New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager

Upload: others

Post on 19-Sep-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

New Pilbara ConferenceRejuvenating livestock exports from the PilbaraJon Giles, Landside Operations Manager

Page 2: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

• Pilbara Ports Authority overview

• History of livestock exports from Port Hedland

• Legislative and safety changes

• Actions undertaken by Pilbara Ports Authority

• Other logistics

• First shipment for 2017

• Long-term options (Lumsden Point General Cargo Facility)

Presentation overview

Page 3: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Overview

Page 4: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Port Locations

Page 5: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Port Hedland OverviewLargest bulk export port in the world – approx. 30% of global seaborne trade

Record total throughput: 500.9Mt (2016/17FY) Increase of 9% from the previous year

Exports: Iron ore, salt, manganese, spodumene (lithium) and others

Imports: Fuel/oils, general cargo, ammonium nitrate

OPERATIONAL BERTHS (19)BHP Billiton Iron Ore 8 berths

Fortescue Metals Group 5 berths

PPA berths (inc Utah Facility) 4 berths

Roy Hill 2 berths

Page 6: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

History of livestock exports

• Port of Port Hedland has always remained open for livestock exports

• Port has existing capability for livestock exports and has recently invested in additional infrastructure to facilitate loading

Page 7: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Legislative and safety changes

• Occupational Safety and Health Act 1984 (OSH Act)

• Marine Transport Offshores Facilities Security Regulations Act 2003

Page 8: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Actions undertaken

2015 Livestock Options Paper • Port Hedland the preferred livestock export port from the Pilbara• Three recommendations:

• Short term – equipment upgrade • Long term – Lumsden point development

Livestock export forum December 2015• Attended by around 50 industry representatives, including the WA Livestock

Exporters Association• Explored requirements with pastoralists, growers, exporters and key agencies

about livestock exports from the Pilbara• Commitment to construct new loading ramp

Darwin site inspection February 2016• NT Livestock Exporters Association • Cedar Park quarantine and collection yards • Elders Live Export • Port of Darwin East Arm Berth

Page 9: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Actions undertaken (continued)

Loading ramp

• Engaged with engineers on the design

• Consulted with industry professionals on the proposed design

• Commenced construction of the new infrastructure

• On-site testing of the new infrastructure

Page 10: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Loading Ramp

Page 11: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Loading Ramp

Page 12: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Loading Ramp

Page 13: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Loading Ramp

Page 14: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Other logistics

• Livestock from station to holding yards

• Livestock from holding yards to the port

• Livestock loading at the port

Page 15: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Transport

Page 16: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Transport (continued)

Page 17: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

First shipment for 2017

• Commissioning of the new loading infrastructure completed

• Media release published 11 August 2017

• Exporter interest and engagement with the port

• Loading vessel nominated to the port

• Loading scheduled to take place 2 September 2017

Page 18: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Longer term export options

Lumsden Point General Cargo Facility

• Aimed at easing congestion across existing PPA Public Berths

• Facility will significantly increase the port’s livestock export capacity and improve operating efficiencies

• Has potential for large laydown areas behind the wharf (between facility and Great Northern Highway) – holding yards and quarantine facilities can be constructed

• Design of the cargo wharf can allow for double and triple road trains to load directly onto livestock vessels

• Facility can provide a modern, efficient livestock export facility that will reduce transport costs, improve animal welfare and quality, reduce driver fatigue and improve road safety

Page 19: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Lumsden Point Development

Page 20: New Pilbara Conference - The New Pilbara Economic Summit · New Pilbara Conference Rejuvenating livestock exports from the Pilbara Jon Giles, Landside Operations Manager • Pilbara

Questions?