May 12, 2011
Paul Grana, Director of Marketing, Tigo EnergyMJ Shiao, Solar Analyst, GTM Research
New Opportunities in Commercial PV System Design
and Development with Module-level Data
Sponsored by:
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 2/30
COPYRIGHT 2011 GTM RESEARCH ALL RIGHTS RESERVED
GTM Research: Overview
2
• GTM Research, a Greentech Media Company,
provides economic and strategic analysis for the
global renewable energy and electricity industries
• Our goal is to deliver critical intelligence and
advisory services that improve business operations
and facilitate informed decision making for our
clients
• Our analyst team includes experts across the green
technology value chain with diverse backgrounds inthe energy, economics, finance, policy, and
information technology sectors
• GTM Research is valued for our objective stance,
integrated economic analysis, and flexibility
approach to client needs. With specific expertise in
solar power, the Smart Grid, advanced
transportation, and carbon management, GTMResearch stands at the forefront of the clean energy
industry
Source: GTM Research
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 3/30
COPYRIGHT 2011 GTM RESEARCH ALL RIGHTS RESERVED
Distributed Optimization• “Distributed Optimization” includes
– Distributed MPPT
• String-level optimization (very low power inverters, string combiners with
optimization)
– Standalone Micro-inverters
• DC-to-AC inversion at the module or dual module level
– Standalone DC Optimizers
• DC-to-DC optimization at the module level
– OEM Module-Level Optimizers
• Sell directly to module manufacturers or other distributed optimizers
– Cell-level optimization
• Typically manufactures proprietary module
– Smart-Grid/Value-Add Optimization
• Provides grid support or backup power in addition to optimization
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 4/30
COPYRIGHT 2011 GTM RESEARCH ALL RIGHTS RESERVED
The Opportunity
Source: GTM Research
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 5/30
COPYRIGHT 2011 GTM RESEARCH ALL RIGHTS RESERVED
The Enablers
Performance
• Efficiencies
• micro-inverter or combined optimizer/inverter efficiencies < 96%
• Limited field comparison data
Reliability
• Limited field experience
• Shift from single product reliability to “fleet reliability”
Bankability
• Attracting bankable parents and partners
• Get acquired (SMA/OKE) or find a bankable module, inverter or distribution partner (SolarEdge/Solon,Tigo/KACO, Enphase/Siemens)
Cost
• Moore’s Law? (probably not)
• Scale is driving cost down, but what are limits? Is contract manufacturing sustainable for cost roadmaps?
Key drivers to enable distributed optimization to rise out of a niche market
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 6/30
COPYRIGHT 2011 GTM RESEARCH ALL RIGHTS RESERVED
The Players
Source: GTM Research
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 7/30
Using Module-Level Data To
Get The Most Out Of
Commercial Solar Plants
May, 2011
Watts Up?
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 8/30
Overview
• Module-level visibility is changing the way installers andsystem owners manage solar arrays, from design throughoperations:
– More sophisticated
understanding of modulemismatch
– Better understanding offailure types and magnitudes
– Improved long-termsystem uptime
– Faster, smarter truck rolls
5/12/2011 8Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 9/305/12/2011 9
The Tigo Energy® Maximizer System
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 10/30
Data Has Been Core To Tigo Energy’s
Development Since The Beginning
5/12/2011 10
Unshaded, roof-mount system, Berkeley, CA (June 14, 2008)
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 11/30
Notes On The Data
• Source: gathered from our deployed fleet of over 150,000Maximizers
– Over 2/3 on commercial rooftops
– Both US and International solar plants
•
Quality: accuracy of +/- 1%, frequency of every 2 seconds• Privacy policy: data only shared in aggregate/sterilized form,
or with consent of system owner
• Caveat: sometimes a little data can be more dangerous thannone at all
5/12/2011 11Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 12/30
1
2
LESSONS FOR SYSTEM
DESIGN
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 13/305/12/2011 Tigo Energy Confidential – Not for Redistribution 13
Understanding Mismatch is Critical for
Good System Design
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 14/30
All Systems Have Mismatch
There are four primarysources of mismatch forwell-designed, unshaded,large-scale systems:
• Module binning mismatch
• Thermal mismatch
• Variable soiling
• Cloud effects
5/12/2011 14Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 15/30Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
PHOTON lab test conditions:
• Direct irradiance from lamps
• No thermal mismatch
• Cleaned front glass
• No hard shade
Source: PHOTON Magazine, November 2010. Test system is 2.5kW array using 180W modules from Tier-I manufacturer
Incremental Energy Harvest in Unshaded Test
Module Binning Mismatch Alone Creates
The Opportunity For Energy Harvest
0.3%
0.0%
0.9%
3.2%
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.5%
System A System B System C Tigo Energy
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 16/30
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 17/30
Ambient Mismatch Is Most Prevalent In
The Mornings And Evenings
5/12/2011 17
0
5
10
15
20
25
30
35
40
45
50
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
M o d u l e V o l t a
g e
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 18/30
Design Can Also Lead To Mismatch
18Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
0
5
10
15
20
25
30
35
:
:
:
:
8 : 1
1 :
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Can you guess what caused
this voltage pattern?
M o d u l e V o l t a
g e
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 19/30
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 20/30
5/12/2011 20
LESSONS FOR
COMMISSIONING
d l l l d
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 21/30
Module-level Data Can Find String
Wiring Problems Immediately
5/12/2011
•
System was designed with strings of eleven modules each• Two strings exhibited unexpected panel power characteristics
• Correction made during commissioning, saving power and O&Mcosts
• Commercial system, California• January 26, 2011, 2:33 pm
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
G di l d
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 22/30
Improper Grounding Can Be Flagged
Right Away
5/12/2011 22
• Maximizer system flagged sub-optimal powerproduction due to charge buildup (indicatingimproper grounding)
• Correction made during commissioning, savingpower and O&M costs
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
A F il d Di d H A V U i
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 23/30
A Failed Diode Has A Very Unique
Signature
5/12/2011 23Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
0
5
10
15
20
25
30
35
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
M o d u l e V o l t a
g e
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 24/30
We Find Failed Diodes Nearly Every Day
5/12/2011 24
In general, 0.5% ofmodules installed havea failed diode
When this happens,system owners ofteninitiate their first-everRMA process formodules
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 25/30
5/12/2011 25
LESSONS FOR
MAINTENANCE
V i bl D d ti B
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 26/30
Variable Degradation Becomes a
Significant Factor over Time
Modules degrade at0.7% per year –
however, system-level degradationwill be significantly
higher due to theincreasing variabilitybetween modules
5/12/2011 26Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
Note: Data from 784 modules, each with a history of at least two years (longest measured time frame is 16 years).
Source: “Outdoor PV Degradation Comparison”. D.C. Jordan, R.M. Smith, C.R. Osterwald, E. Gelak, and S.R. Kurtz. NREL Conference Paper CP-5200-47704
With t M d l l l D t L S l
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 27/30
5/12/2011 27
Without Module-level Data, Large-Scale
O&M is a Guessing Game
Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
Fi i l B fit F M d l l l
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 28/30
Financial Benefits From Module-level
Data
•
Maintenance costs reduced by 25-50% – Eliminate blanket maintenance trips
– Truck rolls are faster because problems are already pinpointed
– Optimize frequency of cleaning trips
•
Commissioning process streamlined – Reduced de-bug time
– Remote monitoring
• System uptime improved
–Reduce impact of variable degradation
– Component failures (e.g. diodes) are flagged immediately
5/12/2011 28Tigo Energy, Inc. | 420 Blossom Hill Road, Los Gatos, California USA 95032 | P: +1.408.402.0802 | F: +1.408.358.6279 | www.tigoenergy.com
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 29/30
Thank you!
Paul Grana
1 (888) 609 - TIGO (8446)
It’s what
everybody
is squawkingabout!
8/6/2019 New Opportunities in Commercial PV System Design and Development with Module-level Data
http://slidepdf.com/reader/full/new-opportunities-in-commercial-pv-system-design-and-development-with-module-level 30/30
Thank You!
Paul Grana, Director of Marketing
Tigo [email protected]
1 (888) 609 - TIGO (8446)[email protected]
MJ Shiao, Solar AnalystGTM [email protected]
For about available GTM ResearchMarket Research Reports:www.gtmresearch.com/list