new long range plan
DESCRIPTION
New Long Range Plan. Plan It 2035 To be adopted by BRTB on 11/20/11 Approved by federal gov’t in early 2012 Must meet federal air quality standards $8.8 billion dollars in regional projects. Upcoming BRTB Projects. Regional Freight Analysis Regional Transit Analysis - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: New Long Range Plan](https://reader035.vdocuments.net/reader035/viewer/2022062314/56814ac3550346895db7d9ee/html5/thumbnails/1.jpg)
New Long Range Plan
• Plan It 2035 – To be adopted by BRTB on 11/20/11
Approved by federal gov’t in early 2012
• Must meet federal air quality standards • $8.8 billion dollars in regional projects
![Page 2: New Long Range Plan](https://reader035.vdocuments.net/reader035/viewer/2022062314/56814ac3550346895db7d9ee/html5/thumbnails/2.jpg)
Upcoming BRTB Projects• Regional Freight
Analysis
• Regional Transit Analysis
• Expanding Modeling
Capabilities
![Page 3: New Long Range Plan](https://reader035.vdocuments.net/reader035/viewer/2022062314/56814ac3550346895db7d9ee/html5/thumbnails/3.jpg)
ENERGY PURCHASING
• Straight from the Grid
• Hedged Purchasing
• Power in Numbers
• $70,000,000.00+
![Page 4: New Long Range Plan](https://reader035.vdocuments.net/reader035/viewer/2022062314/56814ac3550346895db7d9ee/html5/thumbnails/4.jpg)
CMAQ Grants (Congestion Mitigation and Air Quality Improvement)
• Reduce emissions from the on road transportation system
• Currently reviewing applications– 20% match for gov’t– 50% match for P3’s
![Page 5: New Long Range Plan](https://reader035.vdocuments.net/reader035/viewer/2022062314/56814ac3550346895db7d9ee/html5/thumbnails/5.jpg)
Bike to Work Day
• Friday, May 20th
• 1,300+ Riders
• Rallies, Prizes, Fun
• Two Harford County Locations– Bel Air & APG
• www.Bike2WorkCentralMD.com