New World Solar Installations Delivering The Summerfield Project. Tendering for success. In 2006 NWSI tendered for the Summerfield Eco project Our tender was based on a balanced delivery agenda The Balanced Agenda: A Robust Health & Safety Plan Delivery; Cost/Time/Quality - PowerPoint PPT PresentationTRANSCRIPT
New World Solar InstallationsDelivering The Summerfield Project
Tendering for success In 2006 NWSI tendered for the Summerfield Eco project
Our tender was based on a balanced delivery agenda
The Balanced Agenda:
A Robust Health & Safety Plan
Delivery; Cost/Time/Quality
Community engagement ( trainees &Integrated local supply chain
Best people installing best products
End User satisfaction
Environmental impact
Project details:
In 2007/8 NWSI become the sole installer on the
Summerfield project.
NWSI installed on 262 properties
Mainly Solar thermal- 5 ECO properties had PV/Solar Thermal
Grey Water harvesting/Air Source heat pumps
Installation plan ranged from 5 installation a week up to 18
High levels of End User satisfaction. Key elements
Keep residents up to date with the installation phasing.
IE Scaffolding/Roofing work/ Installation/ sign off/ Equipment.
Making a Social Impact
13 Trainee supplied from Jericho and think local
3000 Training Hours on the Project
Jericho remunerated 27K
Devone Johnson from think local is now employed by NWSI
Training outputs
-Build self esteem
-Employability ladder (joblessness)
- Increase skills and knowledge
Building Integrated Local supply chains
Estimated 700 K went back into the local economy as a result of the project
Local Roofing team
Local scaffolding firm
Local Labour
Cylinder manufactured in Sandwell
Birmingham based merchant.
Local recycling business (brum Can )