removal Efficiency required to achieve

    < 600 mg/Nm3% 95

    Gypsum Generation on wet Basis (15 %

    moisture )kg / hr 6600

    Limestone Consumption ( 80 % Purity ) kg / hr 3674

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    FGD Economics for Typical CPP

    13/6/2016

    Power Plant Capacity MW 27

    Sulphur Content in Pet Coke (75 %) Wt% 7

    Sulphur Content in Lignite (25 %) Wt% 3.0

    Limestone Cost ( 300 Rs / ton ) Rs / hr 1102

    Power Consumption kWh 1150

    Power cost (3.0 Rs / kWh) Rs / hr 3450

    Water Consumption m3 / hr 13

    Water Cost (25 Rs/m3 ) Rs / hr 325

    FGD Plant Running Cost Rs / hr 4877

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    FGD Economics for Typical CPP

    13/6/2016

    Power Plant Capacity MW 27

    Sulphur Content in Pet Coke (75 %) Wt% 7

    Sulphur Content in Lignite (25 %) Wt% 3.0

    FGD Gypsum Cost Rs / Ton 740

    Equivalent Market Price for mineral

    Gypsum ( 73% Purity )Rs / Ton 4000

    Revenue Generation from FGD Gypsum

    (benefit of pet coke against coal is to be

    considered separately)

    Rs / Ton 3260

    Rs / Hr 21516

    Lacs / Annum

    (8000 hrs)1721.3

    Investment Rs in Lacs 2700

    Pay Back Period Years < 2

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    Project Execution Project Execution

    Methodologies for FGD plantsMethodologies for FGD plants

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 61

    FGD plant executionFGD plant execution

    � Engineering

    � Procurement

    � Construction

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    13/6/2016

    Schematic Diagram

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 63

    FGD Plant Site Activities

    � FGD Tower manufacturing & erection

    � Oxidation tank manufacturing & erection

    � All ducting fabrication & erection

    � All piping (Slurry circulation, Slurry transfer, filtrate

    return etc)

    � Anti corrosive lining on FGD tower & Oxidation tank

    � Erection assembly, & testing of all bought out

    components

    � Wiring, Cabling & instruments fitting

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    64

    Proposed execution optionsProposed execution options

    Option I- Engineering Services for FGD Plant (All

    procurement to be done by CLIENT)

    Option II- Engineering & Procurement Services

    for FGD Plant (Procurement by TTPL, Payment

    Directly by CLIENT to suppliers)

    Option III- EPC (Turn Key - Engineering,

    Procurement & Construction) excluding civil

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 65

    Option I- Engineering Services

    � Basic Engg, P & I Diagrams, G.A. Drawings/ Layouts

    � Specifications of equipments & Bought outs

    � Specifications for Electrical components & wiring, All

    input specifications & battery limits, Specifications of

    anticorrosive lining

    Phase II- Execution Services

    � Detail engineering, manufacturing drawings,

    assembly drawings, hook up drawings, electrical wiring

    drawings, load data for civil design

    Phase I- Design & Engg Services

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    66

    Option I- Engineering Services

    � Support to client for procurement planning

    � Participation in procurement process, summarization

    of vendor offers, Due diligence and selection of vendors,

    techno commercial discussion and negotiation

    � Project Supervision and inspection services

    � Overall project coordination

    � Stage wise inspection, Inspection after installation

    � Site work supervision, monitoring & controlling

    Phase II- Execution Services Continued..

    13/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 67

    Option I- Engineering Services

    � Pre Commissioning & commissioning of individual

    equipments

    � Commissioning of the plant

    � Provisional performance trials

    � Final Performance trials

    � Operation & Maintenance manual, training & handing

    over

    Phase III- Pre-Commissioning & Commissioning Services

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    68

    Option II- Engineering Services & Procurement

    �In addition to engineering services provided on option

    I, TTPL will also do actual ordering & co-ordination

    � Fund provision for the project, payment to suppliers,

    freight & insurance shall be arranged by client directly

    13/6/2016

  • Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved 69

    Option III- EPC (Excluding Civil)

    � Engineering, Procurement & construction shall be

    done by TTPL

    � Entire civil work will have to be carried out by Client.

    13/6/2016 Corporate CommunicationCopyright © Transparent Technologies Pvt. Ltd. All rights reserved

    70

    Initial Investment with all 3 options

    All Prices are Rs. in Lacs

    Sr.

    No.

    Description Option I

    (Engineering

    Services)

    Option II

    (Engineering &

    Procurement

    Services)

    Option III

    (EPC)

    Major

    Bough

    t Outs

    Indian

    Make

    Major

    Bough

    t Outs

    Chine

    se

    Make

    Major

    Bough

    t Outs

    Indian

    Make

    Major

    Bough

    t Outs

    Chine

    se

    Make

    Major

    Bough

    t Outs

    Indian

    Make

    Major

    Bough

    t Outs

    Chine

    se

    Make

    1 Estimated Cost of Raw Material & Bought out

    Components, Site

    Activities

    1320 1095 1320 1095 1320 1095

    2 Cost of Services for TTPL 716 716 765 765 1360 1283

    3 Total Project Cost 2036 1811 2085 1860 2680 2378

    4 Cost of Civil Budget Estimate

    70-90 70-90 70-9013/6/2016

    Corporate Communication

    Copyright © Transparent Technologies Pvt. Ltd. All rights reserved

    THANK YOU!visit us www.tespl.com