new train exploded tb

10
Parts List PART NUMBER QTY ITEM New train body 2 1 New Train body-seats 4 2 New Train Body-aisle 2 3 wheel 4 4 new axel peg 4 5 New Linkage Arm 2 6 linkage peg 4 7 1 1 2 2 A A B B STUDENT NAME TEACHER NAME DRAWING NAME SCALE MATERIAL DATE CLASS & PERIOD kubis7124 WEDOFF New Train Assembly.iam 1/6 .5 inch Wood and CNC Plastic 12/15/2010 T-202-03

Upload: kubis7124

Post on 23-Jun-2015

396 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: New train exploded tb

Parts List

PART NUMBERQTYITEM

New train body21

New Train body-seats42

New Train Body-aisle23

wheel44

new axel peg45

New Linkage Arm26

linkage peg47

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

New Train Assembly.iam

1/6

.5 inch Wood and

CNC Plastic

12/15/2010

T-202-03

Page 2: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

New Train Assembly.iam

1/4

.5 inch wood and

CNC Plastic

12/15/2010

T-202-03

Page 3: New train exploded tb

SECTION B-B

SCALE 1 / 4

B

B

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

New train body.ipt

1/4

.5 inch Wood

12/14/2010

T-202-03

.50

.05

.10

.05

.50

4.25

.70

.60

1.00

1.00

2.10

.05

3.05

5.40

5.00

.10

.50

All windows outside the doors are congruent and all windows have rounded corners of .125 inches.

The front view of the train is symetrical from right to left.

All trimming above the windows is congruent.

3.00

R6.00

R2.00

.28

.30

Page 4: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

New Train Body-aisle.ipt

1/4

.5 inch Wood

12/15/2010

T-202-03

12.00

11.00

11.50

1.50

4.00

5.00

5.50

2.00

3.00

2.00

3.00

.50

Page 5: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

New Linkage Arm.ipt

1/3

CNC Plastic

1/4/2011

T-202-03

6.57

.50

.13

R.25

.13

.25

.13

R.25

Page 6: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kim2635

WEDOFF

new axel peg.ipt

1:1

11/29/2010

T-202-03

.42.25

.19

.08

2.13

.03

.03

R.24

2.03

2.00

Page 7: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

dunn4058

WEDOFF

linkage peg.ipt

8:1

CNC Plastic

12/1/2010

T-202-03

.27.08

R.16

.33

.25

Page 8: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

dunn4058

WEDOFF

wheel.ipt

1:1

CNC Plastic

11/29/2010

T-202-03

.28

R.37

R.63

2.00

.25

.09

.13

.63

.38

.15

R.13

Page 9: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

Rounded Track.ipt

1/6

wood

12/3/2010

T-202-03

Page 10: New train exploded tb

1

1

2

2

A A

B B

STUDENT NAME

TEACHER NAME

DRAWING NAME

SCALE

MATERIAL

DATE

CLASS & PERIOD

kubis7124

WEDOFF

Track.ipt

1/4

plastic

12/2/2010

T-202-03