![Page 1: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/1.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
General Project Information
Participating Customer: Facility Type:
Contractor / Project #: DN1081 10,000
Facility Name: 125
Street Address: 12
City / Zip Code: 07640 Year Constructed: 1970
Will the project receive EECBG funding?: N Tax Exempt?: Y
ELECTRIC UTILITY INFORMATION
Electric Provider: Gas Provider:
Service Class: Service Class:
Account #: Account #:
06/23/10 12/08/10
07/23/10 01/05/10
Billing Period kWh Consumption: 7,480 Billing Period Therm Consumption: 351
$1,280.64 $483.38
Total Taxes + Fees on Bill: 62.86$ 57.29$
Project SummaryElectric - Average Cost ( $/kWh): $0.163 Gas - Average Cost ( $/Therm): $1.21
Lighting Measures Total: 47,790 7,780.36$ 13,281.04$ 10,624.83$ 2,656.21$ 0.34
Motors & VFD Measures Total: - -$ -$ -$ -$ -
HVAC Electric Measures Total: 5,173 842.13$ 13,517.31$ 10,813.85$ 2,703.46$ 3.21
Refrigeration Measures Total: - -$ -$ -$ -$ -
TOTAL ELECTRIC MEASURES: 52,962 8,622.49$ 26,798.35$ 21,438.68$ 5,359.67$ 0.62
Therms /yr.
TOTAL GAS MEASURES: 399 483.90$ 17,231.90$ 13,785.52$ 3,446.38$ 7.12
Gallons /yr.
TOTAL OIL MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL PROPANE MEASURES: - -$ -$ -$ -$ -
COMBINED TOTALS: 9,106.39$ 44,030.25$ 35,224.20$ 8,806.05$ 0.97
PROJECT TRC TEST: 3.33
Billing Period End Date: Billing Period End Date:
Billing Period Total Cost: Billing Period Total Cost:
C and I GSGH
9007-53003 4120539016
Billing Period Start Date: Billing Period Start Date:
Total Taxes + Fees on Bill:
Simple
Payback (Yrs)
kWh Saved per
Year
Annual
Savings
Total Measure
Cost
Estimated
Incentive
Amount
Total Cost to
Customer
GAS UTILITY INFORMATION
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Harrington Park Township Other
RJ Donnelly Total Facility Square Footage:
Police Station Avg Weekly Hrs of Operation:
49 La Roche Ave # of Full-Time Employees:
Harrington Park
Rockland Electric Co. PSE&G
LightingHVAC
Gas
Percentage of Energy Savings Per Measure Category
Lighting
HVACGas
Percentage of Dollar Savings Per Measure Category
-31.4%
Percent Change in Total Energy Consumuption
7/19/2010 Project Summary
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 2: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/2.jpg)
Default
Annual
Oper.
Hours
Actual
Annual
Oper. Hrs
(if different)
Fixture Location
Fixture
Con-
trolled?
Lighting Measure Description
# of
Fix-
tures
Default
Watts per
Fixture
Actual
Watts per
Fixture (if
different)
Ceiling
Height
>12 ft?
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Existing N Fluorescent, (2) U-Tube, STD lamp 3 96
Proposed N 2' T8 U-Lamp with EB 3 31
Existing N Fluorescent, (2) U-Tube, STD lamp 6 96
Proposed N 2' T8 U-Lamp with EB 6 31
Existing N EXIT Incandescent, (2) 15W lamp 7 30
Proposed N LED Universal Exit Sign 7 2
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (4) 48", STD lamp 4 188
Proposed Y 4' T8 2-lamp with EB plus reflector 4 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed N 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (2) U-Tube, STD lamp 1 96
Proposed N 2' T8 U-Lamp with EB 1 31
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed N 4' T8 2-lamp with EB 1 59
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB 1 59
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (4) 48", STD lamp 4 188
Proposed Y 4' T8 2-lamp with EB plus reflector 4 54
Existing N Fluorescent, (2) U-Tube, STD lamp 1 96
Proposed Y 2' T8 U-Lamp with EB 1 31
Existing N Fluorescent, (2) U-Tube, STD lamp 1 96
Proposed Y 2' T8 U-Lamp with EB 1 31
Existing N Fluorescent, (4) 48", STD lamp 4 188
Proposed N 4' T8 2-lamp with EB plus reflector 4 54
Existing N Fluorescent, (4) 48", STD lamp 3 188
Proposed N 4' T8 2-lamp with EB plus reflector 3 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Lighting Measures
$ 471.51
$ 894.21
$ 216.02
$ 216.02
$ 432.03
$ 108.01
$ 108.01
$ 216.02
$ 78.58
$ 68.71 257
1,378
0.1 689 N
0.2 1,378
0.1 334
N $ 216.02
0.3 2,953
0.4 3,937
$ 324.02
N
0.1 334
N
N
N
$ 216.02
$ 432.03
$ 78.58
$ 78.58
$ 432.03
0.0 180
0.4 2,756
N
1,378
N
N
0.2
$ 68.71
0.1 689
0.2 1,968
N
2,756
0.1 477
0.4
0.0
N 0.2 1,378
N
0.2 1,440
N 0.2
N
N
0.3 2,865
N
N
N
6500
6500
6500
6500
6500
6500
6500
6500
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
19
13
14
15
16
17
18
7
8
9
10
11
12
2
3
4
5
6
6500 1,432 N
6500
6500
6500
6500
6500
6500
6500
6500
Lobby
Sally Port
Stairs to Basement
0.2
6500
6500
Men Bath
Women Bath
1 $ 235.75 4,242
Main Hall
Main Hall
Comm Room
Basement Lounge
Basement Lost & Found
Office 2
Meeting Room
Office 3
Cell Room
Cell Room
Cell Room
Storage Closet
Captain's Office
Chief of Police
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 3: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/3.jpg)
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (1) 12" circular lamp, RS bal. 7 31
Proposed N 18W CIRCLINE w/ dome 7 19
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB 1 59
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (2) 48", STD lamp 3 94
Proposed N 4' T8 2-lamp with EB plus reflector 3 54
$ 7,423.87 4.9 35,974
Est.
Annual
Hours
w/o
Controls
# of
Fixtures
Con-
trolled
Fixture Location
Est.
Annual
Hrs. w/
Controls
Actual
Annual
Hours
(if different)
Lighting Controls Measure Description# of
Units
Reduced
Annual
Lighting
Hours
kW Con-
trolled
# of
Add'l
Relays
Needed
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
1950
0.38
0.38
0.75
0.19
0.09
0.38
0.75
0.10
0.10
0.38
0.19
1
1
1
1
1
1
1
1
1
1
1
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
4550
4550
4550
4550
4550
4550
4550
4550
4550
4550
4550
$ 108.01
$ 321.98
$ 321.98
0.0 414
0.1 829
$ 171.25
$ 321.98
0.0 212
0.0 212
$ 171.25
$ 171.25
0.2 1,657
0.1 829
$ 321.98
207
$ 321.98
$ 171.25 0.0
$ 321.98 0.1 829
414
0.2 1,657
$ 321.98 0.0
0.1 829
6500 4
6500 1
6500 1
6500 2
6500 1
6500 1
12
6500 2
6500 2
6500
19
N 881 $ 324.02 0.1
0.1 689
N $ 108.01 0.1 689
N $ 108.01
0.2 1,378
N $ 108.01 0.0 206
N $ 216.02
0.1 689
N $ 108.01 0.1 689
N $ 108.01
0.0 180
0.1 617
N $ 68.71
0.2 1,378
$ 1,168.22
N $ 216.02
0.1 689 N
N
6500
6500
6500
6500
6500
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
25
26
27
19
20
21
22
23
24
28
29
13
14
15
18
4
6500 1
6500
Office 2
Meeting Room
Office 3
Storage Closet
Captain's Office
4
5
6
7
Women Bath
2
11
Basement Closet
Basement Kithcen
6500
6500
6500
6500
6500
6500
Basement Police
Ordinance
Basement Janitor Closet
Basement Lost & Found
Basement Mens Locker
Basement Hall
Basement Women
Locker
Basement Records
Room
Basement Evidence
Room
Basement Utility Room
Basement Lounge
Basement Lost & Found
Chief of Police
Men Bath
Comm Room
TOTALS:
Lighting Controls
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 4: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/4.jpg)
1950
1950
1950
1950
1950
1950
1950
1950
1950
0.09
0.19
0.19
0.09
0.38
0.19
0.19
0.19
0.38
1
1
1
2
1
1
1
2
1
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech. Occ.Sens Ceiling (low v)
Dual Tech Occ. Sensor Wall Switch
4550
4550
4550
4550
4550
4550
4550
4550
4550 0.0 414 $ 321.98
0.0 414
0.1 829
$ 321.98
$ 643.96
0.0 207
0.0 414
$ 171.25
$ 321.98
0.0 414
0.0 207
$ 321.98
$ 171.25
0.1 829 $ 643.96
0.0 414 $ 171.25
Basement Evidence
Room
6500 1
6500 1
Basement Police
Ordinance
Basement Janitor Closet
6500 1
Basement Women
Locker
Basement Closet
Basement Kithcen
6500
6500 1
2
6500 1
2
6500
6500 1
6500 1
25
26
27
28
19
20
22
23
24
Basement Records
Room
Basement Lost & Found
Basement Mens Locker
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 5: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/5.jpg)
$ 5,857.17 1.3 11,815
Notes:TOTALS:
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 6: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/6.jpg)
Annual
Equiv.
Full Load
Hours
Actual
EFLH (if different)
Existing
Unit
Capacity
(Tons)
HVAC Location Measure Description# of
Units
Age of
Existing
Equipment
(Yrs)
Min.
Required
EER or
SEER
Actual
New EER
or SEER (if higher)
Min.
Required
HSPF (heat pumps)
Actual
HSPF (if higher)
Total Cost
Est.
Demand
Savings
(kW)
Annual
kWh
Savings
13,517.31$ 1.9 5,173
-
- 2 - 4-Ton Electric Split System A/C
1853
1853
21 2,208 $ 6,424.76 1
$ 7,092.54 2,965
0.8
1.1 15.0
1 - 2.5-Ton Electric Split System A/C
51
15.0
TOTALS:
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Packaged HVAC Measures
Notes:
Exterior
Exterior
7/19/2010
Packaged HVAC Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 7: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/7.jpg)
Climate Zone Measure Location Measure Description# of
Units
Proposed
Unit
Capacity
(thousand
BTU/hr)
Age of
Existing
Equipment
(Yrs.)
Total Cost
Natural Gas
Savings
(therms /yr)
17,231.90$ 398.6
$ 17,231.90 398.6 1BasementNewark1 Gas-Fired Boiler 21216
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Gas, Oil, and Propane HVAC Measures
TOTALS
Notes:
7/19/2010
HVAC<Gas_Oil_LPG> Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 8: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/8.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Participating Customer*:
Participating Contractor*:
Facility Name*:
Facility Address: NJ 07640Street City Zip
*as listed on Application
Participating Customer Date Participating Contractor
By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not own the Facility, the Owner has granted permission to Customer for performance of such work.
Date
RJ DonnellyPolice Station49 La Roche Ave Harrington Park,
When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install
Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in
connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation
Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement.
The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection
with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance
of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the Contractor may collect a deposit from Customer prior to performing such work, in which case the final invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during installation may require that some measures identified in the energy assessment cannot be installed, or some areas may require additional measures/quantities to be installed. Should conditions in the field dictate that the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both Market Manager and Customer written approval in the form of an amended Scope of Work Attachment before proceeding with such additional work.
DIRECT INSTALL PROGRAM
PARTICIPATION AGREEMENT
SCOPE OF WORK ATTACHMENT
“Parties”:
Harrington Park Township
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 9: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/9.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Page 2
Scope of Work
Quantity Total
To Be Measure
Installed Cost
3 $235.75
6 $471.51
7 $894.21
2 $216.02
2 $216.02
4 $432.03
1 $108.01
2 $216.02
1 $78.58
1 $68.71
1 $68.71
2 $216.02
4 $432.03
1 $78.58
1 $78.58
4 $432.03
3 $324.02
2 $216.02
1 $108.01
2 $216.02
7 $1,168.22
1 $68.71
1 $108.01
1 $108.01
1 $108.01
2 $216.02
1 $108.01
1 $108.01
3 $324.02
1 $321.98
1 $321.98
1 $321.98
1 $321.98
1 $171.25
1 $321.98
1 $321.98
1 $171.25
1 $171.25
1 $321.98
1 $171.25
2 $643.96
1 $171.25
1 $321.98
1 $321.98Dual Tech. Occ.Sens Ceiling (low v) / Basement Police Ordinance $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Basement Kithcen $64.40 $257.58
Dual Tech Occ. Sensor Wall Switch / Basement Closet $34.25 $137.00
Dual Tech. Occ.Sens Ceiling (low v) / Basement Mens Locker $128.79 $515.17
Dual Tech Occ. Sensor Wall Switch / Basement Lost & Found $34.25 $137.00
Dual Tech. Occ.Sens Ceiling (low v) / Basement Lounge $64.40 $257.58
Dual Tech Occ. Sensor Wall Switch / Women Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Men Bath $34.25 $137.00
Dual Tech. Occ.Sens Ceiling (low v) / Chief of Police $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Captain's Office $64.40 $257.58
Dual Tech Occ. Sensor Wall Switch / Storage Closet $34.25 $137.00
Dual Tech. Occ.Sens Ceiling (low v) / Office 3 $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Meeting Room $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Office 2 $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Comm Room $64.40 $257.58
4' T8 2-lamp with EB plus reflector / Basement Utility Room $64.80 $259.22
4' T8 2-lamp with EB plus reflector / Basement Evidence Room $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement Records Room $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement Women Locker $43.20 $172.81
4' T8 2-lamp with EB plus reflector / Basement Janitor Closet $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement Police Ordinance $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement Kithcen $21.60 $86.41
4' T8 2-lamp with EB / Basement Closet $13.74 $54.97
18W CIRCLINE w/ dome / Basement Hall $233.64 $934.58
4' T8 2-lamp with EB plus reflector / Basement Mens Locker $43.20 $172.81
4' T8 2-lamp with EB plus reflector / Basement Lost & Found $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement Lounge $43.20 $172.81
4' T8 2-lamp with EB plus reflector / Stairs to Basement $64.80 $259.22
4' T8 2-lamp with EB plus reflector / Sally Port $86.41 $345.62
2' T8 U-Lamp with EB / Women Bath $15.72 $62.87
2' T8 U-Lamp with EB / Men Bath $15.72 $62.87
4' T8 2-lamp with EB plus reflector / Chief of Police $86.41 $345.62
4' T8 2-lamp with EB plus reflector / Captain's Office $43.20 $172.81
4' T8 2-lamp with EB / Storage Closet $13.74 $54.97
4' T8 2-lamp with EB / Cell Room $13.74 $54.97
2' T8 U-Lamp with EB / Cell Room $15.72 $62.87
4' T8 2-lamp with EB plus reflector / Cell Room $43.20 $172.81
4' T8 2-lamp with EB plus reflector / Office 3 $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Meeting Room $86.41 $345.62
4' T8 2-lamp with EB plus reflector / Office 2 $43.20 $172.81
4' T8 2-lamp with EB plus reflector / Comm Room $43.20 $172.81
LED Universal Exit Sign / Main Hall $178.84 $715.37
2' T8 U-Lamp with EB / Main Hall $94.30 $377.21
Measure Description / Location Total Cost Amount
2' T8 U-Lamp with EB / Lobby $47.15 $188.60
The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:
Estimated Estimated
Customer Incentive
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 10: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/10.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
1 $171.25
2 $643.96
1 $321.98
1 $321.98
1 $6,424.76
1 $7,092.54
1 $17,231.90
44,030.25$
**Final NJ Clean Energy Incentive Amount:
**ARRA-Funded Incentive Amount:
COMBINED TOTAL:
35,224.20$
-$
35,224.20$
*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are over and above those
deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but shall be paid fully by the Customer and
performed outside of the Participation Agreement. Special Costs include but are not limited to: costs associated with the correction of code or safety violations,
extraordinary scaffolding or crane costs, extraodinary resizing of penetrations, extraordinary conduit and piping runs, and Customer requests to perform work outside of
normal business hours.
**Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive
amount available through NJ Clean Energy Programs per Direct Install project is $80,000.
TOTALS 8,806.05$ $35,224.20
Gas-Fired Boiler / Basement $3,446.38 $13,785.52
4-Ton Electric Split System A/C / Exterior $1,418.51 $5,674.04
2.5-Ton Electric Split System A/C / Exterior $1,284.95 $5,139.81
Dual Tech. Occ.Sens Ceiling (low v) / Basement Evidence Room $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Basement Records Room $64.40 $257.58
Dual Tech. Occ.Sens Ceiling (low v) / Basement Women Locker $128.79 $515.17
Dual Tech Occ. Sensor Wall Switch / Basement Janitor Closet $34.25 $137.00
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 11: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/11.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
General Project Information
Participating Customer: Facility Type:
Contractor / Project #: DN1082 3,000
Facility Name: 50
Street Address: 15
City / Zip Code: 07640 Year Constructed: 1960
Will the project receive EECBG funding?: Y Tax Exempt?: Y
ELECTRIC UTILITY INFORMATION
Electric Provider: Gas Provider:
Service Class: Service Class:
Account #: Account #:
07/23/09 12/08/10
08/21/09 01/05/10
Billing Period kWh Consumption: 3,662 Billing Period Therm Consumption: 598
$732.78 $819.24
Total Taxes + Fees on Bill: 35.69$ 116.51$
Project SummaryElectric - Average Cost ( $/kWh): $0.190 Gas - Average Cost ( $/Therm): $1.18
Lighting Measures Total: 13,316 2,534.85$ 7,952.36$ 6,361.89$ 1,590.47$ 0.63
Motors & VFD Measures Total: - -$ -$ -$ -$ -
HVAC Electric Measures Total: 8,970 1,707.51$ 15,768.90$ 12,615.12$ 3,153.78$ 1.85
Refrigeration Measures Total: - -$ -$ -$ -$ -
TOTAL ELECTRIC MEASURES: 22,286 4,242.36$ 23,721.26$ 18,977.01$ 4,744.25$ 1.12
Therms /yr.
TOTAL GAS MEASURES: 1,121 1,317.55$ 27,527.94$ 22,022.35$ 5,505.59$ 4.18
Gallons /yr.
TOTAL OIL MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL PROPANE MEASURES: - -$ -$ -$ -$ -
COMBINED TOTALS: 5,559.91$ 51,249.20$ 40,999.36$ 10,249.84$ 1.84
PROJECT TRC TEST: 2.36
GAS UTILITY INFORMATION
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Harrington Park Township Office- Large
RJ Donnelly Total Facility Square Footage:
Borough Hall Avg Weekly Hrs of Operation:
85 Harriot Ave # of Full-Time Employees:
Harrington Park
Rockland Electric Co. PSE&G
Total Taxes + Fees on Bill:
Simple
Payback (Yrs)
kWh Saved per
Year
Annual
Savings
Total Measure
Cost
Estimated
Incentive
Amount
Total Cost to
Customer
Billing Period End Date: Billing Period End Date:
Billing Period Total Cost: Billing Period Total Cost:
Small C&I Gen Serv. Secondary GSG
26657-52001 4120938328
Billing Period Start Date: Billing Period Start Date:
Lighting
HVAC
Gas
Percentage of Energy Savings Per Measure Category
Lighting
HVAC
Gas
Percentage of Dollar Savings Per Measure Category
-29.5%
Percent Change in Total Energy Consumuption
7/19/2010 Project Summary
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 12: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/12.jpg)
Default
Annual
Oper.
Hours
Actual
Annual
Oper. Hrs
(if different)
Fixture Location
Fixture
Con-
trolled?
Lighting Measure Description
# of
Fix-
tures
Default
Watts per
Fixture
Actual
Watts per
Fixture (if
different)
Ceiling
Height
>12 ft?
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Existing N Incandescent, (1) 100W lamp 2 100
Proposed Y CF 23-1L SCREW IN CFL DIMMABLE 2 26
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 4-lamp with EB 2 112
Existing N EXIT Compact Fluorescent, (2) 7W lamp 3 21
Proposed N LED EXIT Sign w/ Batt. Backup 3 2
Existing N Fluorescent, (2) U-Tube, STD lamp 1 96
Proposed Y 2' T8 U-Lamp with EB 1 31
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N Incandescent, (1) 60W lamp 2 60
Proposed N CF 13-1L SCREW IN CFL 2 15
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB 1 59
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N Incandescent, (1) 60W lamp 2 60
Proposed N CF 13-1L SCREW IN CFL 2 15
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB 1 59
Existing N Fluorescent, (4) 48", STD lamp 3 188
Proposed Y 4' T8 2-lamp with EB plus reflector 3 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (2) U-Tube, STD lamp 2 96
Proposed N 2' T8 U-Lamp with EB 2 31
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N EXIT Compact Fluorescent, (2) 7W lamp 1 21
Proposed N LED EXIT Sign w/ Batt. Backup 1 2
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed Y 4' T8 2-lamp with EB plus reflector 1 54
Existing N Incandescent, (1) 60W lamp 3 60
Storage Closet
Men Bath
Men Bath
Janitor Closet
Women Bath
Women Bath
Basement - Main Room
Basement - Food
Storage
Basement - Paper
Storage
Basement - Other
Storage
Basement - Exits
1 $ 91.74 2,808
Copy Room
1st Fl Halls
Handicap Bath
Basement - Paper
Storage 3
Basement Utility Room 1
340 NMeeting Room
Basement - Desk
Storage
Basement - Paper
Storage 2
0.1
2
3
4
5
6
19
13
14
15
16
17
18
7
8
9
10
11
12
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
0.1 350
N
N
N
N 0.0 103
N
0.0 187
N 0.1
N
N
0.0 80
0.0 103
N
296
0.1 296
0.1
0.0
0.3 925
0.1 427
N
308
N
N
0.1
$ 324.02
308
$ 108.01
N
0.0 103
N
N
N
$ 108.01
$ 157.17
$ 32.43
$ 132.46
$ 108.01
0.1 444 N
0.1 308
0.0 62
N $ 108.01
0.1 308
0.1
$ 68.71
$ 32.43
$ 64.85
$ 68.71 80
149
$ 97.28
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Lighting Measures
$ 171.34
$ 397.38
$ 78.58
$ 32.43
$ 64.85
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 13: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/13.jpg)
Proposed N CF 13-1L SCREW IN CFL 3 15
Existing N Fluorescent, (2) 48", STD lamp 3 94
Proposed Y 4' T8 2-lamp with EB 3 59
Existing N Incandescent, (1) 60W lamp 2 60
Proposed N CF 13-1L SCREW IN CFL 2 15
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed Y 4' T8 2-lamp with EB 1 59
Existing N Incandescent, (1) 60W lamp 2 60
Proposed Y CF 13-1L SCREW IN CFL 2 15
Existing N Incandescent, (1) 60W lamp 2 60
Proposed Y CF 13-1L SCREW IN CFL 2 15
Existing N Incandescent, (1) 120W lamp 1 120
Proposed N 28W CF Exterior Floodlight w/PE 1 25
Existing N *4' T8 4-lamp with EB* 15 112
Proposed Y **No Upgrade (controls only)** 15 112
Existing N *4' T8 4-lamp with EB* 6 112
Proposed Y **No Upgrade (controls only)** 6 112
Existing N *4' T8 4-lamp with EB* 4 112
Proposed Y **No Upgrade (controls only)** 4 112
Existing N *4' T8 4-lamp with EB* 4 112
Proposed Y **No Upgrade (controls only)** 4 112
Existing N *4' T8 4-lamp with EB* 4 112
Proposed Y **No Upgrade (controls only)** 4 112
Existing N *4' T8 4-lamp with EB* 2 112
Proposed Y **No Upgrade (controls only)** 2 112
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Basement Main Rm
1st Fl Comf Room
1st Fl - Main Office
1st Fl - CFO Office
1st Fl - Health Code
Office
1st Fl - Court Clerk
Basement - Meter Rm
Exterior
Basement Utility Room 1
Basement Utility Room 1
Basement Utility Room 2
Basement Utility Room 2
Basement - vault
2,808
2,808
2,808
38
39
40
41 2,808
2,808
2,808
2,808
2,808
2,808
2,808
34
35
36
37
30
31
32
33
42
43
19
20
21
22
23
24
44
28
29
25
26
27
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
2,808
0.1 444 N
N
0.0 80
0.1 296
N $ 68.71
0.1 241
$ 64.85
N $ 206.13
0.1 207
N $ 64.85 0.1 207
N $ 64.85
- -
N $ 189.42 0.1 312
N $ -
- -
N $ - - -
N $ -
N -
N $ - - -
$ - -
- -
N
<Y/N> $ -
$ - - -
<Y/N> -
<Y/N> $ - - -
$ - -
- -
<Y/N>
<Y/N> $ -
$ - - -
- -
- -
<Y/N> $ -
<Y/N> $ -
- -
- -
<Y/N> $ -
<Y/N> $ -
- -
- -
<Y/N> $ -
<Y/N> $ -
- -
- -
<Y/N> $ -
<Y/N> $ -
$ 97.28
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 14: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/14.jpg)
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
Existing <Y/N>
Proposed <Y/N>
$ 2,905.21 2.0 6,523
Est.
Annual
Hours
w/o
Controls
# of
Fixtures
Con-
trolled
Fixture Location
Est.
Annual
Hrs. w/
Controls
Actual
Annual
Hours
(if different)
Lighting Controls Measure Description# of
Units
Reduced
Annual
Lighting
Hours
kW Con-
trolled
# of
Add'l
Relays
Needed
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Meeting Room
Copy Room
Handicap Bath
TOTALS:
Lighting Controls
$ -
Basement - Other
Storage
2,808 94 -
-
-
95 2,808
$ -
- -
-
$ -
96 2,808
97 2,808
98 2,808 $ -
$ -
-
-
- $ -
99 2,808
- <Y/N>
- 100 2,808
- <Y/N> $ - -
2808 2
<Y/N> -
$ 282.48 1
11
0.0 197
2
3
4
5
6
7
8
9
10
1
Storage Closet
Men Bath
Janitor Closet
Women Bath
Basement - Main Room
Basement - Food
Storage
<Y/N>
<Y/N>
<Y/N>
<Y/N>
13
14
15
2808 1
280812
2808 2
2808 1
2808 1
2808 1
2808 1
2808 3
2808 1
$ - - -
$ 171.25 0.1 371
0.0 59
$ 171.25 0.0 95
93
$ 171.25
- -
$ 171.25 0.0
- -
0.0 59
$ -
556
$ 171.25
0.0 93
$ 282.48 0.1
$ 171.25
- -
0.0 185
$ -
- -
0.0 59
$ -
$ 171.25
$ -
$ 171.25
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
1
1
1
1
1
1
1
1
1
1
842 0.20
0.38
0.10
0.06
0.09
0.06
0.09
0.56
0.19
0.06
842
842
842
842
842
842
842
842
842
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 15: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/15.jpg)
Basement - Desk
Storage
Basement - Paper
Storage 2
Basement - Paper
Storage 3
Basement Utility Room 1
35
36
1st Fl Comf Room
15
16
17
18
31
32
33
34
25
26
27
28
29
30
19
20
21
22
23
24
37
38
39
2
2808 6
2808
2808 1
2808 4
2808
Basement Main Rm
Basement Utility Room 2
Basement - vault
2808
2808 2
2808 1
2808 1
3
2808 1
15
1st Fl - Main Office
1st Fl - CFO Office
2808 2 Basement - Meter Rm
2808 4
2808 4
1st Fl - Health Code
Office
1st Fl - Court Clerk
- - $ -
0.0 185
0.0 185
$ 171.25
$ 171.25
- -
0.0 185
$ -
$ 171.25
- -
0.1 278
$ -
$ 282.48
0.0 118
0.0 93
$ 171.25
$ 282.48
- -
0.0 118
$ -
$ 171.25
0.2 662
0.4 1,656
$ 278.61
$ 282.48
0.1 442
0.1 442
$ 282.48
$ 282.48
0.1 221
0.1 442
$ 282.48
$ 282.48
- -
- -
$ -
$ -
- -
- -
$ -
$ -
- -
- -
$ -
$ -
- -
- -
$ -
$ -
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
1965.6
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech. Occ.Sens Ceiling (line v)
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ.Sens Wall/Corner (line v)
Dual Tech Occ.Sens Wall/Corner (line v)
1
1
1
1
1
1
1
1
1
1
1
1
1
0.19
0.19
0.19
0.28
0.09
0.12
0.12
1.68
0.67
0.45
0.45
0.45
0.22
842
842
842
842
842
842
842
842
842
842
842
842
842
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 16: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/16.jpg)
$ 5,047.15 1.6 6,793 TOTALS:
100 $ - -
90 - $ - -
91 - $ - -
92 - $ - -
93 - $ - -
94 - $ - -
95 - $ - -
- $ - -
97 - $ - -
- 98 - $ -
$ - - 99
Notes:
-
-
96
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 17: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/17.jpg)
Annual
Equiv.
Full Load
Hours
Actual
EFLH (if different)
Existing
Unit
Capacity
(Tons)
HVAC Location Measure Description# of
Units
Age of
Existing
Equipment
(Yrs)
Min.
Required
EER or
SEER
Actual
New EER
or SEER (if higher)
Min.
Required
HSPF (heat pumps)
Actual
HSPF (if higher)
Total Cost
Est.
Demand
Savings
(kW)
Annual
kWh
Savings
15,054.61$ 4.4 7,434
Exterior
Exterior
Notes:
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Packaged HVAC Measures
TOTALS:
1 1,131 5-Ton Electric Split System A/C
271
15.0 29 4,646 $ 8,137.92 1
$ 6,916.69 2,788
2.8
1.7 15.0 2 1,131 3-Ton Electric Split System A/C
-
-
7/19/2010
Packaged HVAC Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 18: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/18.jpg)
Climate Zone Measure Location Measure Description# of
Units
Proposed
Unit
Capacity
(thousand
BTU/hr)
Age of
Existing
Equipment
(Yrs.)
Total Cost
Natural Gas
Savings
(therms /yr)
25,221.90$ 721.2
Notes:
TOTALS
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Gas, Oil, and Propane HVAC Measures
1 Gas-Fired Boiler 21420BasementNewark $ 25,221.90 721.2 1
7/19/2010
HVAC<Gas_Oil_LPG> Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 19: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/19.jpg)
Measure Location# of Units
Installed
Controlled
Unit
Cooling
Capacity
(Tons)
Cooling
Energy
Efficiency
Ratio
(EER)
Opera-
tionally
Tested?
Total Cost
Annual
kWh
Savings
Est.
Demand
Savings
(kW)
-$ - -
Measure Location# of Units
Installed
HVAC Unit
Capacity
(thousand
BTU/hr)
HVAC Fuel
Source
Annual
Fuel
Usage
(therms,
gallons or
KWh /yr)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure Location# of Units
Installed
Annual
HVAC
Electric
Usage
(kWh)
Primary
Fuel
Source for
Heating
Gas, Oil,
or LPG
Usage
(therms or
gal./yr)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure Location# of Units
Installed
Days per
Year
Facility
Operates
Hot Water
Fuel
Source
Current
Flow Rate
(gal./min)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure LocationPipe
Diameter (inches)
Pipe
Length (feet)
Hot Water
Fuel
Source
Low or
High
Temp
Piping?
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
2,663.18$ 1,120 400.0
Hot Water Demand Control Measures
Notes:
2,500
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
HVAC Control Measures
Measure Description
Various 2 $ 445.08
4,000
325.0
20,000 Gas
Measure Description
1
4 Programmable Thermostats
Gas
5ton Split 1
Basement - Boiler 1
Measure Description
2 60 Electric
2,500420
Measure Description
$ 1,860.95 -
600
$ 357.14 520
75.0
TOTALS
Measure Description
Electronic Fuel-Use Economizers
(for Hot Water Heat)
3
Electronic Fuel-Use Economizers
(for AC)3ton Split 1 36 Electric 3,200 $ 357.14 416
7/19/2010
HVAC & HW Controls Measures
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 20: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/20.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Participating Customer*:
Participating Contractor*:
Facility Name*:
Facility Address: NJ 07640Street City Zip
*as listed on Application
Participating Customer Date Participating Contractor
By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not own the Facility, the Owner has granted permission to Customer for performance of such work.
Date
RJ DonnellyBorough Hall85 Harriot Ave Harrington Park,
When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install
Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in
connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation
Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement.
The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection
with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance
of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the Contractor may collect a deposit from Customer prior to performing such work, in which case the final invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during installation may require that some measures identified in the energy assessment cannot be installed, or some areas may require additional measures/quantities to be installed. Should conditions in the field dictate that the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both Market Manager and Customer written approval in the form of an amended Scope of Work Attachment before proceeding with such additional work.
DIRECT INSTALL PROGRAM
PARTICIPATION AGREEMENT
SCOPE OF WORK ATTACHMENT
“Parties”:
Harrington Park Township
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 21: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/21.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Page 2
Scope of Work
Quantity Total
To Be Measure
Installed Cost
2 $91.74
2 $171.34
3 $397.38
1 $78.58
1 $32.43
2 $64.85
1 $68.71
1 $32.43
2 $64.85
1 $68.71
3 $324.02
1 $108.01
2 $157.17
1 $32.43
1 $132.46
1 $108.01
1 $108.01
1 $108.01
3 $97.28
3 $206.13
2 $64.85
1 $68.71
2 $64.85
2 $64.85
1 $189.42
1 $282.48
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $282.48
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $282.48
1 $282.48
1 $171.25
1 $171.25
1 $282.48
1 $278.61Dual Tech. Occ.Sens Ceiling (line v) / 1st Fl Comf Room $55.72 $222.89
Dual Tech Occ.Sens Wall/Corner (line v) / Basement Main Rm $56.50 $225.99
Dual Tech Occ. Sensor Wall Switch / Basement - Meter Rm $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Basement - vault $34.25 $137.00
Dual Tech Occ.Sens Wall/Corner (line v) / Basement Utility Room 2 $56.50 $225.99
Dual Tech Occ.Sens Wall/Corner (line v) / Basement Utility Room 1 $56.50 $225.99
Dual Tech Occ. Sensor Wall Switch / Basement - Paper Storage 3 $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Basement - Paper Storage 2 $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Basement - Desk Storage $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Basement - Other Storage $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Basement - Food Storage $34.25 $137.00
Dual Tech Occ.Sens Wall/Corner (line v) / Basement - Main Room $56.50 $225.99
Dual Tech Occ. Sensor Wall Switch / Women Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Janitor Closet $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Men Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Storage Closet $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Handicap Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Copy Room $34.25 $137.00
Dual Tech Occ.Sens Wall/Corner (line v) / Meeting Room $56.50 $225.99
28W CF Exterior Floodlight w/PE / Exterior $37.88 $151.54
CF 13-1L SCREW IN CFL / Basement - Meter Rm $12.97 $51.88
CF 13-1L SCREW IN CFL / Basement - vault $12.97 $51.88
4' T8 2-lamp with EB / Basement Utility Room 2 $13.74 $54.97
CF 13-1L SCREW IN CFL / Basement Utility Room 2 $12.97 $51.88
4' T8 2-lamp with EB / Basement Utility Room 1 $41.23 $164.90
CF 13-1L SCREW IN CFL / Basement Utility Room 1 $19.46 $77.82
4' T8 2-lamp with EB plus reflector / Basement - Paper Storage 3 $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement - Paper Storage 2 $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement - Desk Storage $21.60 $86.41
LED EXIT Sign w/ Batt. Backup / Basement - Exits $26.49 $105.97
CF 13-1L SCREW IN CFL / Basement - Other Storage $6.49 $25.94
2' T8 U-Lamp with EB / Basement - Paper Storage $31.43 $125.74
4' T8 2-lamp with EB plus reflector / Basement - Food Storage $21.60 $86.41
4' T8 2-lamp with EB plus reflector / Basement - Main Room $64.80 $259.22
4' T8 2-lamp with EB / Women Bath $13.74 $54.97
CF 13-1L SCREW IN CFL / Women Bath $12.97 $51.88
CF 13-1L SCREW IN CFL / Janitor Closet $6.49 $25.94
4' T8 2-lamp with EB / Men Bath $13.74 $54.97
CF 13-1L SCREW IN CFL / Men Bath $12.97 $51.88
CF 13-1L SCREW IN CFL / Storage Closet $6.49 $25.94
2' T8 U-Lamp with EB / Handicap Bath $15.72 $62.87
LED EXIT Sign w/ Batt. Backup / 1st Fl Halls $79.48 $317.90
4' T8 4-lamp with EB / Copy Room $34.27 $137.07
Measure Description / Location Total Cost Amount
CF 23-1L SCREW IN CFL DIMMABLE / Meeting Room $18.35 $73.39
The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:
Estimated Estimated
Customer Incentive
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 22: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/22.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
1 $282.48
1 $282.48
1 $282.48
1 $282.48
1 $8,137.92
1 $6,916.69
1 $357.14
1 $357.14
1 $25,221.90
1 $1,860.95
2 $445.08
51,249.20$
**Final NJ Clean Energy Incentive Amount:
**ARRA-Funded Incentive Amount:
COMBINED TOTAL:
40,999.36$
-$
40,999.36$
*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are over and above those
deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but shall be paid fully by the Customer and
performed outside of the Participation Agreement. Special Costs include but are not limited to: costs associated with the correction of code or safety violations,
extraordinary scaffolding or crane costs, extraodinary resizing of penetrations, extraordinary conduit and piping runs, and Customer requests to perform work outside of
normal business hours.
**Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive
amount available through NJ Clean Energy Programs per Direct Install project is $80,000.
TOTALS 10,249.84$ $40,999.36
Programmable Thermostats / Various $89.02 $356.07
Electronic Fuel-Use Economizers (for Hot Water Heat) / Basement - Boiler $372.19 $1,488.76
Gas-Fired Boiler / Basement $5,044.38 $20,177.52
Electronic Fuel-Use Economizers (for AC) / 3ton Split $71.43 $285.71
Electronic Fuel-Use Economizers (for AC) / 5ton Split $71.43 $285.71
3-Ton Electric Split System A/C / Exterior $1,383.34 $5,533.35
5-Ton Electric Split System A/C / Exterior $1,627.58 $6,510.34
Dual Tech Occ.Sens Wall/Corner (line v) / 1st Fl - Court Clerk $56.50 $225.99
Dual Tech Occ.Sens Wall/Corner (line v) / 1st Fl - Health Code Office $56.50 $225.99
Dual Tech Occ.Sens Wall/Corner (line v) / 1st Fl - CFO Office $56.50 $225.99
Dual Tech Occ.Sens Wall/Corner (line v) / 1st Fl - Main Office $56.50 $225.99
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 23: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/23.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
General Project Information
Participating Customer: Facility Type:
Contractor / Project #: DN1083 2,000
Facility Name: 45
Street Address: 5
City / Zip Code: 07640 Year Constructed: 1970
Will the project receive EECBG funding?: N Tax Exempt?: Y
ELECTRIC UTILITY INFORMATION
Electric Provider: Gas Provider:
Service Class: Service Class:
Account #: Account #:
07/21/09 01/05/10
08/19/09 02/02/10
Billing Period kWh Consumption: 5,112 Billing Period Therm Consumption: 711
$1,061.72 $819.24
Total Taxes + Fees on Bill: 46.15$ 92.61$
Project SummaryElectric - Average Cost ( $/kWh): $0.199 Gas - Average Cost ( $/Therm): $1.02
Lighting Measures Total: 15,617 3,102.52$ 8,307.63$ 6,646.11$ 1,661.53$ 0.54
Motors & VFD Measures Total: - -$ -$ -$ -$ -
HVAC Electric Measures Total: 2,546 505.82$ 7,449.69$ 5,959.75$ 1,489.94$ 2.95
Refrigeration Measures Total: - -$ -$ -$ -$ -
TOTAL ELECTRIC MEASURES: 18,163 3,608.34$ 15,757.32$ 12,605.86$ 3,151.46$ 0.87
Therms /yr.
TOTAL GAS MEASURES: 398 406.97$ 7,179.81$ 5,743.85$ 1,435.96$ 3.53
Gallons /yr.
TOTAL OIL MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL PROPANE MEASURES: - -$ -$ -$ -$ -
COMBINED TOTALS: 4,015.31$ 22,937.13$ 18,349.70$ 4,587.43$ 1.14
PROJECT TRC TEST: 2.77
GAS UTILITY INFORMATION
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Harrington Park Township Other
RJ Donnelly Total Facility Square Footage:
Library Avg Weekly Hrs of Operation:
10 Herring St # of Full-Time Employees:
Harrington Park
Rockland Electric Co. PSE&G
Total Taxes + Fees on Bill:
Simple
Payback (Yrs)
kWh Saved per
Year
Annual
Savings
Total Measure
Cost
Estimated
Incentive
Amount
Total Cost to
Customer
Billing Period End Date: Billing Period End Date:
Billing Period Total Cost: Billing Period Total Cost:
Small C&I Gen. Serv. Secondary GSG
59816-58007 4120938328
Billing Period Start Date: Billing Period Start Date:
Lighting
HVAC
Gas
Percentage of Energy Savings Per Measure Category
Lighting
HVAC
Gas
Percentage of Dollar Savings Per Measure Category
-15.3%
Percent Change in Total Energy Consumuption
7/19/2010 Project Summary
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 24: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/24.jpg)
Default
Annual
Oper.
Hours
Actual
Annual
Oper. Hrs
(if different)
Fixture Location
Fixture
Con-
trolled?
Lighting Measure Description
# of
Fix-
tures
Default
Watts per
Fixture
Actual
Watts per
Fixture (if
different)
Ceiling
Height
>12 ft?
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Existing N Fluorescent, (4) 48", STD lamp 4 188
Proposed Y 4' T8 2-lamp with EB plus reflector 4 54
Existing N Fluorescent, (4) 48", STD lamp 2 188
Proposed Y 4' T8 2-lamp with EB plus reflector 2 54
Existing N Fluorescent, (2) U-Tube, STD lamp 12 96
Proposed N 2' T8 U-Lamp with EB 12 31
Existing N Fluorescent, (2) 24", STD lamp 4 56
Proposed N 2' T8 2-lamp with EB 4 33
Existing N EXIT Incandescent, (2) 20W lamp 4 40
Proposed N LED EXIT Sign w/ Batt. Backup 4 2
Existing N Fluorescent, (4) 48", STD lamp 17 188
Proposed Y 4' T8 2-lamp with EB plus reflector 17 54
Existing N Fluorescent, (2) 24", STD lamp 5 56
Proposed N 2' T8 2-lamp with EB 5 33
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N Incandescent, (1) 60W lamp 1 60
Proposed Y CF 13-1L SCREW IN CFL 1 15
Existing N Incandescent, (1) 60W lamp 2 60
Proposed Y CF 13-1L SCREW IN CFL 2 15
Existing N Incandescent, (1) 60W lamp 2 60
Proposed Y CF 13-1L SCREW IN CFL 2 15
Existing N Incandescent, (1) 40W lamp 6 40
Proposed N CF 9-1L SCREW IN CFL 6 11
Existing N Incandescent, (1) 60W lamp 10 60
Proposed N CF 13-1L SCREW IN CFL 10 15
Existing N Incandescent, (1) 40W lamp 6 40
Proposed N CF 9-1L SCREW IN CFL 6 11
Existing N Incandescent, (1) 75W lamp 3 75
Proposed N CF 18-1L SCREW IN CFL 3 19
$ 5,779.76 4.5 11,854 TOTALS:
Lighting Controls
Main Area
2nd Fl Social Room
2nd Fl Social Room
HVAC Room 1
HVAC Room 2
1st Fl Closet
Mens Bath
Womens Bath
Exterior South
Exterior Front
Exterior Rear
1 $ 432.03 4,242
1st Fl Office 2
Main Area
Main Area
2340 992 N
2340
2340
2340
2340
2340
2340
2340
2340
1st Fl Office 1
Exterior Rear
0.4
2340
2
3
4
5
6
13
14
15
16
7
8
9
10
11
12
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
4,242
2340
2340
2340
2340
2340
2340
0.2 496
Y
N
N
N 0.1 402
N
0.6 2,062
N 0.1
N
N
0.1 304
0.0 83
N
4,216
0.0 83
1.9
0.0
0.1 167
0.1 460
N
167
N
N
0.1
$ 64.85
444
N
0.4 1,190
N
N
$ 64.85
$ 192.13
$ 324.26
$ 192.13
$ 97.91
0.1 460
0.1
$ 342.58
$ 32.43
$ 32.43
$ 32.43 83
243
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Lighting Measures
$ 216.02
$ 1,115.68
$ 274.06
$ 529.84
$ 1,836.13
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 25: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/25.jpg)
Est.
Annual
Hours
w/o
Controls
# of
Fixtures
Con-
trolled
Fixture Location
Est.
Annual
Hrs. w/
Controls
Actual
Annual
Hours
(if different)
Lighting Controls Measure Description# of
Units
Reduced
Annual
Lighting
Hours
kW Con-
trolled
# of
Add'l
Relays
Needed
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
1st Fl Office 1
1st Fl Office 2
2340 4 $ 278.61 1
11
0.2 597
2
6
8
9
10
2
2nd Fl Social Room
HVAC Room 1
HVAC Room 2
1st Fl Closet
Mens Bath
Womens Bath
17
234012
2340 2
2340
2340 1
2340 1
2340 2
2340 1
$ 278.61 0.1 298
$ 171.25
0.8 2,535
0.0 48
0.0 48
$ 171.25
95
$ 171.25
0.0 48
$ 171.25 0.0
$ 171.25
0.0 95
$ 1,114.43
1638
1638
1638
1638
1638
1638
1638
1638
Dual Tech. Occ.Sens Ceiling (line v)
Dual Tech. Occ.Sens Ceiling (line v)
Dual Tech. Occ.Sens Ceiling (line v)
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
Dual Tech Occ. Sensor Wall Switch
1
1
4
1
1
1
1
1
702 0.75
0.38
3.20
0.06
0.06
0.06
0.12
0.12
702
702
702
702
702
702
702
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 26: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/26.jpg)
$ 2,527.88 1.2 3,763 TOTALS:
Notes:
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 27: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/27.jpg)
Annual
Equiv.
Full Load
Hours
Actual
EFLH (if different)
Existing
Unit
Capacity
(Tons)
HVAC Location Measure Description# of
Units
Age of
Existing
Equipment
(Yrs)
Min.
Required
EER or
SEER
Actual
New EER
or SEER (if higher)
Min.
Required
HSPF (heat pumps)
Actual
HSPF (if higher)
Total Cost
Est.
Demand
Savings
(kW)
Annual
kWh
Savings
7,092.54$ 1.3 2,156
Exterior (serves 2nd Fl)
Notes:
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Packaged HVAC Measures
TOTALS:
1 1,131 4-Ton Electric Split System A/C 15.0 20 2,156 $ 7,092.54 1 1.3 -
7/19/2010
Packaged HVAC Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 28: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/28.jpg)
Climate Zone Measure Location Measure Description# of
Units
Proposed
Unit
Capacity
(thousand
BTU/hr)
Age of
Existing
Equipment
(Yrs.)
Total Cost
Natural Gas
Savings
(therms /yr)
6,577.14$ 242.2
Notes:
TOTALS
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Gas, Oil, and Propane HVAC Measures
1 Gas-Fired Furnace 131402nd Fl HVAC Newark $ 6,577.14 242.2 1
7/19/2010
HVAC<Gas_Oil_LPG> Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 29: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/29.jpg)
Measure Location# of Units
Installed
Controlled
Unit
Cooling
Capacity
(Tons)
Cooling
Energy
Efficiency
Ratio (EER)
Opera-
tionally
Tested?
Total Cost
Annual
kWh
Savings
Est.
Demand
Savings
(kW)
-$ - -
Measure Location# of Units
Installed
HVAC Unit
Capacity
(thousand
BTU/hr)
HVAC Fuel
Source
Annual
Fuel
Usage
(therms,
gallons or
KWh /yr)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure Location# of Units
Installed
Annual
HVAC
Electric
Usage
(kWh)
Primary
Fuel
Source for
Heating
Gas, Oil,
or LPG
Usage
(therms or
gal./yr)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure Location# of Units
Installed
Days per
Year
Facility
Operates
Hot Water
Fuel
Source
Current
Flow Rate
(gal./min)
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
Measure LocationPipe
Diameter (inches)
Pipe
Length (feet)
Hot Water
Fuel
Source
Low or
High
Temp
Piping?
Total Cost
Annual
kWh
Savings
Nat. Gas
Savings
(therms /yr)
959.81$ 390 156.0
Hot Water Demand Control Measures
Notes:
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
HVAC Control Measures
Measure Description
- 156.0
3,000
1,200140 Gas
Measure Description
Exterior (Serves 2nd Fl) 1
Measure Description
2
1 2nd Fl 1
48 Electric
Measure Description
$ 357.14 390
$ 602.67
TOTALS
Measure Description
Electronic Fuel-Use Economizers
(for Forced Air Heat)
Electronic Fuel-Use Economizers
(for AC)
7/19/2010
HVAC & HW Controls Measures
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 30: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/30.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Participating Customer*:
Participating Contractor*:
Facility Name*:
Facility Address: NJ 07640Street City Zip
*as listed on Application
Participating Customer Date Participating Contractor
By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not own the Facility, the Owner has granted permission to Customer for performance of such work.
Date
RJ DonnellyLibrary10 Herring St Harrington Park,
When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install
Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in
connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation
Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement.
The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection
with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance
of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the Contractor may collect a deposit from Customer prior to performing such work, in which case the final invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during installation may require that some measures identified in the energy assessment cannot be installed, or some areas may require additional measures/quantities to be installed. Should conditions in the field dictate that the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both Market Manager and Customer written approval in the form of an amended Scope of Work Attachment before proceeding with such additional work.
DIRECT INSTALL PROGRAM
PARTICIPATION AGREEMENT
SCOPE OF WORK ATTACHMENT
“Parties”:
Harrington Park Township
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 31: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/31.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Page 2
Scope of Work
Quantity Total
To Be Measure
Installed Cost
4 $432.03
2 $216.02
12 $1,115.68
4 $274.06
4 $529.84
17 $1,836.13
5 $342.58
1 $32.43
1 $32.43
1 $32.43
2 $64.85
2 $64.85
6 $192.13
10 $324.26
6 $192.13
3 $97.91
1 $278.61
1 $278.61
4 $1,114.43
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $171.25
1 $7,092.54
1 $357.14
1 $6,577.14
1 $602.67
22,937.13$
**Final NJ Clean Energy Incentive Amount:
**ARRA-Funded Incentive Amount:
COMBINED TOTAL:
18,349.70$
-$
18,349.70$
*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are over and above those
deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but shall be paid fully by the Customer and
performed outside of the Participation Agreement. Special Costs include but are not limited to: costs associated with the correction of code or safety violations,
extraordinary scaffolding or crane costs, extraodinary resizing of penetrations, extraordinary conduit and piping runs, and Customer requests to perform work outside of
normal business hours.
**Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive
amount available through NJ Clean Energy Programs per Direct Install project is $80,000.
TOTALS 4,587.43$ $18,349.70
Electronic Fuel-Use Economizers (for Forced Air Heat) / 2nd Fl $120.53 $482.13
Gas-Fired Furnace / 2nd Fl HVAC $1,315.43 $5,261.71
Electronic Fuel-Use Economizers (for AC) / Exterior (Serves 2nd Fl) $71.43 $285.71
4-Ton Electric Split System A/C / Exterior (serves 2nd Fl) $1,418.51 $5,674.04
Dual Tech Occ. Sensor Wall Switch / Womens Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / Mens Bath $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / 1st Fl Closet $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / HVAC Room 2 $34.25 $137.00
Dual Tech Occ. Sensor Wall Switch / HVAC Room 1 $34.25 $137.00
Dual Tech. Occ.Sens Ceiling (line v) / 2nd Fl Social Room $222.89 $891.54
Dual Tech. Occ.Sens Ceiling (line v) / 1st Fl Office 2 $55.72 $222.89
Dual Tech. Occ.Sens Ceiling (line v) / 1st Fl Office 1 $55.72 $222.89
CF 18-1L SCREW IN CFL / Exterior Rear $19.58 $78.33
CF 9-1L SCREW IN CFL / Exterior Rear $38.43 $153.71
CF 13-1L SCREW IN CFL / Exterior Front $64.85 $259.41
CF 9-1L SCREW IN CFL / Exterior South $38.43 $153.71
CF 13-1L SCREW IN CFL / Womens Bath $12.97 $51.88
CF 13-1L SCREW IN CFL / Mens Bath $12.97 $51.88
CF 13-1L SCREW IN CFL / 1st Fl Closet $6.49 $25.94
CF 13-1L SCREW IN CFL / HVAC Room 2 $6.49 $25.94
CF 13-1L SCREW IN CFL / HVAC Room 1 $6.49 $25.94
2' T8 2-lamp with EB / 2nd Fl Social Room $68.52 $274.06
4' T8 2-lamp with EB plus reflector / 2nd Fl Social Room $367.23 $1,468.90
LED EXIT Sign w/ Batt. Backup / Main Area $105.97 $423.87
2' T8 2-lamp with EB / Main Area $54.81 $219.25
2' T8 U-Lamp with EB / Main Area $223.14 $892.55
4' T8 2-lamp with EB plus reflector / 1st Fl Office 2 $43.20 $172.81
Measure Description / Location Total Cost Amount
4' T8 2-lamp with EB plus reflector / 1st Fl Office 1 $86.41 $345.62
The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:
Estimated Estimated
Customer Incentive
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 32: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/32.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
General Project Information
Participating Customer: Facility Type:
Contractor / Project #: DN1084 80,000
Facility Name: 50
Street Address: 3
City / Zip Code: 07640 Year Constructed: 1970
Will the project receive EECBG funding?: N Tax Exempt?: Y
ELECTRIC UTILITY INFORMATION
Electric Provider: Gas Provider:
Service Class: Service Class:
Account #: Account #:
12/17/10 01/05/10
01/20/10 02/02/10
Billing Period kWh Consumption: 7,000 Billing Period Therm Consumption: 947
$1,307.88 $1,225.31
Total Taxes + Fees on Bill: 125.16$ 132.69$
Project SummaryElectric - Average Cost ( $/kWh): $0.169 Gas - Average Cost ( $/Therm): $1.15
Lighting Measures Total: 19,703 3,328.96$ 6,432.62$ 5,146.10$ 1,286.52$ 0.39
Motors & VFD Measures Total: - -$ -$ -$ -$ -
HVAC Electric Measures Total: - -$ -$ -$ -$ -
Refrigeration Measures Total: - -$ -$ -$ -$ -
TOTAL ELECTRIC MEASURES: 19,703 3,328.96$ 6,432.62$ 5,146.10$ 1,286.52$ 0.39
Therms /yr.
TOTAL GAS MEASURES: 133 153.55$ 5,520.95$ 4,416.76$ 1,104.19$ 7.19
Gallons /yr.
TOTAL OIL MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL PROPANE MEASURES: - -$ -$ -$ -$ -
COMBINED TOTALS: 3,482.50$ 11,953.58$ 9,562.86$ 2,390.72$ 0.69
PROJECT TRC TEST: 3.87
GAS UTILITY INFORMATION
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Harrington Park Township Warehouse
RJ Donnelly Total Facility Square Footage:
DPW Avg Weekly Hrs of Operation:
66 Schraalenburgh Road # of Full-Time Employees:
Harrington Park
Rockland Electric Co. PSE&G
Total Taxes + Fees on Bill:
Simple
Payback (Yrs)
kWh Saved per
Year
Annual
Savings
Total Measure
Cost
Estimated
Incentive
Amount
Total Cost to
Customer
Billing Period End Date: Billing Period End Date:
Billing Period Total Cost: Billing Period Total Cost:
Small C&I Gen. Serv. Secondary GSGH
6569660006 2463232
Billing Period Start Date: Billing Period Start Date:
Lighting
Gas
Percentage of Energy Savings Per Measure Category
Lighting
Gas
Percentage of Dollar Savings Per Measure Category
-9.6%
Percent Change in Total Energy Consumuption
7/19/2010 Project Summary
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 33: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/33.jpg)
Default
Annual
Oper.
Hours
Actual
Annual
Oper. Hrs
(if different)
Fixture Location
Fixture
Con-
trolled?
Lighting Measure Description
# of
Fix-
tures
Default
Watts per
Fixture
Actual
Watts per
Fixture (if
different)
Ceiling
Height
>12 ft?
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Existing N Fluorescent, (4) 48", STD lamp 3 188
Proposed N 4' T8 2-lamp with EB plus reflector 3 54
Existing N Fluorescent, (2) 24", STD lamp 1 56
Proposed N 2' T8 2-lamp with EB 1 33
Existing N EXIT Compact Fluorescent, (2) 7W lamp 2 21
Proposed N LED EXIT Sign w/ Batt. Backup 2 2
Existing N Fluorescent, (2) 48", STD lamp 5 94
Proposed N 4' T8 2-lamp with EB 5 59
Existing N Fluorescent, (2) 48", STD lamp 9 94
Proposed N 4' T8 2-lamp with EB 9 59
Existing N Metal Halide, (1) 400W lamp 15 458
Proposed N 4 LAMP T5 HIGH BAY HO FIXTURE 15 234
Existing N EXIT Compact Fluorescent, (2) 7W lamp 4 21
Proposed N LED EXIT Sign w/ Batt. Backup 4 2
Existing N Fluorescent, (2) 24", STD lamp 2 56
Proposed N 2' T8 2-lamp with EB 2 33
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed N 4' T8 4-lamp with EB 1 112
Existing N Incandescent, (1) 60W lamp 2 60
Proposed N CF 13-1L SCREW IN CFL 2 15
Existing N EXIT Compact Fluorescent, (2) 7W lamp 1 21
Proposed N LED EXIT Sign w/ Batt. Backup 1 2
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed N 4' T8 2-lamp with EB 1 59
Existing N Fluorescent, (4) 48", STD lamp 1 188
Proposed N 4' T8 4-lamp with EB 1 112
Existing N Fluorescent, (2) 48", STD lamp 1 94
Proposed N 4' T8 2-lamp with EB 1 59
$ 6,432.62 3.5 19,703
Est.
Annual
Hours
w/o
Controls
# of
Fixtures
Con-
trolled
Fixture Location
Est.
Annual
Hrs. w/
Controls
Actual
Annual
Hours
(if different)
Lighting Controls Measure Description# of
Units
Reduced
Annual
Lighting
Hours
kW Con-
trolled
# of
Add'l
Relays
Needed
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
TOTALS:
Lighting Controls
Bays
Bays
Bays
Locker Room
Locker Room
Locker Room
Locker Room
Mens Bath
Womens Bath
Utility Room
1 $ 223.68 3,900
Office Bath
Office
Stairs to Bays
1,662 NOffice 0.3
2
3
4
5
6
13
14
7
8
9
10
11
12
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
3,900
0.0 95
N
N
Y
N 0.2 1,302
N
0.0 157
Y 0.1
N
N
0.1 314
0.0 190
N
13,890
0.1 314
2.5
0.1
0.0 79
0.1 314
N
145
N
N
0.0
$ 81.41
N
0.0 145
$ 47.40
$ 60.55
$ 47.40
$ 325.64
$ 94.41
$ 60.55
$ 39.49 372
723
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Lighting Measures
$ 47.21
$ 162.82
$ 302.86
$ 426.60
$ 4,512.59
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 34: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/34.jpg)
Climate Zone Measure Location Measure Description# of
Units
Proposed
Unit
Capacity
(thousand
BTU/hr)
Age of
Existing
Equipment
(Yrs.)
Total Cost
Natural Gas
Savings
(therms /yr)
5,520.95$ 133.1
Notes:
TOTALS
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Gas, Oil, and Propane HVAC Measures
1 Gas-Fired Furnace 1511530 ft WarehouseNewark $ 5,520.95 133.1 1
7/19/2010
HVAC<Gas_Oil_LPG> Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 35: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/35.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Participating Customer*:
Participating Contractor*:
Facility Name*:
Facility Address: NJ 07640Street City Zip
*as listed on Application
Participating Customer Date Participating Contractor
By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not own the Facility, the Owner has granted permission to Customer for performance of such work.
Date
RJ DonnellyDPW66 Schraalenburgh Road Harrington Park,
When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install
Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in
connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation
Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement.
The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection
with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance
of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the Contractor may collect a deposit from Customer prior to performing such work, in which case the final invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during installation may require that some measures identified in the energy assessment cannot be installed, or some areas may require additional measures/quantities to be installed. Should conditions in the field dictate that the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both Market Manager and Customer written approval in the form of an amended Scope of Work Attachment before proceeding with such additional work.
DIRECT INSTALL PROGRAM
PARTICIPATION AGREEMENT
SCOPE OF WORK ATTACHMENT
“Parties”:
Harrington Park Township
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 36: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/36.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Page 2
Scope of Work
Quantity Total
To Be Measure
Installed Cost
3 $223.68
1 $47.21
2 $162.82
5 $302.86
9 $426.60
15 $4,512.59
4 $325.64
2 $94.41
1 $60.55
2 $39.49
1 $81.41
1 $47.40
1 $60.55
1 $47.40
1 $5,520.95
11,953.58$
**Final NJ Clean Energy Incentive Amount:
**ARRA-Funded Incentive Amount:
COMBINED TOTAL:
9,562.86$
-$
9,562.86$
*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are over and above those
deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but shall be paid fully by the Customer and
performed outside of the Participation Agreement. Special Costs include but are not limited to: costs associated with the correction of code or safety violations,
extraordinary scaffolding or crane costs, extraodinary resizing of penetrations, extraordinary conduit and piping runs, and Customer requests to perform work outside of
normal business hours.
**Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive
amount available through NJ Clean Energy Programs per Direct Install project is $80,000.
TOTALS 2,390.72$ $9,562.86
Gas-Fired Furnace / 30 ft Warehouse $1,104.19 $4,416.76
4' T8 2-lamp with EB / Utility Room $9.48 $37.92
4' T8 4-lamp with EB / Womens Bath $12.11 $48.44
4' T8 2-lamp with EB / Mens Bath $9.48 $37.92
LED EXIT Sign w/ Batt. Backup / Locker Room $16.28 $65.13
CF 13-1L SCREW IN CFL / Locker Room $7.90 $31.60
4' T8 4-lamp with EB / Locker Room $12.11 $48.44
2' T8 2-lamp with EB / Locker Room $18.88 $75.53
LED EXIT Sign w/ Batt. Backup / Bays $65.13 $260.51
4 LAMP T5 HIGH BAY HO FIXTURE / Bays $902.52 $3,610.07
4' T8 2-lamp with EB / Bays $85.32 $341.28
4' T8 2-lamp with EB / Stairs to Bays $60.57 $242.29
LED EXIT Sign w/ Batt. Backup / Office $32.56 $130.26
2' T8 2-lamp with EB / Office Bath $9.44 $37.77
Measure Description / Location Total Cost Amount
4' T8 2-lamp with EB plus reflector / Office $44.74 $178.94
The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:
Estimated Estimated
Customer Incentive
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 37: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/37.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
General Project Information
Participating Customer: Facility Type:
Contractor / Project #: DN1085 1,000
Facility Name: 40
Street Address: 2
City / Zip Code: Year Constructed: 1970
Will the project receive EECBG funding?: N Tax Exempt?: Y
ELECTRIC UTILITY INFORMATION
Electric Provider: Gas Provider:
Service Class: Service Class:
Account #: Account #:
04/20/10
05/19/10
Billing Period kWh Consumption: 216 Billing Period Therm Consumption:
$38.04
Total Taxes + Fees on Bill: 1.82$
Project SummaryElectric - Average Cost ( $/kWh): $0.168 Gas - Average Cost ( $/Therm): $0.00
Lighting Measures Total: 1,695 284.22$ 471.77$ 377.41$ 94.35$ 0.33
Motors & VFD Measures Total: - -$ -$ -$ -$ -
HVAC Electric Measures Total: - -$ -$ -$ -$ -
Refrigeration Measures Total: - -$ -$ -$ -$ -
TOTAL ELECTRIC MEASURES: 1,695 284.22$ 471.77$ 377.41$ 94.35$ 0.33
Therms /yr.
TOTAL GAS MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL OIL MEASURES: - -$ -$ -$ -$ -
Gallons /yr.
TOTAL PROPANE MEASURES: - -$ -$ -$ -$ -
COMBINED TOTALS: 284.22$ 471.77$ 377.41$ 94.35$ 0.33
PROJECT TRC TEST: 5.01
GAS UTILITY INFORMATION
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Harrington Park Township Warehouse
RJ Donnelly Total Facility Square Footage:
Recycling Center Avg Weekly Hrs of Operation:
# of Full-Time Employees:
Rockland Electric Co. <Select Gas Provider>
Total Taxes + Fees on Bill:
Simple
Payback (Yrs)
kWh Saved per
Year
Annual
Savings
Total Measure
Cost
Estimated
Incentive
Amount
Total Cost to
Customer
Billing Period End Date: Billing Period End Date:
Billing Period Total Cost: Billing Period Total Cost:
C&I
6296660007
Billing Period Start Date: Billing Period Start Date:
Lighting
Percentage of Energy Savings Per Measure Category
Lighting
Percentage of Dollar Savings Per Measure Category
-39.5%
Percent Change in Total Energy Consumuption
7/19/2010 Project Summary
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 38: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/38.jpg)
Default
Annual
Oper.
Hours
Actual
Annual
Oper. Hrs
(if different)
Fixture Location
Fixture
Con-
trolled?
Lighting Measure Description
# of
Fix-
tures
Default
Watts per
Fixture
Actual
Watts per
Fixture (if
different)
Ceiling
Height
>12 ft?
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
Existing N Incandescent, (1) 300W lamp 2 300
Proposed N T8 4-lamp fixture with EB & reflector 2 95
$ 471.77 0.3 1,695
Est.
Annual
Hours
w/o
Controls
# of
Fixtures
Con-
trolled
Fixture Location
Est.
Annual
Hrs. w/
Controls
Actual
Annual
Hours
(if different)
Lighting Controls Measure Description# of
Units
Reduced
Annual
Lighting
Hours
kW Con-
trolled
# of
Add'l
Relays
Needed
Total Cost
Est.
Demand
Savings
(kW)
Annual kWh
Savings
TOTALS:
Lighting Controls
1 $ 471.77 3,900 1,695 YRecycling Center 0.3
New Jersey Office of Clean EnergyDirect Install Program
Energy Assessment Tool
Lighting Measures
7/19/2010
Lighting Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 39: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/39.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Participating Customer*:
Participating Contractor*:
Facility Name*:
Facility Address: NJStreet City Zip
*as listed on Application
Participating Customer Date Participating Contractor
By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not own the Facility, the Owner has granted permission to Customer for performance of such work.
Date
RJ DonnellyRecycling Center
When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install
Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in
connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation
Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement.
The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection
with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance
of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the Contractor may collect a deposit from Customer prior to performing such work, in which case the final invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during installation may require that some measures identified in the energy assessment cannot be installed, or some areas may require additional measures/quantities to be installed. Should conditions in the field dictate that the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both Market Manager and Customer written approval in the form of an amended Scope of Work Attachment before proceeding with such additional work.
DIRECT INSTALL PROGRAM
PARTICIPATION AGREEMENT
SCOPE OF WORK ATTACHMENT
“Parties”:
Harrington Park Township
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.
![Page 40: New Jersey Office of Clean Energy Direct Install Program ...sj-site-legacy-migrate.s3.amazonaws.com/m2243!20.pdf · Savings values are estimates. Actual savings will vary. Incentives](https://reader033.vdocuments.net/reader033/viewer/2022041813/5e58d297a498db487b24a01d/html5/thumbnails/40.jpg)
Savings values are estimates. Actual savings will vary.
Incentives and participation subject to program rules and Participation Agreement.
Page 2
Scope of Work
Quantity Total
To Be Measure
Installed Cost
2 $471.77
471.77$
**Final NJ Clean Energy Incentive Amount:
**ARRA-Funded Incentive Amount:
COMBINED TOTAL:
377.41$
-$
377.41$
*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are over and above those
deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but shall be paid fully by the Customer and
performed outside of the Participation Agreement. Special Costs include but are not limited to: costs associated with the correction of code or safety violations,
extraordinary scaffolding or crane costs, extraodinary resizing of penetrations, extraordinary conduit and piping runs, and Customer requests to perform work outside of
normal business hours.
**Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive
amount available through NJ Clean Energy Programs per Direct Install project is $80,000.
TOTALS 94.35$ $377.41
Measure Description / Location Total Cost Amount
T8 4-lamp fixture with EB & reflector / Recycling Center $94.35 $377.41
The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:
Estimated Estimated
Customer Incentive
7/19/2010 Scope of Work
Direct Install Energy Assessment Tool (ver. 3.3)
©2010 TRC Energy Services. Property of TRC.
Contractor granted limited license.